ML022330074
ML022330074 | |
Person / Time | |
---|---|
Site: | Catawba |
Issue date: | 08/14/2002 |
From: | Dimmery T Duke Power Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML022330074 (9) | |
Text
Duke Power Duke liPpower-EJ PC. Box 1006 526 South Church Street A Dk,EnW Compy Charlotte, NC 28201-1006 August 14, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
Duke Energy Corporation Catawba Nuclear Station, Units 1, and 2 Docket Numbers 50-413 and 50-414 Monthly Performance and Operation Status-July, 2002 Please find attached information concerning the performance and operation status of the Catawba Nuclear Station for the month of July, 2002.
Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.
Sincerely, Terry Dimmery, Manager Nuclear Business Support Attachment XC:
L. A. Reyes, Regional Administrator USNRC, Region II Chandu Patel, Project Manager USNRC, ONRR INPO Records Center Ms. Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Darrell Roberts, Senior Resident Inspector
Document Control Desk U.S. NRC - Catawba bxc:
Gary Gilbert (CN01RC)
K. E. Nicholson (CN01RC)
RGC Site Licensing File ELL (ECO5O)
Operating Data Report Docket No. 50-413 Date August 14,2002 Completed By Roger Williams Telephone 704-382-5346 Operating Status
- 1. Unit Name: Catawba 1
- 2. Reporting Period: July 1, 2002 - July 31, 2002
- 3. Licensed Thermal Power (MWt): 3411 Notes: *Nameplate 1305
- Rating (GrossMWe)
- 4. Nameplate Rating (Gross MWe):
1145 calculated as 1450.000
- 5. Design Electrical Rating (Net Mwe): MVA * .90 power
- 6. Maximum Dependable Capacity (Gross MWe): 1192 factor per Page iii,
- 7. Maximum Dependable Capacity(Net MWe): 1129 NUREG-0020.
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month YTD Cumulative 5087.0 149808.0
- 11. Hours in Reporting Period 744.0 4598.4 123432.3
- 12. Number of Hours Reactor was Critical 744.0 0.0 0.0
- 13. Reactor Reserve Shutdown Hours 0.0 4578.5 121922.6
- 14. Hours Generator On-Line 744.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 0.0 83843116 470728018
- 16. Gross Thermal Energy Generated (MWH) 2534016 5524252 142776347
- 17. Gross Electrical Energy Generated (MWH) 897677 5239582 134655660
- 18. Net Electrical Energy Generated (MWH) 851368 90.0 81.4
- 19. Unit Service Factor 100.0 90.0 81.4
- 20. Unit Availability Factor 100.0 91.2 79.4
- 21. Unit Capacity Factor (Using MDC Net) 101.4 90.0 78.5
- 22. Unit Capacity Factor (Using DER Net) 99.9 0.0 5.7
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 8/14/2002
Page: 6 of 7 UNIT SHUTDOWNS DOCKET NO. 50-413 UNIT NAME: Catawba 1 DATE: August 14, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: July, 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown RIX Event Report S - Scheduled No.
No Outages for the Month Summary:
(2) Method (1) Reason 1 - Manual 2 - Manual Trip/Scram A - Equipment failure (Explain) E - Operator Training/License Examination F - Administrative 3 - Automatic Trip/Scram 4 - Continuation B - Maintenance or Test 5 - Other (Explain)
C - Refueling G - Operator Error (Explain)
D - Regulatory restriction H - Other (Explain) 3C- 8/14/2002
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Catawba Unit 1
- 2. Scheduled next refueling shutdown: November 2003
- 3. Scheduled restart following refueling: December 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 944
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: =
- 9. Projected date of last refueling which can be accommodated by present license capacity:
November 2009 DUKE POWER COMPANY DATE: August 14, 2002 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
Operating Data Report Docket No. 50-414 Date August 14,2002 Roger Williams Completed By Telephone 704-382-5346 Operating Status
- 1. Unit Name: Catawba 2
- 2. Reporting Period: July 1, 2002- July 31, 2002 3411 Notes: *Nameplate
- 3. Licensed Thermal Power (MWt):
1305
- Rating (GrossMWe)
- 4. Nameplate Rating (Gross MWe): calculated as 1450.000
- 5. Design Electrical Rating (Net Mwe): 1145 MVA * .90 power
- 6. Maximum Dependable Capacity (Gross MWe): 1192 factor per Page iii,
- 7. Maximum Dependable Capacity(Net MWe): 1129 NUREG-0020.
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month YTD Cumulative 5087.0 139824.0
- 11. Hours in Reporting Period 744.0 5087.0 116131.9
- 12. Number of Hours Reactor was Critical 744.0 0.0 0.0
- 13. Reactor Reserve Shutdown Hours 0.0 5087.0 114707.8
- 14. Hours Generator On-Line 744.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 0.0 101165541 460376861
- 16. Gross Thermal Energy Generated (MWH) 2534297 6231309 134174280
- 17. Gross Electrical Energy Generated (MWH) 902321 5921166 126733678
- 18. Net Electrical Energy Generated (MWH) 857506 100.0 82.0
- 19. Unit Service Factor 100.0 100.0 82.0
- 20. Unit Availability Factor 100.0 103.1 80.2
- 21. Unit Capacity Factor (Using MDC Net) 102.1 101.7 79.2
- 22. Unit Capacity Factor (Using DER Net) 100.7 0.0 7.1
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 8/14/2002
Page: 7 of 7 UNIT SHUTDOWNS DOCKET NO. 50-414 UNIT NAME: Catawba 2 DATE: August 14, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: July. 2002 No. Date: Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
(2) Method (1) Reason 2 - Manual Trip/Scram I - Manual A - Equipment failure (Explain) E - Operator Training/License Examination 3 - Automatic Trip/Scram 4 - Continuation B - Maintenance or Test F - Administrative 5 - Other (Explain)
C - Refueling G - Operator Error (Explain)
D - Regulatory restriction H - Other (Explain) 3C - 8/14/2002
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Catawba Unit 2
- 2. Scheduled next refueling shutdown: March 2003
- 3. Scheduled restart following refueling: March 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 836
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: --
- 9. Projected date of last refueling which can be accommodated by present license capacity:
May 2012 DUKE POWER COMPANY DATE: August 14, 2002 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT JUNE 2002
- 1. Personnel Exposure The total station liquid release for JUNE has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for JUNE has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.