JAMES A. FITZPATRICK NUCLEAR POWER PLANT NRC INITIAL LICENSE EXAMINATION SCENARIO 27 MAY 2003 I

TITLE:

SCENARIO NUMBER:

NEW LOI-03-01 SCENARIO I, STUCK ROD/RWCU LEAK EOPS PATH:

SIGNATURE VALIDATION TRAINING I

I OPERATIONS Page 1 of 12

SOURCE OF DATE CHANGE 711 103 NRC Validation 7/9/03 Operations Validation BRIEF DESCRIPTION OF CHANGE Eliminate RMS to startup, Event 1 Add detail for required operator actions Make stuck rod malfunction earlier in pull seauence.

Modify Attachment 1, Turnover Page Add turnover info on EPIC Thermal Limit Alarms expected.

Change RWCU pump trip event to B. Steam leak is modeled with elevated temperature in B pump room.

IncorDorate NRC aDproval of validation changes INITIATOR

~

DeVercell y DeVercelly REVIEWED Torbitt Torbii Page 2 of i2

Commitment Document:

r ii Shift Turnover ATTACHMENT 1 A reactor startup is in progress. The plant is at approximately 8% CTP. The Reactor Mode Switch is in RUN. OP-65 is complete through Step D.22.3. ST-5D has just been completed and is satisfactory.

Chemistry has reported that all chemistry parameters are well within specification for Power Operation. I-131 Dose Equivalent is <.2uci/gm. EPIC is indicating thermal limit alarms that are evaluated by Reactor Engineering to be expected values. IT is looking into the EPIC issue. Reactor Engineer guidance is to continue reactor startuD with rods until 25%CTP. You are currently in RWM Step 26.

Page 4 of 12

LOI-03-01 SCENARIO 1, STUCK ROD/RWCU LEAK/EOP5 B.

SFULE:

I.

Initial Protected IC-I 37.

2.

Special Instructions:

a.

Reactor Startup in progress at approximately 8% CTP, RMS in RUN.

b. OP-65 complete through step D.22.3. Ready to start a second condensate pump.
c. FWLC in automatic master control on either reactor feed pump.
d. Confirm Reactor Analyst pull sequence agrees with simulator modeling.
e.
  • denotes critical task(s)
3.

Preset Conditions:

a.
b.

C.

d.
e.

AD07:C and E. Two ADS SRVs fail to open.

f.
g.

RD10:34-19. Forth rod in RWM Group 26 stuck ED24:B on Trigger E-6. Loss of MCC-153 triggered on 12MOV-15 green lamp on.

RDI 3:22:27. Control rod 22-27 fails to scram. RMCS insertion still available.

TC04:A-D. On event trigger 9. All BPVs fail closed after opening CUO2:B on event trigger 5. RWCU Pump B trip.

CU07 on event trigger 5 at 50%, I O minute ramp.

4.

Consumable Forms and Procedures:

d

. AOP-24, STUCK CONTROL ROD, Rev. 7 AOP-1 Reactor Scram, Rev. 39

5.

Modified Shift Turnover Sheet See Attachment 1 Page 3 of 12

EVENT SEQUENCE

2.
3.
4.
5.
6.
7.

Start of second Condensate Pump (Normal)

Continue startup with Rod Withdrawal (Reactivity Manipulation)

Stuck Control Rod (AOP-24) {Component and Tech Specs)

RWCU pump trip and steam leak into Rx Bldg. (Component)

Loss of MCC-152 upon 12MOV-15 closure Non-isolable RB steam leaWEOPb/Manual ScramlEmeraencv Derxessurization fllllaior)

I

a.

I One rod fails to scram fComDonentl

9.

10 BPV's fail closed after opening (Component) 2 ADS SRV's fail to oDen (ComDonent)

D.

1.

Emergency Depressurization in progress with 7 SRVs

'W Page 5 of 12

INSTRUCTOR ACTIVITY Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Brief crew on plant conditions and OP-65 status.

Provide Modified Turnover After the shift turnover, allow no more than five minutes for panel walkdown POSITION All CRS SNOlBOP CRS SNO/RO SNO/RO ANY/ALL CRS OPERATOR ACTlONSlSTANDARD Walkdown the control panels Conduct turnover brief. Order continuation of OP-65 startup Start second condensate pump per OP-3 0.7 Check 33P-8A motor amps Place 33P-88 control switch in start and release.

Check 33P-8A and B motor amps for load sharing.

Verify RPS A and B power source white lamps are lit.

Ensure 34MOV-I OOA(8) is open and 34FCV-137 is closed Order in-sequence rod withdrawal Selects and withdraws control rods in sequence.

Reports that control rod 34-19 will not move at normal drive pressures. May adjust up to 400 psid per OP-25 Section E.

Adjust 03MOV-20 closed to raise drive water D/P in -50 mid increments.

-~

Recognize symptom of AOP-24 Order performance of AOP-24 COMMENTS/EVALUATION

~~

SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA Page 6 of 12

i

(\\

INSTRUCTOR ACTIVITY POS IT1 0 N OPERATOR ACTIONS/STAN DARD COMMENTS/EVALUATION SAT / UNSAT / NA Role Play: After several minutes report lineup as expected.

SNOlBOP Confirm 09-5 panel indications and HCU lineup are normal per Adjust 03MOV-20 open to restore drive water DIP to -260 psid.

Dispatch NPO to perform HCU-34-19 valve lineup per.

Incrementally raise drive DIP at -50 psig increments and attempt rod movement after each adjustment until drive DIP can no longer be raised.

Adjust 03MOV-20 closed to raise drive D/P by -50 psid.

Ensure stuck rod is selected in rod select matrix.

Select OUT NOTCH on rod movement control switch.

OP-25

~~

~~

SAT / UNSAT / NA SNO SNO SAT / UNSAT / NA Report to CRS that rod will not move with maximum D/P applied.

