August 2003 Monthly Operating Report for Beaver Valley Units 1 & 2
ML032651009
Person / Time
Site: Beaver Valley
Issue date: 09/08/2003
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-03-141
Download: ML032651009 (5)


Text

--- -s FENOC

&gEyM~dw - 0gh-M C-M- `

Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077 L-03-141 September 8, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of August, 2003.

Respectfully A_ _

- I- d- cWe.Pearce s - -R

_=; ---- I--: a Vice-PiesidentBVPS; DTJ/cmg Enclosures cc: NRC Regional Office
I -;King of Prussia, PA

. *1 - I . E:., -

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE September 2,2003

-COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: August 2003 Date Type Duration Reason Methiod of Cause / Corrective Actions No. (Y/M/D) F: Forceo (Hours) (1) Shutting S: Scheied Down (2) Comments NONE.

(1) Reason (2) Method A - Equipment Failure (Explain) 1- Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trp / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Expiain)

F - Administative G -Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output until 1611 hours0.0186 days <br />0.448 hours <br />0.00266 weeks <br />6.129855e-4 months <br /> on 8/14/03 when a slight load rejection of approximately 65 MWH occurred due to grid instability following a wide scale power outage that disrupted a large sector of the nation's power grid. The Unit was immediately stabilized and retuedo fu ower.

The Unit continued to operate at a nominal value of 100% output until 0909 hour0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.458745e-4 months <br />s-on 8/23/03, when a planned load reduction to approximately 95% output was commenced. An output of approximately 95% was achieved at 0950 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.61475e-4 months <br /> on 8123103. The 5% load reduction was being made as a conservative measure in order to allow margin for the expected rise in reactor power due to a rise in steam flow that was being used to dislodge foreign material from the seat of Condenser Steam Dump Valve 106A4 that was preventing full closure of the valve.

Following successful closure of the valve, the Unit began to return to full power at 1110 hours0.0128 days <br />0.308 hours <br />0.00184 weeks <br />4.22355e-4 months <br /> on 8123103. A nominal value of 100% output was achieved at 1310 hours0.0152 days <br />0.364 hours <br />0.00217 weeks <br />4.98455e-4 months <br /> on 8/23/03. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

- JO OPERITING DATA REPORT DOCKET NO.2 50-334 UNIT NAME: BVPS UNIT t1 REPORT DATE: 09/02/03 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 c - ***

  • *
  • ra t* *******
  • la. REPORTING PERIOD: AUGUST 2003 k Ratod thermal rower at *
  • BVP8-1 was uprated from 2652 KWt*
1. DESIGN ELECTRICAL RATING (Net WMe): 835
  • to 2689 MWt on 10/20i01. Net *
  • MDC was also uprated from
  • 2 MAX.-DEPENDABLE -CRAPATY 1Net1We)aV----"21 - .- S i e. -

THIS MONTE YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5831.0 239615.0

3. NO. OF ERS. REACTOR WA CRITICAL: 744.0 4530.5 165122.0
4. SERVICE HOURS GENERATOR ON LINE: 744.0 4483.9 162595.9
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 - 0.0 0.0
6. RET ELECTRICAL ENERGY GEN. (KWH): 616890.0 3555199.0 122211206.0
7. GROSS ELECT. ENERGY GEN. (KWH) 652990.0 3775687.0 130445277.0
8. GROSS THERMaL ENERGY GEN. (KWM): 1997525.0 11527798.0 401799107.5
9. UNIT AVAILABILITY FACTOR (M)s 100.0 76.9 69.3
10. UNIT CAPACITY FACTOR (MDC) (O)S ' 101.0 74 *.3 64.8
11. UNIT 3ORCED OUTAGE RATE (t): 0.0 1.3 15.3 1*

-W

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE September 2, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: August 2003 No. Date Type I Duration Reason - Method of Cause I Corrective Actions (Y/MID) F: Forced (Hours) (1) Shutting S: scheduledI I Down (2) {L Comments NONE.

