ML20065K373

From kanterella
Revision as of 12:27, 21 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1994 for VC Summer Nuclear Station
ML20065K373
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/31/1994
From: Haltiwanger J
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
Shared Package
ML20065K371 List:
References
NUDOCS 9404190327
Download: ML20065K373 (4)


Text

. . . . . . . . . . - . . .. . - . - -. . - . = . . - . - . . - . - .... . - .- . - _

- - .- . .~ . . . . . . .

.. 5 Director, Office of Resource Management March Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C.. SUMMER I DATE 4/ 4/94 COMPLETED BY J. W. HALTIWANGER

-l TELEPHONE (803) 345-4297 1- MARCH 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

1. 207 17. -33
2. -36 18. 88
3. -25 19, 250
4. -13 20. 249
5. -12 21. 435
6. -12 22. 545
7. -12 23. 550
8. -12 24. 553
9. -13 25. 553
10. -12 26. -554
11. -13 27. 554
12. -16 28. 553
13. -29 29. 553
14. -30 30. 554 i
15. -35 31, 554
16. -33 l

)

9404190327 940414 PDR ADOCK 05000395 R PDR

_ _ . _ . _ . _ . .. _ ~ ..

- . . . ._ ._ _ _ . ~.

.-. . ~ _ _ _ . - . _ - __ . _ _ - -..._ ._. . . _ . .

, ;4 .

e i

Director, Office of Resource Management March Monthly Operating Report Page 2

ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 4/ 4/94 COMPLETED BY J. W. HALTIWANGER TELEPHONE (803) 345-4297 OPERATING STATUS
1. Reporting Period: March 1994 Gross Hours in Reporting Period: 744
2. Currently Authorized Power Level (MWt): 2775 Max. Depend. Capacity (MWe-Met): 885 Design Electrical Rating (MWe-Net): 900
3. Power Level to Which Restricted (If Any) (MWe-Net) : N/A
4. Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE
5. Number of Hours Reactor Critical 364.5 1780.5 72316.1
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 7 Hours Generator on Line 339.0 1755.0 71034.5
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thernal Energy Generated (MWH) 561136 4032771 185311764
10. Gross Electrical Energy (MWH) 174600 1332190 61455019 ,

t

11. Net Electrical Energy Generated (MWH) 154016 1258505 58425138
12. Reactor Service Factor. 49.0 82.4 80.5 134 Reactor Availability Factor 49.0 82.4 80.5 *
14. Unit Service Factor 45.6 81.3 79.1
15. Unit Availability Factor 45.6 81,3 79.1
16. Unit Capacity Factor (Using MDC) 23.4 65.8 73.5
17. Unit Capacity Factor (Design MWe) 23.0 64.7 72.3
18. Unit Forced Outage Rate 0.0 0.0 5.3
19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each) :

Refueling and Steam Generator Replacement, September 9, 1994, 90 Days

20. If Shut Down at End of Report Period, Estimated Date of Startup: N/A
21. Units in Test Status (Prior to Commercial Operation) : N/A

Director, Office of Resource Management March Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 4/ 4/94 COMPLETED BY J. W. HALTIWANGER TELEPHONE (803) 345-4297 MARCH 1994 NO. DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION / COMMENTS 2 940301 S 405.0 A 1 HYDROGEN LEAK IN MAIN GENERATOR 1.0 REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2.0 METHOD 1: Kinual 2: Manual Scram 3: Automatic Scram 4: Continuation (Use initial Date) 4 5: Power Reduction (Duration 0.0) '

9. Other (Explain)

{

I

Director, Office of Resource Management

. March Monthly Operating' Report

'Page 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT. V. C. SUMMER I DATE 4/ 4/94 COMPLETED BY J. W. HALTI;? ANGER TELEPHONE (803) 345-4297 MARCH 1994 ,

V. C. Summer Station was taken off line at 1524 hours0.0176 days <br />0.423 hours <br />0.00252 weeks <br />5.79882e-4 months <br /> on March 1, 1994, to repair hydrogen leaks in the main generator.

During this outage the "B" reactor coolant pump seal was replaced and work was performed on the reactor building polar crane in-preparation for handling the steam generators during the next refueling outage.

On March 17th at 1232 the reactor was critical. On March 18th at 1223 the generator breaker was closed. Power was held at 30 percent power for secondary water chemistry cleanup. Power was increased to approximately 65 percent on March 21st.

The plant operated at approximately 65 percent power for the rest of March 1994 to conserve fuel.