Public Version of Revised Emergency Plan Implementing Procedures,Including EP-105 Re General Emergency Response, EP-208 Re Security Team Activation & EP-276 Re Fire & Damage Team Phone List.W/Jm Felton 841101 Release Memo
ML20107J877
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 10/08/1984
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20107J875 List:
References
PROC-841008-01, NUDOCS 8411120274
Download: ML20107J877 (51)


Text

{{#Wiki_filter:_

                                                                                               & * *W f                 1-3843068200           Page 1 of 4 -

Revision 13 10/08/84 _ EMERGENCY PLAN PROCEDURE INbEX

               - PROCEDURE REV.                                                                                   DATE SIGNED DATE OF LAST NO. TITLE-NUMBER                                                                                           BY SUPER.        PERIODIC REVI."W EP-101                                           2             Classification of
                                                                                -Emergencies                      09/27/84 EP-102                                           4             Unusual Event Response           07/20/84
    .      , EP-103                                                4             Alert Response                   07/20/84 EP-104                                            4             Site Emergency Response          07/20/84 EP-105                                            5-          ' General Emergency Response       10/05/84 EP-106                                           l              Written Summary Notification                     06/08/84
               -EP-llo                                            2              Personnel Assembly and Accountability                    06/08/84 EP-120                                           1              Site Emergency Coordinator       06/08/84 EP-201                                           1             Technical Support Center (TSC) Activation     -

06/08/84 EP-202 2 Operations Support Center . (OSC) Activation 09/25/84

             'EP-203                                              2             Emergency Operations Facility (EOF) Activation         09/27/84
              -EP-208                                            3              ' Security Team Activation        10/05/84 l

l - EP-210 1 Dose Assessment Team 06/08/84 i - - l EP-220 CANCELLED , EP-221 1- Personnel Dosimetry, Bioassay, l -- and Respiratory Protection Group 06/08/84 [ EP-222 2 Field Survey Group 07/17/84

                                                                                                                                                    ~

, EP-230 3 Chemistry Sampling and l Analysis Team Activation 07/20/84 EP-231 4 Operation of Post-Accident Sampling Systems-

 -i                          .

(PASS) 08/07/34 l .EP-232 CANCELLED h* , EP-233 3 Retrieving and Changing Qyy3 y g Q(QbbbIJ Sample Filters and Cartridges from the Containment Leak Detector e ,

     .                                                                          During Emergencies                07/20/ II#. .      !

amsesir. mar , ~ - - 'n PDR ADOCK 05000352 , F PDR

              .,,,.-..-n_,-.            ,,--.--n,--n.,------,--,-~------=v'-

r-

                                          ~                      - . - - - . . . . ~     ..-.-    n - -     .             -

1 1

                     -o Page 2 of 4 Revision 13 10/08/84
           ..v                                  EMERGENCY PLAN PROCEDURE INDEX
    ,                  PROCEDURE REV.                                                DATE SIGNED DATE.0F LAST NUMBER        NO.- TITLE                                    BY SUPER.          PERIODIC REVIEW l                       EP-234         3    Obtaining Containment Gas Samples from the Containment Leak Detector
                                          -During Emergencies                        07/2'0/84 EP-235         3    Obtaining Reactor Water

, ._ Samples from Sample '7 Sinks Following f . Accident Conditions 07/20/84 EP-236 3 Obtaining Cooling Tower Blowdown Line Water

                              ..           Samples Following                                   '

J' * ' Radioactive Liquid Release after Accident Conditions 08/07/84 EP-237 3 Obtaining the Iodine / Particulate and/or Gas . Samples from the North Vent Wide Range Gas . Monitor (WRGM) 07/20/84 EP-238 3 Obtaining Liquid Radwaste

       ,-                                  Samples from Radwaste Sample Sink Following Accident Conditions                       07/20/84 EP-240         2    Obtaining Off-Gas Samples from the Air Ejector / Holdup Pipe Discharge Sample Station                  06/08/84 i                       EP-241_        4    Sample Preparation and Handling of Highly Radioactive Liquid Samplas                                   10/04/84 EP-242         3    Sample Preparation and       .                                               .

Handling'of Highly - i Radioactive Particulate Filters and Iodine

j. Cartridges 07/20/84 l . EP-243 4 Sample Preparation and

!' Handling of Highly

Radioactive Gas Samples 08/06/84 EP-244 0 Offsite Analysis of High Activity Samples 06/08/84 EP-250 1 Personnel Safety Team .

i- Activation 06/08/84 l . EP-251 1 Plant Survey Group 06/08/84 e

  • Page 3 of 4 Revision 13
                                                                                                          . 10/08/84 ss            -*

EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV. NUMBER NO. TITLE' DATE SIGNED DATE OF LAST BY SUPER. PERIODIC REVIEW EP-252 2 Search and Rescue /First

                                                -Aid                                           07/20/84 EP-254 -              1        Vehicle and Evacuee Control Group                                06/08/84
            ,-EP-255                     1       Vehicle Decontamination EP-260 06/08/84
     ;~

1 Fire and Damage 1 Team Activation 06/08/84 EP-261 1 Damage Repair Group 06/08/84 EP-2,72 1 . Philadelphia Electric Company Officials 06/08/84

                .EP-273                  2       Limerick Station Supervision Call List                         10/04/84

, EP-275 CANCELLED

                ;EP-276                  2       Fire and Damage Team Phone List                              10/05/84 EP-277                  2       Personnel Safety
j. Team Phone List
               ~EP-278                   0 10/05/84 Security Team Phone List                                         12/27/83
                .EP-279                  2-      Emergency Operations Facility (EOF) Group                                   ,

Phone List 10/05/84 EP-280 2 Technical Support Center Phone List 09/27/84 EP-282 2 Government and Emergency Management Agencies 10/05/84 EP-284 2 Company Consultants and Contractors ' ' Phone List 09/27/84 , _EP-287 1 Nearby Public and Industrial Users of Downstream-Water 06/08/84 t EP-291 2 Staffing Augmentation 09/27/84 EP-292 3 Chemistry Sampling and Analysis Team Phone . List 09/27/84 EP-294 1 Dose Assessment Team Phone _ List 06/08/84

EP-301 0 Operating the Evacuation l .

Alarm and River Warning i System 11/11/83

l

         -l l'

Paga 4 of 4

                 .                                                        Revision 13 10/08/84 EMERGENCY PLAN PROCEDURE INDEX                                  !

PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE. BY SUPER. PERIODIC REVIEW EP-303 2 Local Evacuation 04/02/84  !

               'EP-304     2    Partial Plant Evacuation         07/09/84~

EP-305 2 -Site Evacuation 09/25/84 EP-306- 0 Evacuation of tne. , h Information Center 12/27/83

    $           EP-307     1   Reception and Orientation of Support Personnel             06/08/84 EP-312     0   Radioactive Liquid Release                          11/30/83 EP-313     1   Distribution of Thy aid                                        ,

Blocking Tablets 06/08/84 EP-315 0 Calculation of OffsiV4 Doses During a Radiological Emergency ' Using RMMS in the Manual Mode 07/17/84 EP-316 1. Cumulative Population and Near Real-Time -

                             Emergency Dose Calculations for Airborne Releases Manual Method                    07/24/84 EP-317     0   Determination of                                                     ,

Protective Action ' Recommendations 12/27/83

               - EP-318-   0   Liquid Release Dose Calculations Method for Drinkinc Water                   11/30/83

/ EP-319 O Fish Ingestion Pathway Dose Calculation 11/30/83

               -EP-325     0   Use of Containment        -                                       -

Radiation Monitors to Estimate Release Source Term 12/29/83 EP-330 2 Emergency Response

    ,,                         Facility Habitability .          07/20/84 EP-401     1   Entry for Emergency

'.. Repair and Operations 06/08/84 EP-410 1 Recosery Phase Implementation 06/08/84 EP-500 1 Review and Revision of Emergency Plan 06/08/84 E e O

                                                                       .                  ~.
                                                                                                                                                           .-- :. . . .                         - _ . .      . . u:-__
                      ^
  • f-
  • l
                    -                                                                                                                                                                 EP-105, Rav. 5 3843068210                                           ' Page 1 of 17
                                                                                                                                                                                      ,       V        MPG /kml s

Pfb

                 ~                                                                                                                                                               '

PHILADELPHIA ELECTRIC COMPANY

                            '                                                             LIMERICK. GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE
     ^

EP-105 GENERAL EMERGENCY RESPONSE

, 1.0 PURPOSE i

I The purpose of this procedure is to provide guidelines for the site response to a General Emergency. 2.0 RESPONSIBILITIES 2.1 Shift Supervision shall assume the role of Interim Emergency Director when a General Emergency occurs unless the Emergency Director is p esent and performs the necessary steps in this procedure. 2.2 The Station Superintendent or alternate shall assume the role of the Emergency Director, report

                          ~                                         to the Technical Support Center or control room and relieve the Interim Emergency Director.

