Proposed Change 8 to Tech Specs Section 6 to Bring Station Operations Review Committee & Safety Review & Audit Board Into Conformance W/Nuclear Organization
ML20081F198
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/26/1983
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20081F187 List:
References
NUDOCS 8311020382
Download: ML20081F198 (23)


Text

-

, TABLE OF CONTENTS (Cont'd.)

Page No.

SURVEILLANCE LIMITING CONDITIONS FOR OPERATION REQUIREMENTS 6.2.1.B NPPD Safety Review and Audit Board (SRAB) 222 i B.! Membership 223 B.2 Meeting Frequency 223 B.3 Quorum 223 l B.4 Review 223 B.5 Authority 224 B.6 Records 225 B.7 Audits 225 l 6.3 Procedures and Programs 226 6.3.1 Introduction 226 ,

6.3.2 Procedures 226 6.3.3 Maintenance and Test Procedures 226 6.3.4 Radiation Control Procedures 226

.A High Radiation Areas 226a 4

6.3.5 Temporary Changes 226a 6.3.6 Exercise of Procedures 226a 6.3.7 Programs 226a

.A Systems Integrity Monitoring Program 226a

.B Iodine Monitoring Program 226a

.C Environmental Qualification Program 226a i

6.4 Record Retention 228 6.4.1 5 year retention 228 6.4.2 Life retention 228 6.4.3 2 year retention 229 6.5 Station Reporting Requirements 230 6.5.1 Routine Reports 230

.A Introduction 230

.B Startup Report 230

.C Annual Reports 230

.D Monthly Operating Report 231 l

6.5.2 Reportable Occurrences 231

.A Prompt Notification with Written Followup 232

.B Thirty Day Written Reports 234 6.5.3 Unique Reporting Requirements 235 i

8311020392 831026 PDR ADOCK 05000298 p PM

-iv-

I 6.0 ADMINISTRATIVE CONTROLS i 6.1 ORGANIZATION 6.1.1 Responsibility The Division Manager of Nuclear Operations shall have the over-all fulltime

, onsite responsibility for the safe operation of the Cooper Nuclear Station.

During periods when the Division Manager of Nuclear Operations is unavailable,

he may delegate his responsibility to one of the managers in the Nuclear .

Operations Division. '

6.1.2 Offsite The portion of the Nebraska Public Power District management which relates to the operation of this station is shown in Figure 6.1.1.

6.1.3 Plant Staff - Shift Complement The organization for conduct of operation of the station is shown in i Fig. 6.1.2. The shift complement at the station shall at all times ncet the following requirements. Note: Higher grade licensed operators may take the place of lower grade licensed or unlicensed operators.

2 A. A licensed senior reactor operator (SRO) shall be present at the station at all tices when there is any fuel in the reactor.

B. A licensed reactor operator shall be in the control room at all times when there is any fuel in the reactor.

C. Two licensed reactor operators shall be in the control room j during all startup, shutdown and other periods involving signif-icant planned control rod manipulations. A licensed SRO shall 4

either be in the Control Room or immediately available to the

, Control Room during such periods.

I D. A licensed senior reactor operator (SRO) with no other concur-

{

. rent duties shall be directly in charge of any refueling opera-tion, or alteration of the reactor core.

A licensed reactor operator (RO) with no other concurrent duties shall be directly in charge of operations involving the
handling of irradiated fuel other than refueling or reactor

{ core alteration operations.

E. An individual who has been trained and qualified in health physics techniques shall be on site at all times that fuel is g on site.

l F. Minimum crew size during reactor operation shall consist of three licensed reactor operators (one of whom shall be licensed SRO) and three unlicensed operators. Minimum crew size during reactor cold shutdown conditions shall consist of two licensed reactor operators (one of whom shall be licensed SRO) and g one unlicensed operator.

I In the event that any member of a minimum shift crew is absent or incapacitated due to illness or injury a qualified replace-nent shall be designated to report on-site within two hours.

i 5

-219-L

G. A Fire Brigade of at least 5 members shall be maintained at all times. This excludes the 3 members cf the minimum shift crew necessary for safe shutdowns, and other personnel required for other essential functions during a fire emergency. Three fire Brigade members shall be from the Operations Department and 2 support memb rs may be from other departments inclusive of Security personnel.

