Initial Submittal of the Simulator Jpms for Fermi Initial Exam - Sept 2004
ML043030549
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/05/2004
From: Pederson C
Division of Reactor Safety III
To: O'Connor W
Detroit Edison
References
50-341/04-301
Download: ML043030549 (81)


Text

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.H Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2003-301-B1.e 1 JPM Title Duration Page Restore Off-Site Power to an ESF and EDG Bus 10 Minutes COVER SHEET Examinee: SRO / RO Evaluator:

Evaluation Method: Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S U Comments Element S U Comments

  • 1.

2.

3.

  • 4.
  • 5.

6.

7.

  • 8.

9.

______ SATISFACTORY ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question # S U Comments TIME:

TIME:

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date:

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.H Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2003-301-B1.e 1 JPM Title Duration Page Restore Off-Site Power to an ESF and EDG Bus. 10 Minutes 2

References:

Required (R) / Available (A) 23.321 (R)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

This JPM can be used for any ESF/EDG Bus The EDG(s) should be started and paralleled to the ESF Bus, then the Normal Feed Breaker 64B(C)6, 65E(F)6 should then be opened.

Cues are given as a precaution to allow the JPM to be completed even if the simulator is malfunctioning. The Cues will not need to be delivered if the Simulator is functioning properly..

K/A Reference :

262001 A.C. Electrical Distribution - A4. Ability to manually operate and/or monitor in the control room:

(CFR: 41.7 / 45.5 to 45.8)

A4.04 Synchronizing and paralleling of different A.C. supplies RO 3.6 / SRO 3.7 Task Standard:

Off-Site power is restored to ESF and EDG bus in accordance with 23.321.

Initial Conditions:

You are the Control Room NSO. EDG 11 was started manually and is supplying the EDG and ESF Bus.

Off-Site power is available, and the System Service Transformers are available.

EDG 11(12, 13, 14) is running, providing power to the EDG and ESF Bus.

The SM has authorized returning the ESF and EDG Busses to off-site power.

Initiating Cue(s):

The CRS directs you to restore off-site power to EDG Bus 11EA(12EB, 13EC, 14ED) and ESF Bus 64B(C, 65E, 65F).

Another operator will be responsible for the shutdown of the EDG and placing it in standby.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.H Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2003-301-B1.e 1 JPM Title Duration Page Restore Off-Site Power to an ESF and EDG Bus. 10 Minutes 3 PERFORMANCE EVALUATION Time Start CUE:

Synchronize Switch is in the ON position.

  • 1. Place Synchronize Switch for Bus 64B *1. Synchronize Switch is placed in ON.

(64C, 65E, 65F) Normal Feeder Breaker B6 (C6, E6, F6) to ON.

CUE:

Secondary windings on SST #64 (65) indicates 120V AC.

64B (64C, 65E, 65F) Starting Volt Meter indicates voltage of 120V AC.

The Synchroscope is operating.

2. Verify: 2. The following items are verified:

Div. I (II) Syn. Bus Running Volt Meter Div. I (II) Syn. Bus Running Volt Meter indicates voltage on SST # 64 (65) secondary indicates voltage on SST # 64 (65) secondary windings (approximately 120V AC). windings (approximately 120V AC).

Div. I (II) Syn. Bus Starting Volt Meter Div. I (II) Syn. Bus Starting Volt Meter indicates voltage on ESF Bus 64B (64C, 65E, indicates voltage on ESF Bus 64B (64C, 65E, 65F)(approximately 120V AC). 65F)(approximately 120V AC).

Division I (II) Synchroscope is operating. Division I (II) Synchroscope is operating.

CUE:

Synchroscope is rotating slowly in the FAST direction.

3. With EDG Governor Control Switch, adjust 3. Synchroscope is rotating slowly in the FAST EDG speed until synchroscope is rotating direction.

slowly in the FAST direction.

Synchroscope may be in phase and only show slight movement at first. Change EDG frequency slightly to rotate the scope.

CUE:

Running Volt meter reads 120VAC.

Starting Volt meter reads 120VAC.

  • 4. With EDG Voltage Control Switch, adjust *4. Starting Voltage is adjusted until it is equal to Starting Voltage until it is equal to or slightly or slightly higher than Running Bus Voltage higher than Running Bus Voltage indication.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.H Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2003-301-B1.e 1 JPM Title Duration Page Restore Off-Site Power to an ESF and EDG Bus. 10 Minutes 4 CAUTION: When the Normal Feeder Breaker B6 is closed, the operating mode of the EDG will be Speed Droop. Operator Action will be required to keep sufficient load on the EDG and thus prevent the EDG from tripping on Reverse Power.

CUE:

The Synchroscope is at 2 minutes till 12 o'clock.

  • 5. When Synchroscope is at approximately two *5. The Normal Feeder breaker is closed When minutes till 12 o'clock close ESF Bus 64B Synchroscope is at approximately two minutes (64C, 65E, 65F) Normal Feeder Breaker B6 till 12 o'clock.

(C6, E6, F6).

CUE: Synchronize Switch is in OFF.

6. Place Synchronize Switch for ESF Bus 64B 6. Synchronize Switch for the Normal Feeder (64C, 65E, 65F) Normal Feeder Breaker B6 Breaker is placed in OFF.

(C6, E6, F6) to OFF.

CUE:

Load is reduced to 300kW.

kVARS are kept positive.

7. Reduce EDG load to approximately 300kW 7. EDG load is reduced to approximately 300kW while maintaining kVARS positive. while maintaining kVARS positive.

CUE: The Output Breaker is open.

  • 8. Open EDG 11 (12, 13, 14) Output Breaker *8. EDG Output Breaker is opened.

EA3 (EB3, EC3, ED3).

CUE: Acknowledge announcement.

9. Inform the CRS that Offsite Power has been 9. CRS has been notified.

restored to the EDG and ESF bus.

Time Stop

  • Critical Steps Terminating Cue(s):

Offsite power restored to an EDG and ESF Bus in accordance with 23.321.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.H Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2003-301-B1.e 1 JPM Title Duration Page Restore Off-Site Power to an ESF and EDG Bus. 10 Minutes 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.H Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2003-301-B1.e 1 JPM Title Duration Page Restore Off-Site Power to an ESF and EDG Bus. 10 Minutes 6 Simulator Setup IC#:

IC-17 Malfunctions:

Number Title Value None Remote Functions:

Number Title Value None Override Functions:

None Special Instructions:

The EDG(s) should be started and paralleled to the ESF Bus, then the Normal Feed Breaker 64B(C)6, 65E(F)6 should then be opened.

JPM B1.d Cue Sheet Initial Conditions:

You are the Control Room NSO. EDG 11 was started manually and is supplying the EDG and ESF Bus.

Off-Site power is available, and the System Service Transformers are available.

EDG 11(12, 13, 14) is running, providing power to the EDG and ESF Bus.

The SM has authorized returning the ESF and EDG Busses to off-site power.

Initiating Cue(s):

The CRS directs you to restore off-site power to EDG Bus 11EA(12EB, 13EC, 14ED) and ESF Bus 64B(C, 65E, 65F).

Another operator will be responsible for the shutdown of the EDG and placing it in standby.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.A Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2004-301-B1.a 1 JPM Title Duration Page Initiate the High Pressure Coolant Injection System 15 Minutes COVER SHEET Manually Examinee: SRO / RO Evaluator:

Evaluation Method: Perform / Simulator / Alternate Path Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S U Comments Element S U Comments 1.

  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.

______ SATISFACTORY ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question # S U Comments TIME:

TIME:

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date:

JOB PERFORMANCE MEASURE JPM Title No.: NRC EXAM 2004-301-B1.a Initiate the High Pressure Coolant Injection System Revision: 1 Manually (Alternate Path) Page 2

References:

Required (R) / Available (A) 23.202 (R)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom Evaluator Notes:

If the examinee asks about Standby Gas Treatment System, RHR Torus Cooling operation, or notification of Radiation Protection, tell the examinee that this may be done after HPCI is injecting.

Set up the simulator at high power (75% or higher).

Initiate a reactor scram on Low Reactor Water Level by tripping both Reactor Feed Pumps (MF N21 3340 and 3341 set at 0), preventing automatic HPCI initiation (MF E41 1430).

