MONTHYEARL-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-198, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0707 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-241, Submittal of the Updated Final Safety Analysis Report, Revision 272023-11-29029 November 2023 Submittal of the Updated Final Safety Analysis Report, Revision 27 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-053, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-04-14014 April 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-036, Report of Facility Changes, Tests and Experiments2023-03-13013 March 2023 Report of Facility Changes, Tests and Experiments L-23-086, Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0404 March 2023 Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair 2024-09-17
[Table view] Category:License-Monthly Operating Report
MONTHYEARL-05-125, August 2005 Monthly Operating Report for Beaver Valley Power Station, Units 1 and 22005-09-0909 September 2005 August 2005 Monthly Operating Report for Beaver Valley Power Station, Units 1 and 2 L-05-119, June 2005 Monthly Operating Report for Beaver Valley Power, Units 1 and 22005-07-0808 July 2005 June 2005 Monthly Operating Report for Beaver Valley Power, Units 1 and 2 L-05-105, May 2005 Monthly Operating Report for Beaver Valley Power Station2005-06-0707 June 2005 May 2005 Monthly Operating Report for Beaver Valley Power Station L-05-088, April 2005 Monthly Operating Report for Beaver Valley, Units 1 & 22005-05-0606 May 2005 April 2005 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-05-064, March 2005 Monthly Operating Report for Beaver Valley Power Station2005-04-0808 April 2005 March 2005 Monthly Operating Report for Beaver Valley Power Station L-05-044, February 2005 Monthly Operating Report for Beaver Valley, Units 1 & 22005-03-0707 March 2005 February 2005 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-05-024, January 2005 Monthly Operating Report for Beaver Valley, Units 1 and 22005-02-0808 February 2005 January 2005 Monthly Operating Report for Beaver Valley, Units 1 and 2 L-05-004, December 2004 Monthly Operating Report for Beaver Valley Power Station Units 1 and 22005-01-0707 January 2005 December 2004 Monthly Operating Report for Beaver Valley Power Station Units 1 and 2 L-04-157, November 2004 Monthly Operating Report for Beaver Valley Power Station2004-12-0707 December 2004 November 2004 Monthly Operating Report for Beaver Valley Power Station L-04-137, October, 2004 Monthly Operating Report for Beaver Valley Power Station2004-11-0808 November 2004 October, 2004 Monthly Operating Report for Beaver Valley Power Station L-04-133, September 2004 Monthly Operating Report for Beaver Valley Units 1 and 22004-10-0707 October 2004 September 2004 Monthly Operating Report for Beaver Valley Units 1 and 2 L-04-120, August 2004 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 22004-09-0808 September 2004 August 2004 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 2 L-04-111, July 2004 Monthly Operating Report for Beaver Valley Units 1 and 22004-08-0606 August 2004 July 2004 Monthly Operating Report for Beaver Valley Units 1 and 2 L-04-096, June 2004 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 22004-07-0808 July 2004 June 2004 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 2 L-04-079, May 2004 Monthly Operating Report for Beaver Valley Power Station2004-06-0707 June 2004 May 2004 Monthly Operating Report for Beaver Valley Power Station L-04-063, April 2004 Monthly Operating Report for Beaver Valley, Units 1 and 22004-05-0707 May 2004 April 2004 Monthly Operating Report for Beaver Valley, Units 1 and 2 L-04-052, March 2004 Monthly Operating Report for Beaver Valley, Units 1 & 22004-04-0707 April 2004 March 2004 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-04-031, February 2004 Monthly Operating Report for Beaver Valley, Units 1 and 22004-03-0808 March 2004 February 2004 Monthly Operating Report for Beaver Valley, Units 1 and 2 L-04-014, January 2004 Monthly Operating Report for Beaver Valley, Units 1 and 22004-02-0606 February 2004 January 2004 Monthly Operating Report for Beaver Valley, Units 1 and 2 L-03-201, November 2003 Monthly Operating Report for Beaver Valley Units 1 and 22003-12-0505 December 2003 November 2003 Monthly Operating Report for Beaver Valley Units 1 and 2 L-03-184, October 2003 Monthly Operating Report for Beaver Valley, Units 1 & 22003-11-0707 November 2003 October 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-03-156, September 2003 Monthly Operating Report for Beaver Valley Units 1 and 22003-10-0808 October 2003 September 2003 Monthly Operating Report for Beaver Valley Units 1 and 2 L-03-141, August 2003 Monthly Operating Report for Beaver Valley Units 1 & 22003-09-0808 September 2003 August 2003 Monthly Operating Report for Beaver Valley Units 1 & 2 L-03-121, July 2003 Monthly Operating Report for Beaver Valley, Units 