(1) Reason (2) Method A - Equipment Failure (Explain) 1- Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3-Automatic Trip I Scram D - Regulatory Restrcton 4 - Continuation E - Operator Training I Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output until 1613 hours0.0187 days <br />0.448 hours <br />0.00267 weeks <br />6.137465e-4 months <br /> on 8114103 when a slight load rejection of approximately 15 MWH occurred due to grid instability following a wide scale power outage that disrupted a large sector of the nation's power grid. The Unit was imnmediately stabilized-aridmLuuom tlos .wer and wntinued-zoperate Xo avAne_

of 100l/ output for the remainder of the-report period.

N.

Ar OPERATING DATA REPORT DOCET IJO. : 50-412 UNIT NmmNI EVPS UNIT 82 REPORT DATE: 09/02J03 COMPLETED BYs DAVID T. JOWES TELEPHONEt: (724) 682-4962 REPORTING PERIOD: AUGUST 2003

  • ffjtej Rated thermal power at
  • is.
  • BVPB-2 was uprated from 2652 MWt*
1. DESIGN ELECTRICAL RATING (Net EWe)s 836
  • to 2689 Mwt on 10/30/01. Net *
  • KDC was also uprated from
  • 2.- .-7DZnZM&BL1-CXM1WYRF3t-kWe)-S - 131 - '-1 -MWe-.t.-431-MWe. - --* -

TaIs MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5831.0 138398.0

3. NO. OF ERS. REACTOR WAS CRITICAL: 744.0 S831.0 115386.1
4. SERVICE HOURS GENERATOR ON LINEt 744.0 5831.0 114657.5
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (KWH): 614833.0 486485s.0 90047288.0
7. GROSS ELECT. ENERGY GEN. (KW): 647492.0 5116077.0 95148122.0
6. GROSS THERMAL ENERGY GEN. (KWH)s 1998043.0 15575234.0 290174845.0
9. UNIT AVAILABILITY FACTOR (M): 100.0 100.0 82.8
10. UNIT CAPACITY FACTOR (0DC) (S) I - 99.4 100.4 79.0
11. UNIT FORCED OUTAGE RATE tMs 0.0 0.0 9.3

- -- v - - - -

V-I

Text

--- -s FENOC

&gEyM~dw - 0gh-M C-M- `

Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077 L-03-141 September 8, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of August, 2003.

Respectfully A_ _

- I- d- cWe.Pearce s - -R

_=; ---- I--: a Vice-PiesidentBVPS; DTJ/cmg Enclosures cc: NRC Regional Office
I -;King of Prussia, PA

. *1 - I . E:., -

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE September 2,2003

-COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: August 2003 Date Type Duration Reason Methiod of Cause / Corrective Actions No. (Y/M/D) F: Forceo (Hours) (1) Shutting S: Scheied Down (2) Comments NONE.

(1) Reason (2) Method A - Equipment Failure (Explain) 1- Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trp / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Expiain)

F - Administative G -Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output until 1611 hours0.0186 days <br />0.448 hours <br />0.00266 weeks <br />6.129855e-4 months <br /> on 8/14/03 when a slight load rejection of approximately 65 MWH occurred due to grid instability following a wide scale power outage that disrupted a large sector of the nation's power grid. The Unit was immediately stabilized and retuedo fu ower.

The Unit continued to operate at a nominal value of 100% output until 0909 hour0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.458745e-4 months <br />s-on 8/23/03, when a planned load reduction to approximately 95% output was commenced. An output of approximately 95% was achieved at 0950 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.61475e-4 months <br /> on 8123103. The 5% load reduction was being made as a conservative measure in order to allow margin for the expected rise in reactor power due to a rise in steam flow that was being used to dislodge foreign material from the seat of Condenser Steam Dump Valve 106A4 that was preventing full closure of the valve.