Initiate a HPCI controller failure using PO 00004 at a target of 0%.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

K/A Reference :

206000 High Pressure Coolant Injection System A4.02 (4.0/3.8) Ability to manually operate and monitor the HPCI flow controller Task Standard:

HPCI is injecting into the RPV with flow controller in manual in accordance with 23.202.

Use of the appropriate section of 23.202 or Enclosure C of 23.202 is acceptable.

Initial Conditions:

You are the CRNSO The reactor has scrammed due to low reactor water level due to a complete loss of feedwater.

Reactor Water Level is 173 inches and decreasing.

EOP 29.100.01 has been entered (allowing use of Enclosure C).

Initiating Cue(s):

The CRS directs you to manually initiate HPCI and inject into the vessel, and informs you that Torus Cooling and Standby Gas Treatment System will be started later.

JOB PERFORMANCE MEASURE JPM Title No.: NRC EXAM 2004-301-B1.a Initiate the High Pressure Coolant Injection System Revision: 1 Manually (Alternate Path) Page 3 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: All controls and indications are located Note: Examinee may use the placard for HPCI on H11-P602 unless otherwise operation that is on the P602 panel.

specified.

CUE: HPCI Baro Cndr Vacuum Pump is running

1. Place E4101-C003, HPCI Baro Cndr 1 HPCI Baro Cndr Vacuum Pump is Vacuum Pump, in RUN, and verify pump running.

starts CUE: E4150-F003 is OPEN

  • 2 Open E4150-F003, HPCI Stm Sply Otbd *2 E4150-F003, HPCI Stm Sply Otbd is Iso Vlv OPEN CUE: E4150-F059 is OPEN
  • 3 Open E4150-F059, HPCI Lube Oil Clg *3 E4150-F059, HPCI Lube Oil Clg Wtr Sply Wtr Sply Vlv Vlv is OPEN CUE: Aux Oil pump is running and the E4150-F001 is open
  • 4 Initiate a start of HPCI Systen by *4 performing the next two steps a. E4101-C005, HPCI Turbine Aux Oil simultaneously: Pump is running
a. Place E4101-C005, HPCI Turbine Aux b E4150-F001, HPCI Turb Stm Supply Oil Pump, in RUN, and verify pump Iso Vlv is OPEN starts b Open E4150-F001, HPCI Turb Stm Supply Iso Vlv CUE: E4150-F006 is Open
  • 5 Open E4150-F006, HPCI Pmp Inbd Disch *5 E4150-F006, HPCI Pmp Inbd Disch Iso Iso Valve Valve is OPEN CUE: Flow is 0 gpm
  • 6 Adjust flow as necessary on E41-K615, *6 The flow controller does not respond.

HPCI Pump flow controller Examinee informs the CRS that HPCI has failed to respond automatically Note: The examinee should continue on with the procedure by taking Manual control of the HPCI flow controller.

CUE: Flow is 5200 gpm

  • 7. Place E41-K615, HPCI Pump flow *7. E41-K615, HPCI Pump flow controller is in controller in Manual and increase flow to Manual and flow is 5200 gpm 5200 gpm

JOB PERFORMANCE MEASURE JPM Title No.: NRC EXAM 2004-301-B1.a Initiate the High Pressure Coolant Injection System Revision: 1 Manually (Alternate Path) Page 4 Time Stop

  • Critical Steps Terminating Cue(s):

HPCI is injecting water into the RPV at 5200 gpm

JOB PERFORMANCE MEASURE JPM Title No.: NRC EXAM 2004-301-B1.a Initiate the High Pressure Coolant Injection System Revision: 1 Manually (Alternate Path) Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE JPM Title No.: NRC EXAM 2004-301-B1.a Initiate the High Pressure Coolant Injection System Revision: 1 Manually (Alternate Path) Page 6 Simulator Setup IC#:

Any IC with Power >75%

Malfunctions:

None Remote Functions:

None Override Functions:

None Special Instructions:

Initiate a reactor scram on Low Reactor Water Level by tripping both Reactor Feed Pumps (MF N21 3340 and 3341 set at 0), preventing automatic HPCI initiation (MF E41 1430).

Initiate a HPCI controller failure using PO 00004 at a target of 0%.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.A JPM B1.a Cue Sheet Initial Conditions:

You are the CRNSO The reactor has scrammed due to low reactor water level due to a complete loss of feedwater.

Reactor Water Level is 173 inches and decreasing.

EOP 29.100.01 has been entered Initiating Cue(s):

The CRS directs you to manually initiate HPCI and inject into the vessel, and informs you that Torus Cooling and Standby Gas Treatment System will be started later.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.A Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2004-301-B1.a 1 JPM Title Duration Page Feeding Reactor Vessel with SBFW during Reactor 15 Minutes COVER SHEET Vessel Low Level Examinee: SRO / RO Evaluator:

Evaluation Method: Perform / Simulator / Alternate Path Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S U Comments Element S U Comments 1.

2.

  • 3.
  • 4.
  • 5.

6.

7.

______ SATISFACTORY ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question # S U Comments TIME:

TIME:

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date:

JOB PERFORMANCE MEASURE JPM Title No.: NRC EXAM 2004-301-B1.a Feeding Reactor Vessel with SBFW during Reactor Revision: 1 Vessel Low Level (Alternate Path) Page 2

References:

Required (R) / Available (A)

SOP 23.107.01 Standby Feedwater System (R)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

Start this JPM at the CRS Desk in the Simulator.

K/A Reference :

2.1 Generic Knowledge and Abilities:

2.1.17 Ability to make accurate, clear, and concise verbal reports. 3.5 / 3.6 2.1.20 Ability to execute procedure steps. 4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy. 3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation.

3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls. 3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls 3.2 / 3.3 295031 Reactor Low Water Level EA1. Ability to operate and/or monitor the following as they apply to reactor low water level (CFR: 41.7 / 45.6):

EA1.08 Alternate injection systems 3.8 / 3.9 Task Standard:

It is realized that SBFW Pump A(B) is unable to inject to the vessel with the Keylock Mode Select Switch in the TEST position, reposition the Keylock Mode Select Switch and successfully inject to the RPV to restore RPV level to 173 to 214 inches.

Initial Conditions:

The plant has experienced a Reactor Scram.

HPCI, RCIC, and Feedwater are currently unavailable.

Initiating Cue(s):

You are the Control Room NSO.

The CRS has directed you to feed the RPV with Standby Feedwater and restore RPV level to 173 to 214 inches The system is in Standby, IAW 23.107.01 section 5.0.

JOB PERFORMANCE MEASURE JPM Title No.: NRC EXAM 2004-301-B1.a Feeding Reactor Vessel with SBFW during Reactor Revision: 1 Vessel Low Level (Alternate Path) Page 3 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: All controls and indications are located NOTE: The operator may Recognize and on H11-P601 unless otherwise report to CRS the Keylock Mode Select specified. Switch in TEST and request CRS concurrence to place in NORMAL prior to start of the procedure.

NOTE: The operator may perform feeding of the RPV with Standby Feedwater from memory in accordance with Operations Department Expectation (ODE) 10, Emergency Operating Procedure Expectations.

PREREQUSITES: NONE 6.2.1 Start N2103-C003A (B), West (East) 6.2.1 Starts N2103-C003A (B), West (East)

Pump A (B) Aux Lube Oil Pump, if Pump A (B) Aux Lube Oil Pump, if available. available.

6.2.2 If Lube Oil Pump is running, dispatch an NOTE: This Step can be ommitted.

operator to verify lube oil pressure and flow as follows:

1. Lube oil pressure on N21-RA04 (RA03), SBFW Pump A (B) Lube Oil Supply Press Indicator, is greater than 15 psig.
2. There is oil flow through all four bull's eye flow indicators (two on pump and two on motor).

NOTE: If SBFW pumps are needed for vessel inventory and Aux Lube Oil Pump is running, Step 6.2.2 can be omitted without damage to the SBFW Pump CUE: IF ASKED 6.2.2.1 Press>15psig 6.2.2.2 Flow through all four bulls eyes

  • 6.2.3 Start N2103-C001 (2), West (East) *6.2.3 Starts N2103-C001 (2), West (East)

Standby Feedwater Pump A (B). Standby Feedwater Pump A (B).

