MONTHYEARBVY 14-075, Relief Request ISI-06 Inservice Inspection Limited Examinations for the Fourth Ten-Year Interval - Supplement 12014-10-23023 October 2014 Relief Request ISI-06 Inservice Inspection Limited Examinations for the Fourth Ten-Year Interval - Supplement 1 BVY 14-063, Relief Request ISI-06 Inservice Inspection Limited Examinations for the Fourth Ten-Year Interval Vermont Yankee Nuclear Power Station2014-08-19019 August 2014 Relief Request ISI-06 Inservice Inspection Limited Examinations for the Fourth Ten-Year Interval Vermont Yankee Nuclear Power Station BVY 13-078, Submittal of Snubber Program for the Fifth Ten-Year Inservice Inspection Interval2013-08-28028 August 2013 Submittal of Snubber Program for the Fifth Ten-Year Inservice Inspection Interval BVY 13-073, Response to Request for Additional Information Regarding Relief Request ISI-02 - Application of Code Case N-7162013-08-15015 August 2013 Response to Request for Additional Information Regarding Relief Request ISI-02 - Application of Code Case N-716 BVY 13-071, Supplemental Information Re Inservice Inspection Program for Fifth Ten-year Interval & Relief Request ISI-052013-08-0707 August 2013 Supplemental Information Re Inservice Inspection Program for Fifth Ten-year Interval & Relief Request ISI-05 BVY 13-018, Inservice Inspection Program for the Fifth Ten-Year Interval2013-03-27027 March 2013 Inservice Inspection Program for the Fifth Ten-Year Interval BVY 13-008, Inservice Testing Program Plan for the Fifth Ten-Year Interval2013-02-0101 February 2013 Inservice Testing Program Plan for the Fifth Ten-Year Interval BVY 12-086, Inservice Inspection Program Relief Request ISI-PT-02, (Fourth ISI Program Interval)2012-12-21021 December 2012 Inservice Inspection Program Relief Request ISI-PT-02, (Fourth ISI Program Interval) BVY 12-010, Vermont, Submittal of Inservice Inspection, Repair and Replacement for 20112012-02-0101 February 2012 Vermont, Submittal of Inservice Inspection, Repair and Replacement for 2011 BVY 10-049, Summary Report - Inservice Inspection and Repair and Replacement2010-08-23023 August 2010 Summary Report - Inservice Inspection and Repair and Replacement BVY 09-066, 10CFR50.55a(a)(3)(i) Inservice Inspection Program Request VY-ISI-0142009-12-14014 December 2009 10CFR50.55a(a)(3)(i) Inservice Inspection Program Request VY-ISI-014 CNRO-2009-00003, Letter from Entergy Response to Request for Additional Information Regarding Request ISI-2008-1 Use of Later ASME Section Xl Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non Destructive Examination Activ2009-03-17017 March 2009 Letter from Entergy Response to Request for Additional Information Regarding Request ISI-2008-1 Use of Later ASME Section Xl Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non Destructive Examination Activities BVY 09-011, 2008 Summary Report Inservice Inspection and Repair or Replacement2009-02-0909 February 2009 2008 Summary Report Inservice Inspection and Repair or Replacement BVY 07-071, Re-Submittal of Relief Request No. ISI-PT-01, Alternate Testing for Buried Piping Components, Fourth Inservice Inspection (ISI) Interval2007-10-18018 October 2007 Re-Submittal of Relief Request No. ISI-PT-01, Alternate Testing for Buried Piping Components, Fourth Inservice Inspection (ISI) Interval BVY 07-061, Summary Reports for Inservice Inspection and Repairs or Replacements2007-09-0404 September 2007 Summary Reports for Inservice Inspection and Repairs or Replacements BVY 06-072, Response to Request for Additional Information Regarding Relief Request ISI-013, Fourth 10-Year ISI Interval2006-08-25025 August 2006 Response to Request for Additional Information Regarding Relief Request ISI-013, Fourth 10-Year ISI Interval BVY 06-029, Relief Request ISI-013, Fourth ISI Interval2006-03-27027 March 2006 Relief Request ISI-013, Fourth ISI Interval BVY 06-013, Summary Reports for In-Service Inspection and Repairs or Replacements2006-02-0808 February 2006 Summary Reports for In-Service Inspection and Repairs or Replacements ML0706803582006-01-25025 January 2006 4.14.1: Inservice Inspection (ISI) Program, Evaluation of Aging Management Programs, 01/25/2006 ML0706703432006-01-25025 January 2006 Containment Inservice Inspection (CII) Program, Evaluation of Aging Management Programs, 01/25/2006 BVY 04-116, Summary Reports for In-service Inspection and Repairs or Replacements2004-10-20020 October 2004 Summary Reports for In-service Inspection and Repairs or Replacements ML0414602802004-05-17017 May 2004 Supplement to Relief Request ISI-06 BVY 03-106, Revision to Vermont Yankee'S 