Rev 2 to Administrative Procedure TS-1, Grand Gulf Nuclear Station Tech Spec Review,Safety-Related. W/840323 Memo
ML20087N603
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/23/1984
From:
MISSISSIPPI POWER & LIGHT CO.
To:
Shared Package
ML20087N593 List:
References
TS-1, NUDOCS 8404040074
Download: ML20087N603 (6)


Text

_ __

Proc. TS-1 Rev. 2 1 ,

Date MAR 2 3 1984 ADMINISTRATIVE PROCEDURE GGNS TECHNICAL SPECIFICATION REVIEW SAFETY RELATED EVALUATION APPLICABILITY -

SAFETY EVALUATION ENVIRONMENTAL EVALUATION

a. [ ] Applicable [ ] Applicable

[X] Not Applicable [X] Not Applicable Prepared: /

Reviewed: h Kssistant Pr'oject Manager hS l h h k & O b!

~T N S/BQP Group Manager

[ 'RPD Group Man er thy

/q)(ality Eryfineer bd Quality 0 8 Y 3/ 4//f anc /'

l Reviewed / Approved-Project Manager List of Effective Pages Page Rev.

1-2 2 6-9 2 g4o4o4co74 g4o4o3 PDR ADOCK 05000416 P PDR

.' ' ' I REV. 2 GGNS TECHNICAL SPECIFICATION REVIEW MD 9 9 "3 J PROCEDURE NO. TS-1 PAGE 1 of 17 a: -

l t'

f CGNS TECHNICAL SPECIFICATION REVIEW 1.0 PURPOSE 1.1 The purpose of this procedure is to establish the administrative methods to control, coordinate, and record activities related to a

, program to review the GGNS Unit One Technical Specifications.

2.0 REFERENCES

2.1 Commitments -

2.1.1 USNRC letter D. G. Eisenhut/J. B. Richard, dated February 24,

, 1984 2.2 Other References 2.2.1 Nuclear Services Administrative Procedures

a. 2.2, Control of the Final Safety Analysis Report (FSAR)
b. 2.6, Operating License Amendment
i. c. 9.5, Control of the Technical Specifications 2.2.2 NT&L Operational Quality Assurance Manual (MPL-TOP-1A)
a. 2.1.2.1 e. 2.5.3.1
b. 2.1.2.2 f. 2.5.3.2
c. 2.1.2.3 g. 2.5.3.4
d. 2.1.2.4 h. 6.5.4 2.3 Cross-References None.

3.0 DEFINITIONS 3.1 Division of Responsibility (DOR): The process whereby individual technical specifications or entire sections of the GGNS Unit One Technical Specifications have been assigned for review to Lead '

Review Organizations. The DOR is given in Table 1 to this procedure.

DATE REV. 2

, GGNS TECHNICAL SPECIFICATION REVIEW p33 o 9 .c ,

PROCEDURE NO. TS-1

]31

= = - -

PAGE 2

of 17 .

(1) assign the Package for onsite review to a team composed of:

(a) a BPC or GE System Engineer (may or may not be the same individual that performed the review in the Lead Review Organization).

(b) a MP&L Nuclear Plant Engineering (NPE)

Engineer, and (c) a MP&L Senior Reactor Operator (SRO).

NOTE Each team member shall have accecs to pertinent background and source information -

and shall have an adequate understanding of the scope of the review.

(2) if concurrence by the Onsite Review Team with the conclusions and, if applicable, the recommendations of the Lead Review Organization can not be reached, coordinate directly with appropriate Lead Review Organization staff members to discuss and obtain resolution.

NOTE

({.

If satisfactory resolution can not be achieved,

'- im=ediately advise the Project Manager of the conflict.

(a) Resolution of the conflict must be documented by completion and distribution of a

" Telephone or Verbal Conversation Record" (Attachment II) or other appropriate l

document, which must be signed and dated by l

the NSSS/ BOP Group Manager. A copy of the l appropriate resolution document must be attached to the Technical Specification Review Package.

(3) if the Onsite Review Team concurs with the conclusions and, if applicable, the recommendations of the Lead Review Organization, sign the Technical Specification Review Sheet and forward the package I to the Review, Prioritization and Direction Group Manager under cover of a transmittal memorandum similar in format to that given in Attachment XII

- for further review and action.

( __ _

~

DATE REV. 2 n3p 9 9 mea GGNS TECHNICAL SPECIFICATION REVIEW PROCEDURE NO. TS-1

- PAGE 6 Cf 17 R. 4 _ m

b. The Onsite Review Team must:

t n

(1) review all documents contained in the Technical Specification Review Package with emphasis on the scope of the review, the validity of the conclusions and the appropriateness and completeness of recommendations, if included. If considered appropriate, field walkdown must be conducted.

. (2) complete entries on a form similar to the Technical Specification Review Sheet (Attachment VIII)'in accordance with the instructions contained in Attachment IX.