JOB PERFORMANCE MEASURE JPM Title No.: NRC EXAM 2004-301-B1.a Feeding Reactor Vessel with SBFW during Reactor Revision: 1 Vessel Low Level (Alternate Path) Page 4 Elements Standards

  • 6.2.4 Verify the following: *6.2.4 Recognize and report to CRS, N2103-
1. N2103-F001, SBFW Disch To RPV F001 did not Open.

Iso Valve, automatically opens (first Place Keylock Mode Select Switch in pump). NORMAL with CRS concurrence.

2. If running, N2103-C003A (B), West (East) Pump A (B) Aux Lube Oil Verify N2103-F001 Opens.

Pump, automatically stops.

3. Lube oil pressure on N21-RA04 (RA03), SBFW Pump A (B) Lube Oil Supply Press Indicator, is greater than 15 psig.
4. There is oil flow through all four bull's eye flow indicators (two on pump and two on motor)

CUE: IF ASKED:

6.2.2.1 Press>15psig 6.2.2.2 Flow through all four bulls eyes

  • 6.2.5 Throttle N2103-F003, SBFW 4" Disch 6.2.5 RPV level restored to 173 to 214 inches Flow Ctrl Vlv, to restore RPV level 173 to 214 inches.

6.2.6 If more flow is desired, repeat Steps 6.2.1 6.2.6 If more flow is desired, repeat Steps 6.2.1 through 6.2.5 for the second SBFW through 6.2.5 for the second SBFW Pump. Pump.

6.2.7 If more flow is necessary, throttle open 6.2.7 If more flow is necessary, throttle open N2103-F002, SBFW 6" Disch Flow Ctrl N2103-F002, SBFW 6" Disch Flow Ctrl Vlv, to achieve desired flow. Vlv, to achieve desired flow.

Time Stop

  • Critical Steps Terminating Cue(s):

After correcting position of the F001 Keylock Mode Select Switch, SBFW is injecting to the RPV, and RPV level is restored to 173 to 214 inches

JOB PERFORMANCE MEASURE JPM Title No.: NRC EXAM 2004-301-B1.a Feeding Reactor Vessel with SBFW during Reactor Revision: 1 Vessel Low Level (Alternate Path) Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE JPM Title No.: NRC EXAM 2004-301-B1.a Feeding Reactor Vessel with SBFW during Reactor Revision: 1 Vessel Low Level (Alternate Path) Page 6 Simulator Setup IC#:

Any shutdown IC with RPV level at approximately 150 inches Malfunctions:

None Remote Functions:

None Override Functions:

None Special Instructions:

1. Place Standby Feedwater Keylock Mode Switch in TEST
2. Trip HPCI, RCIC, and RFPs.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.A JPM B1.a Cue Sheet Initial Conditions:

The plant has experienced a Reactor Scram.

HPCI, RCIC, and Feedwater are currently unavailable to feed the RPV.

Initiating Cue(s):

You are the Control Room NSO.

The CRS has directed you to feed the RPV with Standby Feedwater and restore RPV level to 173 to 214 inches The system is in Standby, IAW 23.107.01 section 5.0.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.B Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2004-301-B1.b 2 JPM Title Duration Page Manually Initiate Core Spray System with E21-F005A 5 Minutes COVER SHEET Stuck Shut Examinee: SRO / RO / NLO / SROC / STA Evaluator:

Evaluation Method: Perform / Simulator / Alternate Path Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S U Comments Element S U Comments

  • 1.
  • 2.
  • 3.

4.

  • 5.
  • 6.
  • 7.

8.

9.

______ SATISFACTORY ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question # S U Comments TIME:

TIME:

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date:

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.B JPM Title No.: NRC EXAM 2004-301-B1.b Manually Initiate Core Spray System with E21-F005A Stuck Revision: 2 Shut Page 1

References:

Required (R) / Available (A) 23.203 (R)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

This JPM can be performed on either division of Core Spray.

Malfunction VO 00182 at 0% will trip the E21-F005A when opening is attempted.

Start this JPM at the CRS desk.

The simulator should be in a post-scram condition with the following conditions:

  • RPV Level less than 30 inches
  • RPV Pressure at about 250 psig
  • Core Spray Automatic Initiation defeated It is expected that the examinee use the Placard for manual initiation of Core Spray due to being in the EOPs.

K/A

Reference:

209001 Low Pressure Core Spray System - A2. Ability to (a) predict the impacts of the following on the LOW PRESSURE CORE SPRAY SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 /

45.6)

A2.02 Valve closures RO 3.2 / SRO 3.2 Task Standard:

Division II Core Spray is injecting into the RPV at maximum flow in accordance with 23.203.

Initial Conditions:

You are the Control Room NSO.

The reactor has scrammed.

EOP 29.100.01 has been entered.

RPV Water level has decreased to less than 30 inches.

Initiating Cue(s):

The CRS directs you to initiate Division I Core Spray and inject water into the RPV at maximum flow.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.B JPM Title No.: NRC EXAM 2004-301-B1.b Manually Initiate Core Spray System with E21-F005A Stuck Revision: 2 Shut Page 2 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: The next two steps may be performed in any order.

CUE:

  • The RUN light is lit.
  • Motor amps initially peg high then decrease to 60 after 7 seconds.
  • Pump discharge pressure is 320 psig.

CUE:

  • The RUN light is lit.
  • Motor amps initially peg high then decrease to 60 after 7 seconds.

CUE:

  • The OPEN light is Off and the CLOSE light is Off.
  • Flow indicator reads 0 gpm.
  • 3. Throttle open E2150-F005A, CSS Loop A
  • 3. E2150-F005A is noted to have tripped Inboard Isolation Valve. on thermal overload.

NOTE: Ask examinee what his recommendation Note: For one applicant the licensee failed to is. He should request to manually start insert this malfunction. Required tripping both Division II Core Spray and inject water into DIV I pumps to ensure alternate path to use the RPV at maximum flow. DIV II system.

CUE: Announcement acknowledged.

4. Announce to the CRS that Division I Core 4. Announcement made.

Spray System injection valve failed to open.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.B JPM Title No.: NRC EXAM 2004-301-B1.b Manually Initiate Core Spray System with E21-F005A Stuck Revision: 2 Shut Page 3 NOTE: The next two steps may be performed in any order.

CUE:

  • The RUN light is lit.
  • Motor amps initially peg high then decrease to 60 after 7 seconds.
  • Pump discharge pressure is 320 psig.

CUE:

  • The RUN light is lit.
  • Motor amps initially peg high then decrease to 60 after 7 seconds.

CUE:

  • E2150-F005B OPEN light is lit and the CLOSE light is Off.
  • E21-F006B DISC OPEN light is lit and the DISC CLOSE light is Off.
  • Flow indicator reading is increasing.
  • 7. Throttle open E2150-F005B, CSS Loop B(A)
  • 7. E21-F005B is open.

Inboard Isolation Valve.

CUE:

  • E2150-F031B CLOSE light is lit and OPEN light is Off.
  • RPV pressure is decreasing.
8. As Reactor Pressure decreases and flow 8. Verifies E2150-F031B, closes.

through each division exceeds 775 gpm, as indicated on E21-R601B, Div 2 Core Spray Flow Ind, verify E2150-F031B, Core Spray Minimum Flow Bypass, closes.

CUE: Acknowledge announcement.

9. Inform CRS that Division II Core Spray is 9. CRS is informed that Division II Core injecting into the RPV at maximum flow. Spray is injecting into the RPV at maximum flow.

Time Stop

  • Critical Steps Terminating Cue(s):

Division II Core Spray System is injecting into the RPV at maximum flow.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.B JPM Title No.: NRC EXAM 2004-301-B1.b Manually Initiate Core Spray System with E21-F005A Stuck Revision: 2 Shut Page 4 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.B JPM Title No.: NRC EXAM 2004-301-B1.b Manually Initiate Core Spray System with E21-F005A Stuck Revision: 2 Shut Page 5 Simulator Setup IC#:

Malfunctions:

Malfunction VO 00182 at 0% will trip the E21-F005A when opening is attempted Remote Functions:

Override Functions:

Special Instructions:

The simulator should be in a post-scram condition with the following conditions:

  • RPV Level less than 30 inches
  • RPV Pressure at about 250 psig Core Spray Automatic Initiation defeated

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.B JPM B1.b Cue Sheet Initial Conditions:

You are the Control Room NSO.

