MONTHYEARIR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21327A1702021-06-16016 June 2021 ES-401-6 ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 ML21327A3362021-06-16016 June 2021 Handouts to Applicants (Summary) ML21327A3262021-06-16016 June 2021 Administered Written Exam with Answer Key ML21328A1382021-06-16016 June 2021 Proposed Admin JPMs ML21327A3212021-06-16016 June 2021 Administered Scenarios ML21328A1622021-06-16016 June 2021 Proposed Control Room and In-Plant JPMs ML21328A1642021-06-16016 June 2021 Proposed Scenarios ML21328A1662021-06-16016 June 2021 Proposed Written Exam with Answer Key ML21327A3082021-06-16016 June 2021 Administered Admin JPMs ML21327A3422021-06-16016 June 2021 Modified Question Source Information ML21327A3142021-06-16016 June 2021 Administered Control Room and In-Plant JPMs ML21120A0202021-05-0303 May 2021 Operator Licensing Examination Approval IR 05000341/20203022021-03-18018 March 2021 NRC Initial License Examination Report 05000341/2020302 ML22158A1462021-02-0505 February 2021 Fer 2020 Ile ES-301-7 Operating Test Review Worksheet-Final ML22158A1302021-02-0505 February 2021 Fer 2020 ES-201-1 Rev 11 ML22158A1332021-02-0505 February 2021 Fer 2020 Ile Final Es 201-3 ML22158A1382021-02-0505 February 2021 Fer 2020 Ile Es 403-1 RO-SRO Written Exam Grading Quality Checklist ML22158A1582021-02-0505 February 2021 Fer 2020 Ile NRC ES-401-4 Record of Rejected KAs Rev 11 2023-08-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21327A1702021-06-16016 June 2021 ES-401-6 ML21326A1202021-06-16016 June 2021 ES-201-2 ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21327A0922021-06-16016 June 2021 ES-301-6 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A3362021-06-16016 June 2021 Handouts to Applicants (Summary) ML21327A3262021-06-16016 June 2021 Administered Written Exam with Answer Key ML21327A3212021-06-16016 June 2021 Administered Scenarios ML21327A3142021-06-16016 June 2021 Administered Control Room and In-Plant JPMs ML21327A3082021-06-16016 June 2021 Administered Admin JPMs ML21328A1662021-06-16016 June 2021 Proposed Written Exam with Answer Key ML21328A1642021-06-16016 June 2021 Proposed Scenarios ML21328A1622021-06-16016 June 2021 Proposed Control Room and In-Plant JPMs ML21327A3422021-06-16016 June 2021 Modified Question Source Information ML21328A1382021-06-16016 June 2021 Proposed Admin JPMs ML21120A0202021-05-0303 May 2021 Operator Licensing Examination Approval IR 05000341/20203022021-03-18018 March 2021 NRC Initial License Examination Report 05000341/2020302 ML22158A1582021-02-0505 February 2021 Fer 2020 Ile NRC ES-401-4 Record of Rejected KAs Rev 11 ML22158A1382021-02-0505 February 2021 Fer 2020 Ile Es 403-1 RO-SRO Written Exam Grading Quality Checklist ML22158A1332021-02-0505 February 2021 Fer 2020 Ile Final Es 201-3 ML22158A1302021-02-0505 February 2021 Fer 2020 ES-201-1 Rev 11 ML22158A1642021-02-0505 February 2021 Ile Outline Review Comments 2023-08-16
[Table view] |
Text
Appendix D Scenario Outline Form ES-D-1 Facility: Fermi 2 Scenario No. 2 Op-Test No: 2018-1 Examiners: xxxx Operators: SRO-2 (CRS), SRO-1 (ATC), RO-1 (BOP) xxxx Surr (CRS), RO-3 (ATC), RO-2 (BOP) xxxx Initial Conditions: IC-182, MOC, 94% Rx. Power.
Turnover: The plant is operating at 94% following a rod pattern adjustment. Power is being held at 94%
pending an evaluation of thermal limits by Reactor Engineering. In the meantime, the plan for the shift is to swap divisions of CCHVAC for work on the Division 1 CCHVAC chiller. The operational checkout, and IV, for the D2 CCHVAC makeup radiation monitor is complete and in the Unit Log.
Critical Tasks: SC-SCRAM - With reactor at power and with a primary system discharging into the secondary containment MANUALLY SCRAM the reactor, before any area exceed the Maximum Safe Operating (MSO) levels); With a primary system discharging into the secondary containment and area radiation/temperature/water levels exceed maximum safe operating levels in more than one area, INITIATE Emergency Depressurization.
Event Malf. No. Event Event No. Type* Description 1 N/A N (BOP) BOP shifts from Division 1 to Division 2 CCHVAC.
N (SRO) 2 C51MF0006 I (ATC) APRM Flow Unit #2 fails upscale.
I (SRO) ATC bypasses APRM #2 and SRO evaluates LCO 3.3.1.1.
TS T41MF0004 C (BOP) Trip of Div 2 CCHVAC Return Air Fan. AOP 20.413.01 3 C (SRO) entry. BOP starts Div 2 CCHVAC. SRO evaluates LCO TS 3.7.3 and 3.7.4.
