ML022630551

From kanterella
Revision as of 13:36, 25 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
August 2002 Monthly Operating Report for Catawba Nuclear Station, Units 1, and 2
ML022630551
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/13/2002
From: Dimmery T
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022630551 (9)


Text

-i Duke Power I Duke 526 South Church Street wPower. P.O. Box 1006 A D~k,E-.n r-'p-.y Charlotte, NC 28201-1006 September 13, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Duke Energy Corporation Catawba Nuclear Station, Units 1, and 2 Docket Numbers 50-413 and 50-414 Monthly Performance and Operation Status-August, 2002 Please find attached information concerning the performance and operation status of the Catawba Nuclear Station for the month of August, 2002.

Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.

Sincerely, Terry Dimmery, Manager Nuclear Business Support Attachment XC:

L. A. Reyes, Regional Administrator USNRC, Region II Chandu Patel, Project Manager USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Darrell Roberts, Senior Resident Inspector

Document Control Desk U.S. NRC - Catawba bxc:

Gary Gilbert (CN01RC)

K. E. Nicholson (CN01RC)

RGC Site Licensing File ELL (ECO5O)

Operating Data Report Docket No. 50-413 Date September 13,2002 Completed By Roger Williams Telephone 704-382-5346 Operating Status

1. Unit Name: Catawba 1
2. Reporting Period: August 1, 2002 -August 31, 2002
3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1145 calculated as 1450.000 1192 MVA * .90 power
6. Maximum Dependable Capacity (Gross MWe):

factor per Page iii,

7. Maximum Dependable Capacity(Net MWe): 1129 NUREG-0020.
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any-This Month YTD Cumulative
11. Hours in Reporting Period 744.0 5831.0 150552.0
12. Number of Hours Reactor was Critical 744.0 5342.4 124176.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0 5322.5 122666.6
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2533562 96789615 483674517
17. Gross Electrical Energy Generated (MWH) 898129 6422381 143674476
18. Net Electrical Energy Generated (MWH) 851860 6091442 135507520
19. Unit Service Factor 100.0 91.3 81.5
20. Unit Availability Factor 100.0 91.3 81.5
21. Unit Capacity Factor (Using MDC Net) 101.4 92.5 79.6
22. Unit Capacity Factor (Using DER Net) 100.0 91.2 78.6
23. Unit Forced Outage Rate 0.0 0.0 5.7
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 9/13/2002

Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-413 UNIT NAME: Catawba I DATE: September 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: August, 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)

D - Regulatory restriction H - Other (Explain) 3C - 9/13/2002

MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: Catawba Unit 1
2. Scheduled next refueling shutdown: November 2003
3. Scheduled restart following refueling: December 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 944
8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
9. Projected date of last refueling which can be accommodated by present license capacity:

November 2009 DUKE POWER COMPANY DATE: September 13, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

Operating Data Report Docket No. 50-414 Date September 13,2002 Completed By Roger Williams Telephone 704-382-5346 Operating Status

1. Unit Name: Catawba 2
2. Reporting Period: August 1, 2002 -August 31, 2002
3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1145 calculated as 1450.000
6. Maximum Dependable Capacity (Gross MWe): 1192 MVA * .90 power factor per Page iii,
7. Maximum Dependable Capacity(Net MWe): 1129 NUREG-0020.
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month YTD Cumulative

11. Hours in Reporting Period 744.0 5831.0 140568.0 744.0 5831.0 116875.9
12. Number of Hours Reactor was Critical
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0 5831.0 115451.8
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2534616 116646656 475857976
17. Gross Electrical Energy Generated (MWH) 904228 7135537 135078508
18. Net Electrical Energy Generated (MWH) 858725 6779891 127592403
19. Unit Service Factor 100.0 100.0 82.1
20. Unit Availability Factor 100.0 "100.0 82.1
21. Unit Capacity Factor (Using MDC Net) 102.2 103.0 80.3
22. Umt Capacity Factor (Using DER Net) 100.8 101.5 79.3
23. Unit Forced Outage Rate 0.0 0.0 7.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 9/13/2002

Page: 1 of 1 i,

UNIT SHUTDOWNS DOCKET NO. 50-414 UNIT NAME: Catawba 2 DATE: September 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: August, 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination I - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)

D - Regulatory restriction H - Other (Explain) 3C- 9/13/2002

MONTHLY REFUELING INFORMATION REQUEST I. Facility name: Catawba Unit 2

2. Scheduled next refueling shutdown: March 2003
3. Scheduled restart following refueling: March 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 836
8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase:
9. Projected date of last refueling which can be accommodated by present license capacity:

May 2012 DUKE POWER COMPANY DATE: September 13, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT JULY 2002

1. Personnel Exposure The total station liquid release for JULY has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for JULY has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.