Final - Section C Operating
ML032390358
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/21/2003
From: Berry P
Entergy Nuclear Northeast
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
50-333/03-301
Download: ML032390358 (41)


Text

JAMES A. FITZPATRICK NUCLEAR POWER PLANT NRC INITIAL LICENSE EXAMINATION SCENARIO 27 MAY 2003 I

TITLE: LOI-03-01 SCENARIO I,STUCK ROD/RWCU LEAK EOPS SCENARIO NUMBER: NEW PATH:

SIGNATURE VALIDATION TRAINING I

I OPERATIONS Page 1 of 12

SOURCE OF BRIEF DESCRIPTION OF DATE CHANGE CHANGE ~

INITIATOR REVIEWED 711103 NRC Validation Eliminate RMS to startup, Event 1 DeVercelly Torbitt Add detail for required operator actions Make stuck rod malfunction earlier in pull seauence.

7/9/03 Operations Validation Modify Attachment 1, Turnover Page DeVercelly Torbii Add turnover info on EPIC Thermal Limit Alarms expected.

Change RWCU pump trip event to B. Steam leak is modeled with elevated temperature in B pump room.

IncorDorate NRC aDproval of validation changes Page 2 of i2

Commitment Document:

r ii Shift Turnover ATTACHMENT 1 A reactor startup is in progress. The plant is at approximately 8% CTP. The Reactor Mode Switch is in RUN. OP-65 is complete through Step D.22.3. ST-5D has just been completed and is satisfactory.

Chemistry has reported that all chemistry parameters are well within specification for Power Operation. I-131 Dose Equivalent is <.2uci/gm. EPIC is indicating thermal limit alarms that are evaluated by Reactor Engineering to be expected values. IT is looking into the EPIC issue. Reactor Engineer guidance is to continue reactor startuD with rods until 25%CTP. You are currently in RWM Step 26.

Page 4 of 12

LOI-03-01 SCENARIO 1, STUCK ROD/RWCU LEAK/EOP5 B. SFULE:

I. Initial Protected IC-I37.

2. Special Instructions:
a. Reactor Startup in progress at approximately 8% CTP, RMS in RUN.
b. OP-65 complete through step D.22.3. Ready to start a second condensate pump.
c. FWLC in automatic master control on either reactor feed pump.
d. Confirm Reactor Analyst pull sequence agrees with simulator modeling.
e.
  • denotes critical task(s)
3. Preset Conditions:
a. RD10:34-19. Forth rod in RWM Group 26 stuck
b. ED24:B on Trigger E-6. Loss of MCC-153 triggered on 12MOV-15 green lamp on.

C. RDI 3:22:27. Control rod 22-27 fails to scram. RMCS insertion still available.

d. TC04:A-D. On event trigger 9. All BPVs fail closed after opening
e. AD07:C and E. Two ADS SRVs fail to open.
f. CUO2:B on event trigger 5. RWCU Pump B trip.
g. CU07 on event trigger 5 at 50%, I O minute ramp.
4. Consumable Forms and Procedures:

d

. AOP-24, STUCK CONTROL ROD, Rev. 7 AOP-1 Reactor Scram, Rev. 39

5. Modified Shift Turnover Sheet See Attachment 1 Page 3 of 12

EVENT SEQUENCE

2. Start of second Condensate Pump (Normal)
3. Continue startup with Rod Withdrawal (Reactivity Manipulation)
4. Stuck Control Rod (AOP-24) {Component and Tech Specs)
5. RWCU pump trip and steam leak into Rx Bldg. (Component)
6. Loss of MCC-152 upon 12MOV-15 closure
7. Non-isolable RB steam leaWEOPb/Manual ScramlEmeraencv Derxessurization fllllaior)

I a. I One rod fails to scram fComDonentl

9. BPV's fail closed after opening (Component) 10 2 ADS SRV's fail to oDen (ComDonent)

D.

'W

1. Emergency Depressurization in progress with 7 SRVs Page 5 of 12

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTlONSlSTANDARD COMMENTS/EVALUATION Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Brief crew on plant conditions and OP-65 status.

Provide Modified Turnover ~~

After the shift turnover, allow All Walkdown the control panels SAT / UNSAT / NA no more than five minutes for panel walkdown CRS Conduct turnover brief. Order continuation of OP-65 startup SAT / UNSAT / NA SNOlBOP Start second condensate pump per OP-3 0.7 SAT / UNSAT / NA Check 33P-8A motor amps Place 33P-88 control switch in start and release.

Check 33P-8A and B motor amps for load sharing.

Verify RPS A and B power source white lamps are lit.

Ensure 34MOV-I OOA(8) is open and 34FCV-137 is closed CRS Order in-sequence rod withdrawal SAT / UNSAT / NA SNO/RO Selects and withdraws control rods in sequence. SAT / UNSAT / NA SNO/RO Reports that control rod 34-19 will not move at normal drive SAT / UNSAT / NA pressures. May adjust up to 400 psid per OP-25 Section E.

Adjust 03MOV-20 closed to raise drive water D/P in -50 mid increments.

-~

ANY/ALL Recognize symptom of AOP-24 SAT / UNSAT / NA CRS Order performance of AOP-24 SAT / UNSAT / NA Page 6 of 12

(\ i INSTRUCTOR ACTIVITY POSIT10N OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Role Play: After several SNOlBOP Confirm 09-5 panel indications and HCU lineup are normal per SAT / UNSAT / NA minutes report lineup as OP-25 expected. Adjust 03MOV-20 open to restore drive water DIP to -260 psid.

Dispatch NPO to perform HCU-34-19 valve lineup per Attachment 2. ~~ ~~

SNO Incrementally raise drive DIP at -50 psig increments and SAT / UNSAT / NA attempt rod movement after each adjustment until drive DIP can no longer be raised.

