Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20196E893 | 16 June 1999 | Rev 0 to 2B11-0001, Core Shroud B214R1 Structural Evaluation | Stress corrosion cracking EVT-1 Operability Assessment Power Uprate |
ML20202D905 | 21 January 1998 | Rev 0 to 0VA-0114, Control Bldg Transient Temp Analysis During Spring Conditions | B.5.b Mitigating Strategies |
ML20216J115 | 3 September 1997 | Rev 5 to CP&L-CED-M-01, Mlsb Analysis CR Dose Analysis to Support Power Uprate | Power Uprate |
ML20137Y649 | 26 March 1997 | Rev 3 to MSLB Analysis CR Dose Analysis to Support Power Uprate | Operability Assessment Power Uprate |
ML20136E802 | 24 January 1997 | Rev 0 to Control Room & Offsite Doses Due to Control Rod Drop Accident | Power Uprate |
ML20133F374 | 18 September 1996 | Rev 1 to Brunswick Units 1 & 2 Hydro Test P-T Curve Development | Hydrostatic |
ML20202D894 | 12 September 1996 | Rev 0 to 0VA-0104, Control Bldg Transient Temp Analysis | |
ML20217N090 | 5 April 1995 | Rev 0 to CPL-36Q-303, Comparison of ASME Code App a Versus App G Methodology | |
ML20078Q220 | 15 December 1994 | Rev 1 to Caculation CPL-34Q-301, Weld Overlay Repair Design for BSEP Unit 1 Feedwater Safe-End Welds | Safe Shutdown Packing leak High Radiation Area Non-Destructive Examination Weld Overlay Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Stress corrosion cracking Code Reconciliation Earthquake Liquid penetrant Fire Protection Program Backfit Unidentified leakage |
ML20046A329 | 31 December 1992 | Analysis for Bsep,Units 1 & 2 SWS for Analysis for TS 3.7.1.2 Proposed Change. | |
ML20046A340 | 11 August 1992 | Bsep,Unit 1 SWS Hydraulic Analysis, Reflecting Installation of Upgraded NSW Pump Motor Thrust Bearings | |
ML20046A335 | 11 August 1992 | Bsep,Unit 2 SWS Operating Limits, Reflecting Upgraded NSW Pump Motor Thrust Bearings | |
ML20046A326 | 27 March 1992 | Bsep,Units 1 & 2 SW Single Failure Analysis, Reflecting Installation of Plant Mods | |
ML20067A987 | 21 January 1991 | Rev 0 to Flow Evaluation - RHR Valve to Recirculation Tee | |
ML20067A977 | 17 January 1991 | Rev 0 to Summary of Stress for Plan Evaluation | |
ML20067A970 | 16 January 1991 | Rev 0 to Stress Analysis of RHR Valve to Recirculation Tee | |
ML20066C537 | 15 December 1990 | Rev 0 to Through Wall Leak Evaluation for Line 2-SW-234-6-157 | Through Wall Leak |
ML20065N951 | 30 November 1990 | TIP Incident Dose Calculations | |
ML20046A449 | 19 December 1989 | BSEP SE Sys Instrumentation & Control Setpoint Review. |