2.3 The Site Emergency Coordinator shall report to the Emergency Operations Facility and perform the necessary steps in this procedure. 3.0 APPENDICES 3.1 EP-105-1 General Em'erge'ncy Notification Message " 4 3.2 EP-105-2 Emergency Exposure Guidelines 3.3 EP-105-3 General Emergency De-escalation Notification Message ' 3.4 EP-105-4 General Emergency . g (Initial Motificat, 8 [ 3.5 EP O G% eggn neeDist" E " f v uby e>J T -[ - [f > 9 - F f pu 9, g=1 , -

                                                                                                                                                                   \lAl.lD ON!.Y WHEK RE y---                 ..,-e,      -,----,-,,yy,w-+w+y         y,   y,   -
                                                                                 --,-e--,-,w,y            g. _ . we--'m  y-e-re-e+**wtr-t-e--eea------e+w--Nw-w-              e-ve+-    ---*w  e-r e  --we=      ww-c w ww w - ewee-

r - '

  • EP-105, Rev. 5 Page 2 of 17
                                                                                                                                                                             . VAW/ MPG /kml 4.0              PREREQUISITES 4.1 EP-101 Classification of Emergencies, completed 5.0               SPECIAL EQUIPMENT None i
      .                                                                                                                                                                                                                              l l

6.0 SYMPTOMS I None 7.0 ACTION LEVEL 7.1 This procedure shall be implemented when an event occur.s.that is classified as a General Emergency per EP-101 Classification of Emergencies. 8.0 PRECAUTIONS 8.1 Planned radiation exposures should be limited to the administrative guide levels in Appendix 4 r-EP-105-2, Emergency Exposure Guidelines. ) 9.0 PROCEDURE 9.1 ACTIONS 9.1.1 (Interim)'Eme'rgency Director shall: "

                                           ~

9.1.1.1 Verify the emergency classification as determined in EP-101, Classification of Emergencies unless determination has just been made..- 9.1.1.2 Fill out Appendix EP-105-1, General Emergency Notification Message, and give it to the communicator. em 9 9

            ..yg.----         m, . , , . .    ,,---..__m    ,,,_.,...,...,,,7..                    m., , . , , ,,_,,,c . - , ,w,,,_-,._,-  _.. . . , . . _ . . _
                                      . _ _                                        _       _ __ _                  .-_--m   ..
        .      _,l                                                                                                             EP-105, Rev. 5 Page 3 of 17
                                                                                                                               ,      VAW/ MPG /kml s
                                     - 9.1.1.3                       Direct communicator to complete
                    .'                                               notification of the appropriate parties as specified in Appendix EP-105-4, General Emergency Phone List (Initial Notification) or Appendix EP-105-5, General Emergency Phone List (Escalation
                ' l.                                                 or De-escalation) within 15 minutes.

NOTE: The Communicator shall man the NRC RED telephone on a continuous basis until the NRC disconnects. 1 9.1.1.4 Contact the Station Superintendent and the Shift Technical Advisor, inform them of the situation, if not already done.

                                     - 9.1.1.5                       Direct the Info Center Staff                                  4 J to implement EP-306,                                      v#
                                                                    'E' vacua' tion of the Information Center, if not already done. Inform the staff of the wind direction, if there is an airborne release.

9.1.1.6 If there is a radiological release, implement'EP-305, Site Evacuation. 9.1.1.7 If there has not been a radiological release, A. Evacuate all construction personnel, by contacting Bechtel Safety t g Direct them to call for a " Total Project Evacuation" in accordance with Bechtel procedures. Inform them

                                                                           'of nature and preft.rred evacuation direction.

9

                                                                                 ~

B. Contact Yoh Construction Security ~

v. and inform themthataTotalPr&fectEvacuation of~Bechtel Construction personnel is being implemented.

THIS WILL CALL FOR THE ASSEMBLY OF PERSONNEL AT THE UPPER PARKING LOT AND POST #3. IF IT IS DESIRED THAT THEY LEAVE THE SITE, INFORM BECHTEL COMMAND POSTS AT THE UPPER PARKING F*f ., 9 .N E Drug , ,

                                                                                                  -            ~ .                      ~                   u

_w . wm A ~ Amm h -- -- - _ _ . . .

                          - .;            . . . . . . .          . ..       .. - -- mm -.                   m   -.          e.              ..m-      . . - .               _

j > 'l EP-105, Rev. 5

                  .                                                                                                                                Page 4 of 17
                 .J               .

VAW/ MPG /kml

                         ,                                                              C. Select the type of accountability
                          .                                                                    desired for personnel in the 31             -

protected area and implement the j y required actions below:

  • . 1. Emergency Assembly Without
                                      .J '                                                               Accountability
                                                ,.                                                       - Make the following announcement "THIS (IS) (IS NOT) A DRILL.

DESIGNATED EMERGENCY PERSONNEL REPORT TO ASSIGNED EMERGENCY RESPONSE FACILITIES. ALL OTHER

                .                                                         s    i <                       PERSONNEL STAND BY FOR FURTHER ANNOUNCEMENT.                THIS (IS) (IS NOT)

A DRILL."

                                -                                                              2.        Emergency Assembly Wi.th Accountability s ,                                               .
                    .l~                                                                                  a.       Contact the (Inte rim)

Security Team Leader. Inform him of the selected exit point (s), that emergency assembly with accountability is going to be implemented, and to activate the Security Team (EP-208) and to perform personnel accountability in accordance with EP-110, Personnel Assembly and Accounrability.

                   .l                                                                                    b.       Contact Yoh Constr.uct' n
                    , L a                                

Security Rev. 5L OFF-hours ( jandinfomthem that personnel leaving Unit 1 will be reassembling at the

                                           -                                                                      Personnel Processing Center (PPC).

6 ,.- . .m . _ gna;v u

                                                                                                         ?    r' .?

e .i r

                                                                                                                               .n'. r,o.s.. Q+ g .f1 .9      -   .;4
                                                                                                  ~
                                                                                              .-   .3                                                         ,
       .t e

__ - -- ,- .%m -- w- - .

                                                                                                                                                         ~        . . . . .
             . ' l;
             ..                                                                                                                EP-105, Rav. 5 Page 5 of 17
                                                                                                                               . VAW/ MPG /kml
                       ~
                       .                                                                         "THIS (IS) (IS NOT) A DRILL, THIS (IS) (IS NOT) A DRILL.

DESIGNATED EMERGENCY PERSONNEL REPORT TO ASSIGNED

                                      -                                                          EMERGENCY RESPONSE FACILITIES.             ALL OTHER UNIT (ONE) PERSONNEL LEAVE THE PROTECTED AREA IMMEDIATELY AND REASSEMBLE AT THE PERSONNEL PROCESSING CENTER.

7, THIS (IS) (IS NOT) A DRILL. ( THIS (IS) (IS NOT) A DRILL." 9.1.1.8 For OFF-hours, if not already accomplished during an Alert or Site Emergency Response procedure, direct the

                             -                    Shift Clerk to activate the recall list using EP-291, Staffing Augmentation.

If Shift Clerk is not available, this function may be assigned to any available individual.

                                        ^

9.1.1.9 Direct the activation of the Technical Support Center in accordance with EP-201, Technical Support Center (TSC) Activation, if not already activated.

                    ~          '9.1.1.10          Direct activation of the Emergency Operations Facility in accordance with EP-203, Emergency Operations Facility
                                          '       (EOF) Activation, if not already activated.

9.1.1.11 If the ?OF has not been activated

i. earlier, during an Alert or Site L

Emergency Response procedure, direct a

l. communicator to call EOF personnel

[ (directing them to report to the EOF) using EP-279,' EOF' Group Phone List. " 9.1.1.12 Assign an Operations Support Center Coordinator (PO), if not already done, to 1-

                                    '            direct available personnel- to report to l                     .

the Operations' Support Center and-to l l' activate it in accordance with EP-202, Operations Support Center (OSC) Activation. - i r

                                                            ,. , , .,.,,,, ~ . ~_. - .,.,- -__             -
                                                                                                                  ~%y--,-.-y%-            -,yy-,,,-,-..,.,,,.-wmw           y. n
          '- -       }                                                                                                                    EP-105, Rav. 5 Paga 6 of 17
                                                                                                                                          . VAW/ MPG /kml 9.1.1.13      For samples, direct the Shift Chemistry Technician or Chemistry Sampling And Analysis Team Leader to implement EP-230 Chemistry Sampling And Analysis Team Activation.

9.1.1.14 For in-plant surveys, direct a Shift HP

                                                    . Technician or Personnel Safety Team Leader to implement EP-250, Personnel Safety Team Activation.
           ..                           9.1.1.15      For field surveys when a release of
  ,                                                   gaseous radioactive material has occurred i                   ,

or is suspected, direct Dose Assessment Team Leader to implement EP-210, Dose Assessment Team Activation.

  -                         ~~

9.1.1.16 For a release at or greater.than the Alert level in EP-101, Classification of Emergencies, or at the discretion of the Emergency Director, direct the Dose

                                               ,,     Assessment Team Leader to implement EP-210, Dose Assessment Team Activation.