Adjust 03MOV-20 closed to raise drive D/P by -50 psid.

Ensure stuck rod is selected in rod select matrix.

Select OUT NOTCH on rod movement control switch.

SNO Report to CRS that rod will not move with maximum D/P SAT / UNSAT / NA applied.

SNO Restore CRD hydraulic parameters to normal values SAT / UNSAT / NA Adjust 03MOV-20 open to restore drive water DIP to -260 psid.

CRS Consult Technical Specification 3.1.3 SAT / UNSAT / NA CRS Declare control rod 34-19 inoperable and enter condition A. SAT I UNSAT / NA CRS Brief crew on inoperability and required actions SAT / UNSAT I NA Immediately verify stuck rod separation criteria 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to disarm the drive 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to perform SR demonstrating adequate shutdown margin.

TRG! E5 ANYlALL Recognize and report RWCU pump B trip. SAT I UNSAT / NA SNO Dispatch NPO to RWCU pump area. SAT / UNSAT / NA Page 7 of 12

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONSISTANDARD COMMENTS/EVALUATION Role Play: After several SNO Relay report to CRS SAT / UNSAT / NA minutes report a steam leak in overhead area of RWCU pumps on RB 300 foot elevation.

CRS Order actions to trip and isolate RWCU (OP-28, Section G.2) SAT / UNSAT / NA SNO/BOP Turn off RWCU pumps SAT / UNSAT / NA Close 12 MOV-15,18, and 69 ANY/ALL Recognize bus loss coincident with valve closures SAT / UNSAT / NA CRS Order investigation of bus loss.

SNO/BOP Determine/report loss of MCC-152 SAT / UNSAT / NA Determine/reportfailure of 12MOV-15 to close CU07 severity may need to be CRS Recognize RWCU steam leak is un-isolable. SAT / UNSAT / NA slowly adjusted to drive the rest of the scenario actions by trackina temDeratures on SCT ANYlALL Recognize EOP-5 entry condition on RB Area SAT I UNSAT / NA Temperature/Radiation I CRS Enter EOP-5 SAT / UNSAT / NA I Order local area evacuation of reactor building

~~

CRS

~- ~

I SAT / UNSAT / NA SNO Sound station alarm and announce steam leak local area SAT / UNSAT / NA evacuation of reactor building CRS Execute EOP-5 RBlT, RB/R and RB/L concurrently prioritizing SAT UNSAT / NA RB/T CRS Order maximizing Reactor Building area cooling SAT / UNSAT / NA SNOlBOP Start all remaining Crescent Area Unit Coolers. SAT / UNSAT / NA CRS I Before any RB area Temperature exceeds Max Safe, Order I SAT I Manual Scram and enterEOP-2 1*

UNSAT / NA CRITICAL TASK Page 8 of 12

\ i INSTRUCTOR ACTIVITY POSITION ~~

OPERATOR ACTIONS/STANDARD COMMENTSlEVALUATlON SNOlRO Insert Manual Scram and perform AOP-I Immediate Actions SAT / UNSAT / NA

  • Depress Manual Scram pushbuttons Reactor Mode Switch to Shutdown
  • CRITICAL TASK Fully Insert all SRMs and IRMs Verify all rods in (2 will be not full in)

Verify SDlV Vent and Drain valves closed Verify APRMs downscale Verify/Trip Main Turbine Verify electrical distribution fast transfer

~ ~-

Verifv at least 1 Circ Water DumD runnina Order SNO/BOP to level control with Feed/Condensate at 177- SAT / UNSAT / NA 222.5 inches.

Trend level performance and manipulate GEMAC SAT / UNSAT / NA Masterllndividual controllers, RFP discharge valves and RFP trip as necessary to control level.

SNO/RO Recognize and report that 1 rod failed to scram (22-27) and SAT / UNSAT / NA that another (34-19) was previously stuck and also did not insert lGi--- Enter EOP-3 based on 2 rods not inserted to or beyond 02 SAT / UNSAT / NA 1-CRS Order SNO to Pressure Control with EHC in automatic. SAT l UNSAT / NA SNO Confirm EHC controlling pressure in automatic SAT / UNSAT / NA CRS Order SNO/RO to initiate ARI SAT / UNSAT / NA SNOlBOP Initiate ARI and confirm all 5 valves energized. SAT / UNSAT / NA

~~

CRS Order SNO/RO to insert control rods per EP-3 SAT / UNSAT / NA Page 9 of 12

( ( - i INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION

- ~ ~~

If rod 22-27 is attempted, it SNO/RO Determine EP-3 success path is RMCS SAT / UNSAT / NA will insert. Reset ARI by dispatching NPO to Relay Room If rod 34-19 is attempted, it BypassRWM will not EVALUATOR NOTE:

SDlV Hi Level Trip Switch to BYPASS Candidate may recognize Scram Reset Switch to Group 2&3 then I & 4. that 34-19 was previously To reset ARI:

Verify scram group lights lit demonstrated stuck and RFI-RP20 to test declared inoperable. The Establish drive DIP by placing 03FIC-301 in manual and candidate may NOT attempt opening 03FCV-I9A(B). to insert.

May start second CRD pump to support D/P.

May select control rod 34-19 on rod select matrix May attempt to drive in with Rod Movement or Emergency In Control Switch.

Rod will not move Select control rod 22-27 on rod select matrix Attempt to drive in with Rod Movement or Emergency In Control Switch.