Fire Brigade composition may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence of Fire Brigade members provided immediate action is taken to restore the Fire Brigade to within the minimum requirements.

6.1.4 Plant Staff - Qualifications The minimum qualifications, training, replacement training, and retraining of plant personnel at the time of fuel loading or appointment to the active position shall meet the requirements as described in the American National Standards Institute N-18.1-1971, " Selection and Training of Personnel for I

Nuclear Power Plants". The Chemistry and Health Physics Supervisor shall neet or exceed the cualifications of Regulatory Guide 1.8, Sept. 1975; personnel qualification equivalency as stated in the Regulatory Guide may be proposed in selected cases. The minimum frequency of the retraining program shall be every two years. The training program shall be under the direction of the Training Manager.

l A. A training program for the fire brigade will be maintained under the direction of the Training Manager and shall meet l

or exceed the requirements of Section 27 of the NFPA Code 1976, except for Fire Brigade training sessions which shall be held at least quarterly.

The training program requirements will be provided by a quali-fled fire protection engineer.

-219a-

, 6.2 REVIEW AND AUDIT 6.2.1 The organization and duties of committees for the review and audit of station operation shall be as outlined below:

A. Station Operations Review Committee (SORC)

1. Membership:

4 - a. Chairman: Division Manager of Nuclear Operations

b. Technical Staff Manager
c. Operations Manager
d. Technical Manager i e. Operations Supervisor
f. Maintenance Supervisor
g. Instrument and Control Supervisor ,
h. Chemistry and Health Physics Supervisor I 1. Plant Engineering Supervisor J. Reactor Engineer Supervisor
k. Computer Applications Supervisor
l. Quality Assurance Manager - non-voting member.

Alternate members shall be appointed in writing by the Division Manager of Nuclear Operations to serve on a temporary basis; however, no more than two alternates shall serve on the Cor.mittee at any one ,

time.

2. Meeting Frequency: Monthly, and as required on call of the Chairman.

] 3. Quorum: Division Manager of Nuclear Operations or his designated l

{ alternate plus four other members including alternates.

4. Responsibilities:
a. Review all proposed normal, abnormal, maintenance and emergency
operating procedures specified in 6.3.1, 6.3.2, 6.3.3, and 6.3.4
and proposed changes thereto
and any other proposed procedures or changes thereto determined by any member to effect nuclear l safety.

i b. Review all proposed tests and experiments and their results, which=

j involve nuclear hazards not previously reviewed for conformance 4 with technical specifications. Submit tests which may constitute an unreviewed safety question to the NPPD Safety Review and Audit Board for review,

c. Review proposed changes to Technical Specifications.
d. Review proposed changes or modificatiens to station systems or equipment as discussed in the SAR or which involves an unre-viewed safety question as defined in 10CFR50.59(c). Submit changes to equipment or systems having safety significance to the NPPD Safety Review and Audit Board for review.
c. Review station operation to detect potential nuclear safety hazards, i -220-i 1

-- - _- - -,e -rw_.,-.,,,r,, m ,,,,%,m., ., .w-9..--, .-,,v..-,y. ..___ ....- -,,.._y-- -

.-m-- m.

6.2 (cont'd)

f. Investigate all violations of Technical Specifications, including reporting evaluation and recommendations to prevent recurrence, i

to the Assistant General Manager - Nuclear and to the Chairman of the NPPD Safety Review and Audit Board.

! g. Perform special reviews and investigations and render reports thereon as requested by the Chairman of the Safety Review and Audit Board,

h. Review all events which are required by Technical Specifications

. to be reported to the NRC in writing within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

i. Review drills on emergency procedures (including plant evacuation)-

4-and adequacy of communication with off site groups.

J. Periodically review procedures required by Specifications 6.3.1, 6.3.2, 6.3.3, and 6.3.4 as set forth in administrative procedures.