The reactor has scrammed.

EOP 29.100.01 has been entered.

RPV Water level has decreased to less than 30 inches.

Initiating Cue(s):

The CRS directs you to initiate Division I Core Spray and inject water into the RPV at maximum flow.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.C Job Position No. Revision RO NRC EXAM 2004-301-B1.c 0 JPM Title Duration Page Returning a Turbine Control Valve to service 15 minutes COVER SHEET Examinee: SRO / RO Evaluator:

Evaluation Method: Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S U Comments Element S U Comments

1. *11.
  • 2. 12.
  • 3. 13.
  • 4. 14.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.

10.

______ SATISFACTORY ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question # S U Comments Question # S U Comments

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date:

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.C Returning a Turbine Control Valve to service No.: NRC EXAM 2004-301-B1.c Revision: 0 Page 1

References:

Required (R) / Available (A) 23.109 (R)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom Evaluator Notes:

Ensure IC is setup to with #1 HPCV shut with Reactor Power <93%

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

K/A SYSTEM: 241000 Reactor/Turbine Pressure Regulating System - A4. Ability to manually operate and/or monitor in the control room:

A4.08 Control/governor valves (operation) (3.5/3.4)

Enter K/A number, title and rating Task Standard:

  1. 1 HPCV is restored to service Initial Conditions:
  1. 1 HPCV is closed due to failure of the Unitized Actuator Oil Pump Maintenance has been completed and the Unitized Actuator is running.

All Perquisites have been completed for returning the #1 HPCV to service.

Initiating Cue(s):

The CRS directs you to return the #1 HPCV to service.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.C Returning a Turbine Control Valve to service No.: NRC EXAM 2004-301-B1.c Revision: 0 Page 2 Start Time Stop Time Total Time Elements Standards PREREQUSITES: Complete NOTE: Unless otherwise noted, all controls and indications for the following steps are located at COP H11-P804.

CUE: Associated Unitized Actuator (UA) is running.

1. Verify or start Associated Unitized Actuator 1. Associated UA is running.

operating in accordance with 23.110, Unitized Actuator System.

CUE: N3039-F616, HP TSV A Stm Chest Drain Valve is open

  • 2. If #1 HPCV is closed, open N3039-F616, HP *2 N3039-F616, HP TSV A Stm Chest Drain TSV A Stm Chest Drain Valve Valve is open CUE: Steam Valve On-Load Test Mode Select switch is at 10%
  • 3. Place Steam Valve On-Load Test Mode *3. Steam Valve On-Load Test Mode Select Select switch to 10% switch is at 10%

CUE:

  • SELECT light is ON
  • White TRIP SOLENOID A is ON
  • White TRIP SOLENOID B is ON
  • 4. Momentarily depress SELECT/LOCKED *4.

CLOSED pushbutton for the affected HPCV and verify:

  • SELECT light is ON for #1 HPCV
  • White TRIP SOLENOID A is ON
a. SELECT light is ON
  • White TRIP SOLENOID B is ON
b. White TRIP SOLENOID A is ON
c. White TRIP SOLENOID B is ON NOTE:

If less than a 25% mismatch exists between Current Valve Position and End Valve position

(~10%) when the VALVE TEST pushbutton is depressed, the white GOVERNOR FAULT light will not come ON and Annunciator 4D91, ELECTRIC GOVERNOR TROUBLE, will not alarm CUE:

  • Red VALVE TEST light is ON
  • White GOVERNOR FAULT light is ON

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.C Returning a Turbine Control Valve to service No.: NRC EXAM 2004-301-B1.c Revision: 0 Page 3

  • 5. Depress Steam Valve On Load Test red *5.

VALVE TEST pushbutton and verify:

  • Red VALVE TEST light is ON
a. Red VALVE TEST light comes on
b. Annunciator 4D91 is in alarm
c. White GOVERNOR FAULT light comes
  • White GOVERNOR FAULT light is ON ON CUE:
  • Selected HPCV opens ~10%
  • White TRIP SOLENOID A light is OFF
  • White TRIP SOLENOID B light is OFF
  • Affected HPCV red LOCKED CLOSED light is OFF
  • 6. Depress Steam Valve On Load Test green *6.

TRIP RESET pushbutton and verify:

  • #1 HPCV opens ~10%
a. Selected HPCV opens to approximately
  • White TRIP SOLENOID A light is OFF 10% open
b. White TRIP SOLENOID A light goes OFF
  • White TRIP SOLENOID B light is OFF
c. White TRIP SOLENOID B light goes OFF
d. Annunciator 3D89, TURBINE CONT * #1 HPCV red LOCKED CLOSED light is VALVE TEST CLOSURE TRIP, clears OFF
e. Affected HPCV red LOCKED CLOSED light goes OFF CUE: Half-Scram is Reset
  • 7. Reset half-scram as necessary *7. Half-scram is reset CUE: N3039-F612 is closed
  • 8. Close N3039-F612, HP Turb Loop A Line A *8. N3039-F612 is closed Drain Valve CUE: N3039-F616 is closed
  • 9. Close N3039-F616, HP TSV A Stm Chest *9. N3039-F616 is closed Drain Valve
10. Allow approximately 60 seconds before 10. Waits ~60 seconds proceeding to allow Unitized Actuator to recharge CUE:
  • CANCEL TEST light is ON
  • HPCV open to controlling position

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.C Returning a Turbine Control Valve to service No.: NRC EXAM 2004-301-B1.c Revision: 0 Page 4

  • 11. Depress Steam Valve On Load Test white *11.

CANCEL TEST pushbutton and verify:

  • CANCEL TEST light ON
a. CANCEL TEST light comes ON
  • HPCV open to controlling position
b. Selected HPCV opens to controlling position CUE:
  • Red VALVE TEST light is OFF
  • White CANCEL TEST light is OFF
  • Associated TCV red SELECT light is OFF
  • White GOVERNOR FAULT light is OFF
12. After 60 seconds verify:: 12.
a. Red VALVE TEST light goes OFF
  • Red VALVE TEST light is OFF
b. White CANCEL TEST light goes OFF
  • White CANCEL TEST light is OFF
c. Associated TCV red SELECT light goes
  • Associated TCV red SELECT light is OFF OFF
  • White GOVERNOR FAULT light is OFF
d. White GOVERNOR FAULT light goes
e. Annunciator 4D91 is clear CUE: Speed/Load Demand limit set to ~100 MWe above actual Generator MWe
13. Return Speed/Load Demand limit to 13. Speed/Load Demand limit set to ~100 MWe approximately 100 MWe above actual above actual Generator MWe Generator CUE: Turbine Flow Limit set to 5% above Reactor Power, up to a maximum of 100%
14. Return Turbine Flow Limit to 5% above 14. Turbine Flow Limit set to 5% above Reactor Reactor Power, Up to a maximum of 100% Power, up to a maximum of 100%

______ SATISFACTORY ______ UNSATISFACTORY Terminating Cue(s):

  1. 1 HPCV has been returned to service.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.C Returning a Turbine Control Valve to service No.: NRC EXAM 2004-301-B1.c Revision: 0 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.C Returning a Turbine Control Valve to service No.: NRC EXAM 2004-301-B1.c Revision: 0 Page 6 Simulator Setup IC#:

Ensure IC is setup to with #1 HPCV shut with Reactor Power <93%

Malfunctions:

Remote Functions:

Number Title Value Override Functions:

Special Instructions:

You must use the procedure to shut the #1 HPCV. Do not reset the half scram. Also, the UA must be running to complete this JPM.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.C JPM B1.f Cue Sheet Initial Conditions:

  1. 1 HPCV is closed due to failure of the Unitized Actuator Oil Pump Maintenance has been completed and the Unitized Actuator is running.

All Perquisites have been completed for returning the #1 HPCV to service.