Restore CRD hydraulic parameters to normal values Adjust 03MOV-20 open to restore drive water DIP to -260 psid.

SNO SAT / UNSAT / NA CRS Consult Technical Specification 3.1.3 SAT / UNSAT / NA CRS Declare control rod 34-1 9 inoperable and enter condition A.

SAT I UNSAT / NA CRS Brief crew on inoperability and required actions Immediately verify stuck rod separation criteria 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to disarm the drive 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to perform SR demonstrating adequate shutdown margin.

SAT / UNSAT I NA TRG! E5 ANYlALL Recognize and report RWCU pump B trip.

SAT I UNSAT / NA SNO Dispatch NPO to RWCU pump area.

SAT / UNSAT / NA Page 7 of 12

INSTRUCTOR ACTIVITY Role Play: After several minutes report a steam leak in overhead area of RWCU pumps on RB 300 foot elevation.

POSITION OPERATOR ACTIONSISTANDARD SNO Relay report to CRS CRS SNO/BOP Turn off RWCU pumps Order actions to trip and isolate RWCU (OP-28, Section G.2)

Close 12 MOV-15,18, and 69 Recognize bus loss coincident with valve closures Order investigation of bus loss.

Determine/report failure of 12MOV-15 to close Recognize RWCU steam leak is un-isolable.

ANY/ALL CRS SNO/BOP Determine/report loss of MCC-152 CRS ANYlALL CRS Enter EOP-5 Recognize EOP-5 entry condition on RB Area Temperature/Radiation CU07 severity may need to be slowly adjusted to drive the rest of the scenario actions by trackina temDeratures on SCT COMMENTS/EVALUATION SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT I UNSAT / NA SAT / UNSAT / NA I

~-

~

SNO CRS Sound station alarm and announce steam leak local area evacuation of reactor building Execute EOP-5 RBlT, RB/R and RB/L concurrently prioritizing RB/T SAT / UNSAT / NA SAT UNSAT / NA

~~

CRS I Order local area evacuation of reactor building CRS SNOlBOP I SAT / UNSAT / NA Order maximizing Reactor Building area cooling Start all remaining Crescent Area Unit Coolers.

SAT / UNSAT / NA SAT / UNSAT / NA CRS I Before any RB area Temperature exceeds Max Safe, Order I SAT UNSAT / NA I Manual Scram and enterEOP-2 1

  • CRITICAL TASK Page 8 of 12

\\

INSTRUCTOR ACTIVITY POSITION SNOlRO SNO/RO lGi---

1 -CRS SNO CRS SNOlBOP CRS OPERATOR ACTIONS/STANDARD

~~

Insert Manual Scram and perform AOP-I Immediate Actions

  • Depress Manual Scram pushbuttons Reactor Mode Switch to Shutdown Fully Insert all SRMs and IRMs Verify all rods in (2 will be not full in)

Verify SDlV Vent and Drain valves closed Verify APRMs downscale Verify/Trip Main Turbine Verify electrical distribution fast transfer Verifv at least 1 Circ Water DumD runnina

~

~-

Order SNO/BOP to level control with Feed/Condensate at 177-222.5 inches.

Trend level performance and manipulate GEMAC Masterllndividual controllers, RFP discharge valves and RFP trip as necessary to control level.

Recognize and report that 1 rod failed to scram (22-27) and that another (34-1 9) was previously stuck and also did not insert Enter EOP-3 based on 2 rods not inserted to or beyond 02 Order SNO to Pressure Control with EHC in automatic.

Confirm EHC controlling pressure in automatic Order SNO/RO to initiate ARI Initiate ARI and confirm all 5 valves energized.

Order SNO/RO to insert control rods per EP-3 i

COMMENTSlEVALUATlON SAT / UNSAT / NA

  • CRITICAL TASK SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT l UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA

~~

SAT / UNSAT / NA Page 9 of 12

(

INSTRUCTOR ACTIVITY

~

~~

If rod 22-27 is attempted, it will insert.

If rod 34-19 is attempted, it will not To reset ARI:

RFI-RP20 to test If ED is anticipated, TRG! E9 As BPVs are opening If BPVs failed closed:

POSITION SNO/RO CRS SNOlBOP SNO/RO CRS CRS CRS

(

OPERATOR ACTIONS/STAN DARD Determine EP-3 success path is RMCS Reset ARI by dispatching NPO to Relay Room BypassRWM SDlV Hi Level Trip Switch to BYPASS Scram Reset Switch to Group 2&3 then I & 4.

Verify scram group lights lit Establish drive DIP by placing 03FIC-301 in manual and opening 03FCV-I9A(B).

May start second CRD pump to support D/P.

May select control rod 34-19 on rod select matrix May attempt to drive in with Rod Movement or Emergency In Control Switch.

Rod will not move Select control rod 22-27 on rod select matrix Attempt to drive in with Rod Movement or Emergency In Control Switch.

Rod will fully insert May order O/R ADS and T/P Core Spray per EOP-3 If ordered:

Both ADS O/R switches to O/R Both 14MOV-11 valve keylocks to bypass Close 14MOV-11 A and B (l4MOV-11A is de-energized and will not close.

Report all rods in except 1 Exit EOP-3 and enter EOP-2 Recognize that 2 RB area temperatures above max safe requires Emergency Depressurization.

Order pressure control on SRVs at a 200 psig band.

i COMMENTS/EVALUATION SAT / UNSAT / NA EVALUATOR NOTE:

Candidate may recognize that 34-1 9 was previously demonstrated stuck and declared inoperable. The candidate may NOT attempt to insert.