2002 Summary Report for In-service Inspection (NIS-1 Report)2003-11-18018 November 2003 Revision to Vermont Yankee'S 2002 Summary Report for In-service Inspection (NIS-1 Report) ML0328104402003-10-0101 October 2003 Supplement 2 to Fourth-Interval Inservice Inspection (ISI) Program Plan, Submittal of Relief Request RI-01 ML0327403892003-09-25025 September 2003 Supplement to Fourth Interval Inservice Inspection (ISI) Program Plan, Submittal of Relief Request ISI-06 ML0316309692003-06-0505 June 2003 Supplement to Fourth-Interval Inservice Testing (IST) Program Plan ML0309903502003-04-0101 April 2003 Fourth-Interval Inservice Inspection Program Plan, Fourth-Interval Inservice Inspection Pressure Test Program & Request for Approval of ISI Relief Requests, Attachment 2, Appendix C - Attachment 3, Appendix a, Table 1 ML0309903282003-04-0101 April 2003 Fourth-Interval Inservice Inspection Program Plan, Fourth-Interval Inservice Inspection Pressure Test Program & Request for Approval of ISI Relief Requests, Attachments 1 and 2, Appendix B ML0305805442003-01-22022 January 2003 Fourth-Interval Inservice Testing (IST) Program Plan and Request for Approval of IST Relief Requests, Tables 1 - 21 ML0305805372003-01-22022 January 2003 Fourth-Interval Inservice Testing (IST) Program Plan and Request for Approval of IST Relief Requests, Attachments 1 and 2 ML0706802592001-05-15015 May 2001 Report for IWE Inspections Performed for RF022, 05/15/2001 ML0706704081999-11-28028 November 1999 Torus General Visual Report, 10/28/1999 (55 Pages) 2014-08-19
[Table view] Category:Letter
MONTHYEARBVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 IR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report BVY 23-008, Pre-Notice of Disbursement from Decommissioning Trust2023-04-0606 April 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-03-29029 March 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-006, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 20222023-03-29029 March 2023 Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2022 BVY 23-005, Nuclear Onsite Property Damage Insurance2023-03-13013 March 2023 Nuclear Onsite Property Damage Insurance BVY 23-004, Pre-Notice of Disbursement from Decommissioning Trust2023-03-0202 March 2023 Pre-Notice of Disbursement from Decommissioning Trust ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000271/20220022023-02-22022 February 2023 Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station - NRC Inspection Report No. 05000271/2022002 BVY 23-003, Pre-Notice of Disbursement from Decommissioning Trust2023-01-31031 January 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-030, Documentary Evidence of Performance Bond2022-12-30030 December 2022 Documentary Evidence of Performance Bond ML22347A2792022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 IR 05000271/20224012022-12-15015 December 2022 NRC Inspection Report No. 05000271/2022401, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont (Letter Only) BVY 22-028, Re Proof of Financial Protection2022-11-28028 November 2022 Re Proof of Financial Protection BVY 22-027, Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station2022-11-11011 November 2022 Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station BVY 22-026, Pre-Notice of Disbursement from Decommissioning Trust2022-10-31031 October 2022 Pre-Notice of Disbursement from Decommissioning Trust ML22273A1492022-10-0404 October 2022 Review of Decommissioning Funding Status 2022 BVY 22-025, Pre-Notice of Disbursement from Decommissioning Trust2022-10-0404 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-023, Pre-Notice of Disbursement from Decommissioning Trust2022-09-0101 September 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-022, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-22022 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-16016 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-020, Pre-Notice of Disbursement from Decommissioning Trust2022-08-0101 August 2022 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20220012022-08-0101 August 2022 NRC Inspection Report No. 05000271/2022001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont BVY 22-019, Pre-Notice of Disbursement from Decommissioning Trust2022-07-0606 July 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-013, Notification of Revised Decommissioning Cost Estimate2022-06-17017 June 2022 Notification of Revised Decommissioning Cost Estimate 2024-01-04
[Table view] |
Text
Entergy Nuclear Vermont Yankee, LLC Entergy Entergy Nuclear Operations, Inc.