On an interim bases, direct the Shift Technical Advisor to perform dose projections using EP-316, Cumulative

  • Population Dose Calculations for Airborne
  '                                                   Releases-Manual Method or EP-315 Calculation of Offsite Doses during a Radiological Emergency using RMMS in the Manual Mode and to suggest Protective Action Recommendations per EP-317.

9.1.1.17 For fire / damage repair direct the Maintenance Shift Assistant Foreman or Fire and Damage Team Leader to implement EP-260, F, ire and Damage Team Activation and/or EP-261 Damage Repair Group, f 9.1.1.18 For a liquid release, implement EP-312, Radioactive Liquid Release, if required. I.. 9.1.1.19 For Security matters,. contact Security' - . _ Shift Supervision and direct . implementation of EP-208, Security Team , Activation, unless previously done. m e h s O t m - ., ' w , g_.-.e-v-=- - - .-e- -- m.- ee,-ew-,e- - - .s- ,-----.,-w- - - _ _ _ _ _ _ - _ _ _ _ _ _ . _ - -- _-_

                                                      .--...,........-........u.                   . . _       _ _ _ _ .   :  . . . . _ _          _ _ .

l EP-105, Rsv. 5 Page 7 of 17

                                                                                                                         ,    VAW/ MPG /kml
                            .                     9.2  FOLLOW-UP 9.2.1               (Interim) Emergency Director shall:

9.2.1.1 Verify that the Technical Support Center, Emergency Operations Facility and the Operations Support Center have been activated. 9.2.1.2 Periodically evaluate the event classification in accordance with EP-101, Classification of Emergencies. If the

          ^
'?

conditions change, deescalate to an [ , appropriate classification. 9.2.1.3 If classification is de-escalated, fill

                               -                                          out Appendix EP-105-3, General Emergency De-escalation Notification Message, and give it to the communicator and direct the communicator to perform notification of the appropriate parties listed in Appendix EP-105-5, General Emergency Phone List (Esc'alation or De-escalation).

9.2.1.4 Obtain the following information as necessary to formulate further actions: A. Security Status from Security Team Leader - B. Sample analysis from Shift Chemistry Technician or Chemistry Sampling and Analysis Team Leader C. In-plant surveys from Shift HP Technician or Personnel Safety Team Leader D. Field surveys from Shift EP - Technician or Dose Assessment Team Leader E. Dose projections and protective .i - action recommendations from Shift Technical Advisor or Dose Assessment Team Leader

~

O O __,,,_ws, -, _

                                                        .w.                      - r  '
                                                                                                                             ",~' , .-"..'----~~'
                                                                 ,                               ~                                              ~~
       -s

{ EP-105, Rsv. 5

                  .s Paga 8 of 17
                                                                                                         ,    VAW/ MPG /kml F. Fire / Damage Repair status from the Maintenance Shift Assistant Foreman or Fire and Damage Team Leader G. Notification results from Communicator 9.2.1.5            Discuss protective action recommendations with the Site Emergency Coordinator.

9.2.1.6 If not already performed, determine which

         '                                                           additional support personnel are

,' ~ necessary for emergency functions and -

                      ,                                              direct the Shift Clerk or other assigned person to contact ttose personnel.
                           ^

9.2.1.7 Provide site personnel with public address (PA) speaker announcements for any major changes in plant emergency status, such as changing emergency action levels. 9.2.I.8 Evaluate the need and order evacuation of effected areas as necessary. Refer to the following procedures: EP-303 Local Evacuation EP-305 Site Evacuation EP 306 Evacuation of the Information Center 9.2.1.9 Perform the following until relieved by the Site Emergency Coordinator: A. Discuss protective action recommendhtions with the Dose - Assessment Team Leader. B. Provide protective action recommendations to the Pennsylvania Bureau of -Radia' tion Protection.-- C. Inform the various emergency response groups if the recovery phase organization is to be implemented. e 6 m 3,w,v

                                      , - , , -,s     ,v   - - - .
                                                                                                                  ~- -    .'" " '~

e j EP-105, Rcv. 5

            ,.'                                                                                                                                            Page 9 of 17 VAW/ MPG /kml 9.2.2        The Communicator shall:

9.2.2.1 Inform the Emergency Director when appropriate notifications have been made and submit completed copy of Appendix

                                                                -       EP-105-4 General Emergency Phone List (Initial Notification) or Appendix EP-105-5 (Escalation or De-escalation) for Emergency Director's signature.

10.0 REFERENCES

10.1 Limerick Generating Station Emergency Plan

                 ~
             .                     J10.2                   NUREG 0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans in
                           .                                                      Support of Nuclear Power Plants 10.3                  EP-101 Classification of Emergencies 10.4                  EP-201' Technical Support' Center (TSC) Activation 10.5                  EP-202 Operations Support Center (OSC) Activation 10.6                  EP-203 Emergency Operations Facility (EOF)

Activation 10.7 EP-291 Staffing Augmentation 10.8 EP-305 Site Evacuation - 10.9 EP-306 Evacuation of the Information Center

                      ..             10.10                 EP-317 Determination of Protective Action Recommendations 10.11                 EP-316 Cumulative Population Dose Calculations                                                                               -

For Airborne Releases - Manual Method I 10.12 EP-110 Personnel Assembly and Accountability (i 10.13 EP-208 Security Team Activation -. 10.14 EP-210 Dose Assessment Team Activation 10.15 EP-230 Chemistry Sampling and Analysis Team Activation 10.16 EP-250 Personnel Safety Team Activation 1 1 1 l l l-.- . .- _ _ . ..._m - _; _ _ ..g,_. . - - _, _- .- . ~ , -.= - - - - . . - .. .

        . ,   f                                                                                                                           EP-105, RGv. 5
  • Page 10 of 17
                                                                                                                                          ,      VAW/ MPG /kml 10.17     EP-260 Fire and Damage Team Activation 10.18' EP-261 Damage Repair Group 10.19     EP-312 Radicactive Liquid Release 10.20     EP-279 Emergency Operations Facility (EOF) Group
                                                               , Phone List 10.21 .EP-315 Calculations of Offsite Doses during a Radiological Emergency
 .                                                              using RMMS in the Manual Mode.

n .a

  • 4 e m.

O

                                                                                          =

O e' y - i en e e 9

  • M em 4
                           $_ g                                  " " ' '   w-       -,, -                                 ." Fi " " ' ' "
                                                                                                                                             "'y
                                          .-      ,    a   , -                  , -           .-.-- ,         . ,, -- . -                         , . - - - , - ,         - - - - - - - - - . ,
                      .l        '

EP-105 Rnv. 5 Page 11 of 17

                                       ,                                                                                                                                                      ,                 VAW/ MPG /mla APPENDIX EP-105-1
                                   ,-                                                         GENERAL EMERGENCY NOTIFICATION MESSAGE l

MESSAGE: This (IS).(IS NOT) a drill. This (IS) (IS NOT) a drill. This is the Limerick Generating Station calling to report a General Emergency. My name is ,. telephone JE .

                                                                                           .   . Limerick Generating Station.is reporting a General Emergency declared at Unit No.                                                                                                            . Time and date of General Emergency classification are (24 Er Clock Time)                                                                                           (Date)

The basic problem is . There (HAS BEEN) (HAS NOT BEEN) an (AIRBORNE) (LIQUID) radioactive

        ,                     release from the plant.                                                                     The plant status is (STABLE) (IMPROVING)

(DEGRADING) (NOT KNOWN). The prote'ctive action recommended is

  • l (Note 1)~ . The affected area is .

,7 This (IS) (IS NOT) a drill. This (IS) (IS NOT) a drill. Note 1 If a General. Emergency has been declared without prior emergency classification, provide the recommendation to shelter within the 2 mile radius and 5 miles downwind of the i_ plant. If PEMA & BRP are not available, make the recommendation directly to the counties. S l .

                           ..                    . ,                    ,               -_ . . = . , . .-                                    -
                             --,,.,y     ,--p,,  m-   w , = . , - . - -w-,,.--w-w-p.g.w--w,4             --.,,.--     -,,--,-,,y,wmpyyw,.           ., ,.,-,--y,,--+.e-e-          --.w   .y,wiv-%-----y--, -    ,e--,,.-.w,%--   ,,.-e,,,   rem-w-e-

I

                 .      I                                                                                                                            EP-105    5
                    ..                                                                                                                       Paga 12 of 17           .
                              .
  • VAW/ MPG /mla )
                          $                                           APPENDIX EP-105-2                      ,                                                       l
                          .                                    EMERGENCY EXPOSURE GUIDELINES
 ?-                                                          -

Projecte'd Whole Body Thyroid Authorized Function , Dose Dose By

1. Life Saving and (Interim)

Reduction of Injury 75 REM

  • 375 REM Emergency **
 ..           ,,                                                                                                                                 Director

'.* ,2.~ Operation of Equipment

                   .               to. Mitigate an                                                                                                sInterim)

Emergency 25 REM

  • 125 REM Emergency **

Director

3. Protection of Health- .(Interim) and Safety of the Public 5 REM 25 REM Emergency **

Director

4. Other Emergencp 10 CFR 20' 10 CFR 20 (Interim)

Activities limits limits Emergency Director

5. Re-entry / Recovery Station Station Activities Administra- Adminis-

't' - tive Guide- trative' lines Guide lines N/A

Reference:

EPA-520/1-75-001 Table 2.1

                              ** Such exposure shall be on a voluntary basis S

4 4 , O MI e *e en

                                                                                                                                                                 ~
                                                                   ~a y-               --
                                                                                       - ._         4 , y._-.3,y     a_            s,                  --- _

l c _ =. - . . . _ _ _ -. . _ _ . ___,_-____ , .

l EP-105 Rsv. 5 Page 13 of 17

                                                                                                                                                                    .        VAW/ MPG /mla APPENDIX EP-105-3.
                                                   - GENERAL EMERGENCY DE-ESCALATION NOTIFICATION MESSAGE Message:                        This (IS) (IS NOT) a drill.

