ML20133F636

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1996 for VC Summer Nuclear Station Unit 1
ML20133F636
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/31/1996
From: Bell W, Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RC-97-0008, RC-97-8, NUDOCS 9701140302
Download: ML20133F636 (5)


Text

-.-.

South Carolina Electric & Gas Company Gary J.T^ylor P.O. Box 88 Vice Prosident Jenkinsville. Sc 29065 Nuclear operations (803) 345-4344 SCE&G 4'

Ascas:compay hnuary 10, 1997 RC-97-0008

)

Document Control Desk i

U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management i

Gentlemen:

i

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 DECEMBER MONTHLY OPERATING REPORT Enclosed is the December 1996 Monthly Operating Report for the Virgil C. Summer 1

Nuclear Station Unit No.1. This submittalis made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

q.

If there are any questions, please call me at your convenience.

]

Very truly yours, J

I 9701140302 961231 ADOCK 0500 5

[DR Gary. Tayl i

4 jib

)

Attachment c:

W. F. Conway F. Yost R. R. Mahan (w/o attachment)

INPO Records Center Q

R. J. White Marsh & McLennan 3

g L.A.Reyes William G. Wendland (ANI)

A. R. Johnson Pat Haught (Westinghouse)

S. A. Byrne NSRC R. M. Fowlkes RTS (MON 2000)

NRC Resident inspector File (818.03-1)

J. B. Knotts Jr.

DMS K. R. Jackson J<j0110 NUCLEAR EXCELLENCE - A SUNMER TRADITION!

i Director, Office of Resource Management December Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT PDKER LEVEL DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE 1/ 2/97 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 DECEMBER 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

954 17.

954 2.

954 18.

953 3.

954 19.

953 4.

953 20.

953 5.

953 21.

953 6.

953 22.

953 J

7.

955 23.

954 8.

955 24.

954 9.

954 25.

954 i

10.

954 26.

954 11, 955 27.

954 12.

954 28.

955 13.

955 29.

955 i4.

954 30.

954 15, 953 31.

954 16.

955

9 Director, Office of Resource Management December Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE 1/ 2/97 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 OPERATING STATUS

1. Reporting Period:

December 1996 Gross Hours in Reporting Period:

744

2. Currently Authorized Power Level (MWt) : 2900 Max. Depend. Capacity (MWe-Net) :

945 Design Electrical Rating (MWe-Net):

954

3. Power Level to Which Restricted (If Any) (MWe-Net) : N/A
4. Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE
5. Number of Hours Reactor Critical 744.0 7928.9 93071.6
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 7'

Hours Generator on Line 744.0 7830.4 91612.1

8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MRH) 2155936 21895986 240703519
10. Gross Electrical Energy (MWH) 738220 7449360 80155649
11. Net Electrical Energy Generated (MWH) 709709 7155300 76321712
12. Reactor Service Factor 100.0 90.3 81.7
13. Reactor Availability Factor 100.0 90.3 81.7
14. Unit Service Factor 100.0 89.1 80.4
15. Unit Availability Facter 100.0 89.1 80.4
16. Unit Capacity Factor (Using MDC) 100.9 88.0 78.1
17. Unit Capacity Factor (Design MWe) 100.0 87.0 76.8
18. Unit Forced Outage Rate 0.0 0.0 4.2
19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):

NONE

20. If Shut Down at End of Report Period, Estimated Date of Startup: N/A
21. Units in Test Status (Prior to Commercial Operation) : N/A

]

l l

l i

. =. -

=_.

f 8

Director, Office of Resource Management December Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50/395 l

UNIT V. C. SUMMER I DATE 1/ 2/97 COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 1

DECEMBER 1996 NO.

DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION / COMMENTS l

NONE 1.0 REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2.0 METHOD 1: Manual 2: Manual Scram 3: Automatic Scram 4: Continuation (Use initial Date) 5: Power Reduction (Duration 0.0) l

9. Other (Explain) l t

-_ =_- -

Director, Office of Resource Management

~

December Monthly Operating Report Page 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE 1/ 2/97 l

COMPLETED BY W. H. BELL TELEPHONE (803) 345-4389 DECEMBER 1996 1

V. C. SUMMER STATION OPERATED CONTINUOUSLY AT 100 % POWER FOR THE ENTIP2 1

J MONTH OF DECEMBER.

i 1

d 1

!