Duke Duke Energy Corporation 526 South Church Street Pok Energy.
PO Box 1006 Charlotte, NC 28201-1006 April 15, 2003 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555
Subject:
Duke Energy Corporation Catawba Nuclear Station, Units 1, and 2 Docket Numbers 50-413 and 50-414 Monthly Performance and Operation Status-March, 2003 Please find attached information concerning the performance and operation status of the Catawba Nuclear Station for the month of March, 2003 and REVISION 1 of the Unit Shutdowns page narrative section for Catawba Unit 2 for the month of February, 2003.
Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.
Sin erely, a ger Nuclear Business Support Attachment XC:
L. A. Reyes, Regional Administrator USNRC, Region II R. E. Martin, Project Manager USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers E. F. Guthrie, Senior Resident Inspector
Document Control Desk U.S. NRC -
Catawba bxc:
Gary Gilbert (CN0lRC)
K. E. Nicholson (CNO1RC)
RGC Site Licensing File ELL (ECO50)
Operating Data Report Docket No.
Date Completed By Telephone Operating Status
- 1. Unit Name:
Catawba 1
- 2. Reporting Period:
March 1, 2003 -March 31, 2003
- 3. Licensed Thermal Power (MWt):
3411
- 4. Nameplate Rating (Gross MWe):
1305 *
- 5. Design Electrical Rating (Net Mwe):
1145
- 6. Maximum Dependable Capacity (Gross MWe):
1192
- 7. Maximum Dependable Capacity(Net MWe):
1129
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
50-413 April 15,2003 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month
- 11. Hours in Reporting Period 744.0
- 12. Number of Hours Reactor was Critical 744.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator On-Line 744.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Thermal Energy Generated (MWH) 2533322
- 17. Gross Electrical Energy Generated (MWH) 907666
- 18. Net Electrical Energy Generated (MWH) 860818
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (Using MDC Net) 102.5
- 22. Unit Capacity Factor (Using DER Net) 101.0
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
YTD 2160.0 2129.6 0.0 2122.9 0.0 38338009 2591083 2458399 98.3 98.3 100.8 99.4 1.7 Cumulative 155641.0 129234.9 0.0 127718.5 0.0 453202494 149837006 141356085 82.1 82.1 80.3 79.3 5.5
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 4/15/2003
Page: I of I UNIT SHUTDOWNS DOCKET NO. 50-413 UNIT NAME: Catawba I DATE: April 15. 2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: March, 2003 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown RIX Event Report S - Scheduled No.
No Outages for the Month Summary:
(1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C-4/15/2003
MONTHLY REFUELING INFORMATION REQUEST
- 1.
Facility name:
Catawba Unit I
- 2.
Scheduled next refueling shutdown: November 2003
- 3.
Scheduled restart following refueling: December 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 944
- 8.
Present licensed fuel pool capacity: 141 8 Size of requested or planned increase: =-
- 9.
Projected date of last refueling which can be accommodated by present license capacity:
November 2009 DUKE POWER COMPANY DATE: April 15.2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
Operating Data Report Docket No.