5. Authority
a. The Station Operations Review Committee shall be advisory. l
b. The Station Operations Review Committee shall recommend to the Division Manager of Nuclear Operations approval or disapproval of
proposals under items 4, a through e and j above. In case of disagreement between the recommendations of the Station Operations Review Committee and the Division Manager of Nuclear Operations, the

! course determined by the Division Manager of Nuclear Operations to be

the morc conservative will be followed. A written summary of the

! disagreement will be sent to the Assistant General Manager - Nuclear j and to the NPPD Safety Revies and Audit Board.

. c. The Station Operations Review Committee shall report to the i Chairman of the NPPD Safety Review and Audit Board on all re-views and investigations conducted under items 4.f 4.g, 4.h, and 4.i.

d. The Station Operations Review Committee shall make determinations l regarding whether or not proposals considered by the Committee involve unreviewed safety questions. This determination shall
be subject to review by the NPPD Safety Review and Audit Board. l
6. Records:

Minutes shall be kept for all meetings of the Station Operations Review Committee and shall include identification of all documen-4 e

n

-221-

)

l 6.2 (Cont'd) tary material reviewed; copies of the minutes shall be forwarded to the Chairman of the NPPD Safety Review and Audit Board and the Assistant General Manager - Nuclear within one month. l3

7. Procedures:

Written administrative procedures for Committee operation shall be prepared and maintained describing the method for submission and content of presentations to the committee, provisions for use of subcommittees, review and approval by members of written Committee evaluations and recommendations, dissemination of minutes, and such other matters as may be appropriate.

B. NPPD Safety Review and Audit Board (SRAB)

Function: The Board shall function to provide independent review and audit of designated activities.

-222-

8 1

. 6.2 (cont'd)

1. Membership:

i

a. Chairman
b. Vice-Chairnan 1
c. Five Members 4 d. Consultants (as required)

.The Board members shall collectively have the capability required to review problems in the following areas: nuclear power plant operations, nuclear engineering, chemistry and radiochemistry, i metallurgy, instrumentation and control, radiological safety, mechanical and~ electrical engineering, quality assurance {

practices, and other appropriate fields associated with the unique characteristics of the nuclear power plant involved.

When the nature of a particular problem dictates, special &

consultants will be utilized.

Alternate members shall be appointed in writing by the Board

, Chairman to serve on a temporary basis; however, no more than two alternates shall serve on the Board at any one time.

2. Meeting frequency: Semiannually, and as required on call of the Chairman.

i

3. Quorum: Chairman or Vice Chairman, plus four members including l alternates. No more than a minority of the quorum shall be from groups holding line responsibility for the operation of the plant.
4. Review: The following subjects shall be reported to and reviewed by the NPPD Safety Review and Audit Board, i

! a. The safety evaluations-for 1) changes to procedures, equipment or systems and 2) tests or experiments completed under the provision of Section 50.59, 10 CFR, to verify that such actions did not constitute an unreviewed safety question.

I

b. Proposed changes to procedures, equipment or systems which

! involve an unreviewed safety question as defined in Section 50.59, 10 CFR.

l 4

i i

l

-223-1

_.- - m 1 e.: _2. A__

~ '

Enclosure to Attachment 1 CNS Technical Specifications List of Pages Affected by Proposed Change No. 8 Revise Appendix A as follows:

Remove Insert i iv iv v -

l 219 219 219a 219a 220 220 221 221 222 222 223 223 224 224 225 225 226 226 226a 226a 236 236 237 237 I

l l

i i

l r

i e

r4.,. p r +.-- -.--- - - y eeq---%,p-- -,- - -. ---

D 6.2 (cont'd)

c. Proposed tests or experiments which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.
d. Proposed changes to Appendix A Technical Specifiestions or the CNS Operating Licer.ae.
e. Violations of applicable codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
f. Significant operating abnormalities or deviations from normal and expected performance of plant equipment that affect nuclear safety.
g. All events which are required by Technical Specifications to be reported to the NRC in writing within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
h. Any indication of an unanticipated deficiency in some aspect of design or operation of safety related structures, systems, or components.
i. Minutes of meetings of the Station Operations Review Committee.

