November 2003 Monthly Operating Report for Beaver Valley Units 1 and 2
ML033510593
Person / Time
Site: Beaver Valley
Issue date: 12/05/2003
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-03-201
Download: ML033510593 (5)


Text

FENO C Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077 L-03-201 December 5, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of November, 2003. No regulatory commitments are contained in this submittal.

spe tfully Pearce Vice-President BVPS DTJ/cmg Enclosures cc: NRC Regional Office King of Prussia, PA

~~~~~~~~-: ,l;-,,-,.,.:

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE December 1, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: November 2003 No. Date Type Duration Reason Method of Cause / Corrective Actions (YIM/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments 4 031113 F 27.1 H 3 The Unit experienced an automatic Reactor trip following an inadvertent Turbine trip from 100% output during a Solid State Protection System Train B Bi-Monthly Test. This was caused when an I&C Technician inadvertently connected a digital voltmeter to read resistance across the relay contacts for the Reactor Trip Breaker instead of the Reactor Trip Bypass Breaker. This resulted in the opening of the Reactor Trip Breakers thus causing a Turbine trip, and since the Unit was operating above 49% output, an automatic Reactor trip also occurred.

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

________The Unit-beganihe.report period operating at-a nominal value of -100% output.--On-1 1/13/03-aat 1136 hours0.0131 days <br />0.316 hours <br />0.00188 weeks <br />4.32248e-4 months <br />, the Unit experienced an automatic Reactor trip following an inadvertent Turbine trip during a Solid State Protection System Train B Bi-Monthly Test. The Unit was subsequently stabilized in Mode 3. Following an investigation into the cause of the trip, the Unit began to startup entering Mode at 1039 hours0.012 days <br />0.289 hours <br />0.00172 weeks <br />3.953395e-4 months <br /> on 11/14/03. The Reactor was taken critical at 1120 hours0.013 days <br />0.311 hours <br />0.00185 weeks <br />4.2616e-4 months <br /> and Mode 1 was entered at 1158 hours0.0134 days <br />0.322 hours <br />0.00191 weeks <br />4.40619e-4 months <br /> on 11/14/03. The Unit was then synchronized to the electrical grid at 1441 hours0.0167 days <br />0.4 hours <br />0.00238 weeks <br />5.483005e-4 months <br />.on 11/14/03, and escalation to 100% output was begun. Power ascension was halted at approximately 44% output, and a 10% load reduction was begun at 1813 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.898465e-4 months <br /> on 11/14/03 in order to repair No. 1 Governor Valve oscillations. The load reduction was halted at approximately 34% output at 1844 hours0.0213 days <br />0.512 hours <br />0.00305 weeks <br />7.01642e-4 months <br /> on 11/14/03. Following repair of GV-1, the Unit commenced its return to full power-at 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> on 11/15/03. A nominal value of 100% output was achieved at 0333 hours0.00385 days <br />0.0925 hours <br />5.505952e-4 weeks <br />1.267065e-4 months <br /> on 11/16/03. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 12/01/03 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962

,J

  • Notes% Rated thermal power at
  • la. REPORTING PERIOD: - NOVEMBER 2003
  • BVPS-1 was uprated from 2652 MWts
1. DESIGN ELECTRICAL RATING (Net MWe): 835
  • to 2689 MWt on 10/20/01. Net *
  • MDC was also uprated from *

--i -2.-- MAX. DEPENDABLE CAPACITY (Net MWe): -821 - - -* 810 MWe to 821 MWe. - -*

THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 8016.0 241800.0

3. NO. OF HRS. REACTOR WAS CRITICAL: 696.3 6691.8 167283.3
4. SERVICE HOURS GENERATOR ON LINE: 692.9 6641.8 164753.8
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 O.0
6. NET ELECTRICAL ENERGY GEN. (MWH): 568836.0 5353835.0 124009842.0
7. GROSS ELECT. ENERGY GEN. (MWH): 603016.0 5679453.0 132349043.0
8. GROSS THERMAL ENERGY GEM. (MKW): 1817339.0 17280361.0 407551670.5
9. UNIT AVAILABILITY FACTOR (%): 96.2 82.9 69.5
10. UNIT CAPACITY FACTOR (MDC) (%): 96.2 81.4 65.1 II. UNIT FORCED OUTAGE RATE (%): 3.8 1.3 15.2

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE December 1, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: November 2003 No. Date Type Duration Reason Method of Cause / Corrective Actions (Y/M/D) i F: Forced (Hours) (1) Shutting l-_ / S: Scheduled (2) Comments NONE.

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit began the report period operating at a nominal value of 100% output. On 11/5/03 at 0228 hours0.00264 days <br />0.0633 hours <br />3.769841e-4 weeks <br />8.6754e-5 months <br />, the Unit began to reduce thermal power to less than 2652 MWt due to failure of the Leading Edge Flow Meter (LEFM). A corresponding electrical output of approximately 98% was achieved at 0304 hours0.00352 days <br />0.0844 hours <br />5.026455e-4 weeks <br />1.15672e-4 months <br /> on 11/5/03. Upon returning the LEFM to operable status, the Unit commenced to return to full electrical and thermal power at 2145 hours0.0248 days <br />0.596 hours <br />0.00355 weeks <br />8.161725e-4 months <br /> on 11/5/03. -

- .. Full power was achieved at2209.hours-on 11/5/03.- .-.-. . _ _.

The Unit continued to operate at a nominal value of 100% output until 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> on 11/30/03 when a 10% load reduction was commenced in order to support a planned calibration of Loop 11 Delta-T/Tavg. Output was reduced to approximately 90% at 0107 hours0.00124 days <br />0.0297 hours <br />1.76918e-4 weeks <br />4.07135e-5 months <br /> on 11/30/03 in order to gain extra margin as a conservative measure in order to prevent a possible Turbine runback or plant trip during the calibration of Loop II with Loop I experiencing fluctuations high.-

Following completion of the calibration, the Unit commenced to return to full power at 0455 hours0.00527 days <br />0.126 hours <br />7.523148e-4 weeks <br />1.731275e-4 months <br /> on 11/30/03. A nominal value of 100% output was achieved at 0558 hours0.00646 days <br />0.155 hours <br />9.22619e-4 weeks <br />2.12319e-4 months <br /> on 11/30/03..

The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT #2 REPORT DATE: 12/01/03 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 la. REPORTING PERIOD: NOVEMBER 2003

  • nbte: Rated thermal power at *
  • BVPS-2 was uprated from 2652 MWt*
1. DESIGN ELECTRICAL RATING (Net MWe): 836
  • to 2689 Mwt on 10/30/01. Net *
  • MDC was also uprated from *

-- i. MAX. DEPENDABLECAPACITY-(Net'Xffe)v-~-3 V--- -a * **- * * -*

THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 8016.0 140583.0

3. NO. OF HRS. REACTOR WAS CRITICAL: 720.0 7309.4 116864.5
4. SERVICE HOURS GENERATOR ON LINE: 720.0 7293.9 116120.4
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (MaW): 607771.0 6004682.0 91187085.0
7. GROSS ELECT. ENERGY GEN. (MWH): 638771.0 6323505.0 96355550.0
8. GROSS THERMAL ENERGY GEN. (MWH): 1931584.0 19259769.0 293859380.0
9. UNIT AVAILABILITY FACTOR (%): 100.0 91.0 82.6
10. UNIT CAPACITY FACTOR (MDC) (%): 101.6 90.1 78.8
11. UNIT FORCED OUTAGE RATE (%): 0.0 0.4 9.2

Text

FENO C Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077 L-03-201 December 5, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of November, 2003. No regulatory commitments are contained in this submittal.

spe tfully Pearce Vice-President BVPS DTJ/cmg Enclosures cc: NRC Regional Office King of Prussia, PA

