May 2003 Monthly Operating Report for Catawba Nuclear Station, Units 1, & 2
ML031750670
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 06/16/2003
From: Tuckman M
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML031750670 (10)


Text

_ Duke w Energy.

Duke Energr Corporation 526 South Church Street P.O. Box 1006 Charlotte, NC 28201-1006 June 16, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555

Subject:

Duke Energy Corporation Catawba Nuclear Station, Units 1, and 2 Docket Numbers 50-413 and 50-414 Monthly Performance and Operation Status-May, 2003 Please find attached information concerning the performance and operation status of the Catawba Nuclear Station for the month of May, 2003 and Revision 1 of the Personnel Exposure page for the month of April, 2003.

Please be advised the year-to-date and cumulative values for the gross thermal energy generated (MWH) has been in error from June, 1999 to April, 2003 for units 1 and

2. Please advise if these reports submitted in this timeframe should be resubmitted. However this specific data element was omitted for reporting per Generic Letter 97-02 issued May 15, 1997.

Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.

Sincerely, M. S. Tuckman Executive Vice President Nuclear Generation Duke Power Attachment XC:

L. A. Reyes, Regional Administrator USNRC, Region II R. E. Martin, Project Manager

USNRC, ONRR INPO Records Center q
I 1

Document Control Desk U.S. NRC -

Catawba Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers E. F. Guthrie, Senior Resident Inspector bxc:

Gary Gilbert (CNO1RC)

K. E. Nicholson (CNO1RC)

RGC Site Licensing File ELL (ECO50)

Operating Data Report Docket No.

Date Completed By Telephone Operating Status

1. Unit Name:

Catawba 1

2. Reporting Period:

May 1, 2003 - May 31, 2003

3. Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWe):

1305 *

5. Design Electrical Rating (Net Mwe):

1145

6. Maximum Dependable Capacity (Gross MWe):

1192

7. Maximum Dependable Capacity(Net MWe):

1129

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

50-413 June 16.2003 Roger Williams 704-382-5346

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month

11. Hours in Reporting Period 744.0
12. Number of Hours Reactor was Critical 744.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 744.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 2530287
17. Gross Electrical Energy Generated (MWH) 903842
18. Net Electrical Energy Generated (MWH) 858763
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (Using MDC Net) 102.2
22. Unit Capacity Factor (Using DER Net) 100.8
23. Unit Forced Outage Rate 0.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Initial Criticality Initial Electricity Commercial Operation YTD 3623.0 3592.6 0.0 3585.9 0.0 12190558 4372858 4150934 99.0 99.0 101.5 100.1 1.0 Cumulative 157104.0 130697.9 0.0 129181.5 0.0 427055043 151618781 143048620 82.2 82.2 80.5 79.5 5.4 Achieved Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA.90 power ractor per Page lii, NUREG-0020.

Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50Q413 UNIT NAME: Catawba 1 DATE: June 16.2003 COMPLETED BY: Roeer Williams TELEPHONE: 704-382-5346 REPORT MONTH: Mav. 2003 (1) Reason A - Equipment failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administradve o - Operator Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C-6162o03 No.

Date:

Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

MONTHLY REFUELING INFORMATION REOUEST

1.

Facility name:

Catawba Unit 1

2.

Scheduled next refueling shutdown: November 2003

3.

Scheduled restart following refueling: December 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WIL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 944

8.

Present licensed fuel pool capacity: 1418 Size of requested or planned increase: =

9.

Projected date of last refueling which can be accommodated by present license capacity:

November 2009 DUKE POWER COMPANY DATE: June 16.2003 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

Operating Data Report Docket No.

Date Completed By Telephone Operating Status

1. Unit Name:

Catawba 2

2. Reporting Period:

May 1, 2003 -May 31, 2003

3. Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWe):

1305

5. Design Electrical Rating (Net Mwe):

1145

6. Maximum Dependable Capacity (Gross MWe):

1192

7. Maximum Dependable Capacity(Net MWe):

1129

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

50-414 June 16.2003 Roger Williams 704-382-5346

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month

11. Hours in Reporting Period 744.0
12. Number of Hours Reactor was Critical 744.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator On-Line 744.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 2533490
17. Gross Electrical Energy Generated (MWH) 908090
18. Net Electrical Energy Generated (MWH) 862946
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (Using MDC Net) 102.7
22. Unit Capacity Factor (Using DER Net) 101.3
23. Unit Forced Outage Rate 0.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)

YTD 3623.0 3011.5 0.0 2980.0 0.0 9988906 3595325 3410693 82.3 82.3 83.4 82.2 0.4 Cumulative 147120.0 122816.5 0.0 121360.8 0.0 398958733 142241374 134395508 82.5 82.5 80.8 79.8 6.7

25. If ShutDown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Initial Criticality Initial Electricity Comrnmercial Operation Forcast Achieved Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA*.90 power factor per Page ii, NUREG-0020.

Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO. 50414 UNIT NAME: Catawba 2 DATE: June 16.2003 COMPLETED BY: Roger Williams TELEPHONE: 704382-5346 REPORT MONTH: May. 2003 (1) Reason A - Equipment failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)

H - Other (Explain)

(2) Method

- Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C. 6162o03 No.

Date:

Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.

No Outages for the Month Summary:

MONTHLY REFUELING INFORMATION REOUEST

1.

Facility name:

Catawba Unit 2

2.

Scheduled next refueling shutdown: Setember 2004

3.

Scheduled restart following refueling: October 2004 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN TIES REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 917

8.

Present licensed fuel pool capacity: 1418 Size of requested or planned increase: =

9.

Projected date of last refueling which can be accommodated by present license capacity:

May 2012 DUKE POWER COMPANY DATE: June 16.2003 Name of

Contact:

R. A. Williams Phone: (704) - 382-5346

CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT APRIL 2003

1.

Personnel Exposure -

The total station liquid release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

Revision 1 CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT MARCH 2003

1.

Personnel Exposure -

The total station liquid release for MARCH has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for MARCH has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.