Rod will fully insert ~~

CRS May order O/R ADS and T/P Core Spray per EOP-3 ~~

SAT / UNSAT / NA SNOlBOP If ordered: SAT I UNSAT / NA Both ADS O/R switches to O/R Both 14MOV-11 valve keylocks to bypass Close 14MOV-11 A and B (l4MOV-11A is de-energized and will not close.

SNO/RO Report all rods in except 1 SAT / UNSAT / NA CRS Exit EOP-3 and enter EOP-2 SAT / UNSAT / NA If ED is anticipated, TRG! E9 CRS Recognize that 2 RB area temperatures above max safe SAT / UNSAT / NA As BPVs are opening requires Emergency Depressurization.

If BPVs failed closed: CRS Order pressure control on SRVs at a 200 psig band. SAT / UNSAT / NA Page 10 of 12

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATIO SNO Sequentially open and close SRVs as necessary to maintain SAT / UNSAT NA Dressure band CRS If 2 max safe RB area temperatures are exceeded, announce SAT / UNSAT / NA that an emergency depressurization is required.

CRS Enter EOP-2 ED leg and order opening of 7 ADS valves. SAT / UNSAT / NA

  • CRITICAL TASK SNO Open ADS valves A-H (excluding F) SAT / UNSAT / NA
  • CRITICAL TASK SNO Report that ADS valves C and E failed to open SAT IUNSAT / NA

~- ~

  • CRITICAL TASK CRS Order additional SRVs opened to a total of 7 valves SAT / UNSAT / NA
  • CRITICAL TASK SNO

~

Opens 2 additional SRVs and reports 7 valves open I SAT I UNSAT / NA

  • CRITICAL TASK TERMINATE THE SCENARIO Page 11of 12

ATTACHMENT 1 Shift Turnover A reactor startup is in progress. The plant is at approximately 8% CTP.

The Reactor Mode Switch is in RUN. OP-65 is complete through Step D.22.3.

ST-SD has just been completed and is satisfactory.

Chemistry has reported that all chemistry parameters are well within specification for Power Operation. 1-131 Dose Equivalent is <.2uci/gm.

EPIC is indicating thermal limit alarms that are evaluated by Reactor Engineering to be expected values. IT is looking into the EPIC issue.

Reactor Engineer guidance is to continue reactor startup with rods until 25%CTP. You are currently in RWM Step 26.

Page 12 of 12

TITLE: LOI-03-01 SCENARIO 2, TURBINE VIBRATIOWLOSS OF VACUUWATWS SCENARIO NUMBER: NEW PATH:

SIGNATURE VALIDATION TRAINING J

OPERATIONS t;- l-&.bl-+f-L' LOI-03-01 SCENARIO 2, TURBINE VIBRAJION/LOSS OF VACUUM/ATWS Page 1 of 16

~~

L SOURCE OF BRIEF DESCRIPTION OF DATE CHANGE CHANGE INITIATOR REVIEWED 7/1103 I NRC Validation 1 Add Cooper OE refemce DeVercelly Torbitt Add detail to required operator actions ~ ~~

7/9/03 Operations Validation Modifj Attachment 1, Shift turnover DeVercelly Torbitt Add Technical Specification Call related to Event Added missing operator actions related to the onset of event 7 Added recognition that SLC initiation earlier than required is acceptable and may affect the scenario predicted sequence of events.

LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 2 of 16

--A. TITLE. LOI-03-01 SCENARIO 1, STUCK ROD/RWCU LEAK/EOP-5 B. SFTUP:

1. Initial Protected IC-I 38
2. Special Instructions:
a. Plant operating normally at -95% CTP
b. Rod Pattern exchange just completed. Returning to 100% CTP.
c. Confirm Reactor Analyst pull sequence agrees with simulator modeling.
d. Confirm RAP-7.3.16 guidance is at the 09-5 panel
3. Preset Conditions:
a. On Trigger 1, RR19:B fail as is.
b. On Trigger 3, TU04:E at 21% and D at 22% no ramp. (7-9 mils)

C. On Trigger 3, MCOI at 42% severity over 20 minutes.

d. Preset RD22:A at 70%
e. Preset RDOlA:A
4. Consumable Forms and Procedures:

AOP-66, MAIN TURBINE HIGH VIBRATION, REV. 3 AOP-31, LOSS OF CONDENSER VACUUM, REV. 15 AOP-41/42, FEEDWATER MALFUNCTION, Rev. 6/10 AOP-1 Reactor Scram. Rev. 39

5. Modified Shift Turnover Sheet See Attachment 1 LOI-03-01. SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/AlWS Page 3 of 16

Commitment Document:

The crew will take the shift with the plant operating normally at -95% CTP following a rod pattern exchange. Following Reactor Analyst guidance, the crew will continue a power ascent to 100% CTP using recirculation flow. Shortly into the power ascent, the operators will notice that the non-controlling FWLC level instruments are trending down while the controlling is steady. The crew will diagnose that the FWLC controlling instrument has failed as is causing actual level to trend down slowly. The crew will take manual control, of FWLC, enter AOP-42 and determine the cause to be a failed instrument. The crew will then swap FWLC to the alternate instrument input and return to automatic level control. The Control Room Supervisor will consult technical specifications for the failed instrument. The Main Turbine will then lose part of a low pressure blade that will penetrate the low pressure turbine exhaust boot. This will be indicated by a step change in turbine vibration followed by a slow loss of condenser vacuum that will eventually worsen. Turbine vibration will result in entry to AOP-66 but will not be severe enough to require a turbine trip. The condenser vacuum loss will eventually result in AOP-31 entry which will require a power reduction. The vacuum loss will worsen such that power reductions with both recirculation flow and rods will occur. Eventually the AOP-31 manual scram milestone will be met. The manual scram will not be completely successful due to hydraulic blockage in one of the scram discharge volumes. Power will be above 2.5% requiring significant EOP-3 action. As a nuisance, one SDlV vent valve will fail to close. The EP-3 success path will be inserting rods with RMCS and repeated manual scrams. As vacuum continues to trend away, level control will need to transition to HPCl and pressure control augmented with SRVs.