This (IS) (IS NOT) a drill. This is Limerick Generating Station calling to report a change in emergency action level. The General Emergency has .? been (DE-ESCALATED TO) (AN UNUSUAL EVENT) (AN ALERT) (AN SITE

                        ,      EMERGENCY) (TERMINATED). Time and date are
                                                                                               ,                .       The plant status is (stable)

C (24 Hr Clock Time) (Date) (IMPROVING). My name.is . This (IS) (IS NOT) a drill. This (IS) (IS'NOT) a drill. l l I-l l

             .                                                                                                                    O w - w- .- -     ,n-.        ,,..-.,-,,,<.---n...,-.  -
                                                                            ,--,wa.,., - , - - . . , . , ,        ..,,-e-..---,--             ..,_...,,,-.nn.          , , , , , , . , - - . - - - . . , , - . .   .          -,
              ,               .uv  -

il ' EP-i ,, Rav. 5 PZ g:2 14 Qf'17 VAW/ MPG /rgs l APPENDIX EP-105-3 i GENERAL EMERGENCY PilONE LIST Time Initiated (INITI AL NOTIFICATION) Personnel / Agency To Be Notified Phone Number Time Person Responding

a. Emergency Director llome \g G. M.,Leitch Office Alternate llome .

J. F. Franz Office

b. Load Dispatcher Office I

r

c. Montgomery County Emergency Management Agency
d. Pennsylvania Emergency Rev. 5 (8AM-4PM)

Management Agency (After 4PM) Pennsylvania Bureau of (8AM-4PM)

e. Radiation Protection (8AM-4PM) l  !!ar r isburg , PA (8AM-4PM)

(PEllA after hours) { Manager - Public Information llome

 ;     f. Ronald liarper                          Office Pager                                                                           .

f '- ,. g, 9 Director - Emergency [ , IJorhp [y,'. Preparedness Roberta Kankus (J I , itu t/9f1 'lICf [. ,fI- l "Y&h -

                                                                                   .j '~ ;   f Bil d[ .!   .
                                                             . ...                                -- m v- u.          .          -

7 s l~ '

                                                                                                                          . E P A . ., , .-. R:v. .'S '

P g'2 15 ofr17 ! VAW/ MPG /rgs' ,

                                                              ' APPENDIX EP-105                                                        GENERAL EMERGENCY PIIONE LIST Time Initiated                                 (INITIAL NOTIFICATION) l Personnel / Agency To Be Notified                 rPhone Number                     ,          Time   Person Responding                          I y                       x-       ,(
           -h. NRC Operations Center
  • i Betheyda, MD ,

t j l t Make this call last and remain on . telephone'until NRC disconnects ' ' I

  • Person contacting NRC must be j Licensed Operator '

Agencies to be contacted after the above personnel / agencies have .

   .        been notifed                                                                            }

i i i 1. Berks County Emergency { Management Agency l I

j. Chester County Emergency.
  • Services '

l 1 Completed By: Time /Date  ; Verified By: (7A V@ [I. [$ D // p EECTORMA liN\ IED 9 P UqT R1,p,p WEyGKN y 3 ((f $;;'2 jf)y, u b's N i5 a b II k k b I - i l I

   -                  ~           -       - - -
                                                              ~

l r$ . . i

     ,l                                                                                                                         -

EP-v s,'Rav. S-Pigs 16 'o.f '.17; VAW/ MPG /r9s. APPENDIX EP-105-5 GENERAL-EMERGENCY Pi1OliE LIST Time Initiated - (ESCALATIOli OR DE-ESCALATION) Personnel / Agency To Be Notified Phone Number Time Person Responding

a. Emergency Director flome G. M.,Leitch Office f

Alternate llome - J. F. Franz Offico *

b. Load Dispatcher Offic
c. Pennsylvania Bureau of Radiation Protection (8am-4pm) liarrisburg, PA (8am-4pm)

(8am-4pm) (PEMA after hours)

d. NRC Operations Center
  • Dethesda, MD Make this call last and remain on telephone until NRC disconnects I
  • Person contacting t , .. if, i, - *
                                                                      ;;:                                            .k                                               I
'                               9RC!must be *!! .
                                            ~

Licensed Operator ' J 6: !; ' '

                                                                            'l                                                                                        '

p -- g . *

                                                            ,j         ,,
                                                                                                                 .3 f                                            .
                                                                       '~
   . [l*

EP ...s, Ruv. 5

                                                                                                                 .P:gn 17 f9 f '17.'
                                                                                                                .... VAW
                                                                                                                     ,/ MPG /rgs- ,

APPENDIX EP-105-5 GENERAL Et1ERGENCY PilONE LIST Time Initiated (ESCALATION OR DE-ESCALATIO!I) Personnel / Agency To Be Notified Phone Number. Time Person Responding Agencies to be contacted after the abovq personnel / agencies have been notified .

                                                          /'                -
                                                                               - - - - -     T ll        e. Montgomery County Office                                                          -

of Emergency Preparedness

  • and Medical Services .

1 I

f. Berks County Emergency  !

Management Agency

g. Chester County Emergency Services Completed By: *
                                                     ;N_._._______,-___.-

Time /Date

verified By

(INTERIM) EMERGENCY DIRECTOR

                                                                  . . a :.u f', (Y Nl. hf Nkf!!      .

i,- . i ,

                                                          ~

r n on f 4

i '

             ~              '

3843068220 "%208Rg.3 g 1

  • AW/jmv
                       ~
                                                                                                                                                                     /0/$W PHILADELPHIA ELECTRIC COMPANY
                       ,                                            LIMERICK GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-208       SECURITY TEAM ACTIVATION 1.0      PURPOSE The purpose of this procedure is to provide guidelines for
the activation and conduct of operation for the Security J

Team. . .'2. 0 RESPONSIBILITIES 2.1 The Guard Sergeant or designated alternate shall assume the role of the Interim Security Team Leader and perform the steps of this procedure until relieved by the Security Team Leader. 2.2 The Security Team Leader shall relieve the Interim Security Team Leader and perform the steps of this procedure not completed by the Interim Security Team

                                                                                                                                                   ~

Leader. 2.3 The Security Team members shall perform the required ' steps in this procedure.

                           . 3.0         APPENDICES
                          .              3.1              Appendix EP-208-1 Exit Point Staffing for Site Evacuation                               -     -                                                                  .

l 3.2 Appendix EP-208-2 Security team leader check lists 4.0 yREREQUISITES CONTROLLED 5.0 SPECIAI. EQUIPNENT 5.1 Traffic Vests

               .                                                                                           VAllD ONI.Y V!iiR RED O

p- - ep ,

                                      ,-      - _ _ - - .       ,r  _. ,                         _ _ _ _

____,,,,_,.7g- _ _ - c.

                                                                         - - _ _ , . , , , - .             :_- L . ~ , . - - - - . - - . __ _ - . _ - _ _ _ _ _ _
              ,      . s EP-208 R2v. 3 Page 2 of 12 s

VAW/jmv 6.0 SYMPTOMS None 7.0 TCTION LEVEL 7.1 This procedure shall be implemented whenever a. Personnel Assembly is announced, an Alert or higher

i. -

classification is declared, a Site Evacuation is declared or Emergency Director. at the discretion of the (Interim)

                                 - 8.0                     PRECAUTIONS 8.1       Access to the site for. support personnel without i

Limerick security badges during an Alert, site Emergency and General Emergency may only be authorized by the following personnel: 8.1.1 (Interim) Emergency Director

                   ,                                                 8.1.2               (Interim) Security Team Leader Site Emergency Coordinator 8.1.3 9.0              PROCEDURE 9.1       ACTIONS 9.1.1           The Guard Sergeant shall 9.1.1.1         Assume the role of the Interim Security Team .