Initiating Cue(s):

The CRS directs you to return the #1 HPCV to service.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.D Job Position No. Revision RO / SRO NRC EXAM 2004-301-B1.d 1 JPM Title Duration Page Recognize, Respond to Uncontrolled Recirc Pump COVER SHEET 15 minutes Speed Increase Examinee: SRO / RO Evaluator:

Evaluation Method: Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION

SUMMARY

Step # S U Comments

  • 1
  • 2

______ SATISFACTORY ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question # S U Comments TIME:

TIME:

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date:

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.D Recognize, Respond to Uncontrolled Recirc Pump Speed No.: NRC EXAM 2004-301-B1.d Increase Revision: 1 Page 1

References:

Required (R) / Available (A) 20.138.03, Uncontrolled Recirc Flow Increase (R) 20.138.01, Recirculation Pump Trip (A)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom Evaluator Notes:

Insert MF 3686 or MF 3687 for Recirc Pump Walkaway with a 30 second ramp rate. Place plant ~60%.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

K/A

Reference:

202001 Recirculation System - A2. Ability to (a) predict the impacts of the following on the RECIRCULATION SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 / 45.6)

A2.05 Inadvertent recirculation flow increase RO 3.8 / SRO 4.0 Task Standard:

Plant is stable with power at pre-transient level or in single loop with affected pump tripped and the Immediate actions of 20.138.01 assessed.

Initial Conditions:

Plant is at power and no equipment is out of service.

Initiating Cue(s):

Plant is at power and you are the P603 operator. Respond in accordance with plant procedures.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.D Recognize, Respond to Uncontrolled Recirc Pump Speed No.: NRC EXAM 2004-301-B1.d Increase Revision: 1 Page 2 Start Time Stop Time Total Time Elements Standards CUE: North(South) RR MG Set speed(s) is increasing slowly.

  • 1. North(South) RR MG Set speed(s) changing, *1. Affected RR MG Set scoop tube locked.

then Lock scoop tube for affected RR MG Set(s)

CUE: North(South) RR MG Set speed(s) has increased >10% (use a number, not just

>10%)

  • 2. North(South) RR MG Set speed(s) increased *2. One of the affected RR MG sets is tripped

>10%, then Trip one of the affected RR MG and 20.138.01 is entered.

Sets and perform 20.138.01, Recirculation Pump Trip End JPM

______ SATISFACTORY ______ UNSATISFACTORY Terminating Cue(s):

Plant is stable with power at pre-transient level or in single loop with affected pump tripped and the Immediate actions of 20.138.01 assessed.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.D Recognize, Respond to Uncontrolled Recirc Pump Speed No.: NRC EXAM 2004-301-B1.d Increase Revision: 1 Page 3 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.D Recognize, Respond to Uncontrolled Recirc Pump Speed No.: NRC EXAM 2004-301-B1.d Increase Revision: 1 Page 4 Simulator Setup IC#:

IC-15 Malfunctions:

MF 3686 RRS Pump A at 100% with 30 second ramp rate OR MF 3687 RRS Pump B at 100% with 30 second ramp rate Remote Functions:

Number Title Value Override Functions:

Special Instructions:

Ensure the ramp rate is such that the RRS Pump that walks away exceeds 10%.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.D JPM B1.d Cue Sheet Initial Conditions:

Plant is at power and no equipment is out of service.

Initiating Cue(s):

Plant is at power and you are the P603 operator. Respond in accordance with plant procedures.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.H Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2004-301-B1.e 1 JPM Title Duration Page Restore Off-Site Power to an ESF and EDG Bus 10 Minutes COVER SHEET Examinee: SRO / RO Evaluator:

Evaluation Method: Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S U Comments Element S U Comments

  • 1.

2.

3.

  • 4.
  • 5.

6.

7.

  • 8.

9.

______ SATISFACTORY ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question # S U Comments TIME:

TIME:

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date:

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.H Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2004-301-B1.e 1 JPM Title Duration Page Restore Off-Site Power to an ESF and EDG Bus. 10 Minutes 2

References:

Required (R) / Available (A) 23.321 (R)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

This JPM can be used for any ESF/EDG Bus The EDG(s) should be started and paralleled to the ESF Bus, then the Normal Feed Breaker 64B(C)6, 65E(F)6 should then be opened.

Cues are given as a precaution to allow the JPM to be completed even if the simulator is malfunctioning. The Cues will not need to be delivered if the Simulator is functioning properly..

K/A Reference :

262001 A.C. Electrical Distribution - A4. Ability to manually operate and/or monitor in the control room:

(CFR: 41.7 / 45.5 to 45.8)

A4.04 Synchronizing and paralleling of different A.C. supplies RO 3.6 / SRO 3.7 Task Standard:

Off-Site power is restored to ESF and EDG bus in accordance with 23.321.

Initial Conditions:

You are the Control Room NSO. EDG 11 was started manually and is supplying the EDG and ESF Bus.

Off-Site power is available, and the System Service Transformers are available.

EDG 11(12, 13, 14) is running, providing power to the EDG and ESF Bus.

The SM has authorized returning the ESF and EDG Busses to off-site power.

Initiating Cue(s):

The CRS directs you to restore off-site power to EDG Bus 11EA(12EB, 13EC, 14ED) and ESF Bus 64B(C, 65E, 65F).

Another operator will be responsible for the shutdown of the EDG and placing it in standby.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.H Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2004-301-B1.e 1 JPM Title Duration Page Restore Off-Site Power to an ESF and EDG Bus. 10 Minutes 3 PERFORMANCE EVALUATION Time Start CUE:

Synchronize Switch is in the ON position.

  • 1. Place Synchronize Switch for Bus 64B *1. Synchronize Switch is placed in ON.

(64C, 65E, 65F) Normal Feeder Breaker B6 (C6, E6, F6) to ON.

CUE:

Secondary windings on SST #64 (65) indicates 120V AC.

64B (64C, 65E, 65F) Starting Volt Meter indicates voltage of 120V AC.

The Synchroscope is operating.

2. Verify: 2. The following items are verified:

Div. I (II) Syn. Bus Running Volt Meter Div. I (II) Syn. Bus Running Volt Meter indicates voltage on SST # 64 (65) secondary indicates voltage on SST # 64 (65) secondary windings (approximately 120V AC). windings (approximately 120V AC).

Div. I (II) Syn. Bus Starting Volt Meter Div. I (II) Syn. Bus Starting Volt Meter indicates voltage on ESF Bus 64B (64C, 65E, indicates voltage on ESF Bus 64B (64C, 65E, 65F)(approximately 120V AC). 65F)(approximately 120V AC).

Division I (II) Synchroscope is operating. Division I (II) Synchroscope is operating.

CUE:

Synchroscope is rotating slowly in the FAST direction.

3. With EDG Governor Control Switch, adjust 3. Synchroscope is rotating slowly in the FAST EDG speed until synchroscope is rotating direction.

slowly in the FAST direction.

Synchroscope may be in phase and only show slight movement at first. Change EDG frequency slightly to rotate the scope.

CUE:

Running Volt meter reads 120VAC.

Starting Volt meter reads 120VAC.

  • 4. With EDG Voltage Control Switch, adjust *4. Starting Voltage is adjusted until it is equal to Starting Voltage until it is equal to or slightly or slightly higher than Running Bus Voltage higher than Running Bus Voltage indication.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.H Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2004-301-B1.e 1 JPM Title Duration Page Restore Off-Site Power to an ESF and EDG Bus. 10 Minutes 4 CAUTION: When the Normal Feeder Breaker B6 is closed, the operating mode of the EDG will be Speed Droop. Operator Action will be required to keep sufficient load on the EDG and thus prevent the EDG from tripping on Reverse Power.

CUE:

The Synchroscope is at 2 minutes till 12 o'clock.

  • 5. When Synchroscope is at approximately two *5. The Normal Feeder breaker is closed When minutes till 12 o'clock close ESF Bus 64B Synchroscope is at approximately two minutes (64C, 65E, 65F) Normal Feeder Breaker B6 till 12 o'clock.

(C6, E6, F6).

CUE: Synchronize Switch is in OFF.

6. Place Synchronize Switch for ESF Bus 64B 6. Synchronize Switch for the Normal Feeder (64C, 65E, 65F) Normal Feeder Breaker B6 Breaker is placed in OFF.

(C6, E6, F6) to OFF.

CUE:

Load is reduced to 300kW.

kVARS are kept positive.

7. Reduce EDG load to approximately 300kW 7. EDG load is reduced to approximately 300kW while maintaining kVARS positive. while maintaining kVARS positive.

CUE: The Output Breaker is open.

  • 8. Open EDG 11 (12, 13, 14) Output Breaker *8. EDG Output Breaker is opened.

EA3 (EB3, EC3, ED3).

CUE: Acknowledge announcement.

