ML030070180

From kanterella
Revision as of 05:07, 26 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Summary Report - Ncrs Initiated Since 09/10/2002
ML030070180
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/11/2002
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0059
Download: ML030070180 (1)


Text

'-"3

%.Fi

,"-6--form atl o n Only.

Crystal River Nuclear Facility F Summary Report - NCRs Initiated Since 9110/02 Sorted by Origination Date. AR Number, and Priority Selection Criteria: AR Type = NCR and AR Status not = Canceled with Attribute of 1A POT'L OPER/REPORT AR Subject Orig. Date Status Date Priority Potential Oper/Report NCR Owner AR# Originator KEMPS RIDLEY SEA TURTLE RESCUED 20020910 20020910 Y CR3 UNIT 00071078 RONALD TYRIE FROM INTAKE ENALUATORS LIVE TURTLE TAKE NUMBER 75 FOR THE CURRENT REPORTING PERIOD . A LIVE KEMPS RIDLEY SEA TURTLE WAS RESCUED FROM THE INTA KE BAR 13 INCHE S IN DIAMETER AND HAS NO APPARENT INJURIES. THE TURTLE IS CURRENTLY UNDER RACKS AT CR-3. THE TURTLE IS APPROXIMATELY TRANSPORTED TO THE M ARINE SCIENCE CENTER IN OBSERVATION BY MARICULTURE CENTER STAFF AND WILL EITHER BE RELEASED IF HEALTHY OR TO THAT GOVERMENT AGENCY CLEARWATER IF ILL. THIS LIVE TAKE IS IN EXCESS OF THE NFMS BIOLOGICAL OPINION LIMIT AND WILL BE REPORTED STA FF. NOTIFICATION OF THIS REPORTABLE STATUS WAS RECEIVED 9/ 10/02 AT 1328.

BY THE MARICULTURE N CR3 UNIT THERESE BURNETT NCRS WITH A QUESTIONALBLE OPER/REP 20020910 20020910 N CR3AUNAT 00071099 EVALUATORS AND NO OPS REVIEW NCRS MISSIN G OPERATIONS REVIEW IT WAS NOTED THAT 13 NCRS WERE MISSIN G PROPER FOLLOWING A REVIEW OF A WEB REPORT WHICH LISTS OF OPERABILITY/ REPORTABILITY DETERMINATION. AFTER REVIEWING THE 13 NCRS, 5 WERE DETERMINED TO DOCUMENTATION OF OPERATIONS REVIEW DOCUMENTED). THE REMAINING 8 WERE REVIEWED BE HISTORICAL, (MIGRATED FROM OLD PC DA TABASE AND OPERATIONS REVIEW WAS APPROPRIATELY 9, 2002 AND ALL WERE DISPOSITIONED TO HAVE NO OPERABILITY AND/OR REPORTABILITY CONCERNS.

BY LICENSING AND OPERATIONS ON SEPTEMBER OF THE OPERATIONS REVIEW.

HOWEVER IT IS RECOMMENDED THAT THESE 8 NCRS BE CORRECTED WITH APPROPRIAT E DOCUMENTATION RAWLS RC-004-TI4-1 'A' T HOT WIDE RANGE 20020910 20020910 Y CR3 UNIT 00071110 RICKY EVALUATORS IS READING HIGH RC-004-TI4-1 'A' T HOT WIDE RANGE ON THE MCB IS READING HIG H (620 DEGREES VS 604 DEGREES) IN COMPARISON WITH THE REMA INING INITI AL INVESTIGATION REVEALS IF THE DEVICE WAS CALIBRATED, IT W OULD BE OUTSIDE DEVICES COMING OFF OF THE TEMPERATURE ELEMENT.

OF IT AS FOUND DATA OF 15 DEGREES.

20020910 N CR3 UNII SP-163A WASTE GAS H2/02 (M) NOT 20020910 20020910 20020910 N CAR3 UNIAT 00071027 WILLIAM COUNTS EVALUATORS COMPLETED AS SCHEDULED.

GAS ANALYZER PROGRAMMABLE CONTROLLE R WERE KNOWN PERFORMANCE OF SP-163A WILL NOT BE COMPLETED AS SCHEDULED. PROBLEMS WITH THE WASTE TO EXIST PRIOR TO THE SCHEDULED SURVEILLANCE, BUT WERE NOT EXPECTED TO IMPACT ODCM REQUIRED SECTIONS 4.2 AND 4.3. THE INABILITY TO WAS NOT UNDERSTOOD PRIOR. SECTIONS 4.4 AND 4.5 WERE NOT EXPECTED TO PASS, ISOLATE THE SAMPLE POINTS VIA THE KEYPAD AND WERE TO BE FURT HER EVALUATED VIA EXISTING NCR 62555.

i-'age ; or ;

Run Date/Time: 9/11/02 3 26-09 AM Page 2 Of 2 Report Name: RpLAT.NCRslnitLastlaCR3, Created from SrceTbl_ATNCRslnitLast7a