(a) If concurrence with the conclusions and, if applicable, the recommendations of the Lead

, Review Organization can not be reached, immediately advise the NSSS/ BOP Group Manager of the conflict and participate in the resolution, as required (Item 5.4.1.a(2) above).

, (3) complete a form similar to the Technical l Specification Review Package transmittal memorandum (Attachment (XII), attach the Review Package and provide it to the NSSS/ BOP Group Manager for further f review and action. -

5.4.2 , Review, Prioritization and Direction (RPD) Group Review l a. The RPD Group must:

(1) upon receipt of a Technical Specification Reviev Package, assign it for review.

I NOIE Each Group member shall have access to pertinent $

background and source information and shall have an adequate understanding of the scope of the review.

^

(2) review all documents contained in the Technical Specification Review Package with emphasis on the scope of the review, the validity of the conclusion and the appropriateness and completeness of recommendations; the RPD Group will solely determine requirements for further action.

~

DATE REv.2 pg GGNS TECHNICAL SPECIFICATION REVIEW PROCEDURE N0. TS-1

'7 k l7_

[I -

(3) provide appropriate resolution to the

( problems / comments . For significant problems (i.e., e those that have a.Punchlist Item number assigned) if concurrence by the RPD Group with the conclusions and, as applicable, the recom=endations of the Lead Review Organization (R&ES or ADMIN) or the NSSS/ BOP Group Manager can not be reached, coordinate directly with staff members of the appropriate organization to discuss and obtain resolution. !

NOTE If satisfactory resolution can not be achieved, immediately advise the Project Manager of the  ; -

conflict.

4 (a) Resolution of the conflict must be documented by completion and distribution of a

" Telephone or Verbal Conversation Record" (Attachment XI) or other appropriate document. A copy of the appropriate resolution documentation must be attached to the Technical Specification Review Package. f (4) complete entries on a form similar to the RPD Group Technical Specification Review Sheet (Attachment XIII) and attach to the Review Package.

{

(a) If concurrence with the conclusions and, if -

applicable, the recommendations of the Lead  ;

Review Organization (R&ES or ADMIN) or the NSSS/ BOP Group Manager is reached and there ',

are no requirements for further action, g ,

prepare a Review Closure Document in i accordance with paragraph 5.6 below and provide it to the RFD Group Manager for I review and further action. ,

(b) If concurrence with the conclusions and, if applicable, the recommendations of the Lead Review Organization (R&ES or ADMIN) or the NSSS/B0P Group Manager is reached and there are requirements for further action, proceed in accordance with the instructions contained-

! in paragraph 5.5 below.

l l

DATE V'

I GGNS TECHNICAL SPECIFICATION REVIEW 2 MAR 2 31984 PROCEDURE NO. TS-1 l PAGE 8 of 17 A?ti_

, - . m _ ~4Jrc .

L m

,s ..l' ,

5.4.3 Items From Outside Sources

a. Reports of parallel, independent review of other I documents which relate to the GGNS Technical Specifications (e.g. , document chapter reviews by GE,

' etc.) or comments on the technical specifications from any other source must be delivered to the RPD Group Manager for review and, if appropriate, assigned to the applicable Project Review Group (NSSS/ BOP Group or the

  • RPD Group) for consideration in their review of the applicable technical specification.
b. For assigned reviews, the NSSS/ BOP Group Manager must report by memorandum to the RPD Group Manager the results of his Group's review. ,
c. The RPD Group Manager must transmit such reports of items from outside sources to the Technical Specifications Records Control Group under cover of a form similar to the Document Control Form (Attachment XXIII) with instructions to assign a document serial number and make such distribution as may be required.

5.5 Additional Action Requirements 5.5.1 Technical Specification Change F a. The RPD Group Manager must:

l (1) direct the preparation of a proposal to revise the Technical Specifications in the following form, scope, and content:

(a) Technical Specification Problem Sheet (s)

  • related to the subject Technical Specification.

l l

(b) Documents in the Technical Specification Review Package which explain the requirement for the revision.

l l

GGNS TECHNICAL SPECIFICATION REVIEW REV.2 PROCEDURE NO. TS-1 MAR f31984 hg, m -' _Y PAGE 9 of 17

1

^//o 3//y i O<~ & A4 = - m 1 JGu24 : G~~A 6 f h2 /

L,j-l %ss)?p: }&n g Lj&(69L 7 7l ~ A ~ <' f s ~ s & m cML( / 7% A)/d C m /w de tpy ipf9- ,

biem

y ,.p,

/fA4 L' E v% '

U > $'  :~4 h C76 A/S Ss/Q S ts  ; IfQ wark $ 75-/ 3]z t//y C 2) /MM& Auk 71- / )%o, 3/> 3MY v) #d123 Smk Ts-i Wi, 3//r// v Cy) WMM Amhtr -!, J4:~ 2, J/t3/ty p,1 h4M '

Dudzet f;4 th. vic PDFL L PD &

WStC $0*I f /LC S L6 - Y yd'y f'fp,g0(g 8 /~ <

$: +

I. [ Q 0; Nr

-