The resultina challenge to containment may result in SLC injection if not already started.

NOTE:

The main turbine blade loss and resulting vibration are similar to an event that occurred at Cooper in May 2003. Reference OE-16340 Shift Turnover ATTACHMENT 1 The plant is operating normally at -95% CTP. A rod pattern exchange has just been completed and the reactor analvst quidance is to return to 100% CTP usina recirculation flow.

v LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/AWS Page 4 of 16

u NENT EVENT SEQUENCE NO.

1. FWLC Controlling Instrument as is failure (Instrument and Tech Specs)
2. Swap to alternate FWLC Instrument input and return FWLC to automatic.
3. Step change in Turbine Vibration (Component)
4. Slow loss of condenser vacuum (Component)
5. Power reduction with recirculation flow (Reactivity)
6. Power reduction with rod insertion (Reactivity)
7. ATWSIEOPS (Major)
8. SDlV Vent and Drain valve fails to close (component)

D.

1. Control rods beinglinserted using EP-3
2. Level control stable at 0-222.5 inches
3. Pressure control stable L-LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 5 of 16

i

~

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Modified Turnover After the shift turnover, allow All Walkdown the control panels SAT / UNSAT / NA no more than five minutes for panel walkdown CRS Conduct turnover brief. Order continuation of power ascent to SAT / UNSAT / NA 100% usina recirculation flow Der OP-27 Section E.

TRG! E l SNO/BOP Alternatively adjust recirculation MG set speeds in I-3% SAT / UNSAT / NA increments.

Monitor reactor power and core flow between adjustments. ~~

SNO/RO Monitor power pressure and level at 09-5 during ascent. SAT / UNSAT / NA ANY/ALL Recognize off normal RPV water level condition SAT / UNSAT / NA SNO Select FWLC to manual. Stabilize and restore RPV level to SAT / UNSAT / NA green band.

Select the Master Controller to Manual and adjust the manual control potentiometer.

OR Select both MGUs to manual and adjust the manual control Dotentiometers CRS Order entry into AOP-42 SAT / UNSAT / NA

~~~ ~

SNO/BOP Perform actions of AOP-42. SAT / UNSAT I NA Determine that controlling Binstrument is failed which caused an actual low RPV level condition.

CRS Order swap to Alevel transmitter and return FWLC to SAT / UNSAT / NA automatic per OP-2A LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 6 of 16

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTSIEVALUATION SNOIBOP Select OP-2A, section G.30 SAT I UNSAT I NA Place column select switch to A Ensure RPV water level stabilizes Return to Automatic FWLC per G.7 Verify 06-84A and B (MGUs) in manual Select 06LC-83 (Master Controller) to MANUAL Adjust 06LC-83 manual potentiometer to balance 06-84A.

Place 06-84A in BAL Adjust 06LC-83 setpoint tape to balance 06LC-83 Place 06LC-83 in BAL Balance 06-848 by adjusting the manual potentiometer.

Note, this will result in a level change and response by 06LC-83 and 06-84A.

~

Place 06-848 in BAL CRS Reference Technical Specification 3.3.2.A.1 and determine SAT I UNSAT I NA that the failed channel must be tripped within 7 days.

TRGl E3 ANYIALL Recognize Main Turbine High Vibration condition. SAT I UNSAT I NA Severities may need adjustment to ensure 7-9 mils. ~~

CRS Order entry into AOP-66 SAT I UNSAT I NA LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 7 of 16

INSTRUCTOR ACTIVITY POSITION -~

OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION ROLE PLAY: If requested, SNO Determine if alarm is valid. SAT / UNSAT / NA report that there is EPIC Alarm list abnormally high noise levels and vibrations on the Main EPIC TGB Screen Turbine elevation (300) 09-5 recorder 94VR Dispatch operator(s) to turbine Announce turbine bearings 4 and 5 are alarming at elevated vibration values (7-9 mils)

ROLE PLAY as Mike Tallents CRS Report abnormal vibration to Main Turbine Expert SAT / UNSAT / NA and acknowledge report.

State that YOU are coming in CRS May order power reduction using recirculation flow at normal SAT / UNSAT / NA rates to attemDt to reduce vibration levels.

~~~ ~~

S NO/BOP If ordered, commence power reduction using recirculation flow SAT / UNSAT / NA per OP-27 Section E.

Alternatively reduce each MG set speed in I-3%

increments.

~~

Monitor reactor Dower and core flow between adiustments.

~

ANY/ALL Recognize and announce worsening trend in condenser SAT / UNSAT / NA vacuum.

CRS Order entry into AOP-31 SAT / UNSAT / NA LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 8 of 16

~~

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Monitor and adjust MCOl as SNOIBOP Commence actions of AOP-31 SAT / UNSAT I NA necessary to ensure the 0 Determine operation to be in Normal Operating Region of remaining scenario actions Attachment 2 0 Trip Recombiner 0 Ensure Hydrogen Addition System trips 0 Dispatch NPO to verifiy valve lineup at Off Gas Recombiner Panel 0 Close TB Equip Sump Vacuum Drag Isolation valve 0 Dispatch NPO to place spare SJAEs in service 0 Determine source is air in-leakage 0 Ensure Steam Seal Pressure is 1-4 psig 0 Ensure Steam Packing Exhauster vacuum is 10-20 inches.