~~

SAT / UNSAT / NA

~~

SAT I UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA Page 10 of 12

OPERATOR ACTIONS/STAN DARD Sequentially open and close SRVs as necessary to maintain Dressure band COMMENTS/EVALUATIO SAT / UNSAT NA

~- ~

CRS SNO INSTRUCTOR ACTIVITY POSITION SNO CRS CRS SNO SNO

~

Opens 2 additional SRVs and reports 7 valves open If 2 max safe RB area temperatures are exceeded, announce that an emergency depressurization is required.

Enter EOP-2 ED leg and order opening of 7 ADS valves.

Open ADS valves A-H (excluding F)

I SAT I UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA

  • CRITICAL TASK SAT / UNSAT / NA
  • CRITICAL TASK
  • CRITICAL TASK TERMINATE THE SCENARIO Report that ADS valves C and E failed to open Order additional SRVs opened to a total of 7 valves Page 11 of 12 SAT I UNSAT / NA
  • CRITICAL TASK SAT / UNSAT / NA
  • CRITICAL TASK

ATTACHMENT 1 Shift Turnover A reactor startup is in progress. The plant is at approximately 8% CTP.

The Reactor Mode Switch is in RUN. OP-65 is complete through Step D.22.3.

ST-SD has just been completed and is satisfactory.

Chemistry has reported that all chemistry parameters are well within specification for Power Operation. 1-1 31 Dose Equivalent is <.2uci/gm.

EPIC is indicating thermal limit alarms that are evaluated by Reactor Engineering to be expected values. IT is looking into the EPIC issue.

Reactor Engineer guidance is to continue reactor startup with rods until 25%CTP. You are currently in RWM Step 26.

Page 12 of 12

TITLE:

SCENARIO NUMBER:

NEW LOI-03-01 SCENARIO 2, TURBINE VIBRATIOWLOSS OF VACUUWATWS PATH:

SIGNATURE VALIDATION TRAINING J

t;- l-&.bl-+f-OPERATIONS L'

LOI-03-01 SCENARIO 2, TURBINE VIBRAJION/LOSS OF VACUUM/ATWS Page 1 of 16

L DATE 7/1103 SOURCE OF BRIEF DESCRIPTION OF CHANGE CHANGE I NRC Validation 1 Add Cooper OE refemce Add detail to required operator actions 7/9/03 Operations Validation Modifj Attachment 1, Shift turnover Add Technical Specification Call related to Event Added missing operator actions related to the onset of event 7 Added recognition that SLC initiation earlier than required is acceptable and may affect the scenario predicted sequence of events.

~~

INITIATOR DeVercelly

~

~~

DeVercelly REVIEWED Torbitt Torbitt LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 2 of 16

--A.

TITLE.

LOI-03-01 SCENARIO 1, STUCK ROD/RWCU LEAK/EOP-5 B.

SFTUP:

1.
2.
3.
4.
5.

Initial Protected IC-I 38 Special Instructions:

a. Plant operating normally at -95% CTP
b. Rod Pattern exchange just completed. Returning to 100% CTP.
c. Confirm Reactor Analyst pull sequence agrees with simulator modeling.
d. Confirm RAP-7.3.16 guidance is at the 09-5 panel Preset Conditions:
a.
b.

C.

d.

Preset RD22:A at 70%

e.

Preset RDOl A:A On Trigger 1, RR19:B fail as is.

On Trigger 3, TU04:E at 21% and D at 22% no ramp. (7-9 mils)

On Trigger 3, MCOI at 42% severity over 20 minutes.

Consumable Forms and Procedures:

AOP-66, MAIN TURBINE HIGH VIBRATION, REV. 3 AOP-31, LOSS OF CONDENSER VACUUM, REV. 15 AOP-41/42, FEEDWATER MALFUNCTION, Rev. 6/10 AOP-1 Reactor Scram. Rev. 39 Modified Shift Turnover Sheet See Attachment 1 LOI-03-01. SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/AlWS Page 3 of 16

Commitment Document:

The crew will take the shift with the plant operating normally at -95% CTP following a rod pattern exchange. Following Reactor Analyst guidance, the crew will continue a power ascent to 100% CTP using recirculation flow. Shortly into the power ascent, the operators will notice that the non-controlling FWLC level instruments are trending down while the controlling is steady. The crew will diagnose that the FWLC controlling instrument has failed as is causing actual level to trend down slowly. The crew will take manual control, of FWLC, enter AOP-42 and determine the cause to be a failed instrument. The crew will then swap FWLC to the alternate instrument input and return to automatic level control. The Control Room Supervisor will consult technical specifications for the failed instrument. The Main Turbine will then lose part of a low pressure blade that will penetrate the low pressure turbine exhaust boot. This will be indicated by a step change in turbine vibration followed by a slow loss of condenser vacuum that will eventually worsen. Turbine vibration will result in entry to AOP-66 but will not be severe enough to require a turbine trip. The condenser vacuum loss will eventually result in AOP-31 entry which will require a power reduction. The vacuum loss will worsen such that power reductions with both recirculation flow and rods will occur. Eventually the AOP-31 manual scram milestone will be met. The manual scram will not be completely successful due to hydraulic blockage in one of the scram discharge volumes. Power will be above 2.5% requiring significant EOP-3 action. As a nuisance, one SDlV vent valve will fail to close. The EP-3 success path will be inserting rods with RMCS and repeated manual scrams. As vacuum continues to trend away, level control will need to transition to HPCl and pressure control augmented with SRVs.

The resultina challenge to containment may result in SLC injection if not already started.

NOTE:

The main turbine blade loss and resulting vibration are similar to an event that occurred at Cooper in May 2003. Reference OE-16340 Shift Turnover ATTACHMENT 1 The plant is operating normally at -95% CTP. A rod pattern exchange has just been completed and the reactor analvst quidance is to return to 100% CTP usina recirculation flow.

v LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/AWS Page 4 of 16

u N E N T NO.

1.
2.
3.
4.
5.
6.
7.
8.