Leader. ' 9.1.1.2 Call or assign someone to call the Security Team Leader and required group members by using EP-278 Security Team Phone List. 9.1.1.3 Assign Group Leaders from available security personnel to the following groups to perform the duties in Section 9.2 as required for ' the situation: I-i I I

                               ,,+..,.m---....-.,-,,-m...              -,            , . - . , . ,.              -.-,,.,.y_.._-.      . , . ~ . . , . ,,.,,,    .- - - - . , . . .           . , . , , , -

l

            .                                                                                                           EP-208 Rav. 3 Page 3 of 12
                                                                                                           +

VAW/jmv A. Access Control B. Personnel Accountability C. Plant Security AT ANY TIME DURING THIS PROCEDURE THE INTERIM SECURITY TEAM LEADER MAY BE RELIEVED BY THE SECURITY TEAM LEADER. 9.1.1.4 At an Alert or higher the security gate'on 5 269' elevation of the turbine enclosure $ should be locked. 9.1.1.5 If informed by the (Interim) Emergency Director that the EOF is to be activated, contact the access control groupleader to . .have personnel dispatched to EOF. 9.1.1.6 If assembly with accountability is announced, perform the following steps: A. Ensure that the Access Control Group assigns security personnel at the Personnel Processing Center to assist in controlling personnel access. B. Ensure that the Plant Security Group are stationed at the appropriate personnel exit areas. C. Activate the Personnel Accountability Group to perform personnel accountability checks in accordance with

                   ..                                                      EP-110, Personnel Assembly and Accountability (Section 9.1.5.1) .

9.1.1.7 If informed by the (Interim) Emergency - Director that a site evacuation is going to be declared, perform the following: A. Ensure that the Access Control Group

assigns security personnel to the appropriate site access control points and selected offsite assembly area.

B. Ensure that the Plant Security Group assigns security personnel to the selected personnel exit areas and required protected area access control points. 4 9

       .-----,,------.myg.,g,--                    ump. y       --me=.,                        . - , - -     -y-g=y==,r ea -   u-=.-   og - a  s

c ' - - - - - - - . - - ~ . ~ ,

              -*           1 EP-208 Rav. 3
                                                                                                     .           Page 4 of 12 s

VAW/jmv C. Activate the Personnel Accountability Group to perform personnel accountability checks in accordance with

                                                     -              EP-110, Personnel Assembly and Accountability (section 9.1.5.2) .
                                                         ,      D. Immediately notify the (Interim)

Emergency Di ector when the Access Control Group is at the appropriate site access control points and the Plant Security Group is at the selected 7 personnel exit areas so evacuation can commence.that the site 9.1.1.8 Advise the (Interim) Emergency Director concerning the need for support of off-site security agencies, if necessary. 9.1.1.9 Coordinate the actions of off-site security agency required. personnel if their assistance is 9.1.1.10 Use che needed.,cklists in Appendix,EP-208-3 as 9.2 FOLLOW-UP

g. ~ .

9.2.1 The Security Team Leader shall: 9.2.1.1 Report to the Technical Support Center. 9.2.1.2 Review the current status of the emergency and relieve the Interim Security Team

                              ..                              Leader.

>i - 9.2.1.3 Ensure that the necessary groups are staffed and perf.ormi,ng the appropriate sections of this procedure. Augment groups as

  • necessary, by using EP-278, Security Team i

Phone List.

  • 9.2.1.4 Keep the (Interim) Emergency Director updated on status of the team's activities.

9.2.1.5

        .                                                    Periodically re-evaluate the security situation and make appropriate recommendations to the (Interim) Emergency Director.

9.2.1.6 Use checklists in appendix EP-208-2 as necessary. l . t . .

                          .                                                                                                                                                                                   1
         . ..         ",i   ,

EP-208 Rav. 3

                                                                                                                                                            .                             Page 5 of 12 VAW/jmv 9.2.1.7 Implement LGS Plant Protection Procedures as appropriate.
       ,                                   9.2.2                The Access Control Group shall:

1 THIS GROUP IS COMPRISED OF CONSTRUCTION SECURITY, FORCE i MEMBERS. THE CONSTRUCTION SECURITY SHIFT SUPERVISION IS THE APPROPRIATE CONTACT. 9.2.2.1 Be activated when directed by the (Interim) Security Team Leader. 4 9.2.2.2 Receive instructions via the best means available (telephone, radio, etc.) and obtain stocks. traffic vests from the Security 9.2.2.3 Members of the accass control group will be dispatched to each of the following locations to control access: A. North Parking Lot B. Post 93 C. Main Access Gate (Gate #1) D. Gate #2 E. Back Access Gate (Post #10) P. Cross Road Outside Gate il (Evergreen

  • and Sanatoga Roads)

SECURITY PERSONNEL NEED NOT BE POSTED AT A GATE THAT WILL REMAIN LOCKED DURING THE EMERGENCY. . 9.2.2.4 If EOF is activated, members of the access control group will be dispatched to the EOF to perform the actions in EP-203 Emergency

  • Operations Facaility (EOF) activation.

l 9.2.2.5 During assembly with accountability: A. Dispatch access control group members to the Personnel Processing Center to control personnel access. l 9.2.2.6 During a site evacuation e

                                                   .-,.....~we.         ..,,,-,e   -------,,.-,-,a, a_,,-_ _ . - - , ~ - - - - - - + - - - - - - - - - - - - - - - - - - - - - - - - - -

7 ~3,

                      , .                                                                                                                                                                        EP-208 Rav. 3 Page 6 of 12
  • VAW/jav A.
                                    ,-                                                                                          Control access and vehicle traffic by providing security personnel at locations required by Appendix EP-208-1.                                                           ;

B. Imm6diately notify the (Interim) Security Team Leader when security personnel are stationed at the required site access control points so the site evacuation can begin.

               ,.                                                                       9.2.3 The Personnel Accountability Group shall:

, i 9.2.3.1 For Personnel Accountability Check without Site Evacuation: A.

                                     .                                                                                         Perform a personnel accountability check as detailed in EP-110, Personnel Assembly and Accountability, Section 9.1.5.1.

9.2.3.2 For Site Evacuation A. Report to the Administration Guard 2 Station and perform personnel Accountability in accordance with EP-110, Personnel Assembly and Accountability, Section 9.1.5.2. 9.2.4 The Plant Security Group shall 9.2.4.1 Maintain plant security in accordance with Plant Protection procedures, and as directed by the (Interim) Security Team Leader.

                                 .,                                                9.2.4.2                    In the event of an Assembly with Accountability and Site Evacuation, assist personnel in the evacuation of affected areas and the performance of personnel accountability in accordance with EP-110.

9.2.4.3 Issue emergency dosimetry as directed by the Personnel Safety Team Leader for incoming personnel per PP-2, Emergency Admittance Procedure. 9.2.4.4 For assembly with accountability:

                                                                             - -                              A. ' Assist the Personnel Accountability Group with the evacuation of non-
   ~ ~

essential personnel from the Protected i Area. 8

  1. e e

_ - -- -- -- 3 p j-- ,;,7--'=

                                                                                                                                 -.mn g a-e   --

y a s -- "~*F 7

                                                                                                                                                                                            '-"9 'E""'*-S "-

8 '

 ' ~        r   _ _ ,       . - , ,      sv...-       ,._ . . . - ~v_       ~.. . , . - . . _                           .- ~ .                     ..__.m_,,__                . . , , . _ _ --.                . - - , , _ - _ .
                                                           -.                                                                                       m EP-208 Rav. 3 Page 7 of 12

. $ VAW/jav B. Perform the instructions detailed in Step 9.1.4.1 of EP-110, Personnel Assembly and Accountability. 9.2.4.5 For Site Evacuation: A. Control access to the protecced area by providing security personnel at locations required by Appendix EP-208-1. B. Perform the instructions detailed in

       .'                                                                Step 9.1.4.2 of EP-110, Personnel Assembly and Accountability.

C. Immediately notify the (Interim) Security Team Leader when security personnel are positioned and ready at 4 the personnel exit areas. 10.0 ~ REFERENCES" ' 10.1 Limerick Generation Station Emergency Plan 10.2 Limerick Generating Station Security Plan and

    ,_                                                   Procedures 10.3      EP-278 Security Team Phone List
        .                          l           10.4     EP-110 Personnel Assembly and Accountability 10.5     EP-203 Emergency Operations Facilities (; EOF)

Activation 10.6 PP-2 Emergency Admittance Procedure l . . o l l ... 4 e 9

                - _ _ _ _ _ . y ,, ,,                          -

m.-.