0 DisPatch oPerators to search for air leak ~~ ~ ~~ ~~

CRS Set Manual Scram benchmark of 23-25 inches Hg SAT / UNSAT / NA CRS Order power reduction with recirculation flow to counter SAT / UNSAT I NA vacuum trend. Caution against reducing below 50% core flow.

Based w o n vacuum trend rate, may order raDid rates SNO/BOP Reduce recircualtion flow to -50% Core Flow at normal rates SAT I UNSAT I NA per OP-27 Section E.

Alternatively reduce each MG set speed in I-3%

increments.

Monitor reactor power and core flow between adjustments.

SNO/BOP Reduce recirculation flow to -50% Core Flow at rapid rates per SAT I UNSAT I NA OP-27 Section G.1 Simultaneously reduce both Recirc MG controllers to reduce speed continuously to a value near but greater than 50% core flow.

LOI-03-03. SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 9 of 16

I INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD 1 COMMENTSlEVALUATlON 4NY/ALL Recognize/reportthat condenser vacuum is still worsening I SAT / UNSAT / NA SRS Order insertion of the first cram group. SAT / UNSAT / NA ROLE PLAY: As NPO, report SNO/RO Select and fully insert all rods in the first cram group SAT / UNSAT I NA

hat there is a visible tear in ihe exhaust boot of LP turbine B.

Monitor and adjust MCOI as ANYlALL Recognize/report that condenser vacuum is still worsening necessary to force manual scram Delete TU04: D and E CRS Order Manual Scram SAT / UNSAT I NA

~-

I SAT IUNSAT

~~

SNO/RO Insert Manual Scram and perform AOP-1 Immediate Actions NA Depress Manual Scram pushbuttons Reactor Mode Switch to Shutdown Fully Insert all SRMs and IRMs Verify all rods in (Many will not be)

Verify SDlV Vent and Drain valves closed (One will not be)

Verify APRMs downscale (Will not be)

Verify at least ICirc Water pump running CRS Order SNO/BOP to level control with Feed and Condensate SAT / UNSAT / NA 177-222.5 inches SNO/BOP Manipulate RFP, GEMAC Controllers and RFP Discharge SAT / UNSAT / NA valves as necessarv to control RPV level.

LOI-03-01SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 10 of 16

( i INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION SNO/RO May report one SDlV Vent valve failed to close. SAT / UNSAT / NA Based upon priorities, this information may be withheld until a less challenging time in the scenario.

CRS If reported, order select SDlV Isolation Valve Test to Testllsol. SAT I UNSAT / NA

~ ~~ ~~

SNO/RO Report multiple rods out, APRMs NOT downscale SAT / UNSAT / NA

~

  • CRITICAL TASK CRS Order SNOlRO to perform the following EOP-3 actions SAT / UNSAT / NA Initiate ARI
  • CRITICAL TASK
  • Reduce recirculation flow to minimum Trip both recirculation pumps Override ADS May order SLC Initiation
  • Determine EP-3 success path and insert rods.

Initiation of SLC may affected the predicted scenario sequence from this point forward.

LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 11 of 16

I INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION SNO/RO Perform the following EOP-3 actions: SAT / UNSAT / NA Select ARI Switch to ACT

  • CRITICAL TASK
  • Adjust both recirculation GEMAC manual controls to minimum speed demand while trending RPV level
  • Select both drive motor breaker control switches to STOP Select both ADS override switches to override
  • CRITICAL TASK Note SLC tank level Select SLC control switch to ordered division.

Verify pump running light on Verify pump discharge pressure is above RPV pressure.

Verifv RWCU-18 and 69 close.

CRS Order SNOlBOP to terminate and prevent all injection except SAT / UNSAT / NA SLC, CRD and RClC per EP-5. New level band is -1 9 to 110.

Injection source will be HPCI. Caution against rapid injection.

  • CRITICAL TASK SNO/BOP Perform the following EOP-3/EP-5 level control actions: SAT / UNSAT / NA
  • Reduce running RFP(s) MIA stations to manual minimum.
  • CRITICAL TASK
  • Ensure running RFP min flow valve(s) open Shut 34MOV-lOOA,B and 34 FCV-137. (Not required until RFPs are shutdown)

SNO 1OMOV-27A/B Auto Control to bypass and close 1OMOV- SAT / UNSAT / NA 27AIB (May be deferred) 14MOV-lIA/B Auto Actuation to Bypass and close 14MOV-11A/B (may be deferred)

LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 12 of 16

I \ \

1 INSTRUCTOR ACTIVITY 1 POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION 1 CRS Order SNO to pressure control with EHC in automatic. Band of 900-1000 psig.

SAT / UNSAT / NA I SNO Confirm EHC in automatic controlling RPV pressure in band. SAT / UNSAT / NA CRS Order reinjection with HPCl per EP-5. Level band of -1 9 to SAT / UNSAT / NA II O inches Adjust MCOI to force loss of SNOlBOP Reinject with HPCl by: SAT / UNSAT / NA e Ensure SGT running (will be) e Ensure 01-125MOV-I 3A / B is open 0 Ensure HPCl flow controller in Manual minimum e Depress turbine trip reset e Verify / align automatic initiation lineup e Control speed to control injection e Ensure speed maintained greater than 2100 RPM CRS Order control rod insertion with EP-3 success paths I SAT / UNSAT / NA SNO/RO NOTE: SNOlRO should pursue both paths in that RMCS can SAT UNSAT NA complete partial insertions while SDIVs are draining to enable Manual scrams.