EVENT SEQUENCE FWLC Controlling Instrument as is failure (Instrument and Tech Specs)

Swap to alternate FWLC Instrument input and return FWLC to automatic.

Step change in Turbine Vibration (Component)

Slow loss of condenser vacuum (Component)

Power reduction with recirculation flow (Reactivity)

Power reduction with rod insertion (Reactivity)

ATWSIEOPS (Major)

SDlV Vent and Drain valve fails to close (component)

D.

1.
2.
3.

Pressure control stable Control rods beinglinserted using EP-3 Level control stable at 0-222.5 inches L-LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 5 of 16

i

~

INSTRUCTOR ACTIVITY Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Modified Turnover After the shift turnover, allow no more than five minutes for panel walkdown TRG! E l POSITION All CRS SNO/BOP SNO/RO ANY/ALL SNO CRS SNO/BOP CRS OPERATOR ACTIONS/STANDARD Walkdown the control panels Conduct turnover brief. Order continuation of power ascent to 100% usina recirculation flow Der OP-27 Section E.

Alternatively adjust recirculation MG set speeds in I-3%

increments.

Monitor reactor power and core flow between adjustments.

Monitor power pressure and level at 09-5 during ascent.

Recognize off normal RPV water level condition Select FWLC to manual. Stabilize and restore RPV level to green band.

Select the Master Controller to Manual and adjust the manual control potentiometer.

OR Select both MGUs to manual and adjust the manual control Dotentiometers Order entry into AOP-42

~~~

~

Perform actions of AOP-42.

Determine that controlling B instrument is failed which caused an actual low RPV level condition.

Order swap to A level transmitter and return FWLC to automatic per OP-2A COMMENTS/EVALUATION SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA

~~

SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT I NA SAT / UNSAT / NA LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 6 of 16

INSTRUCTOR ACTIVITY TRGl E3 Severities may need adjustment to ensure 7-9 mils.

POSITION SNOIBOP

~

CRS ANYIALL CRS OPERATOR ACTIONS/STANDARD Select OP-2A, section G.30 Place column select switch to A Ensure RPV water level stabilizes Return to Automatic FWLC per G.7 Verify 06-84A and B (MGUs) in manual Select 06LC-83 (Master Controller) to MANUAL Adjust 06LC-83 manual potentiometer to balance 06-84A.

Place 06-84A in BAL Adjust 06LC-83 setpoint tape to balance 06LC-83 Place 06LC-83 in BAL Balance 06-848 by adjusting the manual potentiometer.

Note, this will result in a level change and response by 06LC-83 and 06-84A.

Place 06-848 in BAL Reference Technical Specification 3.3.2.A. 1 and determine that the failed channel must be tripped within 7 days.

Recognize Main Turbine High Vibration condition.

~~

Order entry into AOP-66 COMMENTSIEVALUATION SAT I UNSAT I NA SAT I UNSAT I NA SAT I UNSAT I NA SAT I UNSAT I NA LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 7 of 16

INSTRUCTOR ACTIVITY ROLE PLAY: If requested, report that there is abnormally high noise levels and vibrations on the Main Turbine elevation (300)

ROLE PLAY as Mike Tallents and acknowledge report.

State that YOU are coming in POSITION SNO CRS CRS S NO/BO P ANY/ALL CRS OPERATOR ACTIONS/STAN DARD

-~

Determine if alarm is valid.

EPIC Alarm list EPIC TGB Screen 09-5 recorder 94VR Dispatch operator(s) to turbine Announce turbine bearings 4 and 5 are alarming at elevated vibration values (7-9 mils)

Report abnormal vibration to Main Turbine Expert May order power reduction using recirculation flow at normal rates to attemDt to reduce vibration levels.

~~~

~~

If ordered, commence power reduction using recirculation flow per OP-27 Section E.

Alternatively reduce each MG set speed in I-3%

increments.

Monitor reactor Dower and core flow between adiustments.

~~

~

Recognize and announce worsening trend in condenser vacuum.

Order entry into AOP-31 COMMENTS/EVALUATION SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 8 of 16

INSTRUCTOR ACTIVITY

~~

Monitor and adjust MCOl as necessary to ensure the remaining scenario actions POSITION SNOIBOP CRS CRS SNO/BOP SNO/BOP OPERATOR ACTIONS/STAN DARD Commence actions of AOP-31 0

0 0

0 0

0 0

0 0

0 Determine operation to be in Normal Operating Region of Trip Recombiner Ensure Hydrogen Addition System trips Dispatch NPO to verifiy valve lineup at Off Gas Recombiner Panel Close TB Equip Sump Vacuum Drag Isolation valve Dispatch NPO to place spare SJAEs in service Determine source is air in-leakage Ensure Steam Seal Pressure is 1-4 psig Ensure Steam Packing Exhauster vacuum is 10-20 inches.

DisPatch oPerators to search for air leak Set Manual Scram benchmark of 23-25 inches Hg Order power reduction with recirculation flow to counter vacuum trend. Caution against reducing below 50% core flow.

Based won vacuum trend rate, may order raDid rates Reduce recircualtion flow to -50% Core Flow at normal rates per OP-27 Section E.

Alternatively reduce each MG set speed in I-3%

increments.

Monitor reactor power and core flow between adjustments.

Reduce recirculation flow to -50% Core Flow at rapid rates per OP-27 Section G.1 Simultaneously reduce both Recirc MG controllers to reduce speed continuously to a value near but greater than 50% core flow.

COMMENTS/EVALUATION SAT / UNSAT I NA

~~

~

~~

~~

SAT / UNSAT / NA SAT / UNSAT I NA SAT I UNSAT I NA SAT I UNSAT I NA LOI-03-03. SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 9 of 16

INSTRUCTOR ACTIVITY Order insertion of the first cram group.