Old FerryVTRoad
~ Brattleboro,
~~~~~~~~~~~~~~~~~~~185 05302-0500 June 5, 2003 BVY 03-54 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)
Supplement to Fourth-Interval Inservice Testing!(IST) Pro!ram Plan On January 22, 2003, Vermont Yankee Nuclear Power Station (VY) submitted to the NRC a revised Inservice Testing (IST) Program as required by IOCFR50.55a(f)(4)(ii).
On May 19, 2003, a conference call was held between the NRC and VY regarding the above Program and Relief Request RR-POI "Service Water Pump Testing." Based upon this conversation, VY has enhanced the justification of Relief Request RR-PO] by including the details of our Service Water Pump oil analysis program/process. This justification is documented in section 6 "Proposed Alternative and Basis for Use" of the attached Relief Request.
During the same confereice call, a discussion was also held regarding the difficulties associated with testing the SW Pumps during the winter months. Section 4 "Impracticality of Compliance" of the attached Relief Request has been modified to capture the difficulties associated with winter flow rate testing.
The revised Relief Request RR-POI is attached in total, with a revision bar indicating the location of the above discussed changes relative to that submitted on January 22.
If you have any questiols on this transmittal, please contact Mr. Thomas B. Silko at (802) 258-4146.
Sincerely,
//Jam s M. eVincentis Manager, Licensiig Attachment cc: USNRC Region I Administrator USNRC Resident Inspector - VY USNRC Project Manager - VY Vermont Department of Public Service oc4l
SUMMARY
OF VERMONT YANKEE COMMITMENTS BVY NO.: 0 3- 5Y The following table identifies commitments made in this document by Vermont Yankee. Any other actions discussed in the submittal represent intended or planned actions by Vermont Yankee. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Licensing Manager of any questions regarding this document or any associated commitments.
COMMITMENT COMMITTED DATE l _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _l__ _ _ _ _ _ _ _ _ _ O R "OUTA G E" osje I $,-/d,1 F ______________________________________________________________________________
Docket No. 50-271 BVY 03-54 Attachment Vermont Yankee Nuclear Power Station Supplement to Fourth-Interval Inservice Testing (IST) Program Plan Revised Relief Request RR-PO]
Based on the above, significant redesign and modification of the station Service Water System would be required to obtain direct measurement of pump flow. Such redesign and modification would be costly and burdensome to Vermont Yankee.
The Service Water system has a test flow loop, which is connected to the Fire Protection System header. This permits testing individual pumps, one at a time. However, this test loop does not provide Service Water flow to heat loads. Rather, the flow is discharged to the intake structure. The Service Water cross-tie valves must be shut, one Service Water subsystem is aligned to supply cooling water, and the other Service Water subsystem is aligned to the test loop. In the subsystem aligned to the test loop, one pump is stopped and the other is the pump under test.
