Issuance of Order for Interim Compensatory Security Measures
ML020510226
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/25/2002
From: Collins S
Office of Nuclear Reactor Regulation
To: Hinnant C
Progress Energy Co
Hansen A, NRR/DLPM, 415-1390
References
IN-98-035, TAC MB4172
Download: ML020510226 (5)


Text

SAFEGUARDS INFORMATION February 25, 2002 C. S. Hinnant Senior Vice President and Chief Nuclear Officer H. B. Robinson Steam Electric Plant, Unit No. 2 Progress Energy, Inc.

410 South Wilmington Street Raleigh, NC 27601

SUBJECT:

ISSUANCE OF ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES FOR - H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2

Dear Mr. Hinnant:

The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Order that modifies the current operating license for your facility to require compliance with the specified interim safeguards and security compensatory measures. The Order applies to all Addressees listed in to the enclosed Order. These interim compensatory measures are listed in (contains Safeguards Information) to the enclosed Order. The Commission recognizes that you have voluntarily and responsibly implemented additional security measures following the events of September 11, 2001, but, in light of the continuing generalized high-level threat environment, the Commission concludes that the security measures should be embodied in an Order, consistent with the established regulatory framework. The Commission has determined that the generalized high-level threat environment requires that the enclosed Order be effective immediately.

These actions are interim and the basis for the Order is the need to take prudent actions to address security requirements in the present generalized high-level threat environment. This Order does not obviate the need for licensees to continue to meet the objectives of Security Level III described in NRC Information Notice 98-35, and maintain the effectiveness of existing security measures taken in response to the events of September 11, 2001. The requirements will remain in effect pending notification from the Commission that a significant change in the threat environment has occurred, or until the Commission determines that other changes are needed following a more comprehensive re-evaluation of current safeguards and security programs.

The enclosed Order calls for responses and actions within specified time frames. Please contact your Licensing Project Manager to facilitate resolution of any issues related to compliance with the requirements in the enclosed Order, or if you have any other questions.

NOTICE: Attachment 2 to the Order (Interim Compensatory Measures) contains "Safeguards Information." Upon separation of Attachment 2 to the Order, this letter, the enclosed Order, and Attachment 1 to the Order (Address List) are "DECONTROLLED."

SAFEGUARDS INFORMATION

C. Hinnant The enclosed Order has been forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA/

Samuel J. Collins, Director Office of Nuclear Reactor Regulation Docket No. 50-261

Enclosures:

1. Order
2. Order Attachment 1 - Address List
3. Order Attachment 2 - Interim Compensatory Measures for High Threat Environment (Safeguards Information) cc w/enclosures 1 and 2 only: See next page

H. B. Robinson Steam Electric Plant, Unit No. 2 cc:

Mr. William D. Johnson Mr. Mel Fry, Director Vice President and Corporate Secretary N.C. Department of Environment Carolina Power & Light Company and Natural Resources Post Office Box 1551 Division of Radiation Protection Raleigh, North Carolina 27602 3825 Barrett Dr.

Raleigh, North Carolina 27609-7721 Ms. Karen E. Long Assistant Attorney General Mr. Robert P. Gruber State of North Carolina Executive Director Post Office Box 629 Public Staff - NCUC Raleigh, North Carolina 27602 Raleigh, North Carolina 27626-0520 U.S. Nuclear Regulatory Commission Mr. Virgil R. Autry, Director Resident Inspector's Office South Carolina Department of Health H. B. Robinson Steam Electric Plant Bureau of Land & Waste Management 2112 Old Camden Road 2600 Bull Street Hartsville, South Carolina 29550 Columbia, South Carolina 29201 Mr. T. P. Cleary Mr. Terry C. Morton Plant General Manager Manager Carolina Power & Light Company Performance Evaluation and H. B. Robinson Steam Electric Plant, Unit Regulatory Affairs CPB 7 No. 2 Carolina Power & Light Company 3581 West Entrance Road Post Office Box 1551 Hartsville, SC 29550 Raleigh, North Carolina 27602-1551 Mr. T. D. Walt Mr. John H. ONeill, Jr.

Director of Site Operations Shaw, Pittman, Potts & Trowbridge Carolina Power & Light Company 2300 N Street, NW.

H. B. Robinson Steam Electric Plant, Unit Washington, DC 20037-1128 No. 2 3581 West Entrance Road Mr. B. L. Fletcher III Hartsville, South Carolina 29550 Manager - Regulatory Affairs Carolina Power & Light Company Public Service Commission H. B. Robinson Steam Electric Plant, State of South Carolina Unit No. 2 Post Office Drawer 11649 3581 West Entrance Road Columbia, South Carolina 29211 Hartsville, South Carolina 29550-0790 Mr. H. K. Chernoff Supervisor, Licensing/Regulatory Programs Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550

C. Hinnant February 25, 2002 The enclosed Order has been forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA/

Samuel J. Collins, Director Office of Nuclear Reactor Regulation Docket No. 50-261

Enclosures:

1. Order
2. Order Attachment 1 - Address List
3. Order Attachment 2 - Interim Compensatory Measures for High Threat Environment (Safeguards Information) cc w/enclosures 1 and 2 only: See next page DISTRIBUTION (with enclosures 1 and 2 only):

PUBLIC SCollins/JJohnson VDricks JShea OGC ACRS SECY GHill (2 copies per docket)

PD2-2 AHansen EDunnington HBerkow RCorreia RidsRgn2MailCenter Accession No. ML020490039 (Package)

Accession No. ML020 (Cover Letter)

Accession No. ML020510635 (Order)

Accession No. ML020520654 (Order Attachment 1 - Address List)

OFFICE DLPM/PM DLPM//LA DLPM/SC DIPM/D NAME REnnis BClayton JClifford BBoger DATE 2/21/02 2/21/02 2/21/02 2/22/02 OFFICE OGC DLPM/D NRR/ADPT NRR/D NAME LChandler JZwolinski BSheron N/A SCollins DATE 2/22/02 2/22/02 2/25/02 OFFICIAL RECORD COPY

CNO Heading The enclosed Order has been forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA/

Samuel J. Collins, Director Office of Nuclear Reactor Regulation Docket No(s).

Enclosures:

1. Order
2. Order Attachment 1 - Address List
3. Order Attachment 2 - Interim Compensatory Measures for High Threat Environment (Safeguards Information) cc w/enclosures 1 and 2 only: See next page DISTRIBUTION (with enclosures 1 and 2 only):

PUBLIC SCollins/JJohnson VDricks JShea OGC ACRS SECY GHill (2 copies per docket)

PD Reading Project Director Section Chief Project Manager Licensing Assistant Region Contact Accession No. ML020520754 (Package)

Accession No. ML020510637 (Cover Letter)

Accession No. ML020510635 (Order)

Accession No. ML020520654 (Order Attachment 1 - Address List)

OFFICE DLPM/PM DLPM//LA DLPM/SC DIPM/D NAME REnnis BClayton JClifford BBoger DATE 2/21/02 2/21/02 2/21/02 2/22/02 OFFICE OGC DLPM/D NRR/ADPT NRR/D NAME LChandler JZwolinski BSheron N/A SCollins DATE 2/22/02 2/22/02 2/25/02 OFFICIAL RECORD COPY