ML20196K083

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Page 3.4-3,reflecting Implementation of BWROG Enhanced Option I-A,reactor Stability long-term Solution
ML20196K083
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/29/1999
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20196K082 List:
References
NUDOCS 9907080136
Download: ML20196K083 (2)


Text

d

.GNRO-99/00050 l

ATTACHMENT 2 Marked-up TS Page 3.4-3 attached l

6 l

i l

I l

9907000136 990629 PDR ADOCK 05000416 P

PDR

i Recirculation Loops Operating 3.4.1 ACTIONS (continued) i CONDITION REQUIRED ACTION COMPLETION TIME ow as a E.1 Place the reactor pt function mode switch in the POWER within Region A.

shutdown pos i

OR

~

1 l

No recirculation loo l

in operation

\\

i MODE 1 N

[ No recirculation loops l

Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> l

in operation,4*--

l "9E 2 s d

[ Required limit Declare associated Immediately j

modifications not limit (s) not met, performed.

GRAND GULF 3.4-3 Amendment No. 120