                         "1 EP-208 Rev. 2
                                                                                                                                                                                  . Page 8 of 12 s                                                                                                                                                            VAW/jmv e

APPENDIX EP-208-1 EXIT POINT STAFFING FOR SITE EVACUATION (1) DAY SHIFT AFTERNOON SHIFT NIGHT SHIFT TSC PERSONNEL EXIT AREA . P ADMIN PERSONNEL

                   ,                        EXIT AREA                                                            P                                     P
                                                                                                                                                                                        P TURBINE DECK GATE - 269 ' (4)  _

P NORTH VEHICLE  ;

                                        ,  ACCESS GATE                                                         P SOUTH VEHICLE ACCESS GATE                                                        P COOLING TOWER                                         '

GATE 'P NORTH PARKING LOT A A POST 93 A A A

       '                                  MAIN ACCESS GATE                                                                                                                                                                        '

(GATE #1) A A A GATE 92 A . A BACK ACCESS GATE o _ (POST 10) , , A CORNER SANATOGA & EVERGREEN ROADS A A

                                                                                                                                      ,                                                A OFFSITE ASSEMBLY AREA , (SEE NOTE 2)                                          A                                            A                                  A s

NOTES: (1) Security personnel need not be stationed at a gate which is to remain locked during the Emergency. (2) The offsite assembly or Limerick. Airport. area is either Cromby Generating Station (3) A = Access Control Group P = Plant Security Group r. (4) This should be locked at an Alert or above. f' . 1

                                                                                                                            -           -,-w-            -
                                                                                                                                                                   ,n
 -           ~+,          e--,e--,um          m--,-..-~--,vv-         e-~-owm-,r-,-------m-            .,-wa-a--              - - - -

we~e--+me-w_ ww- ww r e own ww w = ~

       '                                                     ~~                           ^ -
                                     ~

e EP-208 R2v. 2 Page 9 of 12 ' s

  • VAW/jmv
                                            .                                                                          APPENDIX EP-208-2 SECURITY INFORMATION ONLY Notice of Personnel Arrival DATE:

TIME: Time,of Notice: Time of Arrival:

1. Names of Persons Social Security Number
                 .'                                 A.
                                   .                                                                                                                A.

B. B.

                                           - .C .
                                                .                                                                                                   C.

D. D. E.

                                                                                               -                                                   E.

F. F.

2. Where personnel are arriving from 4

3. Name of person individuals are to see

                                       .      4.              Escorted by:

1 5. Security Clearance Basis if unescorted access granted NAME SSN COMMENT

                                                                                    ~

A.

B.

C._ 7 I 7 .r , w

                                                                                 '_     =

wmw-- -

                                                                                                                              -.-,'s  -
m. ,
                                                                                                                                              -.-,.'.'v-newyw   ,
                                                                                                                                                                         . ~ ,
                  ,             - . -p
o-EP-208 Rev. 2 s , Page 10 of 12
  • VAW/jmv APPENDIX EP-208-2
                                                                                          ,                SECURITY INFORMATION ONLY
 )

Notice of Vehicle Arrival

                                                                                                  ~

i DATE:

                 ~
                              -                                                                                                                                TIME:  _

i.

. 1. Type of Vehicle 2 License Number 7
3. Company Truck registation number
4. Name of Driver
5. Helper (If any)

P

6. Expected arrival time g 7. Actual arrival time f .

O N e 1 l 1 i i D >$ 0 9 I

                                                                                                    . -- .-.    .        . w   ,

vr 4 gw>-.--y---.p.., g ,,y, w g ..w,.-wg.,,q-p,,,p 9+n,, ,,,y,.-gm Mr&-* wmwweSwm ww -vs r y w'+ y w -wsw*wW-

t i

           .                                                                                     EP-208 Rev. 2 s
  • Page 11 of 12 VAW/jav APPENDIX EP-208-2 SECURITY INFORMATION ONLY Injured Person History
                                                                                      ~

i - DATE: TIME:

1. Name of Person Injured 2.. Social Security Number
                               ,'3 . Payroll Number
4. Home Address 5.

Company Injured Person Employed by

6. Contamination (If any)
                        .      7. How did injury happen?

8. Where did accident happen? (Location) Location of gate required for access to protected area

9. s.

i. dnder what circumstances did accident happen?

10. Was ambulance called? (At w' hat time?)
11. Time of ambulance arrival

. 12. Time of aA'bulance departure

13. Where was injured taken? (Hospital name)
                    ., -                                                                                                     EP-208 Rav. 2 Page 12 of 12                                l VAW/jav                               l
                                                        .           APPENDIX EP-208-2 SECURITY INFORMATION ONLY Notice of Release DATE:                                                        TIME:
  1. ~
1. Notice of Site Evacuation 10 miles or beyond 5
                                     . A. Ascertain from H.P. the plume direction B. Note the course of plume so that gates or posts in the plume path can be evacuated.
1) Annunciate this information to Operation Security,
          -                                           Construction Samurity                                                                         ,
2) Check with Security Forces to make sure that Security
                                 --                   Force Members are not in path, make sure all gates, posts in path are locked and secured.
3) Ensure by checking with H.P. that the planned path taken by rover patrols does not take them through plume i path.

e a em 6 o 6

                                                                            .e= v -ey   -w-   yw,-,ie,--,    6-----   ,_ g.-   ___y mm_._y,_..        __._. __ _ _ __,

l EP-276 Rsv. 2 3843068230 Page 1 or 4

                                                                                     ,V        / MPG /mla I         eMK+

a PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-276 FIRE AND DAMAGE TEAM PHONE LIST 1.0 PURPOSE

        .,                         The purpose of this procedure is to provide guidelines and

-~ information to call in Fire and Damage Team Members. 2.0 RESPONSIBILITIES

                                   ~2.1      The Fire and Damage Team Leader shall be responsible to call in group members.

3.0 APPENDICES None 4.0 PREREQUISITES None

                         -5 . 0     SPECIAL EQUIPMENT None

{- , , . 6.0 SYMPTOMS BOMTROU_ED a#, a m..

                                   ,p     . c a
p. z M+op;dratA10PY wmu& 1:o8 s c ED3M E33E0 O

g

~ - - - . . - . . . =... .. - - . . - - - . . . l EP-276 Rcv. 2

          ~~*                                                                                                                                   Page 2 of 4
                                                                                                                                          .       VAW/ MPG /mla s

7.0 ACTION LEVEL 7.1 This procedure can be used when the Fire and Damage Team is activated or when additional personnel are needed. , 8.0 PRECAUTIONS-None 1. 9.0 PROCEDURE 9.1 Actions 9.1.1 The Fire and Damage Team Leader shall call people from the following list until appropriate positions are filled. 9.1.2 FIRE AND DAMAGE TEAM LEADER: HOME WORK ENGINEER - MAINTENANCE-J. B. Cotton k , ASSISTANT ENGINEER - MAINTENANCE G. Paptzun . f MAINTENANCE SHIFT ASSISTANT FOREMAN (Interim) _, Rotating Shift Assignment [ Name (24 Hour Clock Time) 9.1.3 FIRE FIGHTING GROUP LEADER

                                                                                     -(FIRE BRIGADE LEADER)

SHIFT SUPERVISOR Contact Control Room at

                                                                   .                                                                            pg s
                                                        ./           p)

( .6B' UgiringIRE 2,IGHTINC' sRIGAr E3 GROUP Q MEMBER

                                                                                                                                   !.ij 11      S o~ , ,i g, :;f
                                                                         ;             E           5 J:g                       _'

U A 5) ct hift ChrkJ i ,3 [j $ 3 Control Room jf 9., j u

     <(i                       .

5 q

                   <;            1                        t   ',
w. . , . - - me e e - - m. _ - .-

o> ;y; i - p ,* . . 9 {J

  • EP-276 Rev. 2
                    .                                                                                                                    Page 3 of 4
                                                                                                                           .             VAW/ MPG /mla
                        ,-                 9.1.5                 DAMAGE REPAIR GROUP LEADERS:

SUPFRVISING ENGINEER, MAINTENANCE

                                                                                                                                                  ^  ~~ 1 R. Costagliola a

J . SUPERVISOR, MAINTENANCE (Alternate) T. O'Mara " '

                                         !                                                                             L          &
        ~

9.1.6 DAMAGE REPAIR GROUP MEMBERS:

                                                          .                                                       ,,s                    O
l. G. R. Benson l l J. W. Berger, Jr.

l R. R. Black f K. F. Borton - l l K. W. Bowerson l J. F. Cook i i P. G. DeMauriac f I S. R. Dennett ' e l . i l B. W. Didonatt l T. C. Essex l H. P. Gi'ovan, III l J. J.~Graney L. D. Hil'1 ',

  ~

l l P. J. Klein l T. R. Landis l D. J. Leperson g

l. L. G. Macenter l .._ D. C. McCloskey m ,m o l- @ /I-). * - by[ i ' ^. <

b

                                         --{-r h
                                         'd. ii.: ' "            ;T Q d ) f1 i ,ge. ;,r       1 ,EW     j-e                qq sj/^'                 '
                                                                                          ,;n 3
                                                               .)M                                                b i f                        a        1'        L                                 J         4 9
                                                                        --                       -w       -,-

y - -~es y- ,,-,+w -

                                                                                                                             --r    -,r,    ,-,-y          w , ,w--- - . , ,

I? . l- EP-276 Rev. 2

            . .                                                         P go 4 of 4
                                                                    ,   VAW/ MPG /mla 7

f l- F. J. McGowan l- D. L. Moore l W. A. Paulson l J. A. Perkins l T. E. Peters l T. G. Potts, Jr j l S. N. Rapone

           . j'                       G. J. Reed l,                      D. P. Roller l

R. A. Roller l G. F. Schweiger

                ~l                       R. J. Scott, Jr.

l C. R. Sheak i . l G. K. Shipe l- D. E. Smith l R. H. Trautz , l E. P. Troy, Jr. l W. L. Warpole 9.1.7 FIRE PROTECTION ASSISTANT-A, Mount *

10.0 REFERENCES

I None . O e t 6

           .,                                                                                                EP-277 R2v. 2 3843068240                        Paga 1 of 4
                                                                                                              ,VAW              G/mla s                                                                       .
                                                                                                                                 /WI5b
                         ;                               PHILADELPHIA ELECTRIC COMPANY
                          ,                                LIMERICK GENERATING STATION EMERGENCY PLAN 7MPLEMENTING PROCEDURE EP-277 PERSONNEL SAFETY TEAM PHONE LIST 1.0             PURPOSE The purpose of this procedure is to provide guidelines and information to call in Personnel Safety Team Members.