9. Inform the CRS that Offsite Power has been 9. CRS has been notified.

restored to the EDG and ESF bus.

Time Stop

  • Critical Steps Terminating Cue(s):

Offsite power restored to an EDG and ESF Bus in accordance with 23.321.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.H Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2004-301-B1.e 1 JPM Title Duration Page Restore Off-Site Power to an ESF and EDG Bus. 10 Minutes 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.H Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2004-301-B1.e 1 JPM Title Duration Page Restore Off-Site Power to an ESF and EDG Bus. 10 Minutes 6 Simulator Setup IC#:

IC-17 Malfunctions:

Number Title Value None Remote Functions:

Number Title Value None Override Functions:

None Special Instructions:

The EDG(s) should be started and paralleled to the ESF Bus, then the Normal Feed Breaker 64B(C)6, 65E(F)6 should then be opened.

JPM B1.d Cue Sheet Initial Conditions:

You are the Control Room NSO. EDG 11 was started manually and is supplying the EDG and ESF Bus.

Off-Site power is available, and the System Service Transformers are available.

EDG 11(12, 13, 14) is running, providing power to the EDG and ESF Bus.

The SM has authorized returning the ESF and EDG Busses to off-site power.

Initiating Cue(s):

The CRS directs you to restore off-site power to EDG Bus 11EA(12EB, 13EC, 14ED) and ESF Bus 64B(C, 65E, 65F).

Another operator will be responsible for the shutdown of the EDG and placing it in standby.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.F Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2004-301-B1.f 0 JPM Title Duration Page Perform Mode Switch in REFUEL and One Rod Out 20 Minutes COVER SHEET Interlock Verification Examinee: SRO / RO Evaluator:

Evaluation Method: Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S U Comments Element S U Comments

1.
  • 11.
2.
  • 12.
  • 3.
  • 13.
  • 4. 14.
  • 5. 15.
  • 6. 16.
  • 7. 17.
  • 8. 18.
  • 9. 19.
  • 10.

______ SATISFACTORY ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question # S U Comments TIME:

TIME:

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date:

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.F JPM Title No.: NRC EXAM 2004-301-B1.f Perform Mode Switch in REFUEL and One Rod Out Revision: 1 Interlock Verification Page 2

References:

Required (R) / Available (A) 24.623 (R)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom Evaluator Notes:

Establish an IC with the reactor shutdown in Mode 5.

Give student a copy of 23.623, section 5 with steps marked off up to step 5.1.2.

The examiner will act as verifier, but CAN NOT say if action is incorrect.

K/A

Reference:

201002 Reactor Manual Control System - K4. Knowledge of REACTOR MANUAL CONTROL SYSTEM design feature(s) and/or interlocks which provide for the following: (CFR: 41.7)

K4.02 Control rod blocks RO 3.5 / SRO 3.5 Task Standard:

Mode Switch in Refuel and One Rod Out Interlock verified.

Initial Conditions:

You are the P603 Operator.

The reactor has been shutdown. The plant is about to begin refueling operations.

Initiating Cue(s):

The CRS directs you to perform Mode Switch in Refuel and One Rod Out Interlock Verification per 24.623 Section 5.1.

All prerequisites (Section 4.0) for the performance of this surveillance are satisfied.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.F JPM Title No.: NRC EXAM 2004-301-B1.f Perform Mode Switch in REFUEL and One Rod Out Revision: 1 Interlock Verification Page 3 PERFORMANCE EVALUATION Time Start Elements Standards Note: The examinee should go to step 5.1.2 in the procedure CUE: The core is not off-loaded.

1. If core is off loaded, install the following 1. Core is verified to be not off-load. N/A is jumpers in RR panel H11-P606 to defeat entered in the space provided.

SRM/IRM control rod block, otherwise N/A:

a. Between terminals 62 and 63 of TB1B
b. Between terminals 62 and 63 of TB4B CUE: All operable control rods are FULLY INSERTED.
2. Verify all operable Control Rods are 2. All operable Control Rods are verified FULLY INSERTED by one of the FULLY INSERTED.

following:

or

  • A second Licensed Operator or technically qualified member of the unit Technical staff.

CUE: The Rod Worth Minimizer Bypass switch is in BYPASS.

CUE:

  • The Reactor Mode switch is locked in REFUEL.
  • The Refuel Mode One Rod Permissive light is On.
  • 4. Lock REACTOR MODE switch in
  • 4. REACTOR MODE switch is locked in REFUEL and verify: REFUEL:
a. REFUEL MODE ONE ROD a. Refuel Mode One Rod Permissive PERMISSIVE light on. light is verified on
b. Annunciator 3D113, CONTROL b. Annunciator 3D113 is verified in ROD WITHDRAWAL BLOCKED alarm.

alarms.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.F JPM Title No.: NRC EXAM 2004-301-B1.f Perform Mode Switch in REFUEL and One Rod Out Revision: 1 Interlock Verification Page 4 CUE:

  • The Rod Select Power switch is ON.
  • The Refuel Mode One Rod Permissive light is lit.
  • 5. Place ROD SELECT POWER switch in
  • 5. Rod Select Power switch is ON.

ON and verify: a. The Refuel Mode One Rod

a. REFUEL MODE-ONE ROD Permissive light is verified to PERMISSIVE light remains on. remain lit
b. Annunciator 3D113, CONTROL b. Annunciator 3D113 is verified to ROD WITHDRAWAL BLOCKED, remain lit remains in alarm.

CUE:

  • The control rod select light on the Rod Select Matrix is lit.
  • The Rod Out Perm light is lit.
  • The Refuel Mode One Rod Permissive light is not lit.
  • 6. Select the desired control rod, record rod *6 An edge control rod is selected, its number, and verify: number is recorded, and:
a. The control rod meets the a. Rod Out Perm light is verified on.

requirements for withdrawal b. Annunciator 3D113 is verified

b. ROD OUT PERM light on clear.
c. Annunciator 3D113, CONTROL c. Refuel Mode One Rod Permissive ROD WITHDRAWAL BLOCKED, light is verified off.

clears

d. REFUEL MODE ONE ROD PERMISSIVE light off CAUTION: In Mode 5, the shorting links shall be removed and all personnel shall remain out of the line-of-sight of the core when any control rod in a fueled region of a new core is withdrawn until both the following conditions have been satisfied:
1. The Core loading has been verified, including independent verification of videotapes.
2. The analytically determined strongest rod has been fully withdrawn and the reactor has been verified to remain subcritical.

CUE: Position 02 is indicated.

  • 7. Withdraw selected rod one notch
  • 7. The control rod is withdrawn one notch to (Position02). Position 02.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.F JPM Title No.: NRC EXAM 2004-301-B1.f Perform Mode Switch in REFUEL and One Rod Out Revision: 1 Interlock Verification Page 5 Note: The following step will de-energize the Select Matrix CUE:

  • The Rod Select Power switch is OFF.
  • The Process Computer displays B535, ROD OUT ROD BLOCK-ON.
  • 8. Place ROD SELECT POWER switch in
  • 8. Rod Select Power switch is OFF, and:

OFF and verify: a. Annunciator 3D113 alarms

a. Annunciator 3D113, CONTROL b. IPCS displays CONTROL ROD ROD WITHDRAWAL BLOCKED, OUT ROD BLOCK - BLOCKED alarms.
b. IPCS point C11DC0128 displays CONTROL ROD OUT ROD BLOCK - BLOCKED.

CUE: ROD SELECT POWER switch is ON.

  • 9. Place ROD SELECT POWER switch in
  • 9. The ROD SELECT POWER switch is ON.

ON.

NOTE: Do not select a control rod which has been withdrawn and bypassed IAW Tech Spec 3.10.6 CUE:

  • The control rod select light on the Rod Select Matrix is lit
  • The Refuel Mode One Rod Permissive light is not lit.
  • The Rod Out Perm light is not lit.
  • 10. An edge control rod is selected, its record rod number, and verify: number is recorded, and:
a. REFUEL MODE-ONE ROD a. The Refuel Mode One Rod PERMISSIVE light off. Permissive light is verified off
b. ROD OUT PERM light off. b. Rod Out Perm light is verified off
c. Annunciator 3D113, CONTROL c. Annunciator 3D113 is verified to ROD WITHDRAWAL BLOCKED remain in alarm remains in alarm.