Select and fully insert all rods in the first cram group ROLE PLAY: As NPO, report

hat there is a visible tear in ihe exhaust boot of LP turbine B.

SAT / UNSAT / NA SAT / UNSAT I NA Monitor and adjust MCOI as necessary to force manual scram Recognize/report that condenser vacuum is still worsening Order Manual Scram Delete TU04: D and E SAT / UNSAT I NA POSITION 4NY/ALL SRS SNO/RO Order SNO/BOP to level control with Feed and Condensate 177-222.5 inches Manipulate RFP, GEMAC Controllers and RFP Discharge valves as necessarv to control RPV level.

ANYlALL SAT / UNSAT / NA SAT / UNSAT / NA CRS SNO/RO CRS SNO/BO P I

OPERATOR ACTIONS/STANDARD 1 COMMENTSlEVALUATlON Recognize/report that condenser vacuum is still worsening I SAT / UNSAT / NA

~~

~-

Insert Manual Scram and perform AOP-1 Immediate Actions I SAT I UNSAT NA Depress Manual Scram pushbuttons Reactor Mode Switch to Shutdown Fully Insert all SRMs and IRMs Verify all rods in (Many will not be)

Verify SDlV Vent and Drain valves closed (One will not be)

Verify APRMs downscale (Will not be)

Verify at least I Circ Water pump running LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 10 of 16

I N STR U CTOR ACTIVITY POSITION SNO/RO CRS SNO/RO CRS CRS

(

OPERATOR ACTIONS/STANDARD May report one SDlV Vent valve failed to close.

Based upon priorities, this information may be withheld until a less challenging time in the scenario.

If reported, order select SDlV Isolation Valve Test to Testllsol.

~

~~

~~

Report multiple rods out, APRMs NOT downscale Announce EOP-3 entry from EOP-2

~

Order SNOlRO to perform the following EOP-3 actions Initiate ARI Override ADS May order SLC Initiation -

Initiation of SLC may affected the predicted scenario sequence from this point forward.

  • Reduce recirculation flow to minimum Trip both recirculation pumps
  • Determine EP-3 success path and insert rods.

i COMMENTS/EVALUATION SAT / UNSAT / NA SAT I UNSAT / NA SAT / UNSAT / NA

  • CRITICAL TASK SAT I UNSAT I NA
  • CRITICAL TASK SAT / UNSAT / NA
  • CRITICAL TASK LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 11 of 16

I INSTRUCTOR ACTIVITY POSITION SNO/RO SNO CRS S N O/BO P SNO OPERATOR ACTIONS/STANDARD Perform the following EOP-3 actions:

Select ARI Switch to ACT

  • Adjust both recirculation GEMAC manual controls to minimum speed demand while trending RPV level
  • Select both drive motor breaker control switches to STOP Select both ADS override switches to override
  • Determine EP-3 success path is both RMCS and Manual Scrams If ordered to inject SLC, Verify Squib Valve ready lights are on Note SLC tank level Select SLC control switch to ordered division.

Verify pump running light on Verify pump discharge pressure is above RPV pressure.

Verifv RWCU-18 and 69 close.

Order SNOlBOP to terminate and prevent all injection except SLC, CRD and RClC per EP-5. New level band is -1 9 to 1 10.

Injection source will be HPCI. Caution against rapid injection.

Perform the following EOP-3/EP-5 level control actions:

  • Reduce running RFP(s) MIA stations to manual minimum.
  • Ensure running RFP min flow valve(s) open Shut 34MOV-lOOA,B and 34 FCV-137. (Not required until RFPs are shutdown)

1 OMOV-27A/B Auto Control to bypass and close 1 OMOV-27AIB (May be deferred) 14MOV-lIA/B Auto Actuation to Bypass and close 14MOV-11 A/B (may be deferred)

COMMENTS/EVALUATION SAT / UNSAT / NA

  • CRITICAL TASK SAT / UNSAT / NA
  • CRITICAL TASK SAT / UNSAT / NA
  • CRITICAL TASK SAT / UNSAT / NA
  • CRITICAL TASK SAT / UNSAT / NA LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 12 of 16

I

\\

OPERATOR ACTIONS/STAN DARD Order SNO to pressure control with EHC in automatic. Band of 900-1 000 psig.

Confirm EHC in automatic controlling RPV pressure in band.

Order reinjection with HPCl per EP-5. Level band of -1 9 to I

I O inches Reinject with HPCl by:

1 INSTRUCTOR ACTIVITY 1 POSITION

\\

COMMENTS/EVALUATION SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA 1 CRS Adjust MCOI to force loss of I SNO CRS SNOlBOP NOTE: SNOlRO should pursue both paths in that RMCS can complete partial insertions while SDIVs are draining to enable Manual scrams.

To reset ARI, RFI-RP20 to Test SAT UNSAT NA CRS SNO/RO

  • Raise drive water D/P. Options include shut CRD-56, Start second CRD pump, manually adjust FIC-301 to open AOV-I9A(B)

SNO/RO Rod insertion by EITHER RMCS or Manual Scrams is considered a Critical Task.

Both are not reauired.

e e

0 e

e e

e -

Ensure SGT running (will be)

Ensure 01-1 25MOV-I 3A / B is open Ensure HPCl flow controller in Manual minimum Depress turbine trip reset Verify / align automatic initiation lineup Control speed to control injection Ensure speed maintained greater than 2100 RPM Order control rod insertion with EP-3 success paths I SAT / UNSAT / NA EP-3 RMCS path actions:

I SAT I UNSAT / NA e

Dispatch NPO to reset ARI and observe solenoids de-energized. (if not already done)

  • RWM Keylock to Bypass
  • CRITICAL TASK EVALUATOR NOTE:
  • Select and drive rods full in in EP-3 attachment sequence I using rod movement or emergency in switch.

I LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 13 of 16

necessary to force RFP trip and loss of bwass valves

~~

CRS SNO I CRS SNO

(

OPERATOR ACTIONS/STANDARD Recognize that as condenser vacuum continues to worsen, Pressure control will need to transition to HPCl augmented with SRVs.

Trend BllT and if not already done, order SLC injection before exceeding BllT If ordered to inject SLC, Verify Squib Valve ready lights are on Note SLC tank level Select SLC control switch to ordered division.

Verify pump running light on Verify pump discharge pressure is above RPV pressure.

Verify RWCU-18 and 69 close.

Order transition of RPV pressure control to HPCl and augment with SRVs. Modify band to 800-1000 psig.

To transition Pressure Control.

Augment HPCl operation with sequential opening of SRV's to maintain 800-1000 psig COMMENTS/EVALUATION SAT / UNSAT / NA SAT / UNSAT / NA

  • CRITICAL TASK SAT / UNSAT I NA
  • CRITICAL TASK

~~

~~

SAT / UNSAT / NA

~~

~

SAT / UNSAT / NA LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 14 of 16

INSTRUCTOR ACTIVITY OPERATOR ACTIONS/STANDARD Before condenser vacuum is less than 8 inches Hg, order closure of the MSIVs.

Select all 8 MSlV control switches to CLOSE.

Report downward trend in SLC tank level.

EP-3 Manual Scram path actions Dispatch NPO to reset ARI and observe solenoids de-RFI-RP21 :AI, A2, B1, and B2 to hang RPS jumpers COMMENTS/EVALUATION SAT / UNSAT / NA SAT / UNSAT I NA SAT / UNSAT / NA SAT / UNSAT / NA

  • CRITICAL TASK When the scram is reset, delete malfunction RD22A When all rods in:

When SDIVs are drained insert Manual Scram POSITION SAT / UNSAT / NA CRS SNO SNO SNO/RO CRS energized (if not already done)

Order/hang 09-1 5/17 auto scram jumpers.

Open CRD-56 if closed.

SDlV Hi Level Trip to Bypass EVALUATOR NOTE:

Rod insertion by EITHER RMCS or Manual Scrams is considered a Critical Task.

Rx Scram Reset to Group 2 and 3 then 1 and 4.

I Both are not required.

I Order SLC secured TERMINATE THE SCENARIO Exit EOP-3 and enter EOP-2 LOI-03-01 SCENARIO 2, TURBINE VIBRATION/LOSS OF VACUUM/ATWS Page 15 of 16

W

I I

I JAMES A. FITZPATRICK NUCLEAR POWER PLANT NRC INITIAL LICENSE EXAMINATION SCENARIO 27 MAY 2003 I

I TITLE:

SCENARIO NUMBER:

NEW LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 PATH:

SIGNATURE I

VALIDATION TRAINING LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 1 of 13

SOURCE OF BRIEF DESCRIPTION OF DATE CHANGE CHANGE INITIATOR REVIEWED 7JIC-b,-kt 7/3/03 NRC Validation Add detail to required operator actions DeVercelly Delete ramp on Event 2 L-LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 2 of 13

.--.A.

llllu2 LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 B.

1.

Initial Protected IC-1 39

2.

Special Instructions:

a. PJant operating normally at 100% CTP
b. Confirm Reactor Analyst pull sequence agrees with simulator modeling.
c. Confirm Reactor Analyst RAP-7.3.16 guidance is available at 09-5 panel.
d. Ensure LPRM bypass postings are current to support scenario.
e. Bypass additional LPRMs as necessary to support Event 2 Tech Spec exercise.
f. Ensure A and B SW pumps in service. C in standby
3.

Preset Conditions:

a.

NM11:683613 on Trigger E-2 at 100% severity and nc ramp (mus: resnw IC, LPRM Upscale failure. (LPRM will be assigned to a B division APRM such that upon failure, APRM inop on 2 per level count).

O r a rrigaer override LDRW 36-!-B downscale white lamp on OG04 on Trigger E-3, Combustion in Off-Gas Annunciator 09-6-1 -23 crywotf on Trigger E-3 Recombiner trip on Trigger E-3 RR15:A on Trigger E-6 at 50% severity and 10 minute ramp, Steam Leak in Drywell.

Preset RD13:XX:W, One rod fail to scram ED18:X on Fast transfer trigger assigned to Trigger E-7, Loss of 10500 Bus.

b.
c.
d.
e.
f.
g.
h.
4.

Consumable Forms and Procedures:

AOP-5, Combustion in SJAE After Condenser, Rev. 10 AOP-1 Reactor Scram. Rev. 39

5.

Modified Shift Turnover Sheet See Attachment 1 u

LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 3 of 13

.-C.

RY:

Commitment Document:

The scenario begins with the plant operating normally at 100% CTP. A repair of the C SW strainer has just been completed and the tags are clear. The shift will swap to the C SW pump in service and B in Standby to facilitate a pressure leak test of the C SW pump strainer. An LPRM will fail upscale resulting in a single APRM upscale trip. A half scram on APRM upscale will result. The crew will determine a failed LPRM as the cause and bypass the LPRM. The bypass will result in an INOP APRM on the 2 per levet count basis.

A Tech Spec review will identify a Potential LCO with trip function maintained by the remaining divisional APRMs. A fire in the SJAE After Condenser will require entry to AOP-5. Actions to extinguish the fire will not be successful until Rx power has been reduced with both recirculation flow and control rods. After the fire is out, a steam leak in the drywell will force entry into EOP-2 and 4. On the Manual Scram, a single rod will fail to insert and will subsequently be driven in by normal RMCS. On the fast transfer, the 10500 bus will experience catastrophic failure resulting in a loss of containment cooling capability with the A RHR loop as well as a loss of both A and B RHR pumps. This reduces EOP-4 actions to a single (D) RHR pump in the B loop. A sinnle d w e l l sprav evolution will result in scenario termination.

