September 2004 Monthly Operating Report for Sequoyah, Units 1 and 2
ML042860467
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/08/2004
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML042860467 (4)


Text

October 8, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT - SEPTEMBER MONTHLY OPERATING REPORT The enclosure provides the September Monthly Operating Report as required by Sequoyah Technical Specification Section 6.9.1.10.

If you have any questions concerning this matter, please call me at (423) 843-7170 or J. D. Smith at (423) 843-6672.

Sincerely, Original signed by:

P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure

ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)

MONTHLY OPERATING REPORT SEPTEMBER 2004 UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79

OPERATING DATA REPORT DOCKET NO. 50-327 UNIT NAME Sequoyah 1 DATE October 01, 2004 COMPLETED BY Renee McKaig TELEPHONE (423) 843-8963 REPORTING PERIOD: September 2004

1. Design Electrical Rating 1,160.00
2. Maximum Dependable Capacity (MWe-Net) 1,148.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,481.20 138,469.65
4. Number of Hours Generator On-line 720.00 6,459.58 136,444.16
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 831,094.00 7,504,946.00 149,140,164.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 1 gross maximum dependable capacity factor was 100.47 for the month of September 2004.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1

OPERATING DATA REPORT DOCKET NO. 50-328 UNIT NAME Sequoyah 2 DATE October 01, 2004 COMPLETED BY Renee McKaig TELEPHONE (423) 843-8963 REPORTING PERIOD: September 2004

1. Design Electrical Rating 1,160.00
2. Maximum Dependable Capacity (MWe-Net) 1,124.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 6,186.95 142,911.18
4. Number of Hours Generator On-line 720.00 6,144.38 140,644.34
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 813,118.00 6,943,464.00 150,925,835.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 gross maximum dependable capacity factor was 100.34 for the month of September 2004.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)