~~~~~~~~-: ,l;-,,-,.,.:

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE December 1, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: November 2003 No. Date Type Duration Reason Method of Cause / Corrective Actions (YIM/D) F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments 4 031113 F 27.1 H 3 The Unit experienced an automatic Reactor trip following an inadvertent Turbine trip from 100% output during a Solid State Protection System Train B Bi-Monthly Test. This was caused when an I&C Technician inadvertently connected a digital voltmeter to read resistance across the relay contacts for the Reactor Trip Breaker instead of the Reactor Trip Bypass Breaker. This resulted in the opening of the Reactor Trip Breakers thus causing a Turbine trip, and since the Unit was operating above 49% output, an automatic Reactor trip also occurred.

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

________The Unit-beganihe.report period operating at-a nominal value of -100% output.--On-1 1/13/03-aat 1136 hours0.0131 days <br />0.316 hours <br />0.00188 weeks <br />4.32248e-4 months <br />, the Unit experienced an automatic Reactor trip following an inadvertent Turbine trip during a Solid State Protection System Train B Bi-Monthly Test. The Unit was subsequently stabilized in Mode 3. Following an investigation into the cause of the trip, the Unit began to startup entering Mode at 1039 hours0.012 days <br />0.289 hours <br />0.00172 weeks <br />3.953395e-4 months <br /> on 11/14/03. The Reactor was taken critical at 1120 hours0.013 days <br />0.311 hours <br />0.00185 weeks <br />4.2616e-4 months <br /> and Mode 1 was entered at 1158 hours0.0134 days <br />0.322 hours <br />0.00191 weeks <br />4.40619e-4 months <br /> on 11/14/03. The Unit was then synchronized to the electrical grid at 1441 hours0.0167 days <br />0.4 hours <br />0.00238 weeks <br />5.483005e-4 months <br />.on 11/14/03, and escalation to 100% output was begun. Power ascension was halted at approximately 44% output, and a 10% load reduction was begun at 1813 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.898465e-4 months <br /> on 11/14/03 in order to repair No. 1 Governor Valve oscillations. The load reduction was halted at approximately 34% output at 1844 hours0.0213 days <br />0.512 hours <br />0.00305 weeks <br />7.01642e-4 months <br /> on 11/14/03. Following repair of GV-1, the Unit commenced its return to full power-at 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> on 11/15/03. A nominal value of 100% output was achieved at 0333 hours0.00385 days <br />0.0925 hours <br />5.505952e-4 weeks <br />1.267065e-4 months <br /> on 11/16/03. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 12/01/03 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962