I Shift Turnover ATTACHMENT 1 I

1 The plant is operating normally at 100% CTP. Maintenance has just completed a repair to the C SW pump L-discharge strainer and the tags have been cleared. An NPO is standing by with maintenance to perform a I pressure leak check of the strainer. Swap to the C SW pump in service and B in Standbv.

b LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 4 of 13

EVENT NO.

I.

2.
3.
4.
5.
6.
7.

D.

T F

1.

Completion of 1 Drywell Spray Evolution EVENT SEQUENCE Swap in service Service Water pumps (Normal)

LPRM Upscale failure/APRM half scram (Instrument and Tech Specs)

Combustion in SJAE After Condenser (AOP-5) (Component)

AOP-5 directed power reduction with recirculation flow (Reactivity)

AOP-5 directed power reduction with Control Rods (Reactivity)

Steam leak in the Drywell (Major)

Loss of 10500 bus (Component) c-LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 5 of 13

i

-~

OPERATOR ACTIONS/STANDARD Walkdown the control panels INSTRUCTOR ACTIVITY COMMENTS/EVALUATION SAT / UNSAT / NA Simulator in RUN Recorder and Alarm Power ON Simulator Checklist Complete Provide Modified Turnover After the shift turnover, allow no more than five minutes for Dane1 walkdown

~

After short times, act as NPO and report:

Chlorine and chemical cleaning isolated to B Pump 46SWS-2C is open C SW strainer has no leakage Chlorine and chemical cleaning started on C Pump TRG! E2 POSITION 411 CRS SNO/BOP ANY /ALL Conduct turnover brief. Order coordination with field to start C SW pump and place B in STBY per OP-42 G.l Swap SW pumps per OP-42 0

e e

e e

e e

0 e

0 0

Dispatch NPO to isolate chemical cleaning and chlorine to B SW pump.

Dispatch NPO to verify discharge valve (46SWS-2C) is open.

Place C SW pump control switch in START.

Verify motor amps less than 163 Verify no strainer leakage with NPO Place and hold SW pump B control switch in stop When header pressure is normal release switch tgo NORMAL Place SW pump B control switch in PTL Verify A and C pump motors at less than 163 amps Verify header pressure 85 to 100 psig Start chemical cleaning and chlorine injection on C pump.

Recognize/Report APRM B upscale, half scram B and LPRM upscale alarm. Determine failed LPRM is 36-1 3-8 SAT / UNSAT / NA SAT I UNSAT / NA SAT / UNSAT / NA LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 6 of 13

INSTRUCTOR ACTIVITY OPERATOR ACTIONS/STAN DARD Wlieil L.IFIFv1 amplifier card is selc?,cted to k?Y, override 1.PRM downscale wtiite Iarny 0

R I X,XXXX X X XX X XX Y. X X X 0 I1 COMMENTSEVALUATION TRG! E3 Cause of recombiner trip is low outlet temDerature

~

POSITION SNO/RO CRS S N O/BO P CRS ANY/ALL

~

Report that all other APRMs are stable.

I SAT I UNSAT I NA

~~

~

Order bypass of LPRM 36-1 3-B per OP-I 6 Select OP-16 section E.ll.

Bypass APRM per section E. 16 by placing bypass switch to B and confirming bypass lamp/EPIC alarm.

Verify APRM B bypass lamp at 09-14 Select APRM meter function switches to the LPRM 36-1 3-B PIT( ~1 I r w n Illll)ilflpl I 3rd 1 1 1 ~ 3 )

Verify individual LPRM downscale and bypass lamps on.

Verify meter face LPRM bypass lamp is lit.

Verify APRM meter reads zero.

Place meter function switch in AVERAGE.

Ensure rod select power is on.

Select a neighboring control rod at 09-5 to check RBM inputs.

Turn off rod select power then turn on.

May contact RE to determine effect on RBM Count APRM total and per level remaining inputs by counting LPRM card switches that remain in OP.

ReDort results to CRS Recognize that APRM is inoperable on 2 per level criteria and consult Tech Specs 3.3.1.I and TRM 3.3.8.1. Determine that no condition entry is required.

RecognizeIReport indications of combustion in SJAE after condenser.

SAT / UNSAT I NA SAT I UNSAT / NA SAT / UNSAT / NA SAT / UNSAT I NA LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 7 of 13

INSTRUCTOR ACTIVITY I DELETEOG04 POSITION CRS SNO/BOP CRS SNO/BOP SNO/RO SNOlBOP CRS SNO/RO OPERATOR ACTIONS/STANDARD Announce entry to AOP-5. Direct SNOlBOP to perform actions May review E-plan for fire event applicability Perform the following AOP-5 actions:

Ensure Hydrogen Injection trips.

of AOP-5.

Ensure tempering gate hoist is closed.

Dispatch NPO to place manipulate SJAEs lineup.

Report to CRS that power reduction is required until 40% or fire is extinguished.

Continue with SJAE alianment changes.

__ ~-

~

Brief crew and direct SNO/BOP to reduce power using recirculation flow to 50% core flow or the fire is out.

NOTE: CRS judgment on desired power ramp rate.

Alternatively adjust Recirculation GEMAC controllers in 1-3%

increments without going below 50% core flow.

Concurrently reduce both GEMACs at a rapid rate without going below 50% core flow Monitor power/pressure/level during downpower.

Report Core Flow at - 50% and combustion still indicated.

Order SNO/RO to insert the first cram group Select the first rod in the cram group and fully insert all rods in the cram group using Rod Movement or Emergency In Control Switch.

OR COMMENTWEVALUATION SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 8 of 13

I INSTRUCTOR ACTIVITY OPERATOR ACTIONS/STANDARD COMMENTS/EVALUATION Recognize that combustion has extinguished.

Off Gas Flow rate rises Off Gas Radiation lowers Stack Radiation rises.