CUE: The control rod indicates Position 00.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.F JPM Title No.: NRC EXAM 2004-301-B1.f Perform Mode Switch in REFUEL and One Rod Out Revision: 1 Interlock Verification Page 6

  • 11. Attempt to withdraw selected rod, and
  • 11. Verify the control rod does not withdraw verify rod will not withdraw. when a drive out signal is applied.

CUE: The Rod Select Power switch is in OFF and Returned to ON.

  • 12. Place ROD SELECT POWER switch in
  • 12. The ROD SELECT POWER switch is OFF, then back to ON. placed in OFF and returned to ON.

CUE:

  • The control rod is selected at Position 02 and inserts to Position 00 when the ROD IN signal is given.
  • ROD OUT PERM light is lit.
  • REFUEL MODE-ONE ROD PERMISSIVE light not lit.
  • Process Computer displays B535, ROD OUT ROD BLOCK-OFF.
  • 13. Select and fully insert the previously
  • 13. The correct control rod is selected and withdrawn control rod to Position 00 and inserted to Position 00, and:

verify: a. Annunciator 3D113 verified clear

a. Annunciator 3D113, CONTROL b. Rod Out Perm light verified on ROD WITHDRAWAL BLOCKED,
b. Refuel Mode One Rod Permissive clears.

light verified off

b. ROD OUT PERM light on.
c. IPCS point C11DC0128 displays
c. REFUEL MODE-ONE ROD CONTROL ROD OUT ROD PERMISSIVE light off. BLOCK - NORMAL
d. IPCS point C11DC0128 displays CONTROL ROD OUT ROD BLOCK - NORMAL.

CUE: All operable control rods are FULLY INSERTED.

14. Verify all control rods are FULLY 14. All operable Control Rods are verified INSERTED by one of the following: FULLY INSERTED.
  • Second Licensed Operator or technically qualified member of the unit Technical staff.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.F JPM Title No.: NRC EXAM 2004-301-B1.f Perform Mode Switch in REFUEL and One Rod Out Revision: 1 Interlock Verification Page 7 CUE:

  • Rod Select Power switch is OFF.
  • The Refuel Mode One Rod Permissive light is lit.
15. Place ROD SELECT POWER switch in 15. The Rod Select Power switch is in OFF.

OFF and verify: a. Annunciator 3D113 is

a. Annunciator 3D113, CONTROL acknowledged ROD WITHDRAWAL BLOCKED, b. Refuel Mode One Rod Permissive alarms. light is verified on
b. REFUEL MODE-ONE ROD PERMISSIVE lamp on.

CUE: Step 5.1.1 was not performed.

16. If step 5.1.1 was performed, remove the 16. N/A is entered in the space provided.

jumpers in RR panel H11-P606 to restore SRM/IRM control rod block function, otherwise N/A.

CUE: From the SM Leave the Reactor Mode switch in the REFUEL Position.

17. Position the Reactor Mode switch as 17. The Reactor Mode switch is left in the determined by the SM. REFUEL Position.

Note: The Next step should be marked N/A.

18. If directed by the SM, perform the 18. N/A is entered in the space provided.

following. Otherwise N/A.

a. Place the Reactor Mode switch in SHUTDOWN
b. Reset Reactor Scram IAW 23.610 CUE: Another Licensed Operator will perform the I.V.
19. Record Mode Switch Position 19. REFUEL is entered CUE: Rod Worth Minimizer Bypass Switch is in OPERATE.
20. If required by plant conditions, place Rod 20. Rod Worth Minimizer Bypass Switch is in Worth Minimizer Bypass Switch in OPERATE.

OPERATE.

CUE: Name, initials, and signature are recorded.

21. Record test personnel. 21. Printed Name, Initials, and Signature.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.F JPM Title No.: NRC EXAM 2004-301-B1.f Perform Mode Switch in REFUEL and One Rod Out Revision: 1 Interlock Verification Page 8 Time Stop

  • Critical Steps Terminating Cue(s):

Mode Switch in Refuel and One Rod Out Interlock Verification surveillance (24.623) is complete.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.F JPM Title No.: NRC EXAM 2004-301-B1.f Perform Mode Switch in REFUEL and One Rod Out Revision: 1 Interlock Verification Page 9 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.F JPM Title No.: NRC EXAM 2004-301-B1.f Perform Mode Switch in REFUEL and One Rod Out Revision: 1 Interlock Verification Page 10 Simulator Setup IC#:

Malfunctions:

Remote Functions:

Override Functions:

Special Instructions:

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.F JPM B1.f Cue Sheet Initial Conditions:

You are the P603 Operator.

The reactor has been shutdown. The plant is about to begin refueling operations.

Initiating Cue(s):

The CRS directs you to perform Mode Switch in Refuel and One Rod Out Interlock Verification per 24.623 Section 5.1.

All prerequisites (Section 4.0) for the performance of this surveillance are satisfied.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.G Job Position No. Revision RO / SRO NRC EXAM 2004-301-B1.g 1 JPM Title Duration Page SGTS Exhaust Damper Failure 10 minutes COVER SHEET Examinee: SRO / RO Evaluator:

Evaluation Method: Perform / Simulator/ Alternate Path Start Time Stop Time Total Time PERFORMANCE EVALUATION

SUMMARY

Step # S U Comments 1

  • 2
  • 3 4

5 6

7 8

9 10

  • 11
  • 12

______ SATISFACTORY ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question # S U Comments TIME:

TIME:

TIME:

TIME:

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date:

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.G Job Position No. Revision RO / SRO NRC EXAM 2004-301-B1.g 1 JPM Title Duration SGTS Exhaust Damper Failure 10 minutes Page 1

References:

Required (R) / Available (A) 23.404, Standby Gas Treatment System (R)

ARP 3D35, Div I/II FP Vent Exh Radn Monitor Upscale Trip (A)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom Evaluator Notes:

Simulator Setup:

  • Any IC that will allow SGTS operation.
  • Activate (T46)-RF1544 at the same time to cause T46F002A to fail closed.

When the operator is directed to start D1 SGTS there will be no flow. The operator will report this condition and start D2 SGTS, IF the operator asks for guidance direct the candidate to shutdown D1 SGTS and start D2 SGTS.

When D2 SGTS is operating, with normal air flow, the task is complete.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

K/A Reference :

261000 Standby Gas Treatment System - A2. Ability to (a) predict the impacts of the following on the STANDBY GAS TREATMENT SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 / 45.6)

A2.01 Low system flow RO 2.9 / SRO 3.1 Task Standard:

Division 2 SGTS is running, with normal operating air flow.

Initial Conditions:

As observed in the Control Room.

Initiating Cue(s):

You are the Third NSO in the Control Room.

CRS directs you to start Div 1 SGTS, in preparation for RBHVAC fan work.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.G Job Position No. Revision RO / SRO NRC EXAM 2004-301-B1.g 1 JPM Title Duration SGTS Exhaust Damper Failure 10 minutes Page 2 Start Time Stop Time Total Time Elements Standards PREREQUSITES: Completed CAUTION: Operation of SGTS during any activity which involves a chemical release in the Reactor Building (such as paint vapors and cleaning solvents) should only be performed during an emergency, as this can affect the performance of the Charcoal Filters.

CAUTION: If RBHVAC is shutdown while SGTS is running, radionuclide migration may occur during periods of elevated off-gas concentrations. This had the potential to initiate the standby division of SGTS and shift CCHVAC to recirc CUE: T4600-F407 is Open

1. Open of verify open T4600-F407, RBHVAC to 1. T4600-F407 is Open.

SGTS Iso Vlv CUE: T4600-C003 is running T4600-F004A, F008A, F409 are open

  • 2. Start T4600-C003, Div 1 SGTS and verify: *2. T4600-C003 is running
  • T4600-F004A, F008A, F409 are open T4600-F004A, F008A, F409 open CUE: Div 1 SGTS has no flow (show on flow recorder)
  • 3. Verify T46-R800A, Div 1 SGTS Exh Gas Flow *3. Examinee notices Div 1 SGTS flow is not proper Recorder, indicates between 3420 and 4180 cfm. and reports to CRS, CUE: If the examinee does not recommend shut down Div 1 SGTS and starting Div 2 SGTS, then direct:
  • Start Div 2 SGTS Evaluator Note: Go to section 8.0 of 23.404
4. If necessary, start RBHVAC 4. Step is N/A CUE: T4600-F407 is Open
5. Open or verify open T4600-F407, RBHVAC to 5. T4600-F407 is OPEN SGTS Iso Vlv
6. If T4600-F406 is open 6. This step is N/A
7. If T4600-F410 is open 7. This step is N/A CUE: T4600-C003 is in OFF/RESET
8. Place T4600-C003, Div 1 SGTS Exhaust Fan in 8. T4600-C003 is in OFF/RESET OFF/RESET CUE: T4600-F004A, F008A. F409 are shut
9. Verify T4600-F004A, F008A, F409 close 9. T4600-F004A, F008A. F409 are shut

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.G Job Position No. Revision RO / SRO NRC EXAM 2004-301-B1.g 1 JPM Title Duration SGTS Exhaust Damper Failure 10 minutes Page 3 CUE: Standby mode is not desired at this time.