J. Disagreement between the recommendations of the Station Opern-ions Review Committee and the Division Manager of Nuclear Operations l

k. Review of events covered under e,f,g, and h above include reporting to appropriate members of management on the results of investiga-tions and recommendations to prevent or reduce the probability of recurrence.
5. Authority: The NFPD Safety Review and Audit Board shall report to and be advisory to the Assistant General Manager - Nuclear on those areas of responsibility specified in Specifications 6.2.1.B.4 and 6.2.1.B.7.

-224-

. _ , . .- ._ . ._._ _ _ - . . - . - = _ . . . - . - - . - - . . . . - _.

6.2 (cont'd)

6. Records:

1 1

$' Minutes shall be recorded for all meetings of the NPPD Safety Review and Audit Board and shall identify all documentary material reviewed. Copies of the minutes shall be forwarded to i

the Assistant General Manager - Nuclear and the Division Manager '

of Nuclear Operations, and such others as the Chairman may designate within one month of the meeting.

4

7. Audits:

4 'l j Audits of selected aspects of plant operation shall be performed l under the cognizance of SRAB with a frequency commensurate j with their safety significance. Audits performed by the Quality Assurance Department which meet this specification shall be i

considered to meet the SRAB audit requirements if the audit results are reviewed by SRAB. A representative portion of procedures and records of the activities performed during the audit period shall be audited and, in addition, observations of performance of operating and maintenance activities shall be included. These audits shall encompass:

I i

l i

e l

i l

l 1

l l

I l- -225-i _.

6.2 (cont'd)

a. Verification of compliance with internal rules, procedures (for examole: normal, off-normal, emergency, operating, maintenance, surveillance, test, and radiatien control procedures) and applicable license conditions at least once per 24 months.
b. The training, qualification, and performance of the operating staff at least once per 24 months.
c. The Emergency Plan and implementing procedures at least once per 12 montns.
d. The Security Plan and implementing procedures at least once per 12 months.
c. The facility fire protection and its implementing procedures at least once per 24 months,
f. A fire protection and loss prevention inspection will be performed utilizing either qualified off-site licensee personnel or an out-side fir protection consultant at least once per 12 months.
g. An inspection and audit by an outside qualified fire protection consultant shall be performed at least once per 36 months.

-225a-

6.3 PROCEDURES AND PROGRAMS 6.3.1 Introduction Station personnel shall be provided detailed written procedures to be used for operation and maintenance of system components and systems that could have an effect on nuclear safety.

6.3.2 Procedures Written procedures and instructions including applicable check off lists shall be provided nnd adhered to for the following:

A. Normal startup, operation, shutdown and fuel handling operations of the station including all systems and components involving nuclear safety.

B. Actions to be taken to correct specific and foreseen potential l or actual malfunctions of safety related systems or components including responses to alarms, primary system leaks and abnormal reactivity changes.

C. Emergency conditicins involving possible or actual releases of radio-active materials.

D. Implementing procedures of the Security Plan and the Emergency Plan, E. Implementing procedures for the fire protection program.

F. Administrative procedures for shift overtime.

6.3.3 Maintenance and Test Procedures The following maintenance and test procedures will be provided to satisfy routine inspection, preventive maintenance programs, and operating license requirements.

A. Routine testing of Engineered Safeguards and equipment as required by the facility License and the Technical Specifications.

B. Routine testing of standby and redundant equipment.

C. Preventive or corrective maintenance of plant equipment and systems that could have an effect on nuclear safety.

D. Calibration and preventive maintenance of instrumentation that could affect the nuclear safety of the plant.

E. Special testing of equipment for proposed changes to operational procedures or proposed system design changes.

6.3.4 Radiation Control Procedures Radiation control procedures shall be maintained and made available to all station personnel. These procedures shall show permissible radiation exposure, and shall be consistent with the requirements of 10 CFR 20.

-226- ,

._ = - - . . .. _ = . _ = _ . ~ - , - _ - _ - .