To reset ARI, RFI-RP20 to Test SNO/RO EP-3 RMCS path actions:

e Dispatch NPO to reset ARI and observe solenoids de-I SAT I UNSAT / NA

  • CRITICAL TASK energized. (if not already done)

EVALUATOR NOTE:

  • RWM Keylock to Bypass-.
  • Raise drive water D/P. Options include shut CRD-56, Rod insertion by EITHER Start second CRD pump, manually adjust FIC-301 to open RMCS or Manual Scrams is AOV-I9A(B) considered a Critical Task.

Both are not reauired.

  • Select and drive rods full in in EP-3 attachment sequence I using rod movement or emergency in switch. I LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 13 of 16

( ,

OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Recognize that as condenser vacuum continues to worsen, SAT / UNSAT / NA necessary to force RFP trip Pressure control will need to transition to HPCl augmented with and loss of bwass valves SRVs.

~~

CRS Trend BllT and if not already done, order SLC injection before SAT / UNSAT / NA exceeding BllT

  • CRITICAL TASK SNO If ordered to inject SLC, SAT / UNSAT I NA Verify Squib Valve ready lights are on
  • CRITICAL TASK Note SLC tank level Select SLC control switch to ordered division.

Verify pump running light on Verify pump discharge pressure is above RPV pressure.

Verify RWCU-18 and 69 close. ~~ ~~

Order transition of RPV pressure control to HPCl and augment SAT / UNSAT / NA I CRS with SRVs. Modify band to 800-1000 psig. ~~ ~

SNO To transition Pressure Control. SAT / UNSAT / NA Augment HPCl operation with sequential opening of SRV's to maintain 800-1000 psig LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 14 of 16

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION CRS Before condenser vacuum is less than 8 inches Hg, order SAT / UNSAT / NA closure of the MSIVs.

SNO Select all 8 MSlV control switches to CLOSE. SAT / UNSAT I NA SNO Report downward trend in SLC tank level. SAT / UNSAT / NA RFI- RP21:AI, A2, B1, and SNO/RO EP-3 Manual Scram path actions SAT / UNSAT / NA B2 to hang RPS jumpers Dispatch NPO to reset ARI and observe solenoids de-

  • CRITICAL TASK energized (if not already done)

EVALUATOR NOTE:

Order/hang 09-15/17 auto scram jumpers.

Open CRD-56 if closed. Rod insertion by EITHER RMCS or Manual Scrams is When the scram is reset, SDlV Hi Level Trip to Bypass considered a Critical Task.

delete malfunction RD22A Rx Scram Reset to Group 2 and 3 then 1 and 4. I Both are not required.

When SDIVs are drained insert Manual Scram CRS When all rods in: SAT / UNSAT / NA Order SLC secured I Exit EOP-3 and enter EOP-2 TERMINATE THE SCENARIO LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 15 of 16

W I I JAMES A. FITZPATRICK NUCLEAR POWER PLANT NRC INITIAL LICENSE EXAMINATION SCENARIO 27 MAY 2003 I I I TITLE: LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 SCENARIO NUMBER: NEW PATH:

SIGNATURE VALIDATION I

TRAINING LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 1 of 13

SOURCE OF BRIEF DESCRIPTION OF DATE CHANGE CHANGE INITIATOR REVIEWED 7/3/03 NRC Validation Add detail to required operator actions DeVercelly 7JIC-b ,-kt Delete ramp on Event 2 L-LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 2 of 13

.--.A. llllu2 LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 B.

1. Initial Protected IC-139
2. Special Instructions:
a. PJant operating normally at 100% CTP
b. Confirm Reactor Analyst pull sequence agrees with simulator modeling.
c. Confirm Reactor Analyst RAP-7.3.16 guidance is available at 09-5 panel.
d. Ensure LPRM bypass postings are current to support scenario.
e. Bypass additional LPRMs as necessary to support Event 2 Tech Spec exercise.
f. Ensure A and B SW pumps in service. C in standby
3. Preset Conditions:
a. NM11:683613 on Trigger E-2 at 100% severity and nc ramp (mus: r e s n w IC , LPRM Upscale failure. (LPRM will be assigned to a B division APRM such that upon failure, APRM inop on 2 per level count).
b. O r a rrigaer override LDRW 36-!-B downscale white lamp on
c. OG04 on Trigger E-3, Combustion in Off-Gas
d. Annunciator 09-6-1-23 crywotf on Trigger E-3
e. Recombiner trip on Trigger E-3
f. RR15:A on Trigger E-6 at 50% severity and 10 minute ramp, Steam Leak in Drywell.
g. Preset RD13:XX:W, One rod fail to scram
h. ED18:X on Fast transfer trigger assigned to Trigger E-7, Loss of 10500 Bus.
4. Consumable Forms and Procedures:

AOP-5, Combustion in SJAE After Condenser, Rev. 10 AOP-1 Reactor Scram. Rev. 39

5. Modified Shift Turnover Sheet See Attachment 1 u

LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 3 of 13

.-C. RY:

Commitment Document:

The scenario begins with the plant operating normally at 100% CTP. A repair of the C SW strainer has just been completed and the tags are clear. The shift will swap to the C SW pump in service and B in Standby to facilitate a pressure leak test of the C SW pump strainer. An LPRM will fail upscale resulting in a single APRM upscale trip. A half scram on APRM upscale will result. The crew will determine a failed LPRM as the cause and bypass the LPRM. The bypass will result in an INOP APRM on the 2 per levet count basis.

A Tech Spec review will identify a Potential LCO with trip function maintained by the remaining divisional APRMs. A fire in the SJAE After Condenser will require entry to AOP-5. Actions to extinguish the fire will not be successful until Rx power has been reduced with both recirculation flow and control rods. After the fire is out, a steam leak in the drywell will force entry into EOP-2 and 4. On the Manual Scram, a single rod will fail to insert and will subsequently be driven in by normal RMCS. On the fast transfer, the 10500 bus will experience catastrophic failure resulting in a loss of containment cooling capability with the A RHR loop as well as a loss of both A and B RHR pumps. This reduces EOP-4 actions to a single (D) RHR pump in the B loop. A sinnle d w e l l sprav evolution will result in scenario termination.