Order chemistry to complete a confirmatory hydrogen sample.

SAT UNSAT NA Recognize indications of steam leak in drywell.

SAT / UNSAT I NA Order establishment of a Torus Vent per OP-37 SAT / UNSAT / NA Set a benchmark for a manual scram of 2-2.3 psig drywell pressure.

Commence actions to establish Torus vent.

NOTE: No actions will actually complete due to rate of rise in drywell pressure.

Recognize/Report manual scram benchmark SAT / UNSAT / NA SAT / UNSAT I NA SAT / UNSAT / NA 1 TRG! E6 L

I POSITION 4NY/AL L CRS I\\NY/ALL CRS SNOlBOP ANY/ALL SNO/RO CRS Insert Manual Scram and perform AOP-1 Immediate Actions Depress Manual Scram pushbuttons Reactor Mode Switch to Shutdown Fully Insert all SRMs and IRMs Verify all rods in (One will not be)

Verify SDIV Vent and Drain valves closed Verify APRMs downscale Verifyhrip Main Turbine Verify electrical fast transfer NSS-RSS Verify at least 1 Circ Water pump running Order SNO/BOP to level control with FeedKondensate at 177-222.5 inches.

SAT / UNSAT I NA LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 9 of 13

I I

I I

SNO/BOP SNO/RO SNO I

INSTRUCTORACTIVITY I POSITION I OPERATOR ACTIONS/STANDARD I COMMENTS/EVALUATION Trend level performance and manipulate GEMAC Master/lndividual controllers, RFP discharge valves and RFP trip as necessary to control level.

Recognize and report that 1 rod failed to scram and that the 10500 is de-energized with A and C EDGs running Dispatch NPO to assess status of 10500 bus and EDGs I

CRS SNO Role Play: Report as NPO that 10500 bus has heavy damage at the 1051 4 breaker and heavy smell of burnt insulation.

Order SNO to Pressure Control with EHC in automatic.

Confirm EHC controlling pressure in automatic SAT / UNSAT / NA SAT / UNSAT / NA CRS SNO SAT / UNSAT / NA Order actions of AOP-18 Perform actions of AOP-18. Prioritize S/D of EDG A and C.

SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA RecognitelReport EOP2/4 entry condition on DNV pressure Announce entry into EOP-2 and 4 Recognize/Report HPCl initiation Determine HPCl injection not needed and order HPCl tripped Trip HPCl SAT / UNSAT / NA SAT / UNSAT / NA SAT / UNSAT / NA SAT UNSAT NA SAT / UNSAT / NA ANY/ALL CRS ANYIALL CRS SNO LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 10 of 13

INSTRUCTOR ACTIVITY RRI 5:A severity may need to be adjusted to force scenario milestones OPERATOR ACTIONSISTANDARD When torus pressure >2.7 psig order B loop of RHR in torus spray with excess flow to torus cooling.

POSITION CRS COMMENTSIEVALUATION SAT / UNSAT I NA SNO 1 CRS SNOlRO CRS SNO SNO I

\\

~~~~~

~~~~

~

Startup B loop RHR in Torus Spray. Excess flow to torus I SAT I UNSAT I NA cooling while observing current limitation on RHR pump.

Start D RHR pump Open IOMOV-39B Open IOMOV-38B Verify 1 OMOV-16B closes Throttle 1 OMOV-34B to greater than 6500 gpm pump flow.

Verify RHRISW keep full alarm clear Start BID RHRISW pump Throttle IOMOV-89B to 4000 gpm per pump Close IOMOV-66B Place spray control switch in manual and verify white lamp lit.

Set a torus pressure benchmark of 15 psig. Order terminate and prevent RHR and Core Spray per EP-5 Close IOMOV-27NB Keylock override 14MOV-1 I N B Close 14MOV-I 1 N B (1 1 A de-energized)

Stop Core SDrav pumps N B Keylock override 1 OMOV-27NB to bypass SAT / UNSAT I NA SAT I UNSAT I NA Order RPV cooldown at 400 degrees per hour with caution that d w e l l steam leak is contributing to cooldown I SAT I UNSAT I NA Trend cooldown and adjust bypass jack and auxiliary steam loads to commence a cooldown at < 100 degrees per hour.

I SAT I UNSAT I NA Announce torus pressure 15 psig milestone 1 SAT I UNSAT I NA LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 11 of 13

INSTRUCTOR ACTIVITY POSITION CRS SNO CRS CRS SNO I ANY/ALL OPERATOR ACTIONS/STANDARD Ordedconfirm drywell cooling fans and recirculation pumps tripped Trip both recircualtion pumps Confirm operation in safe region of DNV spray initiation limit.

Order drywell sprays using B RHR. Caution SNO to terminate drywell sprays before drywell pressure drops below 0 psig.

Places B RHR in drywell spray observing caution for excessive pump amps.

Place spray control switch in manual and verify white lamp is lit Open IOMOV-26B Throttle 1 OMOV-31 B to raise drywell spray flow Throttle 1 OMOV-346 to lower torus cooling flow Trend and report drop in drywell pressure TERMINATE THE SCENARIO COMMENTS/EVALUATION SAT / UNSAT I NA SAT / UNSAT / NA SAT / UNSAT / NA

  • CRITICAL TASK SAT / UNSAT / NA
  • CRITICAL TASK SAT / UNSAT / NA LOI-03-01 SCENARIO 3, Combustion in After Condenser, Steam Leak in Drywell, EOP-4 Page 12 of 13

i-ATTACHMENT 1 Shift Turnover The plant is operating normally at 100% CTP. Maintenance has just completed a repair to the C SW pump discharge strainer and the tags have been cleared. An NPO is standing by with maintenance to perform a pressure leak check of the strainer. Swap to the C SW pump in service and B in Standby.

Page 13 of 13