Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20196E89316 June 1999Rev 0 to 2B11-0001, Core Shroud B214R1 Structural EvaluationStress corrosion cracking
EVT-1
Operability Assessment
Power Uprate
ML20202D90521 January 1998Rev 0 to 0VA-0114, Control Bldg Transient Temp Analysis During Spring ConditionsB.5.b Mitigating Strategies
ML20216J1153 September 1997Rev 5 to CP&L-CED-M-01, Mlsb Analysis CR Dose Analysis to Support Power UpratePower Uprate
ML20137Y64926 March 1997Rev 3 to MSLB Analysis CR Dose Analysis to Support Power UprateOperability Assessment
Power Uprate
ML20136E80224 January 1997Rev 0 to Control Room & Offsite Doses Due to Control Rod Drop AccidentPower Uprate
ML20133F37418 September 1996Rev 1 to Brunswick Units 1 & 2 Hydro Test P-T Curve DevelopmentHydrostatic
ML20202D89412 September 1996Rev 0 to 0VA-0104, Control Bldg Transient Temp Analysis
ML20217N0905 April 1995Rev 0 to CPL-36Q-303, Comparison of ASME Code App a Versus App G Methodology
ML20078Q22015 December 1994Rev 1 to Caculation CPL-34Q-301, Weld Overlay Repair Design for BSEP Unit 1 Feedwater Safe-End WeldsSafe Shutdown
Packing leak
High Radiation Area
Non-Destructive Examination
Weld Overlay
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Stress corrosion cracking
Code Reconciliation
Earthquake
Liquid penetrant
Fire Protection Program
Backfit
Unidentified leakage
ML20046A32931 December 1992Analysis for Bsep,Units 1 & 2 SWS for Analysis for TS 3.7.1.2 Proposed Change.
ML20046A34011 August 1992Bsep,Unit 1 SWS Hydraulic Analysis, Reflecting Installation of Upgraded NSW Pump Motor Thrust Bearings
ML20046A33511 August 1992Bsep,Unit 2 SWS Operating Limits, Reflecting Upgraded NSW Pump Motor Thrust Bearings
ML20046A32627 March 1992Bsep,Units 1 & 2 SW Single Failure Analysis, Reflecting Installation of Plant Mods
ML20067A98721 January 1991Rev 0 to Flow Evaluation - RHR Valve to Recirculation Tee
ML20067A97717 January 1991Rev 0 to Summary of Stress for Plan Evaluation
ML20067A97016 January 1991Rev 0 to Stress Analysis of RHR Valve to Recirculation Tee
ML20066C53715 December 1990Rev 0 to Through Wall Leak Evaluation for Line 2-SW-234-6-157Through Wall Leak
ML20065N95130 November 1990TIP Incident Dose Calculations
ML20046A44919 December 1989BSEP SE Sys Instrumentation & Control Setpoint Review.