I Shift Turnover ATTACHMENT 1 I 1 The plant is operating normally at 100% CTP. Maintenance has just completed a repair to the C SW pump

,L-discharge strainer and the tags have been cleared. An NPO is standing by with maintenance to perform a I pressure leak check of the strainer. Swap to the C SW pump in service and B in Standbv.

b LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 4 of 13

'- EVENT EVENT SEQUENCE NO.

I. Swap in service Service Water pumps (Normal)

2. LPRM Upscale failure/APRM half scram (Instrument and Tech Specs)
3. Combustion in SJAE After Condenser (AOP-5) (Component)
4. AOP-5 directed power reduction with recirculation flow (Reactivity)
5. AOP-5 directed power reduction with Control Rods (Reactivity)
6. Steam leak in the Drywell (Major)
7. Loss of 10500 bus (Component)

D. -FT

1. Completion of 1 Drywell Spray Evolution c-LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 5 of 13

i

-~

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Modified Turnover After the shift turnover, allow 411 Walkdown the control panels SAT / UNSAT / NA no more than five minutes for Dane1 walkdown CRS Conduct turnover brief. Order coordination with field to start C SAT / UNSAT / NA

~

SW pump and place B in STBY per OP-42 G.l After short times, act as NPO SNO/BOP Swap SW pumps per OP-42 SAT I UNSAT / NA and report: 0 Dispatch NPO to isolate chemical cleaning and chlorine to Chlorine and chemical B SW pump.

cleaning isolated to B e Dispatch NPO to verify discharge valve (46SWS-2C) is Pump open.

46SWS-2C is open e Place C SW pump control switch in START.

C SW strainer has no e Verify motor amps less than 163 leakage e Verify no strainer leakage with NPO Chlorine and chemical cleaning started on C e Place and hold SW pump B control switch in stop Pump e When header pressure is normal release switch tgo NORMAL 0 Place SW pump B control switch in PTL e Verify A and C pump motors at less than 163 amps 0 Verify header pressure 85 to 100 psig 0 Start chemical cleaning and chlorine injection on C pump.

TRG! E2 ANY/ALL Recognize/ReportAPRM Bupscale, half scram B and SAT / UNSAT / NA LPRM upscale alarm. Determine failed LPRM is 36-13-8 LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 6 of 13

~

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTSEVALUATION I SAT I UNSAT I NA

~

SNO/RO Report that all other APRMs are stable.

~~ ~

CRS Order bypass of LPRM 36-13-B per OP-I 6 SAT / UNSAT I NA SNO/BOP Select OP-16 section E . l l . SAT I UNSAT / NA Bypass APRM per section E.16 by placing bypass switch to B and confirming bypass lamp/EPIC alarm.

Verify APRM B bypass lamp at 09-14 Select APRM meter function switches to the LPRM 36-13-B Wlieil L.IFIFv1 amplifier card is PIT( ~1 I rwn Illll)ilflpl I 3rd 111 ~ 3 )

selc?,ctedto k?Y, override Verify individual LPRM downscale and bypass lamps on.

1.PRM downscale wtiite Iarny Verify meter face LPRM bypass lamp is lit.

0 I1 Verify APRM meter reads zero.

0R I X,XXXX X X XX X XX Y. X X X Place meter function switch in AVERAGE.

Ensure rod select power is on.

Select a neighboring control rod at 09-5 to check RBM inputs.

Turn off rod select power then turn on.

May contact RE to determine effect on RBM Count APRM total and per level remaining inputs by counting LPRM card switches that remain in OP.

ReDort results to CRS CRS Recognize that APRM is inoperable on 2 per level criteria and SAT / UNSAT / NA consult Tech Specs 3.3.1 .Iand TRM 3.3.8.1. Determine that no condition entry is required.

TRG! E3 ANY/ALL RecognizeIReport indications of combustion in SJAE after SAT / UNSAT I NA condenser.

Cause of recombiner trip is low outlet temDerature LOI-03-01SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 7 of 13

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTWEVALUATION CRS Announce entry to AOP-5. Direct SNOlBOP to perform actions SAT / UNSAT / NA of AOP-5.

May review E-plan for fire event applicability SNO/BOP Perform the following AOP-5 actions: SAT / UNSAT / NA Ensure Hydrogen Injection trips.

Ensure tempering gate hoist is closed.

Dispatch NPO to place manipulate SJAEs lineup.

Report to CRS that power reduction is required until 40% or fire is extinguished.

Continue

~-

with SJAE alianment changes.

~

CRS Brief crew and direct SNO/BOP to reduce power using SAT / UNSAT / NA recirculation flow to 50% core flow or the fire is out.

NOTE: CRS judgment on desired power ramp rate.

SNO/BOP Alternatively adjust Recirculation GEMAC controllers in 1-3% SAT / UNSAT / NA increments without going below 50% core flow.

OR Concurrently reduce both GEMACs at a rapid rate without going below 50% core flow SNO/RO Monitor power/pressure/level during downpower. SAT / UNSAT / NA I DELETEOG04 SNOlBOP Report Core Flow at - 50% and combustion still indicated. SAT / UNSAT / NA CRS Order SNO/RO to insert the first cram group SAT / UNSAT / NA SNO/RO Select the first rod in the cram group and fully insert all rods in SAT / UNSAT / NA the cram group using Rod Movement or Emergency In Control Switch.

LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 8 of 13

I INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION 4NY/ALL Recognize that combustion has extinguished. SAT / UNSAT / NA Off Gas Flow rate rises Off Gas Radiation lowers Stack Radiation rises.

CRS Order chemistry to complete a confirmatory hydrogen sample. SAT UNSAT NA 1 TRG! E6 I\NY/ALL Recognize indications of steam leak in drywell. SAT / UNSAT I NA I CRS Order establishment of a Torus Vent per OP-37 SAT / UNSAT / NA Set a benchmark for a manual scram of 2-2.3 psig drywell pressure. L SNOlBOP Commence actions to establish Torus vent. SAT / UNSAT I NA NOTE: No actions will actually complete due to rate of rise in drywell pressure.

ANY/ALL Recognize/Report manual scram benchmark SAT / UNSAT / NA SNO/RO Insert Manual Scram and perform AOP-1 Immediate Actions Depress Manual Scram pushbuttons Reactor Mode Switch to Shutdown Fully Insert all SRMs and IRMs Verify all rods in (One will not be)

Verify SDIV Vent and Drain valves closed Verify APRMs downscale Verifyhrip Main Turbine Verify electrical fast transfer NSS-RSS Verify at least 1 Circ Water pump running CRS Order SNO/BOP to level control with FeedKondensate at 177- SAT / UNSAT I NA 222.5 inches.

LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 9 of 13

I I I I I INSTRUCTORACTIVITY I POSITION I OPERATOR ACTIONS/STANDARD I COMMENTS/EVALUATION SNO/BOP Trend level performance and manipulate GEMAC I SNO/RO Master/lndividual controllers, RFP discharge valves and RFP trip as necessary to control level.

Recognize and report that 1 rod failed to scram and that the 10500 is de-energized with A and C EDGs running SAT / UNSAT / NA Role Play: Report as NPO SNO Dispatch NPO to assess status of 10500 bus and EDGs SAT / UNSAT / NA that 10500 bus has heavy damage at the 10514 breaker and heavy smell of burnt insulation.

CRS Order SNO to Pressure Control with EHC in automatic. SAT / UNSAT / NA SNO Confirm EHC controlling pressure in automatic SAT / UNSAT / NA CRS Order actions of AOP-18 SAT / UNSAT / NA SNO Perform actions of AOP-18. Prioritize S/D of EDG A and C. SAT / UNSAT / NA ANY/ALL RecognitelReport EOP2/4 entry condition on DNV pressure SAT / UNSAT / NA CRS Announce entry into EOP-2 and 4 SAT / UNSAT / NA ANYIALL Recognize/Report HPCl initiation SAT / UNSAT / NA CRS Determine HPCl injection not needed and order HPCl tripped SAT UNSAT NA SNO Trip HPCl SAT / UNSAT / NA LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 10 of 13

\

I INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONSISTANDARD COMMENTSIEVALUATION RRI 5:A severity may need to CRS When torus pressure >2.7psig order B loop of RHR in torus SAT / UNSAT I NA be adjusted to force scenario spray with excess flow to torus cooling.

milestones I SAT I UNSAT I NA

~~~~~ ~~~~ ~

SNO Startup B loop RHR in Torus Spray. Excess flow to torus cooling while observing current limitation on RHR pump.

Place spray control switch in manual and verify white lamp lit.

Start D RHR pump Open IOMOV-39B Open IOMOV-38B Verify 1OMOV-16B closes Throttle 1OMOV-34B to greater than 6500 gpm pump flow.

Verify RHRISW keep full alarm clear Start BID RHRISW pump Throttle IOMOV-89B to 4000 gpm per pump Close IOMOV-66B 1 CRS Set a torus pressure benchmark of 15 psig. Order terminate and prevent RHR and Core Spray per EP-5 SAT / UNSAT I NA SNOlRO Keylock override 1OMOV-27NB to bypass SAT I UNSAT I NA Close IOMOV-27NB Keylock override 14MOV-1I N B Close 14MOV-I 1N B (11A de-energized)

Stop Core SDrav pumps N B CRS Order RPV cooldown at 4 0 0 degrees per hour with caution that d w e l l steam leak is contributing to cooldown I SAT I UNSAT I NA SNO Trend cooldown and adjust bypass jack and auxiliary steam loads to commence a cooldown at < 100 degrees per hour.

I SAT I UNSAT I NA SNO Announce torus pressure 15 psig milestone 1 SAT I UNSAT I NA LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 11of 13

INSTRUCTOR ACTIVITY POSITION OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION CRS Ordedconfirm drywell cooling fans and recirculation pumps SAT / UNSAT I NA tripped SNO Trip both recircualtion pumps SAT / UNSAT / NA CRS Confirm operation in safe region of DNV spray initiation limit. SAT / UNSAT / NA CRS Order drywell sprays using B RHR. Caution SNO to terminate

  • CRITICAL TASK drywell sprays before drywell pressure drops below 0 psig.

SNO Places B RHR in drywell spray observing caution for excessive SAT / UNSAT / NA pump amps.

  • CRITICAL TASK Place spray control switch in manual and verify white lamp is lit Open IOMOV-26B Throttle 1OMOV-31B to raise drywell spray flow Throttle 1OMOV-346 to lower torus cooling flow I ANY/ALL Trend and report drop in drywell pressure SAT / UNSAT / NA TERMINATE THE SCENARIO LOI-03-01SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 12 of 13

i-ATTACHMENT 1 Shift Turnover The plant is operating normally at 100% CTP. Maintenance has just completed a repair to the C SW pump discharge strainer and the tags have been cleared. An NPO is standing by with maintenance to perform a pressure leak check of the strainer. Swap to the C SW pump in service and B in Standby.

Page 13 of 13