6,3 (cont'd) g A. High Radiation Areas In lieu of the " control device" or " alarm signal" required by Paragraph 20.203 (c) (2) of 10 CFR 20 each High Radiation Area (100 mrem /hr or greater) shall be barricaded and conspicuously posted as a High Radiation Area and entrance thereto shall be controlled by requiring notification

, and permission of the shift supervisor. Any individual or group of indi-viduals permitted to enter such areas shall be provided with a radiation monitoring device which continuously indicates the radiation dose rate in the area.

i 6.3.5 Temporary Changes Temporary changes to procedures which do not change the intent of the original procedure may be made, provided such changes are approved by two members of the operating staff holding SR0 licenses. Such changes shall be documented and subsequently reviewed by the Division Manager of Nuclear Operations within one month, 6.3.6 Exercise of Procedures Drills of the Emergency Plan procedures shall be conducted annually, including a check of communications with offsite support groups. Drills on the procedures specified in 6.3.2.A B, and C above shall be con-ducted as part of the retraining program.

l 6.3.7 Programs

The following programs shall be established

A. Systems Integrity Monitoring Program

^

A program shall be established to reduce leakage to as low as practical l 1evels from systems outside the primary containment during a serious i

accident that would or could contain highly radioactive fluids. This program shall include provisions establishing preventive maintenance and periodic visual inspection requirements, and leak testing requirements for each system at a frequency not to exceed refteling cycle intervals.

B. Iodine Monitoring Program A program shall be established to casure the capability to accurately l i determine the airborne iodine concentration in vital areas under accident conditions. This program shall include training of personnel, procedures for monitoring and provisions for maintenance of sampling and analysis equipment.

C. Environmental Qualification Program A. By no later than June 30, 1982 all safety-related electrical equipment in the facility shall be qualified in accordance with the provisions of: Division of Operating Reactors " Guidelines for Evaluating Environmental Qualification of Class IE Electrical Equipment in 1

Operating Reactors" (DOR Guidelines); or, NUREG-0588 " Interim Staff I

-226a-

6.3 (c on t ' d)

Position on Environmental Qualification of Safety-Related Electrical Equipment", December 1979. Copies of these documents are attached to Order for Modification of License DPR-46 dated October 24, 1980.

B. By no lat?r than December 1, 1980, complete and auditible records must be available and maintained at a central location which describe the environmental qualification method used for all safety-related electrical equipment in sufficient detail to document the degree of compliance with the DOR Guidelines or NUREG-0588. Thereafter, such records should be updated and maintained current as equipment is '

replaced, further tested, or otherwise further qualified.

t t

-227-

, . , 9 .---a

6.4 RECORD RETENTION 6.4.1 5 Year Retention Records and/or logs relative to the following items shall be kept in a manner convenient for review ar.d shall be retained for at least 5 years unless a longer p('iod is required by applicable regulations.

A. Records of normal station operation, including power levels and periods of operation at each power level, '

B. Records of periodic checks, inspection and/or calibrations performed to verify that Surveillancy Requirements are being met.

C. Records of principal maintenance activitics, including inspection, repair, substitution or ~eplacement of principal items of equipment pertaining to nuclear safety.

D. Records of reportable occurrences as specified in 6.5.2.

E. Record of changes to plant procedures.

F. Records of special tests and experinents.

G. Records of wind speed and direction.

6.4.2 Life Retention Records and logs relating to the following items shall be kept for the life of the plant.

A. Records of changes maJe to the station as described in the Safety Analysis Report and amendments and reflected in updated, corrected and as-built drawings and records.

B. Records of new and spent fuel inventory and assembly histories.

C. Records or station radiation and contamination surveys.

D. Records of off-site environmental monitoring surveys.

E. Records of radiation exposure for all station personnel, including all contractors and visitors to the station in accordance with 10 CFR 20.

F. Records of radioactivity in liquid and gaseous wastes released to the environment.

G. Design Fatigue Usage Evaluation

1. Monitoring, recording, and evaluation will be met for various portions of the reactor coolant pressure boundary (RCPb) for which detailed fatigue

-228-

6.4.2.G (cont'd) usageevaluationperthepSMEBoilerandPressureVesselCode Section Ill was performed for the conditions defined in the design specification. The locations to be monitored shall be:

a. The feedwater nozzles
b. The shell at or near the waterline
c. The flange studs
2. Monitoring, Recording, Evaluating, and Reporting
a. Operational transients that occur during plant operations will, at least annually, be reviewed and compared to the transient conditions defined in the component stress report for the locations listed in 1 above, and used as a basis for the existing fatigue analysis,
b. The number of transients which are comparable to or more severe than the transients evaluated in the stress report Code fatigue usage calculations will be recorded in an operating log book.

