Proposed Tech Specs Re MCPR Limits for Two Recirculation Loop Operation
ML20134N761
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/20/1996
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20134N756 List:
References
NUDOCS 9611270101
Download: ML20134N761 (1)


Text

__

~ ~.. _

P 3^

SLs l

2.0 2.0 SAFETY LIMITS (SLs)

I 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1.With the reactor steam dome pressure < 785 psig or core-i flow < 10% rated core flow:

l THERMAL POWER shall be s 25% RTP.

i

  • 2.1.1.2 With the reactor steam dome pressure m.785 psig and core flow = 10% rated core flow:

MCPR shall be a 1.12 for.two recirculation loop operation or a 1.14 for single recirculation loop' 1

operation.

2.1.1. 3 -: Reactor vessel water level shall be greater than the top of active irradiated fuel.

J 2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be 's 1325 psig.

2.2' SL Violations With any SL violation, the following actions shall be completed:

2.2.1 Within I hour, notify the NRC Operations Center, in accordance with 10 CFR 50.72.

I 2.2.2 Within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:

j 2.2.2.1 Restore compliance with all SLs; and

- 2.2.2.2. Insert all insertable control rods.

W 2.2.3 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, _ notify the plant manager.and the corporate i

/

executive responsible ~ for overall plant nuclear safety.

)

4.

  • MCPR values in T.S. 2.1.1.2-are applicable only for cycle 9 operation.

I

~

(continued)

GRAND GULF 2.0 Amendment No._ M4, - 131 9611270101 961120 M

.POR-.ADOCK 05000416