1 & 22003-08-0707 August 2003 July 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-03-107, June 2003 Monthly Operating Report for Beaver Valley, Units 1 & 22003-07-0808 July 2003 June 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-03-096, May 2003 Monthly Operating Report for Beaver Valley, Units 1 & 22003-06-0606 June 2003 May 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-03-077, April 2003 Monthly Operating Report for Beaver Valley, Units 1 and 22003-05-0606 May 2003 April 2003 Monthly Operating Report for Beaver Valley, Units 1 and 2 L-03-058, March 2003 Monthly Operating Report for Beaver Valley Power Station2003-04-0707 April 2003 March 2003 Monthly Operating Report for Beaver Valley Power Station L-03-043, February 2003 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 22003-03-10010 March 2003 February 2003 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 2 L-03-027, January 2003 Monthly Operating Report for Beaver Valley Power Station2003-02-0707 February 2003 January 2003 Monthly Operating Report for Beaver Valley Power Station L-02-116, November 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-12-0606 December 2002 November 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-111, October 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-11-0707 November 2002 October 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-104, September 2002 Monthly Operating Report for Beaver Valley2002-10-0707 October 2002 September 2002 Monthly Operating Report for Beaver Valley L-02-096, August 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-09-0606 September 2002 August 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-085, July 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-08-0707 August 2002 July 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-074, June 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-07-0808 July 2002 June 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-071, May 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-06-0707 June 2002 May 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-056, April 2002 Monthly Operating Report for Beaver Valley Power Station2002-05-0707 May 2002 April 2002 Monthly Operating Report for Beaver Valley Power Station L-02-037, March 2002 Monthly Operating Report for Beaver Valley, Units 1 & 22002-04-0505 April 2002 March 2002 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-02-026, February 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-03-0707 March 2002 February 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 2005-09-09
[Table view] |
Text
--- -s FENOC
&gEyM~dw - 0gh-M C-M- `
Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077 L-03-141 September 8, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of August, 2003.
Respectfully A_ _
- I- d- cWe.Pearce s - -R
- _=; ---- I--: a Vice-PiesidentBVPS; DTJ/cmg Enclosures cc: NRC Regional Office
- I -;King of Prussia, PA
. *1 - I . E:., -
UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE September 2,2003
-COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: August 2003 Date Type Duration Reason Methiod of Cause / Corrective Actions No. (Y/M/D) F: Forceo (Hours) (1) Shutting S: Scheied Down (2) Comments NONE.
(1) Reason (2) Method A - Equipment Failure (Explain) 1- Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trp / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Expiain)
F - Administative G -Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output until 1611 hours0.0186 days <br />0.448 hours <br />0.00266 weeks <br />6.129855e-4 months <br /> on 8/14/03 when a slight load rejection of approximately 65 MWH occurred due to grid instability following a wide scale power outage that disrupted a large sector of the nation's power grid. The Unit was immediately stabilized and retuedo fu ower.
The Unit continued to operate at a nominal value of 100% output until 0909 hour0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.458745e-4 months <br />s-on 8/23/03, when a planned load reduction to approximately 95% output was commenced. An output of approximately 95% was achieved at 0950 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.61475e-4 months <br /> on 8123103. The 5% load reduction was being made as a conservative measure in order to allow margin for the expected rise in reactor power due to a rise in steam flow that was being used to dislodge foreign material from the seat of Condenser Steam Dump Valve 106A4 that was preventing full closure of the valve.
Following successful closure of the valve, the Unit began to return to full power at 1110 hours0.0128 days <br />0.308 hours <br />0.00184 weeks <br />4.22355e-4 months <br /> on 8123103. A nominal value of 100% output was achieved at 1310 hours0.0152 days <br />0.364 hours <br />0.00217 weeks <br />4.98455e-4 months <br /> on 8/23/03. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.