For those transients which are more severe, available data, such as the metal and fluid temperatures, pressures, flow rates, and other conditions will be recorded in the log book,

c. The number of transient events that exceed the design specification quantity and the number of transient events with a severity greater than that included in the existing Code fatigue usage calculations shall be added. When this sum exceeds the predicated number of 2

design condition events by twenty-five ,a fatigue usage evaluation of such events will be performed for the affected portion of the RCPB.

H. Records of individual plant staff members showing qualifications, training and retraining.

I. Records for Environmental Qualification which are covered under the pro-visions of Specification 6.3.

J. Records of the service lives of all hydraulic and mechanical snubbers, listed on Tables 3.6.1, 3.6.2, 3.6.3, 3.6.4 including the date at which the service life commences and associated installation and maintenance records.

6.4.3 2 Year Retention Records and logs relating to the following items shall be kept for two years.

A. The test results, in units of microcuries, for leak tests of sources performed pursuant to Specification 3.8.A.

B. Records of annual physical inventories verifying accountability of the sources on record.

1. See paragraph N-415.2, ASME Section III, 1965 Edition.
2. The Code rules permit exclusion of twenty-five (25) stress cycles from secondary stress and fatigue usage evaluation. (See paragraphs N-412(t)(3) and N-417.10(f) of the Sumner 1968 Addenda to ASME Section III, 1968 Edition.)

-229-

6.5 STATION REPORTING REQUIREMENTS 6.5.1 Routine Reports A. Introduction - In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following identified reports shall be submitted to the individual (s) designated in the current revision of Reg. Guide 10.1 unless otherwise noted.

B. Startup Report

1. A summary report of plant startup and power escalation testing shall be submitted following:
a. Receipt of an operating license,
b. Amendncnt to the license involving a planned increase in power level.
c. Installation of fuel that has a different design or has been manufactured by a different fuel supplier.
d. Modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of the plant.

The report shall address each of the tests identified in the FSAR and shall include a description of the measured values of the operating conditions or characteristics obtained during the test paustam and a tumpatisuu of these values -lih de=Ign predictions and specifications. Any corrective actions that were required to obtain satisfactory operation shall also be described. Any additional specific details required in license conditions based on other commitments shall be included in this report.

2. Startup reports shall be submitted within (1) 90 days following completion of the startup test program, (2) 90 days following resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest.

If all three events are not completed, supplementary reports shall be submitted every three months.

C. Annual Reports l Routine reports covering the subjects noted in 6.5.1.C.1 6.5.1.C.2, and 6.5.1.C.3 for the previous calendar year shall be submitted prior to March 1 of each year.

1

(

i <

l -230-1

1. A tabulation on an annual basis of the number of station, utility and other personnel (including contractors) re-ceiving exposures greater than 100 mrem /yr and their associated man rem exposure according to work and job functions, 1/ e.g. , reactor operations atd surveillance,
inservice inspection, routine maintenance, special main-tenance (describe maintenance), waste proce sing, and refueling. The dose assignment to various duty functions may be estimates based on pocket dosimeter, TLD, or film badge measurenents. Small exposures totaling less than 20%

of the individual total dose need not be accounted for. In the aggregate, at least 80% of the total whole body dose received from external sources shall be assigned to specific major work functions.

2. A summary description of facility changes, tests or experi-ments in accordance with the requirements of 10CFR50.59(b).
3. Pursuant to 3.8.A. a report of radioactive source leak testing. This report is required only if the tests reveal the presence of 0.005 microcuries or more of removable contamination.

I D. Monthly Operating Report i Routine reports of operating statistics, shutdown experience, and a narrati e summary of operating experience relating to safe operation of the facility, shall be submitted on a monthly basis to the individual designated in the current revision of Reg.