2.0 , RESPONSIBILITIES The Personnel Safety Team Leader shall be responsible to call in team members. 3.0 APPENDICES None 4.0 PREREQUISITES None 5,0 SPECIAL' EQUIPMENT

                                                                                   ~                                                                   ~

F 6.O

                                    ~

SYMPTOMS

f None k.[b d E 7.0 ACTION LEVEL i 7.1 Thi~spriqced6re diniiby-used "whg n[tle herstidn[L d Safety eam are nee' ed.{i{ a[cyvgted %wjeg.jd{.ti]1' peyplii {4 -

l .

                                                                                                              = = " = - - -          r = ' ' ' " - -
                                                                                         ------1

p_ g-_.- . - - _ _ i EP-277 Rev. 2

         'j      '                                                                                                             Page 2 of 4 VAW/ MPG /mla 8.0        PRECAUTIONS-
                     -        None S.0        PROCEDURE l                9.1          ACTIONS 9.1.1               .The Personnel Safety Team Leader shall call people from the following list until appropriate positions are filled.
           .                               9.1.2               Personnel Safety Team Leader:                                                 ,         _

l - Home Work l . R.W. Dubiel l R. Titolo l 9.1.3 Plant Survey Group Leader

                                                             #                                                 Home                  Work l                                                                                                                                       [
                                           ~

T b.Mscisz

                                                                 . Baker C                    -

9.1.3.1 Plant Survey Group Members 9 Health Physics Technicians listed in 9.1.8. 9.1.4 Personnel Dosimetry, Bioassay, and

Respiratory Protection Group Leader
                                                                                                                                                         )

Home Work j ,.

                        ~
                                                                                                                                                      /

[ l G. Murphy

  • l (Alt.) F. Molohon

( / Personnel Dosimetry,. Bioassay, and.

                               -           9.1.'4.1
                                                        .       Respiratory Protection Group Members Any Health Physics Technicians listed in 9.1.8, (two required).

9.1.5 Vehicle an E (FTc7 trY Nu tte$Aer L gj

                                                                ,4 i (-l.3.;'!.9 Nfbh"bNNII,f>

s w '~ D. Sai th .f d . 3.

                                                                               ~

(11t . cone .

                                                                                                                                             /
                                                             ]                                      -

m. _...7

                                                                                                                 * * * ' ' *        * * + * *      '
                                                                                                                                                          'I'*
                                                                                 .~
                                                                                             ~
                                                             -           , -                     d

m- s EP-277 Rev. 2

             ,                                                         Page 3 of 4
                                                                      ,VAW/ MPG /mla s
               .       9.1.5.1       Vehicle and Evacuee Control Group Members Health Physics Technicians listed in 9.1.8.

9.1.6 , Vehicle Decontamination Group Members Any Health Physics Technicians listed in 9.1.8, as needed.

  ~

9.1.7 Search and Rescue /First Aid Group Leader Home Work YJ. Krais

                  ~

jy. ) R. Dickenson 9.1.7.1 Search and Rescue /First Aid Group Memb'ers

                                             ~
                               ^

Health Physics Technicians listed

                                     ~1n 9.1.8 9.1.8          Health Physics Technicians
          .                         _'                          Home         Work i

Baker, S. Fay, D. Gordon, K. Gosnay, R. Gruber, J. Eines, D. Parducci, A. l "'~ Assistant Technicians 7 1/ ' Bilinski, M'. Chobot, J. Engle, R. Gerhart, J. Golden, E. is Hass, D. Kanaskie, J. Landis, B. a, m' m, ) __3

EP-277 Rev. 2 Page 4 of 4

                                                                                                   .VAW/ MPG /mla 1                                                                .

l Aspistant Techniciins (Cont'd)

  • I l Nugent, D.

Red, C. Reyes, A. Root, N. Strubilla, W. weisford, S. l . 9.1.9 . Contract Personnel j.. Dailey, R. Engle, M. L. Gerry, M. E. Giddings, R. Gordon, G. Harcombe, R.

                                .                        Lightner, J.

Mahanes, 3. M. Muscarella, J. E. Smith, B. G. Smith, W. . Wiecjorek, J. Woodring, T.

10.0 REFERENCES

i None e o e , e e 4

                                                                   '~
                                                                      % f [: gli-ua l M ;Q;a &g l

y 'iAnG a' 1 }.\ .  !?' o 4 F 4 g _

3843068250

          .   .        1                                                                                                                             EP-279 Rsv. 2 Paga 1 of 4 VAW/ MPG /rgs s

PHILADELPHIA ELECTRIC COMPANY

                                                                                                                                                                              /*ffh
                         .                                      LIMERICK GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE 1

EP-279 EMERGENCY OPERATIONS FACILITY (EOF) GROUP PHONE LIST 1.0 PURPOSE .. 7, The purpose of this procedure is to provide guidelines and

-l information to call in the EOF Staff.
                           ,2. 0     RESPONSIBILITIES 2.1     The Communicator shall 'ue responsible to call in group members as needed.

3.0 APPENDICES . None 4.0 PREREQUISITES None , -5. 0 SPECIAL EQU'IPMENT l l CONTRDLLED . l 6.0 SYMPTOMS M f;3 f5 y,d k l - D 9 i l~ None Ek: ti i

                                 ~

! 7.0 ACTION LEVEL l 7.1 'fhis procedure can be used when the EOF is activated !_. or additional personnel , agtedeg q p p .. p 7 g is Yh 95 N!/ ( p f{ ,n i ' g 9 4W.

                                                                                                                  ~!                 .a
                                                                                                                                         ) nnd   a 0 E.J 1! u a a u    ;.n                    un

[

                                                                        .  . . _ - _ _ _ . _ . ~ . ,                 . . . _ , , . . - . . .           . _ . _ _ _ . _ _ . . .      _ _ - _ . _     _
               !                                                                                  EP-279 Rev. 2
          +'                                                                                        Page 2 of 4
                                                                                               ,    VAW/RPG/rgs s

8.0 PRECAUTIONS-None 9.0 PROCEDURE 9.1 ACTIONS 9.1.1 The communicator shall call people from the p following list until appropriate positions are filled. 9.1.2 Site Emergency Coordinator

             -l ~                                        'W. T. Ullrich Supt. Nuc. Gen.

i Alt. R. H. Logue

                                                     ! Supt. Nuc. Serv.
                                            .        t
                                                   ! Alt.

R. S. Fleishmann II

t. PBAPS 9.1.3 H,ealth Physics and Chemistry Coordinator -
                                                                                                                       /

[ W. J. Knapp Dir. Rad. Prot. Alt. J. Fongheiser ,'. hys. Rad. Prot. 9.1.4 Planning and Scheduling Coordinator .. J. W. Spencer Sta' tup Direc, tor P. Law TRB Chairman 9.1.5 Procedures Support- Coordinator l W. C. Birely Sr. Eng. Licensing C. R. Endriss ' ^ Regulatory Engineer . fh i Bef h, a 9 0 y ;'.n, <nj a w ( % ik a t0.(J,n;. t gs 7

      .      l'                                                                                               EP-279 Rev. 2
        -   s'                                                                                                   Page 3 of 4 VAW/ MPG /rgs
               -                 9.1.6                Dose Assessment Team Leader                                               -,
                                                                                                                                   \

g/- l- , G. Murphy HP Technical Support v l D Romdold

r. Physicist Corporate 9.1.7 ' EOF Mechanical Engineering Liaison l J. T. Robb r

Weidersum C 9.1.8 EOF Electrical Engineering Liaison W. C. Ramer Field Engineer Alt. A. W. Jones TT' eld Engineer . . _ _. 9 .1. 9' ' EOF Liaison - Corporate Communications s

                                                     'M. D. McCormic.k Asst. Mgr. Energy Education and Information l'                                     J. Tucker 3-L bI

' - Alt. R. H. Geiger Sr. Energy Info. Rep. l F. L. Pinnell 9.1.10 Emergency Prep. Coor. . F - R. A. Kankus Dir. Em. Prep' Alt. K. W. Schlecker Physicist Emer. Prep L l Mike Mezias . .