- JO OPERITING DATA REPORT DOCKET NO.2 50-334 UNIT NAME: BVPS UNIT t1 REPORT DATE: 09/02/03 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 c - ***
- la. REPORTING PERIOD: AUGUST 2003 k Ratod thermal rower at *
- BVP8-1 was uprated from 2652 KWt*
- 1. DESIGN ELECTRICAL RATING (Net WMe): 835
- to 2689 MWt on 10/20i01. Net *
- MDC was also uprated from
- 2 MAX.-DEPENDABLE -CRAPATY 1Net1We)aV----"21 - .- S i e. -
THIS MONTE YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5831.0 239615.0
- 3. NO. OF ERS. REACTOR WA CRITICAL: 744.0 4530.5 165122.0
- 4. SERVICE HOURS GENERATOR ON LINE: 744.0 4483.9 162595.9
- 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 - 0.0 0.0
- 6. RET ELECTRICAL ENERGY GEN. (KWH): 616890.0 3555199.0 122211206.0
- 7. GROSS ELECT. ENERGY GEN. (KWH) 652990.0 3775687.0 130445277.0
- 8. GROSS THERMaL ENERGY GEN. (KWM): 1997525.0 11527798.0 401799107.5
- 9. UNIT AVAILABILITY FACTOR (M)s 100.0 76.9 69.3
- 10. UNIT CAPACITY FACTOR (MDC) (O)S ' 101.0 74 *.3 64.8
- 11. UNIT 3ORCED OUTAGE RATE (t): 0.0 1.3 15.3 1*
-W
UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE September 2, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: August 2003 No. Date Type I Duration Reason - Method of Cause I Corrective Actions (Y/MID) F: Forced (Hours) (1) Shutting S: scheduledI I Down (2) {L Comments NONE.
(1) Reason (2) Method A - Equipment Failure (Explain) 1- Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3-Automatic Trip I Scram D - Regulatory Restrcton 4 - Continuation E - Operator Training I Ucense Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output until 1613 hours0.0187 days <br />0.448 hours <br />0.00267 weeks <br />6.137465e-4 months <br /> on 8114103 when a slight load rejection of approximately 15 MWH occurred due to grid instability following a wide scale power outage that disrupted a large sector of the nation's power grid. The Unit was imnmediately stabilized-aridmLuuom tlos .wer and wntinued-zoperate Xo avAne_
of 100l/ output for the remainder of the-report period.
N.
Ar OPERATING DATA REPORT DOCET IJO. : 50-412 UNIT NmmNI EVPS UNIT 82 REPORT DATE: 09/02J03 COMPLETED BYs DAVID T. JOWES TELEPHONEt: (724) 682-4962 REPORTING PERIOD: AUGUST 2003
- ffjtej Rated thermal power at
- BVPB-2 was uprated from 2652 MWt*
- 1. DESIGN ELECTRICAL RATING (Net EWe)s 836
- to 2689 Mwt on 10/30/01. Net *
- KDC was also uprated from
- 2.- .-7DZnZM&BL1-CXM1WYRF3t-kWe)-S - 131 - '-1 -MWe-.t.-431-MWe. - --* -
TaIs MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5831.0 138398.0
- 3. NO. OF ERS. REACTOR WAS CRITICAL: 744.0 S831.0 115386.1
- 4. SERVICE HOURS GENERATOR ON LINEt 744.0 5831.0 114657.5
- 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 6. NET ELECTRICAL ENERGY GEN. (KWH): 614833.0 486485s.0 90047288.0
- 7. GROSS ELECT. ENERGY GEN. (KW): 647492.0 5116077.0 95148122.0
- 6. GROSS THERMAL ENERGY GEN. (KWH)s 1998043.0 15575234.0 290174845.0
- 9. UNIT AVAILABILITY FACTOR (M): 100.0 100.0 82.8
- 10. UNIT CAPACITY FACTOR (0DC) (S) I - 99.4 100.4 79.0
- 11. UNIT FORCED OUTAGE RATE tMs 0.0 0.0 9.3
- -- v - - - -
V-I
Text
--- -s FENOC
&gEyM~dw - 0gh-M C-M- `
Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077 L-03-141 September 8, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of August, 2003.
Respectfully A_ _
- I- d- cWe.Pearce s - -R
- _=; ---- I--: a Vice-PiesidentBVPS; DTJ/cmg Enclosures cc: NRC Regional Office
- I -;King of Prussia, PA
. *1 - I . E:., -
UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE September 2,2003
-COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: August 2003 Date Type Duration Reason Methiod of Cause / Corrective Actions No. (Y/M/D) F: Forceo (Hours) (1) Shutting S: Scheied Down (2) Comments NONE.
(1) Reason (2) Method A - Equipment Failure (Explain) 1- Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trp / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Expiain)
F - Administative G -Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output until 1611 hours0.0186 days <br />0.448 hours <br />0.00266 weeks <br />6.129855e-4 months <br /> on 8/14/03 when a slight load rejection of approximately 65 MWH occurred due to grid instability following a wide scale power outage that disrupted a large sector of the nation's power grid. The Unit was immediately stabilized and retuedo fu ower.
The Unit continued to operate at a nominal value of 100% output until 0909 hour0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.458745e-4 months <br />s-on 8/23/03, when a planned load reduction to approximately 95% output was commenced. An output of approximately 95% was achieved at 0950 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.61475e-4 months <br /> on 8123103. The 5% load reduction was being made as a conservative measure in order to allow margin for the expected rise in reactor power due to a rise in steam flow that was being used to dislodge foreign material from the seat of Condenser Steam Dump Valve 106A4 that was preventing full closure of the valve.