Guide 10.1 no later than the tenth of each month following the calendar month covered by the report.

6.5.2 Reportable Occurrences Reportable occurrences, including corrective actions and measures to prevent reoccurrence, shall be reported to the NRC. Supplemental reports may be required to fully describe final resolution of occurrence. In case of corrected or supplemental reports, a licensee event report shall be completed and reference shall be made to the original report date.

i I

l 1/ This tabulation supplements the requirements of $20.407 of 10CFR Part 20.

I i

l -231-

A. Prompt Notification With Written Followup. The types of events listed below shall be reported as expeditiously as possible, but within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by telephone and confirmed by telegraph, mailgram, or facsimile transmission to the appropriate Regional Office, no later than the first working day following the event, with a written follow-up report within two weeks. The written follow-up report shall include, as a minimun, a con.pleted copy of a licensee event report form.

Information provided on the licensee event report form shall be supplemented, as needed, by additional narrative material to provide complete explanation of the circumstances surround-ing the event.

1. Failure of the reactor protection system or other systems subject to limiting safety system settings to initiate the required protective function by the time a monitored parameter reaches the setpoint specified as the limiting safety system setting in the technical specifications or failure to complete the required protective function.

Note: Instrument drift discovered as a result of testing need not be reported under this item but may be reportable under items 6.5.2.A.5, 6.5.2.A.6 or 6.5.2.B.1 below.

2. Operation of the unit or affected systems when any parameter or operation subject to a limiting condition is less conservative than the least conservative aspect of the limiting condition for operation established in the technical specifications.

Note: If specified action is taken when a system is found to be operating between the most conservative and the least conservative aspects of a limiting condition for operation listed in the technical specifications, the limiting condition for operation is not considered to have been violated and need not be reported under this item, but it may be reportable under item 6.5.2.B.2 below.

3. Abnormal degradation discovered in fuel cladding, reactor coolant pressure boundary, or primary containment.

( Note: Leakage of valve packing or gaskets within the limits l for identified leakage set forth in technical spec-ifications need not be reported under this item.

l 1

-232-

A

4. Reactivity anomalies, involving disagreement with the predicted value of reacttvity balance under steady state conditions during power operation, greater than or equal to 1% Ak/k; a calculated reactivity balance indicating a shutdown margin less conservative than specified in the technical specifications; short-term reactivity increases that correspond to a reactor period of less than 5 seconds or. if sub-critical, an unplanned reactivity insertio's of more than 0.5%

Ak/k or occurrence of any unplanned criticality.

5. Failure or malfunction of one or more components which prevents or could prevent, by itself, the fulfillment of the functional requirements of system (s) used to cope with accidents analyzed in the SAR.
6. Personnel error or procedural inadequacy which prevents or could prevent, by itself, the fulfillment of the functional requirements of systems required to cope with accidents analyzed in the SAR.

Note: For items 6.5.2.A.5 and 6.5.2.A.6 reduced redundancy that does not result in a loss of system function need not be reported under this section but may be reportable under items 6.5.2.B.2 and 6.5.2.B.3 below.

7. Conditions arising from natural or man-made events that, as a direct result of the event require plant shutdown, operation of safety systems, or other protective measures required by technical specifications.
8. Errors discovered in the transient or accident analyses or in the methods used for such analyses as described in the safety analysis report or in the bases for the technical specifications that have or could have permitted reactor operation in a manner less conservative than assumed in the analyses.
9. Performance of structures, systems, or components that requires remedial action or corrective measures to prevent operation in a manner less conservative than assumed in the accident analyses in the safety analysis report or technical specifications bases; or discovery during plant life of conditions not specifically con-sidered in the safety analysis report or technical specifications that require remedial action or corrective measures to prevent the existence or development of an unsafe condition, t

I

-233-

Note: This item is intended to provide for reporting of potentially generic problems.

B. Thirty Day Written Reports. The reportable occurrences discussed below shall be the subject of written reports to che appropriate Regional Office within thirty days of occurrence of the event.