                                                                                                                      ~

9.1.11 Communicators and Statu's, Board Keepers I5 s '- Minimum ,gi ,;y

                                                                                     'y:(
                                                               , ,. s            . -

K'..Cenh'i,' '3'. . .i OW Oh

                                      "'~

W.i'LewiSt R. De'gre'gogior J. Dixon' 8 e--

                      ~   - , , _ . . - - . _ _

y _.

                   !*                                                                                EP-279 Rev. 2 Page 4 of 4
         -                                                                                   .             VAW/ MPG /rgs s
                                                      /                                                                                                      7 ommunicators and Status Board Keepers (Cont'd)                                                       /

J. Fitzgerald l R. Hawthorne J. Hopkins M. Horton l R.-Kovach

                                                 . Todd Moore J. Stott Scott Wagner S. Weik
l . 1
.                                    9.1.12          Data Display Operators l                                 M. McCormick                                                     .

10.O REFERENCES - None e O 9

   *                                                             .          t                                                                  .
                                                                                       .p p        .,.

f c.e1 53 ' ' (!$/lig.,?/{,%'

                                      ..-                                                      is y
                                                            . q, p a( ,

O s

                                                                                                      &  w
                                                                                                                 -evw    y,  ,., , . g.,y   - - , , , , ,- g
                    \l                                                                                 EP-282 R&v. 2 Paga 1 of 5 3843068260                V / MPG /rgs
                                                                                                   .g             o/rp PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE l EP-282             GOVERNMENT AND EMERGENCY MANAGEMENT AGENCIES PHONE LIST 1.0      PURPOSE
           .                         The purpose of this procedure is to supply pertinent information to government and emergency management agencies.
                            ,2 . 0   RESPONSIBILITIES
                                     '2.1        The (Interim) Emergency Director or the' Site Emergency coordinator shall be responsible for the decision to implement this procedure.

The Codimunicator shall be responsible to notify the

                                                         ~

2.2 required agencies. 3.0 APPENDICES None 4.0 PREREQUISITES None l: 5.0 SPECIAL EQUIPMENT None ppm L 6.0 SYMPTOMS CONTROLL]td DI

                                      ~ne                                  a r 3, o a, uusm M m nj s v ? >q, f y .-p r   hi        .w. a       9      g,;,

f I . e

                                          ,4. -                                                               -.         - - -

e_ _ ~ _ _ _ - __ _. . - _ _ . . _ _ _ _ . _ _ _ _ _ _ _ _ _ . = _ _ _ _ . L-l EP-282 Rev. 2

                   .                                                                                                                                             Page 2 of 5 VAW/ MPG /rgs s

7.0 ACTION LEVEL 7.1- This-procedure may be used when a government or emergency management agency must be contacted. 8.0 FRECAUTIONS lone p' .. ~ 9.0- PROCEDURE 9 .1 - ACTIONS

     ~

9.1.1 The Communicat.or shall-be directed to contact . appropriate agencies by the Emergency. Director or Site Emergency Coordinator using the following list. Address Phone

                                                                                                                                                                 ,             m f
                                                                                                                                                                                           ~

9.1.2 U. S. Nuclear Region I Regulatory 631 Park Ave.

             .                                                     Commission                                King of Prussia,

[ , PA 19406

 ;.                                      9.1.2.1                   Office of Inspection and Enforcement                                                                             6 Region 1                                  631 Park Avenue                                 ,'

I King of Prussia,

                        - . -                                                                                PA 19406 s

L 9.1.2.2 Office of Washington, Nuclear Reactor' DC 20555 Regulation Harold Denton (Director) 9.1.3 Dept. of Energy Brookhaven Radiological Nat. Lab Program. Upton, NY 11973 'W . . [ a (.!' , . i1es: e ri j. ,. . 3,+. <GP y,., up p. , 3. u, .

- 2,. (- c. . ;u .,m .; g. ..,

_ .. ,; ~ Ok - O e _ 4mem _ __

                - -[                                                                                                              EP-282 Rev. 2
                  -                                                                                                                   Page 3 of 5
                                                                                                                             ,        VAW/ MPG /rgs s

Address Phone

                       .                                                                                                             r       ~~

9.1.4 Environmental Curtis Building Protection .6th & Walnut Sts. Agency Philadelphia, PA 19106 9.1.5 Department of Governors Island Transportation New York, NY 3rd U.S. Coast 10004 Guard District 9.1.6 Department of Dept of Agriculture Agriculture Chief, Division Bureau of Fcod of Milk .& Chemistry Sanitation 2301 N. Cameron St Harrisburg, PA W. Fouse 17110-9408

                    .                      9.1.7                      Department of Energy Rep.

r

                                          ~9.1.8                      Pennsylvania                     Room B-151 Emergency                        Transportation Management                       And Safety Bldg.

(P.O. Box 332 1-17105) Duty Officer Harrisburg, Pa

    .'                    - -                                                                          17120 9.1.9                      Department of               , Harrisburg, PA                  f Environmental
                                                                . Resources 9.1.9.1                    Office of                        Room B-102 Public                           Transportation Information                      & Safety Bldg.

Harrisburg, PA h . Ellen Sprinkle .17120 Director Harrisburg, PA 6 Rggional Office 1875 New Hope h.,[ 4?Rg[y! .!j ~ fl ;h 2 ph ff- $g N Norristown, PA - in ! l } G 11 Q!'(.i :l fi,q) :l.l Na -

     .                                                                              ~d 5 ~    *!
                                                                                              -2
                                                                                                     ?ll:_.(.-3b)':.:<}'4
                                                                                                                          <;    e               lYh ? E
                                                                                                        . J .:
) f y e

e

     *"9 s                 ,
                                                        - , - - 9 3eW             w--

l= EP-282 Rev. 2

                      '                                                                                      Page 4 of 5 VAW/ MPG /rgs Address                Phone
                           -                                                                        .       V 9.1.10        Bureau of               P.O. Box 2063 Radiation               Harrisburg, PA Protection,             17120 Dept. of Env. Resources 9.1.10.1      Personnel &

Home Phones T. Gerusky W. Dornsife M. Reilley 9.1.11 Pennsylvania 21. S. Brown St. l State Health Lewistown, PA

                                                         ,, Center                   .17044 9.1.12        State Police            Rt. 422 &

Barracks Lewis Rd. (Limerick) Limerick, PA 9.1.13 Delaware Civil State Police & Defense Agency Civil Defense

                                 -                                                    Emergency Management Section.

9.1.14 New Jersey P.O. Box 7068 Civil Defense West Trenton Agency N.J., 08625 9.1.15 Maryland Civil , Sudbrook Lane Defense Agency Reisterstown Rd. Pikesville, MD 21208

                                       .        9.1.16        Montgomery               100 Wilson Blvd.

A . County Dept. Eagleville, PA of Emergency 19403 Services 9.1.'17 Chester 14 E. Biddle St.

                                                   .._        County Dept.            West Chester, PA.
                                             .I f               I                                 f
                                                                                           .o       *.a
a. m ;a y ,j _ ;" %, L '" J
                                                                                            ~9 a"     p
              .                                                                         ,_   u        [;

W S'._ _ . - . _ _.

e

              .      .o .
          '       sg 4[                                                                                                                                             EP-282 Rev. 2 Page 5 of 5
                                                                                                                                                          .         VAW/ MPG /rgs Address                                     Phone 9.1.18'              .Berks County                              Agricultural Dept. of                                  Center, l                                            -

Emergency RD-1 Services Leesport, PA 19533 (

10.0 REFERENCES

S' None -

                                                      ~

9 J a.. - m . p h

                                                           ? ;n S.9-                %

( p . :4 .:'l -,,, ;('" e g. .e . .

                                                                                                  .. q 013 7           t
                                                                                                                                                        ..A
                                                           ..a v y;
                                                                                     .d :, '. '; = ,.i.

He .. -t

                                                                                                                                                        .: :n
                                                                                                                                                         .          j.

51 .: - 5 f .}  :;r ,:

  *^
                                                                   ~-N.2          y                 If Y ;.1         'i           *'
                                                                                                                                            ?
  • pj "* '.

M a; .$ ~t -, 4 cf .) - P.)

                                                                                                                          ~ as                   .n.;             -

y .- -- u, ag . 4 O 6

                                                                                                                                                                  .=e-         , , - - . - - * - -
                                                                ._            _..,%   ~ =..-            w   -~m-          ~%_.e.--w..
  '#          'o,,                                     UNITED STATES                           j f             n                             NUCLEAR REGULATORY COMMISSION
 .g             i                                    WASHINGTON, D. C. 20555 November 1,1984 k,, . . . . . ,o/

i j 50-352/353 Limerick MEMORANDUM FOR: Chief, Document Management Branch, TIDC FROM: Director, Division of Rules and Records, ADM

SUBJECT:

REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has determined that it may now be made publici available. f f

                                                             . M. Felton, Director ivision of Rules and Recor '#

Office of Administration

Attachment:

As stated W ^ 0}}