ML20067A970
From kanterella
ML20067A970 | |
Person / Time | |
---|---|
Site: | Brunswick ![]() |
Issue date: | 01/16/1991 |
From: | STRUCTURAL INTEGRITY ASSOCIATES, INC. |
To: | |
Shared Package | |
ML19310E585 | List: |
References | |
CPL-16Q-304, CPL-16Q-304-R, CPL-16Q-304-R00, NUDOCS 9102080072 | |
Download: ML20067A970 (38) | |
Similar Documents at Brunswick | |
---|---|
Category:ARCHIVE RECORDS
MONTHYEARML20196E8931999-06-16016 June 1999
[Table view]Rev 0 to 2B11-0001, Core Shroud B214R1 Structural Evaluation ML20155C6921998-10-27027 October 1998 Audit Rept for Audit Conducted on 981006-09 on Implementation of GL 98-01, Year 2000 Readiness of Computer Sys at Npps ML20202D9051998-01-21021 January 1998 Rev 0 to 0VA-0114, Control Bldg Transient Temp Analysis During Spring Conditions ML20216J1151997-09-0303 September 1997 Rev 5 to CP&L-CED-M-01, Mlsb Analysis CR Dose Analysis to Support Power Uprate ML20137Y6491997-03-26026 March 1997 Rev 3 to MSLB Analysis CR Dose Analysis to Support Power Uprate ML20136E8021997-01-24024 January 1997 Rev 0 to Control Room & Offsite Doses Due to Control Rod Drop Accident ML20134L3121996-11-20020 November 1996 Press Release II-96-96, NRC Staff Proposes $150,000 Fine Against CP&L at Brunswick ML20134H2481996-11-13013 November 1996 Press Release II-96-94, NRC Schedules Special Insp Exit Meeting at Brunswick Plant ML20128Q1391996-10-18018 October 1996 Press Release II-96-85, NRC Staff Holds Predecisional Enforcement Conference to Discuss Brunswick Equipment Concerns W/Cp&L ML20133F3741996-09-18018 September 1996 Rev 1 to Brunswick Units 1 & 2 Hydro Test P-T Curve Development ML20202D8941996-09-12012 September 1996 Rev 0 to 0VA-0104, Control Bldg Transient Temp Analysis ML20217N0901995-04-0505 April 1995 Rev 0 to CPL-36Q-303, Comparison of ASME Code App a Versus App G Methodology ML20078Q2201994-12-15015 December 1994 Rev 1 to Caculation CPL-34Q-301, Weld Overlay Repair Design for BSEP Unit 1 Feedwater Safe-End Welds ML20058N8231993-12-22022 December 1993 Undated Package Consisting of Attachment 1 to Employee Concerns Program ML20046A3291992-12-31031 December 1992 Analysis for Bsep,Units 1 & 2 SWS for Analysis for TS 3.7.1.2 Proposed Change. ML20046A3351992-08-11011 August 1992 Bsep,Unit 2 SWS Operating Limits, Reflecting Upgraded NSW Pump Motor Thrust Bearings ML20046A3401992-08-11011 August 1992 Bsep,Unit 1 SWS Hydraulic Analysis, Reflecting Installation of Upgraded NSW Pump Motor Thrust Bearings ML20046A3261992-03-27027 March 1992 Bsep,Units 1 & 2 SW Single Failure Analysis, Reflecting Installation of Plant Mods ML20079M9501991-11-11011 November 1991 Responses to NUMARC Aquatic Resources Survey & Questionnaire to Support Part 51 Rule Change Socioeconomic & Waste Mgt Questions ML20079M9901991-11-11011 November 1991 Responses to NUMARC Aquatic Resources Survey & Questionnaire to Support Part 51 Rule Change Socioeconomic & Waste Mgt Questions ML20067A9871991-01-21021 January 1991 Rev 0 to Flow Evaluation - RHR Valve to Recirculation Tee ML20067A9771991-01-17017 January 1991 Rev 0 to Summary of Stress for Plan Evaluation ML20067A9701991-01-16016 January 1991 Rev 0 to Stress Analysis of RHR Valve to Recirculation Tee ML20066C5371990-12-15015 December 1990 Rev 0 to Through Wall Leak Evaluation for Line 2-SW-234-6-157 ML20065N9511990-11-30030 November 1990 TIP Incident Dose Calculations ML20046A4491989-12-19019 December 1989 BSEP SE Sys Instrumentation & Control Setpoint Review. ML20129F4831985-05-0909 May 1985 Package of Compilations of Results of Operator Licensing & Requalification Exams ML20009G1221981-05-11011 May 1981 Telcon W/D McGuire Re Temporary Loss of Power to Security Sys on 810511.Power Loss Caused Inability to Monitor Security Alarms in CAS & Secondary Alarm Station.Sys Back on Line & Fully Operational.Written Rept Submitted by 810815 1999-06-16 Category:OPERATIONS SUPPORT-CALCULATIONS MONTHYEARML20196E8931999-06-16016 June 1999
[Table view]Rev 0 to 2B11-0001, Core Shroud B214R1 Structural Evaluation ML20202D9051998-01-21021 January 1998 Rev 0 to 0VA-0114, Control Bldg Transient Temp Analysis During Spring Conditions ML20216J1151997-09-0303 September 1997 Rev 5 to CP&L-CED-M-01, Mlsb Analysis CR Dose Analysis to Support Power Uprate ML20137Y6491997-03-26026 March 1997 Rev 3 to MSLB Analysis CR Dose Analysis to Support Power Uprate ML20136E8021997-01-24024 January 1997 Rev 0 to Control Room & Offsite Doses Due to Control Rod Drop Accident ML20133F3741996-09-18018 September 1996 Rev 1 to Brunswick Units 1 & 2 Hydro Test P-T Curve Development ML20202D8941996-09-12012 September 1996 Rev 0 to 0VA-0104, Control Bldg Transient Temp Analysis ML20217N0901995-04-0505 April 1995 Rev 0 to CPL-36Q-303, Comparison of ASME Code App a Versus App G Methodology ML20078Q2201994-12-15015 December 1994 Rev 1 to Caculation CPL-34Q-301, Weld Overlay Repair Design for BSEP Unit 1 Feedwater Safe-End Welds ML20046A3291992-12-31031 December 1992 Analysis for Bsep,Units 1 & 2 SWS for Analysis for TS 3.7.1.2 Proposed Change. ML20046A3401992-08-11011 August 1992 Bsep,Unit 1 SWS Hydraulic Analysis, Reflecting Installation of Upgraded NSW Pump Motor Thrust Bearings ML20046A3351992-08-11011 August 1992 Bsep,Unit 2 SWS Operating Limits, Reflecting Upgraded NSW Pump Motor Thrust Bearings ML20046A3261992-03-27027 March 1992 Bsep,Units 1 & 2 SW Single Failure Analysis, Reflecting Installation of Plant Mods ML20067A9871991-01-21021 January 1991 Rev 0 to Flow Evaluation - RHR Valve to Recirculation Tee ML20067A9771991-01-17017 January 1991 Rev 0 to Summary of Stress for Plan Evaluation ML20067A9701991-01-16016 January 1991 Rev 0 to Stress Analysis of RHR Valve to Recirculation Tee ML20066C5371990-12-15015 December 1990 Rev 0 to Through Wall Leak Evaluation for Line 2-SW-234-6-157 ML20065N9511990-11-30030 November 1990 TIP Incident Dose Calculations ML20046A4491989-12-19019 December 1989 BSEP SE Sys Instrumentation & Control Setpoint Review. 1999-06-16 |
Text