The written report shall include, as a minimum, a completed copy of a licensee event report form. Information provided on the licensee event report form shall be supplemented, as needed, by additional narrative material to provide complete explanation of the circumstances surrounding the event.

1. Reactor protection system or engineered safety feature instrument settings which are fcund to be less conserv-ative than those established by the technical specifica-tions but which do not prevent the fulfillment of the functional requirements of affected systems.
2. Conditions leading to operation in a degraded mode permitted by a limiting condition for operation or plant shutdown required by a limiting condition for operation.

Note: Routine surveillance testing, instrument calibration, or preventative maintenance which require system configurations as described in items 6.5.2.B.1 and 6.5.2.B.2 need not be reported except where test results themselves reveal a degraded mode as described above.

3. Observed inadequacies in the implementation of admin-istrative or procedural controls which threaten to cause reduction of degree of redundancy provided in reactor protection systems or engineered safety feature systems.
4. Abnormal degradation of systems other than those specified in item 6.5.2.A.3 above designed to contain radioactive material resulting from the fission p rocess .

Note: Scaled sources or calibration sources are not included under this item. Leakage of valve packing or gaskets within the limits for identified leakage set forth in technical specifications need not be reported under this item.

-234-

6.5.3. Unique Reporting Requirements Reports sh.ill be submitted to the Director, Nuclear Reactor Regulation, USNRC, Washington, DC 20555, as follows:

A. Reports on the following areas shall be submitted as noted:

None.

-235-

GENERAL MANAGER ASSISTANT GENERAL MANAGER-NUCLEAR NPPD SAFETY REVIEW AND TECHNICAL STAFF AUDIT BOARD MANAGER, NPG (S R AB) y NUCLEAR OPERATIONS NUCLEAR SERVICES QUALITY ASSURANCE DIVISION - MAN AGER DIVISION - MANAGER DIVISION - MANAGER I

I I

FIRE PROTECTION QUAILTY ASSURANCE QUAILTY ASSURANCE PRO G R AM M AN AGE R - CNS MANAGER - G.O.

SITE NUCLEAR NUCLEAR LICENSING NUCLEAR ENGINEERING NUCLEAR PROJECTS AD MIN.

SUPPORT 8 SAFETY DEPARTMENT DEPARTMENT OF FIC E DEPARTMENT-MANAGE R DEFARTMENT-MANAGER MANAGER DE PARTMENT MANAGER Figur e 6.l.1 NPPD Nuclear Power Group Organization Chort

1 o

e

NUCLEAR OPERATIONS DIVISION MANAGER STATION OPERATIONS FIRE PROTECTION REVIEW COMMITTEE - - - - - - - -

ENGINEER W (SO R C) 1 QUAllTY ASSURANCE l TECH NIC A L STAFF MANAGER - CNS l~~ MANAGER T RAINING TECHNICAL OPERATIONS ADMINISTRATIVE SERVICES MANAGER M AN AGER MANAGER MANAGER OPERATIONS SPECI A L TRAINING PRCXIECTS SUPERVISO R ENGl' JEER SECURITY ADMINIS TR ATIVE M ATE RIA L SUPPORT S U PERVISOft SUPERVISO R SUPERVISOR N,

CHEM 8 HP COMPUTER PLANT REACTOR APPLICATIONS ENGINEER ENGINEE R SUPERVISOR SUPER VISO R SUPERVI SOR SUPE RVISOR MAINTENANCE I8C OPERATIONS

" SUPERVISOR O SHI SUPERVISOR SUPERVISOR (S R 0)

S/S THREE/ SHIFT RO- NRC REACTOR OPERATORS LICENSE SHIFT SRO-NRC SENIOR REACTOR OPERATORS SUPERVISORS (SRO)

LICENSE 1/S

) 0- FUNCTIONAL POSITION ONLY ELECTRIC AL MAINTENANCE MECHANICAL PHYSICALLY LOCATED IN GENERAL OFFICE SUPER VISOR SCHEDULER SUPERVISOR 2/Sl UNIT OPER (RO)

VSl STATION (UNLICENSED)OPER.

Figure 6. l.2 NPPD Cooper Nuclear S tation Orgonization Chart