Date Completed By Telephone Operating Status
- 1. Unit Name:
Catawba 2
- 2. Reporting Period:
March 1, 2003 -March 31, 2003
- 3. Licensed Thermal Power (MWt):
3411
- 4. Nameplate Rating (Gross MWe):
1305 *
- 5. Design Electrical Rating (Net Mwe):
1145
- 6. Maximum Dependable Capacity (Gross MWe):
1192
- 7. Maximum Dependable Capacity(Net MWe):
1129
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
50-414 April 15.2003 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month
- 11. Hours in Reporting Period 744.0
- 12. Number of Hours Reactor was Critical 132.5
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator On-Line 101.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Thermal Energy Generated (MWH) 201699
- 17. Gross Electrical Energy Generated (MWH) 64532
- 18. Net Electrical Energy Generated (MWH) 51791
- 19. Unit Service Factor 13.6
- 20. Unit Availability Factor 13.6
- 21. Unit Capacity Factor (Using MDC Net) 6.2
- 22. Unit Capacity Factor (Using DER Net) 6.1
- 23. Unit Forced Outage Rate 9.9
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
YTD 2160.0 1548.5 0.0 1517.0 0.0 43346419 1807083 1710429 70.2 70.2 70.1 69.2 0.7 Cumulative 145657.0 121353.5 0.0 119897.8 0.0 432316246 140453132 132695244 82.3 82.3 80.6 79.6 6.8
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Initial Criticality Initial Electricity Commercial Operation Achieved 3A - 4/15/2003
Page: 1 of 2 UNIT SHUTDOWNS DOCKET NO. 50-414 UNIT NAME: Catawba 2 DATE: April 15. 2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: March, 2003 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
1 03/01/03 5
629.22 C
END-OF-CYCLE 12 REFUELING OUTAGE 2
03/27/03 S
2.75 B
MAIN TURBINE OVERSPEED TRIP TEST 3
03/28/03 F
11.05 A
REPAIR FEEDWATER VALVE (2CA-42)
Summary:
Catawba unit 2 began the month of March operating at approximately 14% power and decreasing to begin end-of-cycle 12 refueling outage. The unit was taken off-line 03/01/03 at 0056 to begin end-of-cycle 12 refueling outage. The end-of-cycle 12 refueling outage spanned 26.22 days. The unit was placed on-line 03/27/03 at 0609. During power escalation, the unit held at 11% power from 03/27/03 at 0622 to 03/27/03 at 0658 due to shift turnover. The unit increased power and held at 19% power from 0757 to 1411 due to main turbine soak. The turbine overspeed trip test was performed 03/27/03 at 0411. The unit was placed on-line 03/27/03 at 1656. The unit held at 19% power from 1751 to 03/28/03 at 1650 due to main feedwater nozzle swap. The unit began decreasing power on 03/28/03 at 1650 and was taken off-line 03/28/03 at 1835 to repair feedwater valve (2CA-42) and turbine intercept valve #2. The unit was placed on-line 03/29/03 at 0538. On 03/29/03 at 0717 the unit held at 19% power until 1154 (Cont'd)
(1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C - 4/15/2003
Page: 2 of 2 UNIT SHUTDOWNS DOCKET NO. 50-414 UNIT NAME: Catawba 2 DATE: April 15. 2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: March, 2003 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
Summary:
due to main feedwater nozzle swap. The unit held at 76% power from 03/30/03 at 0632 to 0840 due to power ascension testing. The unit held at 90% power due to nuclear instrumentation calibration from 1511 to 1640. The unit held at 94% power from 03/30/03 at 1829 to 03/31/03 at 0256 due to process cabinet deltaT channel calibrations.
The unit returned to 100% full power on 03/31/03 at 1037 and operated at or near 100% full power the remainder of the month.
(1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C - 4/15/2003
MONTHLY REFUELING INFORMATION REQUEST
- 1.
Facility name:
Catawba Unit 2
- 2.
Scheduled next refueling shutdown: September 2004
- 3.
Scheduled restart following refueling: October 2004 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 917 S.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase:
=-
- 9.
Projected date of last refueling which can be accommodated by present license capacity:
May 2012 DUKE POWER COMPANY DATE: April 15,2003 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT FEBRUARY 2003
- 1.
Personnel Exposure -
The total station liquid release for FEBRUARY has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for FEBRUARY has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
REVISION 1 Page: I of 1 UNIT SHUTDOWNS DOCKET NO. 50-413 UNIT NAME: Catawba 1 DATE: March 13. 2003 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: February. 2003 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
MAIN TURBINE TRIP GENERATED BY HI HI STEAM GENERATOR lB LEVEL Summary:
Catawba unit I began the month of February operating at approximately 100% full power. On 02/04/02 at 1005 a automatic reactor trip was initiated from 100% full power by a main turbine trip generated by Hi Hi steam generator lB level. The unit was placed on-line 02/05/03 at 2311. During power escalation, the unit held at 18% power from 02/06/03 at 0013 to 0103 due to main feedwater nozzle swap. The unit held at 55% power from 0520 to 0550 to place second main feedwater pump in service. The unit held at 87% power from 1044 to 1207 to perform the main turbine control valve movement test. The unit returned to 100% full power on 02/06/03 at 1700 and operated at or near 100% full power the.
remainder of the month.
(1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C - 4/15/2003