RC-96-0031, Monthly Operating Rept for Jan 1996 for Virgil C Summer Nuclear Station,Unit 1

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1996 for Virgil C Summer Nuclear Station,Unit 1
ML20097E169
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 01/31/1996
From: Haltiwanger J, Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RC-96-0031, RC-96-31, NUDOCS 9602130337
Download: ML20097E169 (5)


Text

_ . . _ .__ _ m . . _ _ _

<

  • South C:rolins Ellctric & Gas Comptny Grry J. Taylor P.O Box 88 Vice President  !

jf . Jenkinsville, SC 29065 Nuclear Operations i 5 (803) 345-4344 l NE ASCRAflCormary February 6, 1996 RC-96-0031 4

l Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management Gentlemen:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 JANUARY 1996 MONTHLY OPERATING REPORT Enclosed is the January 1996 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No.1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Ver trulyyours, ary 1 yl r  ;

jlb i Attachment c: O. W. Dixon F. Yost R. R. Mahan INPO Records Center R. J. White Marsh & McLennan S. D. Ebneter William G.Wendland (ANI)

J. l. Zimmerman Pat Haught (Westinghouse)

5. A. Byrne NSRC NRC Resident Inspector Document Management System (879)

J. B. Knotts J r. RTS (MON 2000)

K. R. Jackson File (818.03-1) 130062 9602130337 960131 PDR ADOCK 05000395 R PDR

  • h 4FI , '

NUCLEAR EXCELLENCE - A SUMMER TRADITIONI v t

J . .

Director, Office of Resource Management January Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 2/ 1/96 COMPLETED BY J. W. HALTIWANGER TELEPHONE (803) 345-4297 JANUARY 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

1. 942 17. 944
2. 941 18. 943
3. 941 19. 942
4. 943 20. 944
5. 943 21. 943
6. 943 22. 943
7. 943 23. 943
8. 943 24. 943
9. 942 25. 944
10. 941 26. 945
11. 942 27. 945
12. 942 28. 944
13. 943 29. 944
14. 943 30. 943
15. 944 31. 944
16. 943 l i

l i

1

d .

l Director, Office of Resource Management January Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 2/ 1/96 COMPLETED BY J. W. HALTIWANGE TELEPHONE (803) 345-4297 OPERATING STATUS

1. Reporting Period: January 1996 Gross Hours in Reporting Period: 744
2. Currently Authorized Power Level (MWt): 2775 Max. Depend. Capacity (MWe-Net): 885 Design Electrical Rating (MWe-Net): 900
3. Power Level to Which Restricted (If Any) (MWe-Net) : N/A
4. Reasons for Restrictions: N/A l THIS MONTH YR TO DATE CUMULATIVE
5. Number of Hours Reactor Critical 744.0 744.0 05886.7
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 l
7. Hours Generator on Line 744.0 744.0 84525.7 l
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
9. Gross Thermal Energy Generated (MWH) 2062493 2062493 220870026 I
10. Gross Electrical Energy (MWH) 701780 701780 73408069
11. Net Electrical Energy Generated (MWH) 673544 673544 69839956
12. Reactor Service Factor 100.0 100.0 81.1
13. Reactor Availability Factor 100.0 100.0 81.1
14. Unit Service Factor 100.0 100.0 79.8
15. Unit Availability Factor 100.0 100.0 79.8
16. Unit Capacity Factor (Using MDC) 102.3 102.3 74.5
17. Unit Capacity Factor (Design MWe) 100.6 100.6 73.3
18. Unit Forced Outage Rate 0.0 0.0 4.5
19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):

REFUEL 9, APRIL 14, 1996, 40 DAYS

20. If Shut Down at End of Report Period, Estimated Date of Startup: N/A
21. Units in Test Status (Prior to Commercial Operation): N/A

a 0 -

1 Director, Office of Resource Management January Monthly Operating Report Page 3 l

l

ATTACHMENT III l UNIT SHUTDOWNS AND POWER REDUCTIONS I DOCKET NO. 50/395

. UNIT V. C. SUMMER I 1 3 DATE 2/ 1/96 I COMPLETED BY J. W. HALTIWANGER )

TELEPHONE (803) 345-4297

JANUARY 1996
NO. DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION / COMMENTS l

! NONE l j l 1.0 REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction l E: Operator Training and License Examination F: Administrative l G: Operational Error H: Other (Explain) 2.0- METHOD 1: Manual 2: Manual Scram 3: Automatic Scram 4: Continuation (Use initial Date) 5: Power Reduction (Duration 0.0) l

9. Other (Explain) j I

i i

)

l l

)

i 1

i l

i d .

. j Director, Office of Resource Management January Monthly Operating Report Page 4 ATTACHMENT IV  ;

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE l

DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 2/ 1/96 COMPLETED BY J. W. HALTIWANGER TELEPHONE (803) 345-4297 JANUARY 1996  ;

V.C. Summer, Unit 1, operated at approximately 100 percent for the entire month of January. l l

l 1

l l

l l

_ -