.GNRO-99/00050 l
ATTACHMENT 2 Marked-up TS Page 3.4-3 attached l
6 l
i l
I l
9907000136 990629 PDR ADOCK 05000416 P
i Recirculation Loops Operating 3.4.1 ACTIONS (continued) i CONDITION REQUIRED ACTION COMPLETION TIME ow as a E.1 Place the reactor pt function mode switch in the POWER within Region A.
shutdown pos i
~
1 l
No recirculation loo l
in operation
\\
i MODE 1 N
[ No recirculation loops l
Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> l
in operation,4*--
l "9E 2 s d
[ Required limit Declare associated Immediately j
modifications not limit (s) not met, performed.
GRAND GULF 3.4-3 Amendment No. 120