Duke Power Company P Duke A Duke Energy Company WPower.

A Duke Energy Company Energy Center P.O. Box 1006 Charlotte, NC 28201-1006 June 13, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Duke Energy Corporation Catawba Nuclear Station, Units 1, and 2 Docket Numbers 50-413 and 50-414 Monthly Performance and Operation Status-May, 2002 Please find attached information concerning the performance and operation status of the Catawba Nuclear Station for the month of May, 2002.

Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.

Sincerely, Terry Dimmery, Manager Nuclear Business Support Attachment XC:

L. A. Reyes, Regional Administrator USNRC, Region II Chandu Patel, Project Manager USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Darrell Roberts, Senior Resident Inspector

Document Control Desk U.S. NRC - Catawba bxc:

Gary Gilbert (CN01RC)

K. E. Nicholson (CN01RC)

RGC Site Licensing File ELL (EC050)

Operating Data Report Docket No. 50-413 Date June 13,2002 Completed By Roger Williams Telephone 704-382-5346 Operating Status

1. Unit Name: Catawba 1
2. Reporting Period: May 1, 2002 - May 31, 2002
3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1145 calculated as 1450.000
6. Maximum Dependable Capacity (Gross MWe): 1192 MVA * .90 power 1129 factor per Page iii,
7. Maximum Dependable Capacity(Net MWe):

NUREG-0020.

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month YTD Cumulative

11. Hours in Reporting Period 744.0 3623.0 148344.0
12. Number of Hours Reactor was Critical 350.6 3134.4 121968.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 330.7 3114.5 120458.6
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1059703 57603994 444488896
17. Gross Electrical Energy Generated (MWH) 375599 3754781 141006876
18. Net Electrical Energy Generated (MWH) 350624 3560620 132976698
19. Unit Service Factor 44.4 86.0 81.2
20. Unit Availability Factor 44.4 86.0 81.2
21. Unit Capacity Factor (Using MDC Net) 41.7 87.0 79.2
22. Unit Capacity Factor (Using DER Net) 41.2 85.8 78.3
23. Unit Forced Outage Rate 0.0 0.0 5.8
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 6/13/2002

Page: l of t UNIT SHUTDOWNS DOCKET NO. 50-413 UNIT NAME: Catawba 1 DATE: June 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: May. 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

05/01/02 5 410.38 C 4 END-OF-CYCLE 13 REFUELING OUTAGE 2 05/18/02 5 2.95 B MAIN TURBINE OVERSPEED TRIP TEST Summary:

The unit began the month of May in end-of-cycle 13 refueling outage. The end-of-cycle 13 refueling outage spanned 21.07 days. The unit was placed on-line 05/18/02 at 0223.

The unit held at 18% power from 0510 to 0919 for required soaking for main turbine overspeed trip testing and then decreased power and held at 10% power from 1001 to 1050 to perform the turbine overspeed trip test. The main turbine overspeed trip test occurred on 05/18/02 at 1050.The unit was placed on-line 05/18/02 at 1347. During power escalation the unit held at 40% power from 1803 to 1859 to assess power ascension ramp rate restrictions. The unit held at 51% power from 2346 to 05/19/02 at 0215 and at 95%

power from 05/19/02 at 2219 to 05/20/02 at 0104 due to power ascension testing. The unit held at 98% power from 0328 to 1017 to evaluate indicated high delta T in excess of 100%.

The unit returned to 100% full power on 05/20/02 at 1100 and operated at or near 100% full power the remainder of the month.

(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)

D - Regulatory restriction H - Other (Explain) 3C - 6/13/2002

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Catawba Unit 1
2. Scheduled next refueling shutdown: November 2003
3. Scheduled restart following refueling: December 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 944
8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: --
9. Projected date of last refueling which can be accommodated by present license capacity:

November 2009 DUKE POWER COMPANY DATE: June 13, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

Operating Data Report Docket No. 50-414 Date June 13,2002 Completed By Roger Williams Telephone 704-382-5346 Operating Status

1. Unit Name: Catawba 2
2. Reporting Period: May 1, 2002- May 31, 2002
3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1145 calculated as 1450.000
6. Maximum Dependable Capacity (Gross MWe): 1192 MVA * .90 power
7. Maximum Dependable Capacity(Net MWe): 1129 factor per Page iii, NUREG-0020.
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month YTD Cumulative

11. Hours in Reporting Period 744.0 3623.0 138360.0
12. Number of Hours Reactor was Critical 744.0 3623.0 114667.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0 3623.0 113243.8
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2534491 69940517 429151837
17. Gross Electrical Energy Generated (MWH) 908596 4453280 132396251
18. Net Electrical Energy Generated (MWH) 862233 4232087 125044599
19. Unit Service Factor 100.0 100.0 81.8
20. Unit Availability Factor 100.0 100.0 81.8
21. Unit Capacity Factor (Using MDC Net) 102.6 103.5 80.0
22. Unit Capacity Factor (Using DER Net) 101.2 102.0 78.9
23. Unit Forced Outage Rate 0.0 0.0 7.2
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 6/13/2002

Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-414 UNIT NAME: Catawba 2 DATE: June 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: May. 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

(1) Reason (2) Method A - Equipment failure (Explain) E - Operator Training/License Examination 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test F - Administrative 3 - Automatic Trip/Scram 4 - Continuation C - Refueling G - Operator Error (Explain) 5 - Other (Explain)

D - Regulatory restriction H - Other (Explain) 3C - 6/13/2002

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Catawba Unit 2
2. Scheduled next refueling shutdown: March 2003
3. Scheduled restart following refueling: March 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 836
8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: --
9. Projected date of last refueling which can be accommodated by present license capacity:

May 2012 DUKE POWER COMPANY DATE: June 13, 2002 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT APRIL 2002

1. Personnel Exposure The total station liquid release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.