Therefore, to test one pump, it is necessary to provide all Service Water cooling loads with one subsystem, comprising two Service Water pumps. During approximately 7 months of the year, Connecticut River water temperatures preclude this method when the plant is operating, due to elevated heat sink temperatures and heat removal capacity. Therefore, this test loop cannot be regularly used for quarterly testing each quarter.
Testing during the remaining 5 months (approximately November through March) is impractical due to equipmelit concerns, personnel safety, and scheduling difficulty. Since the service water pump test requires taking each service water subsystem out of service, the test must be inserted into the 13-week schedule at a time that does not have an adverse impact on other scheduled work.
The process of realigning the service water system, isolating one subsystem, testing the off-line subsystem, unisolatinig the tested subsystem, realigning the service water system, isolating the other subsystem, testing the second subsystem, and recovery to the normal operating configuration takes a full shift in favorable weather. The test loop and instrumentation taps are outdoors on the service water pump room roof. If the weather is below freezing, the test cannot be performed due to instrumentation icing and the personnel safety concerns associated with severe cold weather. Therefore, a scheduled test might have to be cancelled at the last minute, disrupting the scheduled work week. The test would then have to be rescheduled for a subsequent week in anotier 13-week schedule.
Therefore, testing on-line is impractical due to equipment concerns, personnel safety, and scheduling difficulties.
- 5. Burden Caused by Compliance The burden imposed by compliance witi the Code requirement would be a redesign of the Service Water system to provide a flow element and sufficient straight piping runs downstream of each Service Water pump. This system redesign would be so extensive that it could not be accomplished within the building that currently houses the Service Water pumps, since these straight piping runs would have to be approximately 12 feet long (10 pipe diameters for 14-inch pipe).
- 6. Proposed Alternative and Basis for Use A review of the historical test data for these pumps indicates that theses pumps are higily reliable and have not been susceptible to frequent or unanticipated failures. Plant operating experience has shown that the performance of the Service Water pumps degrades slowly over an extended period due to normal system wear. During the 3 rd Ten-Year Inservice Testing Interval, one Service Water pump was replaced, disassembled, and inspected each operating cycle, with each pump being replaced and inspected at least once every 6 years. The results of those inspections and replacements demonstrated that the service life of a Service Water pump is considerably greater than 6 years, and that pump performance can be reliably trended and predicted using data gathered during pump capacity testing perforned each refueling outage. Therefore, replacement of Service Water pumps on a fixed interval is not proposed for this Relief Request. Service Water pumps will be replaced when periodic testing indicates that replacement is prudent.
During each refueling outage, a head-flow curve will be generated in accordance with ISTB-5210, and the pump comprehensive test will be performed in accordance with ISTB-5223. This will provide information so that the performance of the pump can be compared to the degree possible with the quarterly test data and previous refueliig Attachment Page 2 of 3
outage head curve data. Overall peak and full spectrum vibration measurements will be also be taken at each of the points used to generate the head curve to provide additional operational information.
On a quarterly basis, a test will be performed by measuring pump differential pressure and motor vibration, and the data will be compared to the degree possible with the head-flow curve obtained during the refueling outage.
The Service Water pumps are in the Vermont Yankee Oil Analysis Program, described in station procedure DP 0213. Lube oil samples are taken quarterly from each service water pump. A complete laboratory analysis of the oil is performed, including wear particles, lubricity, additives, water, dirt (silicon), and oxidation. In addition, the oil in the Service Water pumps was changed to synthetic oil (SHC 630), due to the superior performance and service life of the synthetic oil.
- 7. Duration of Proposed Alternative This relief is requested for the duration of the Vermont Yankee 4t'l Inservice Testing Ten-Year Interval (September 1, 2003 through August 31, 2013).
- 8. Precedents A similar request was approved for the 3rd Ten-Year Interval (TAC No. M85067, dated September 3, 1993). This request differs from the one previously approved in that VY does not propose to disassemble and examine Service Water pumps on a fixed frequency, but rather as indicated by the results of periodic testing.
Attachment Page 3 of 3