,J

  • Notes% Rated thermal power at
  • la. REPORTING PERIOD: - NOVEMBER 2003
  • BVPS-1 was uprated from 2652 MWts
1. DESIGN ELECTRICAL RATING (Net MWe): 835
  • to 2689 MWt on 10/20/01. Net *
  • MDC was also uprated from *

--i -2.-- MAX. DEPENDABLE CAPACITY (Net MWe): -821 - - -* 810 MWe to 821 MWe. - -*

THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 8016.0 241800.0

3. NO. OF HRS. REACTOR WAS CRITICAL: 696.3 6691.8 167283.3
4. SERVICE HOURS GENERATOR ON LINE: 692.9 6641.8 164753.8
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 O.0
6. NET ELECTRICAL ENERGY GEN. (MWH): 568836.0 5353835.0 124009842.0
7. GROSS ELECT. ENERGY GEN. (MWH): 603016.0 5679453.0 132349043.0
8. GROSS THERMAL ENERGY GEM. (MKW): 1817339.0 17280361.0 407551670.5
9. UNIT AVAILABILITY FACTOR (%): 96.2 82.9 69.5
10. UNIT CAPACITY FACTOR (MDC) (%): 96.2 81.4 65.1 II. UNIT FORCED OUTAGE RATE (%): 3.8 1.3 15.2

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE December 1, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD: November 2003 No. Date Type Duration Reason Method of Cause / Corrective Actions (Y/M/D) i F: Forced (Hours) (1) Shutting l-_ / S: Scheduled (2) Comments NONE.

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit began the report period operating at a nominal value of 100% output. On 11/5/03 at 0228 hours0.00264 days <br />0.0633 hours <br />3.769841e-4 weeks <br />8.6754e-5 months <br />, the Unit began to reduce thermal power to less than 2652 MWt due to failure of the Leading Edge Flow Meter (LEFM). A corresponding electrical output of approximately 98% was achieved at 0304 hours0.00352 days <br />0.0844 hours <br />5.026455e-4 weeks <br />1.15672e-4 months <br /> on 11/5/03. Upon returning the LEFM to operable status, the Unit commenced to return to full electrical and thermal power at 2145 hours0.0248 days <br />0.596 hours <br />0.00355 weeks <br />8.161725e-4 months <br /> on 11/5/03. -

- .. Full power was achieved at2209.hours-on 11/5/03.- .-.-. . _ _.

The Unit continued to operate at a nominal value of 100% output until 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> on 11/30/03 when a 10% load reduction was commenced in order to support a planned calibration of Loop 11 Delta-T/Tavg. Output was reduced to approximately 90% at 0107 hours0.00124 days <br />0.0297 hours <br />1.76918e-4 weeks <br />4.07135e-5 months <br /> on 11/30/03 in order to gain extra margin as a conservative measure in order to prevent a possible Turbine runback or plant trip during the calibration of Loop II with Loop I experiencing fluctuations high.-

Following completion of the calibration, the Unit commenced to return to full power at 0455 hours0.00527 days <br />0.126 hours <br />7.523148e-4 weeks <br />1.731275e-4 months <br /> on 11/30/03. A nominal value of 100% output was achieved at 0558 hours0.00646 days <br />0.155 hours <br />9.22619e-4 weeks <br />2.12319e-4 months <br /> on 11/30/03..

The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT #2 REPORT DATE: 12/01/03 COMPLETED BY: DAVID T. JONES TELEPHONE: (724) 682-4962 la. REPORTING PERIOD: NOVEMBER 2003

  • nbte: Rated thermal power at *
  • BVPS-2 was uprated from 2652 MWt*
1. DESIGN ELECTRICAL RATING (Net MWe): 836
  • to 2689 Mwt on 10/30/01. Net *
  • MDC was also uprated from *

-- i. MAX. DEPENDABLECAPACITY-(Net'Xffe)v-~-3 V--- -a * **- * * -*

THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 8016.0 140583.0

3. NO. OF HRS. REACTOR WAS CRITICAL: 720.0 7309.4 116864.5
4. SERVICE HOURS GENERATOR ON LINE: 720.0 7293.9 116120.4
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (MaW): 607771.0 6004682.0 91187085.0
7. GROSS ELECT. ENERGY GEN. (MWH): 638771.0 6323505.0 96355550.0
8. GROSS THERMAL ENERGY GEN. (MWH): 1931584.0 19259769.0 293859380.0
9. UNIT AVAILABILITY FACTOR (%): 100.0 91.0 82.6
10. UNIT CAPACITY FACTOR (MDC) (%): 101.6 90.1 78.8
11. UNIT FORCED OUTAGE RATE (%): 0.0 0.4 9.2