4 BBAZP603_ C (ATC) Swap of the running RRMG LO Pump due to noise (field A153NOISE C (SRO) report) and fluctuating amps.
5 N21MF0019 R (ATC) N. Condenser Pump Trips R (SRO) AOP 20.107.01 entry; ATC lowers power using Recirc. flow to 88%.
B21MF0103 M (ALL) RB Steam Tunnel Leak.
6 7 B21MF0015 C (BOP) MSIVs Fail to Isolate.
B21MF0054 C (SRO) Crew should attempt to isolate leak when area temp 160ºF EOPRF0033 (MNO). IF area temp is 200ºF and MSIVs are not closed, EOPRF0036 crew should manually close them. (MSL C MSIVs do not fully close.).
Reactor Manual Scram (Mode Switch to Shutdown) before RB Steam Tunnel Area temp reaches Max Safe Operating Temperature (MSO) of 210ºF. (CT)
D-41
Appendix D Scenario Outline Form ES-D-1 Facility: Fermi 2 Scenario No. 2 Op-Test No: 2018-1 Examiners: xxxx Operators: SRO-2 (CRS), SRO-1 (ATC), RO-1 (BOP) xxxx Surr (CRS), RO-3 (ATC), RO-2 (BOP) xxxx Initial Conditions: IC-182, MOC, 94% Rx. Power.
Turnover: The plant is operating at 94% following a rod pattern adjustment. Power is being held at 94%
pending an evaluation of thermal limits by Reactor Engineering. In the meantime, the plan for the shift is to swap divisions of CCHVAC for work on the Division 1 CCHVAC chiller. The operational checkout, and IV, for the D2 CCHVAC makeup radiation monitor is complete and in the Unit Log.
Critical Tasks: SC-SCRAM - With reactor at power and with a primary system discharging into the secondary containment MANUALLY SCRAM the reactor, before any area exceed the Maximum Safe Operating (MSO) levels); With a primary system discharging into the secondary containment and area radiation/temperature/water levels exceed maximum safe operating levels in more than one area, INITIATE Emergency Depressurization.
Event Malf. No. Event Event No. Type* Description 8 E41MF0007 M (ALL) HPCI Steam Leak.
9 C (BOP) HPCI Fails to Isolate.
EOPRF0022 C (SRO) E4150-F002 Failure to Auto Isolate / E4150-F600 E41MF0001 Thermal Overload E41MF0008 Fire Alarm in the HPCI Quad; HPCI Area temp
>148ºF (MNO).
NOTE: 154ºF in HPCI area generates isolation signal.
E4150-F002 will not close, and E4150-F600 loses power. The leak cannot be isolated.
When Area Temperatures are >MSO (210ºF) in 2 areas, Emergency Depressurization is directed.
CRS directs BOP to open 5 SRVs (ADS preferred). (CT)
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor D-41
Appendix D Scenario Outline Form ES-D-1 Facility: Fermi 2 Scenario No. 3 Op-Test No: 2018-1 Examiners: C. Zoia Operators: SRO-1 (CRS), RO-1 (ATC), Surr. (BOP)
D. Reeser SRO-2 (CRS), RO-2 (ATC), Surr. (BOP)
Initial Conditions: IC-183, S/U, Rx Press at 700 psig, pulling control rods to raise RPV Pressure to 944 to 949 psig.
Turnover: The plant is in MODE 2 at ~4.5% CTP during a startup. RPV pressure is 700 psig with the N.
RFPT feeding via the SULCV, which is ~30% open. The S. RFPT has been warmed and speed brought back down to 1000 rpm.
Plans for the shift are to re-commence power ascension by withdrawing control rods.
Critical Tasks: RPV - Loss of Level - ED WHEN RPV water level cannot be determined, depressurize the RPV, ignoring cooldown rate; RPV - Loss of Level - FLOOD WHEN RPV water level cannot be determined, and RPV pressure is below the Minimum Steam Cooling Pressure (MSCP), inject into the RPV to FLOOD the RPV to the Main Steam Lines OR establish RPV pressure above the MSCP.
Event Malf. No. Event Event No. Type* Description NA R (ATC) Increase reactor power/pressure using control rods.
1 R (SRO) 2 C51MF0010 I (ATC) IRM B Upscale Failure (value = 130). ATC bypasses IRM B.
I (SRO) ATC resets half scram. SRO evaluates LCO 3.3.1.1.
TS D11MF0021 I (All) East Fuel Pool Div 1 Rad Monitor downscale failure. SRO 3 evaluates LCOs 3.3.6.2, 3.3.7.1.
TS C11MF1118 C (ATC) E. CRD Pump Trip. W. CRD Pump fails to develop 4 discharge pressure on start (closed discharge valve).
C11RF0122 C (SRO)
C11RF0257 C (ATC) Accumulator Trouble Alarm on a withdrawn Control Rod.
5 Crew to exercise Immediate Action to Scram.
C (SRO)
B21MF0021 M (All) Steam Leak in the Drywell.
6 7 EOPRF0037 C (BOP) Division 1 EECW fails to initiate on High Drywell Pressure.
ATC to initiate manually.
C (SRO)
C93RF0001 M (All) Seismic Event leading to a Loss of RPV Level Indication /
8 RPV Emergency Depressurization (CT) / RPV Flooding C97MF1087 (CT).
B21MF0059/
60/73
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor D-41