Following successful closure of the valve, the Unit began to return to full power at 1110 hours0.0128 days <br />0.308 hours <br />0.00184 weeks <br />4.22355e-4 months <br /> on 8123103. A nominal value of 100% output was achieved at 1310 hours0.0152 days <br />0.364 hours <br />0.00217 weeks <br />4.98455e-4 months <br /> on 8/23/03. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.
- JO OPERITING DATA REPORT DOCKET NO.2 50-334 UNIT NAME: BVPS UNIT t1 REPORT DATE: 09/02/03 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 c - ***
- la. REPORTING PERIOD: AUGUST 2003 k Ratod thermal rower at *
- BVP8-1 was uprated from 2652 KWt*
- 1. DESIGN ELECTRICAL RATING (Net WMe): 835
- to 2689 MWt on 10/20i01. Net *
- MDC was also uprated from
- 2 MAX.-DEPENDABLE -CRAPATY 1Net1We)aV----"21 - .- S i e. -
THIS MONTE YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5831.0 239615.0
- 3. NO. OF ERS. REACTOR WA CRITICAL: 744.0 4530.5 165122.0
- 4. SERVICE HOURS GENERATOR ON LINE: 744.0 4483.9 162595.9
- 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 - 0.0 0.0
- 6. RET ELECTRICAL ENERGY GEN. (KWH): 616890.0 3555199.0 122211206.0
- 7. GROSS ELECT. ENERGY GEN. (KWH) 652990.0 3775687.0 130445277.0
- 8. GROSS THERMaL ENERGY GEN. (KWM): 1997525.0 11527798.0 401799107.5
- 9. UNIT AVAILABILITY FACTOR (M)s 100.0 76.9 69.3
- 10. UNIT CAPACITY FACTOR (MDC) (O)S ' 101.0 74 *.3 64.8
- 11. UNIT 3ORCED OUTAGE RATE (t): 0.0 1.3 15.3 1*
-W
UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE September 2, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: August 2003 No. Date Type I Duration Reason - Method of Cause I Corrective Actions (Y/MID) F: Forced (Hours) (1) Shutting S: scheduledI I Down (2) {L Comments NONE.
(1) Reason (2) Method A - Equipment Failure (Explain) 1- Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3-Automatic Trip I Scram D - Regulatory Restrcton 4 - Continuation E - Operator Training I Ucense Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output until 1613 hours0.0187 days <br />0.448 hours <br />0.00267 weeks <br />6.137465e-4 months <br /> on 8114103 when a slight load rejection of approximately 15 MWH occurred due to grid instability following a wide scale power outage that disrupted a large sector of the nation's power grid. The Unit was imnmediately stabilized-aridmLuuom tlos .wer and wntinued-zoperate Xo avAne_
of 100l/ output for the remainder of the-report period.
N.
Ar OPERATING DATA REPORT DOCET IJO. : 50-412 UNIT NmmNI EVPS UNIT 82 REPORT DATE: 09/02J03 COMPLETED BYs DAVID T. JOWES TELEPHONEt: (724) 682-4962 REPORTING PERIOD: AUGUST 2003
- ffjtej Rated thermal power at
- BVPB-2 was uprated from 2652 MWt*
- 1. DESIGN ELECTRICAL RATING (Net EWe)s 836
- to 2689 Mwt on 10/30/01. Net *
- KDC was also uprated from
- 2.- .-7DZnZM&BL1-CXM1WYRF3t-kWe)-S - 131 - '-1 -MWe-.t.-431-MWe. - --* -
TaIs MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 5831.0 138398.0
- 3. NO. OF ERS. REACTOR WAS CRITICAL: 744.0 S831.0 115386.1
- 4. SERVICE HOURS GENERATOR ON LINEt 744.0 5831.0 114657.5
- 5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 6. NET ELECTRICAL ENERGY GEN. (KWH): 614833.0 486485s.0 90047288.0
- 7. GROSS ELECT. ENERGY GEN. (KW): 647492.0 5116077.0 95148122.0
- 6. GROSS THERMAL ENERGY GEN. (KWH)s 1998043.0 15575234.0 290174845.0
- 9. UNIT AVAILABILITY FACTOR (M): 100.0 100.0 82.8
- 10. UNIT CAPACITY FACTOR (0DC) (S) I - 99.4 100.4 79.0
- 11. UNIT FORCED OUTAGE RATE tMs 0.0 0.0 9.3