Reply to Response to Order for Interim Safeguards and Security Compensatory Measures
ML021290397
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/02/2002
From: Zwolinski J
NRC/NRR/DLPM
To: Moyer J
Carolina Power & Light Co
Subbaratnam R, NRR/DLPM, 415-1478
References
TAC MB4172
Download: ML021290397 (6)


Text

May 2, 2002 Mr. J. W. Moyer, Vice President Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 3581 West Entrance Road Hartsville, South Carolina 29550

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - REPLY TO RESPONSE TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES (TAC NO. MB4172)

Dear Mr. Moyer:

On February 25, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued an Order modifying the operating license for the H. B. Robinson Steam Electric Plant, Unit 2 (HBRSEP) to require compliance with the specified interim safeguards and security compensatory measures. The interim compensatory measures (ICMs) were listed in Attachment 2 to the Order. When issuing the Order, the Commission recognized that you have voluntarily and responsibly implemented additional security measures following the events of September 11, 2001, but in light of the continuing generalized high-level threat environment, the Commission concluded that the security measures should be embodied in an Order consistent with the established regulatory framework.

The Order required responses and actions within specified timeframes.Section III.A of the Order required licensees to immediately start implementation of the requirements listed in to the Order and to complete implementation no later than August 31, 2002.

Section III.B of the Order required licensees to notify the Commission: (1) if they are unable to comply with the requirements described in Attachment 2, (2) if compliance with any of the requirements is unnecessary in their specific circumstances, (3) if implementation of any of the requirements would cause the licensee to be in violation of the provisions of any Commission regulation or the facility license, or (4) if implementation of any of the requirements described in would adversely impact the safe operation of the facility.Section III.C.1 of the Order required licensees to submit to the Commission, within 20 days of the date of the Order, a schedule for achieving compliance with each requirement described in Attachment 2 to the Order.Section IV of the Order noted that in accordance with 10 C.F.R. § 2.202, the licensee must submit an answer to the Order and may request a hearing on the Order within 20 days of the date of the Order and, where good cause is shown, consideration would be given to extend the time to request a hearing.

In a letter dated March 15, 2002 (Carolina Power & Light Company (CP&L) letter no. RNP-RA/02-0030), you submitted a response to the Order for the HBRSEP. You did not request either an extension of time to respond to the ICMs or an extension of time in which to request a hearing.

The NRC staff has reviewed your response and finds that you have satisfied the 20-day reporting requirements of the Order.

The NRC will determine the effectiveness of your implementation of the ICMs through on-site inspections. I would like to remind you that, pursuant to Section III.C.2 of the Order, you are to report to the Commission when you have achieved full compliance with the requirements described in Attachment 2 to the Order.

Please contact Ram Subbaratnam at (301) 415-1478 if you have any other questions on these issues.

Sincerely,

/RA/

John A. Zwolinski, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-261 cc: See next page The NRC staff has reviewed your response and finds that you have satisfied the 20-day reporting requirements of the Order.

The NRC will determine the effectiveness of your implementation of the ICMs through on-site inspections. I would like to remind you that, pursuant to Section III.C.2 of the Order, you are to report to the Commission when you have achieved full compliance with the requirements described in Attachment 2 to the Order.

Please contact Ram Subbaratnam at (301) 415-1478 if you have any other questions on these issues.

Sincerely,

/RA/

John A. Zwolinski, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-261 cc: See next page DISTRIBUTION:

PUBLIC GHill (2)

RPalla SCollins/JJohnson PDII-2 R/F JBelanger VDricks LMarsh RCrlenjak JShea GTracy VOrdaz BSheron WBorchardt BBoger OGC RAlbert RSubbaratnam ACRS/ACNW RSullivan EDunnington SECY TKoshy RMartin LReyes, RII BBonser, RII

  • See Previous concurrence Accession No. ML021290397 OFFICE DLPM/PM*

EP*

DSSA*

DIPM*

NSIR*

OGC*NLO NAME RMartin C. Gibson M.Rubin W.Dean A. Madison J. Goldberg DATE 4/30/02 4/25/02 4/29/02 4/29/02 4/25/02 4/23/02 OFFICE PDII-2/PM*

PDII-2/LA PDII-2/SC(A)

PDII/D*

DLPM/D*

NAME RSubbaratnam EDunnington TKoshy HBerkow JZwolinski DATE 4/24/02 5/02/02 4/24/02 4/30/02 4/22/02 OFFICIAL RECORD COPY

Mr. J. W. Moyer H. B. Robinson Steam Electric Carolina Power & Light Company Plant, Unit No. 2 cc:

Mr. William D. Johnson Mr. Mel Fry, Director Vice President and Corporate Secretary N.C. Department of Environment Carolina Power & Light Company and Natural Resources Post Office Box 1551 Division of Radiation Protection Raleigh, North Carolina 27602 3825 Barrett Dr.

Raleigh, North Carolina 27609-7721 Ms. Karen E. Long Assistant Attorney General Mr. Robert P. Gruber State of North Carolina Executive Director Post Office Box 629 Public Staff - NCUC Raleigh, North Carolina 27602 Post Office Box 29520 Raleigh, North Carolina 27626-0520 U.S. Nuclear Regulatory Commission Resident Inspectors Office Mr. Virgil R. Autry, Director H. B. Robinson Steam Electric Plant South Carolina Department of Health 2112 Old Camden Road Bureau of Land & Waste Management Hartsville, South Carolina 29550 Division of Radioactive Waste Management 2600 Bull Street Mr. T. P. Cleary Columbia, South Carolina 29201 Plant General Manager Carolina Power & Light Company Mr. Terry C. Morton H. B. Robinson Steam Electric Plant, Unit No. 2 Manager 3581 West Entrance Road Performance Evaluation and Hartsville, SC 29550 Regulatory Affairs CPB 7 Carolina Power & Light Company Mr. T. D. Walt Post Office Box 1551 Director of Site Operations Raleigh, North Carolina 27602-1551 Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2 Mr. John H. ONeill, Jr.

3581 West Entrance Road Shaw, Pittman, Potts & Trowbridge Hartsville, South Carolina 29550 2300 N Street, NW.

Washington, DC 20037-1128 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 Mr. B. L. Fletcher III Manager - Regulatory Affairs Mr. H. K. Chernoff Carolina Power & Light Company Supervisor, Licensing/Regulatory Programs H. B. Robinson Steam Electric Plant, Carolina Power & Light Company Unit No. 2 H. B. Robinson Steam Electric Plant, 3581 West Entrance Road Unit No. 2 Hartsville, South Carolina 29550-0790 3581 West Entrance Road Hartsville, South Carolina 29550