Following successful closure of the valve, the Unit began to return to full power at 1110 hours0.0128 days <br />0.308 hours <br />0.00184 weeks <br />4.22355e-4 months <br /> on 8123103. A nominal value of 100% output was achieved at 1310 hours0.0152 days <br />0.364 hours <br />0.00217 weeks <br />4.98455e-4 months <br /> on 8/23/03. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

- JO OPERITING DATA REPORT DOCKET NO.2 50-334 UNIT NAME: BVPS UNIT t1 REPORT DATE: 09/02/03 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 c - ***

  • *
  • ra t* *******
  • la. REPORTING PERIOD: AUGUST 2003 k Ratod thermal rower at *
  • BVP8-1 was uprated from 2652 KWt*
1. DESIGN ELECTRICAL RATING (Net WMe): 835
  • to 2689 MWt on 10/20i01. Net *
  • MDC was also uprated from
  • 2 MAX.-DEPENDABLE -CRAPATY 1Net1We)aV----"21 - .- S i e. -

THIS MONTE YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5831.0 239615.0

3. NO. OF ERS. REACTOR WA CRITICAL: 744.0 4530.5 165122.0
4. SERVICE HOURS GENERATOR ON LINE: 744.0 4483.9 162595.9
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 - 0.0 0.0
6. RET ELECTRICAL ENERGY GEN. (KWH): 616890.0 3555199.0 122211206.0
7. GROSS ELECT. ENERGY GEN. (KWH) 652990.0 3775687.0 130445277.0
8. GROSS THERMaL ENERGY GEN. (KWM): 1997525.0 11527798.0 401799107.5
9. UNIT AVAILABILITY FACTOR (M)s 100.0 76.9 69.3
10. UNIT CAPACITY FACTOR (MDC) (O)S ' 101.0 74 *.3 64.8
11. UNIT 3ORCED OUTAGE RATE (t): 0.0 1.3 15.3 1*

-W

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE September 2, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: August 2003 No. Date Type I Duration Reason - Method of Cause I Corrective Actions (Y/MID) F: Forced (Hours) (1) Shutting S: scheduledI I Down (2) {L Comments NONE.

(1) Reason (2) Method A - Equipment Failure (Explain) 1- Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3-Automatic Trip I Scram D - Regulatory Restrcton 4 - Continuation E - Operator Training I Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output until 1613 hours0.0187 days <br />0.448 hours <br />0.00267 weeks <br />6.137465e-4 months <br /> on 8114103 when a slight load rejection of approximately 15 MWH occurred due to grid instability following a wide scale power outage that disrupted a large sector of the nation's power grid. The Unit was imnmediately stabilized-aridmLuuom tlos .wer and wntinued-zoperate Xo avAne_

of 100l/ output for the remainder of the-report period.

N.

Ar OPERATING DATA REPORT DOCET IJO. : 50-412 UNIT NmmNI EVPS UNIT 82 REPORT DATE: 09/02J03 COMPLETED BYs DAVID T. JOWES TELEPHONEt: (724) 682-4962 REPORTING PERIOD: AUGUST 2003

  • ffjtej Rated thermal power at
  • is.
  • BVPB-2 was uprated from 2652 MWt*
1. DESIGN ELECTRICAL RATING (Net EWe)s 836
  • to 2689 Mwt on 10/30/01. Net *
  • KDC was also uprated from
  • 2.- .-7DZnZM&BL1-CXM1WYRF3t-kWe)-S - 131 - '-1 -MWe-.t.-431-MWe. - --* -

TaIs MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5831.0 138398.0

3. NO. OF ERS. REACTOR WAS CRITICAL: 744.0 S831.0 115386.1
4. SERVICE HOURS GENERATOR ON LINEt 744.0 5831.0 114657.5
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (KWH): 614833.0 486485s.0 90047288.0
7. GROSS ELECT. ENERGY GEN. (KW): 647492.0 5116077.0 95148122.0
6. GROSS THERMAL ENERGY GEN. (KWH)s 1998043.0 15575234.0 290174845.0
9. UNIT AVAILABILITY FACTOR (M): 100.0 100.0 82.8
10. UNIT CAPACITY FACTOR (0DC) (S) I - 99.4 100.4 79.0
11. UNIT FORCED OUTAGE RATE tMs 0.0 0.0 9.3

- -- v - - - -

V-I