Duke Power P Duke 526 South Church Street P.O. Box 1006 S Power Charlotte, NC 28201-1006 A Duke Energy Company February 14, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
Duke Energy Corporation Catawba Nuclear Station, Units 1, and 2 Docket Numbers 50-413 and 50-414 Monthly Performance and Operation Status-January, 2002 Please find attached information concerning the performance and of operation status of the Catawba Nuclear Station for the month January, 2002.
Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.
Si erely, err Dimrnery, nager Nu ear Business Support Attachment XC:
L. A. Reyes, Regional Administrator USNRC, Region II Chandu Patel, Project Manager USNRC, ONRR INPO Records Center Ms. Margaret Aucoin C'>
Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Darrell Roberts, Senior Resident Inspector
Document Control Desk U.S. NRC - Catawba bxc:
Gary Gilbert (CN01RC)
K. E. Nicholson (CN01RC)
RGC Site Licensing File ELL (EC050)
Operating Data Report Docket No. 50-413 Date February 14,2002 Completed By Roger Williams Telephone 704-382-5346 Operating Status
- 1. Unit Name: Catawba 1
- 2. Reporting Period: January 1, 2002 - January 31, 2002 3411 Notes: *Nameplate
- 3. Licensed Thermal Power (MWt):
1305
- Rating (GrossMWe)
- 4. Nameplate Rating (Gross MWe): calculated as 1450.000
- 5. Design Electrical Rating (Net Mwe): 1145 MVA * .90 power
- 6. Maximum Dependable Capacity (Gross MWe): 1192 factor per Page iii,
- 7. Maximum Dependable Capacity(Net MWe): 1129 NUREG-0020.
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, if any:
This Month YTD Cumulative 744.0 145465.0
- 11. Hours in Reporting Period 744.0 744.0 119577.9
- 12. Number of Hours Reactor was Critical 744.0 0.0 0.0
- 13. Reactor Reserve Shutdown Hours 0.0 744.0 118088.1
- 14. Hours Generator On-Line 744.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 0.0 13315307 400200209
- 16. Gross Thermal Energy Generated (MWH) 2528806 910503 138162598
- 17. Gross Electrical Energy Generated (MWH) 910503 865154 130281232
- 18. Net Electrical Energy Generated (MWH) 865154 100.0 81.2
- 19. Unit Service Factor 100.0 100.0 81.2
- 20. Unit Availability Factor 100.0 103.0 79.2
- 21. Unit Capacity Factor (Using MDC Net) 103.0 101.6 78.2
- 22. Unit Capacity Factor (Using DER Net) 101.6 0.0 5.9
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 2/14/2002
Page: I of 1 UNIT SHUTDOWNS DOCKET NO. 50-413 UNIT NAME: Catawba I DATE: February 14, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: January, 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
(2) Method (1) Reason 1 - Manual E - Operator Training/License Examination 2 - Manual Trip/Scram A - Equipment failure (Explain)
F - Administrative 3 - Automatic Trip/Scram 4 - Continuation B - Maintenance or Test 5 - Other (Explain)
C - Refueling G - Operator Error (Explain)
D - Regulatory restriction H - Other (Explain) 3C- 2/14/2002
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Catawba Unit 1
- 2. Scheduled next refueling shutdown: April 2002
- 3. Scheduled restart following refueling: May 2002 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 860
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: --
- 9. Projected date of last refueling which can be accommodated by present license capacity:
November 2009 DUKE POWER COMPANY DATE: February 14, 2002 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
Operating Data Report Docket No. 50-414 Date February 14,2002 Completed By Roger Williams 704-382-5346 Telephone Operating Status
- 1. Unit Name: Catawba 2
- 2. Reporting Period: January 1, 2002 - January 31, 2002 3411 Notes: *Nameplate
- 3. Licensed Thermal Power (MWt):
1305
- Rating (GrossMWe)
- 4. Nameplate Rating (Gross MWe): calculated as 1450.000
- 5. Design Electrical Rating (Net Mwe): 1145 MVA * .90 power
- 6. Maximum Dependable Capacity (Gross MWe): 1192 factor per Page iii,
- 7. Maximum Dependable Capacity(Net MWe): 1129 NUREG-0020.
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month YTD Cumulative 744.0 135481.0
- 11. Hours in Reporting Period 744.0 744.0 111788.9
- 12. Number of Hours Reactor was Critical 744.0 0.0 0.0
- 13. Reactor Reserve Shutdown Hours 0.0 744.0 110364.8
- 14. Hours Generator On-Line 744.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 0.0 15848308 375059628
- 16. Gross Thermal Energy Generated (MWH) 2533001 920205 128863176
- 17. Gross Electrical Energy Generated (MWH) 920205 875556 121688068
- 18. Net Electrical Energy Generated (MWH) 875556 100.0 81.5
- 19. Unit Service Factor 100.0 100.0 81.5
- 20. Unit Availability Factor 100.0 104.2 79.5
- 21. Unit Capacity Factor (Using MDC Net) 104.2 102.8 78.4
- 22. Unit Capacity Factor (Using DER Net) 102.8 0.0 7.3
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 2/14/2002
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50-414 UNIT NAME: Catawba 2 DATE: February 14, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: January. 2002 Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence No.
F - Forced Hours Shutdown R/X Event Report S -Scheduled No.
No Outages for the Month Summary:
(2) Method (1) Reason 1 - Manual E - Operator Training/License Examination 2 - Manual Trip/Scram A - Equipment failure (Explain)
F - Administrative 3 - Automatic Trip/Scram 4 - Continuation B - Maintenance or Test 5 - Other (Explain)
C - Refueling G - Operator Error (Explain)
D - Regulatory restriction H - Other (Explain) 3C - 2/14/2002
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Catawba Unit 2
- 2. Scheduled next refueling shutdown: March 2003
- 3. Scheduled restart following refueling: March 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 836
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: --
- 9. Projected date of last refueling which can be accommodated by present license capacity:
May 2012 DUKE POWER COMPANY DATE: February 14,2002 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT DECEMBER 2001
- 1. Personnel Exposure The total station liquid release for DECEMBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for DECEMBER has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.