9. If desired, place SGTS in Standby Mode 9. This step is N/A CUE: T4600-C004 is running T4600-F004B, F008B, F408 are open
  • 2. Start T4600-C004, Div 2 SGTS Exhaust Fan and *2. T4600-C004 is running verify: T4600-F004B, F008B, F408 open
  • T4600-F004A, F008A, F409 are open CUE: Div 2 SGTS flow is 4000 cfm
  • 3. Verify T46-R800B, Div 2 SGTS Exh Gas Flow *3. Div 2 SGTS flow is between 3420 and 4180 cfm Recorder, indicates between 3420 and 4180 cfm.

End JPM

______ SATISFACTORY ______ UNSATISFACTORY Terminating Cue(s):

D2 SGTS is in operation, with normal operating air flow.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.G Job Position No. Revision RO / SRO NRC EXAM 2004-301-B1.g 1 JPM Title Duration SGTS Exhaust Damper Failure 10 minutes Page 4 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.G Job Position No. Revision RO / SRO NRC EXAM 2004-301-B1.g 1 JPM Title Duration SGTS Exhaust Damper Failure 10 minutes Page 5 Simulator Setup IC#:

Any IC that will allow SGTS operation.

Malfunctions:

Remote Functions:

Activate (T46)-RF1544 at the same time to cause T46F002A to fail closed Override Functions:

Special Instructions:

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.G JPM B1.g Cue Sheet Initial Conditions:

As observed in the Control Room.

Initiating Cue(s):

You are the Third NSO in the Control Room.

CRS directs you to start Div 1 SGTS, in preparation for RBHVAC fan work.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.G Job Position No. Revision RO / SRO NRC EXAM 2004-301-B1.g 1 JPM Title Duration Page SGTS Exhaust Damper Failure 10 minutes COVER SHEET Examinee: SRO / RO Evaluator:

Evaluation Method: Perform / Simulator/ Alternate Path Start Time Stop Time Total Time PERFORMANCE EVALUATION

SUMMARY

Step # S U Comments 1

  • 2
  • 3 4

5 6

7 8

9 10

  • 11
  • 12

______ SATISFACTORY ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question # S U Comments TIME:

TIME:

TIME:

TIME:

______ SATISFACTORY ______ UNSATISFACTORY OVERALL EVALUATOR COMMENTS:

Evaluator Signature / Date:

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.G Job Position No. Revision RO / SRO NRC EXAM 2004-301-B1.g 1 JPM Title Duration SGTS Exhaust Damper Failure 10 minutes Page 1

References:

Required (R) / Available (A) 23.404, Standby Gas Treatment System (R)

ARP 3D35, Div I/II FP Vent Exh Radn Monitor Upscale Trip (A)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom Evaluator Notes:

Simulator Setup:

  • Any IC that will allow SGTS operation.
  • Activate (T46)-RF1544 at the same time to cause T46F002A to fail closed.

When the operator is directed to start D1 SGTS there will be no flow. The operator will report this condition and start D2 SGTS, IF the operator asks for guidance direct the candidate to shutdown D1 SGTS and start D2 SGTS.

When D2 SGTS is operating, with normal air flow, the task is complete.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

K/A Reference :

261000 Standby Gas Treatment System - A2. Ability to (a) predict the impacts of the following on the STANDBY GAS TREATMENT SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 / 45.6)

A2.01 Low system flow RO 2.9 / SRO 3.1 Task Standard:

Division 2 SGTS is running, with normal operating air flow.

Initial Conditions:

As observed in the Control Room.

Initiating Cue(s):

You are the Third NSO in the Control Room.

CRS directs you to start Div 1 SGTS, in preparation for RBHVAC fan work.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.G Job Position No. Revision RO / SRO NRC EXAM 2004-301-B1.g 1 JPM Title Duration SGTS Exhaust Damper Failure 10 minutes Page 2 Start Time Stop Time Total Time Elements Standards PREREQUSITES: Completed CAUTION: Operation of SGTS during any activity which involves a chemical release in the Reactor Building (such as paint vapors and cleaning solvents) should only be performed during an emergency, as this can affect the performance of the Charcoal Filters.

CAUTION: If RBHVAC is shutdown while SGTS is running, radionuclide migration may occur during periods of elevated off-gas concentrations. This had the potential to initiate the standby division of SGTS and shift CCHVAC to recirc CUE: T4600-F407 is Open

1. Open of verify open T4600-F407, RBHVAC to 1. T4600-F407 is Open.

SGTS Iso Vlv CUE: T4600-C003 is running T4600-F004A, F008A, F409 are open

  • 2. Start T4600-C003, Div 1 SGTS and verify: *2. T4600-C003 is running
  • T4600-F004A, F008A, F409 are open T4600-F004A, F008A, F409 open CUE: Div 1 SGTS has no flow (show on flow recorder)
  • 3. Verify T46-R800A, Div 1 SGTS Exh Gas Flow *3. Examinee notices Div 1 SGTS flow is not proper Recorder, indicates between 3420 and 4180 cfm. and reports to CRS, CUE: If the examinee does not recommend shut down Div 1 SGTS and starting Div 2 SGTS, then direct:
  • Start Div 2 SGTS Evaluator Note: Go to section 8.0 of 23.404
4. If necessary, start RBHVAC 4. Step is N/A CUE: T4600-F407 is Open
5. Open or verify open T4600-F407, RBHVAC to 5. T4600-F407 is OPEN SGTS Iso Vlv
6. If T4600-F406 is open 6. This step is N/A
7. If T4600-F410 is open 7. This step is N/A CUE: T4600-C003 is in OFF/RESET
8. Place T4600-C003, Div 1 SGTS Exhaust Fan in 8. T4600-C003 is in OFF/RESET OFF/RESET CUE: T4600-F004A, F008A. F409 are shut
9. Verify T4600-F004A, F008A, F409 close 9. T4600-F004A, F008A. F409 are shut

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.G Job Position No. Revision RO / SRO NRC EXAM 2004-301-B1.g 1 JPM Title Duration SGTS Exhaust Damper Failure 10 minutes Page 3 CUE: Standby mode is not desired at this time.

9. If desired, place SGTS in Standby Mode 9. This step is N/A CUE: T4600-C004 is running T4600-F004B, F008B, F408 are open
  • 2. Start T4600-C004, Div 2 SGTS Exhaust Fan and *2. T4600-C004 is running verify: T4600-F004B, F008B, F408 open
  • T4600-F004A, F008A, F409 are open CUE: Div 2 SGTS flow is 4000 cfm
  • 3. Verify T46-R800B, Div 2 SGTS Exh Gas Flow *3. Div 2 SGTS flow is between 3420 and 4180 cfm Recorder, indicates between 3420 and 4180 cfm.

End JPM

______ SATISFACTORY ______ UNSATISFACTORY Terminating Cue(s):

D2 SGTS is in operation, with normal operating air flow.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.G Job Position No. Revision RO / SRO NRC EXAM 2004-301-B1.g 1 JPM Title Duration SGTS Exhaust Damper Failure 10 minutes Page 4 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.G Job Position No. Revision RO / SRO NRC EXAM 2004-301-B1.g 1 JPM Title Duration SGTS Exhaust Damper Failure 10 minutes Page 5 Simulator Setup IC#:

Any IC that will allow SGTS operation.

Malfunctions:

Remote Functions:

Activate (T46)-RF1544 at the same time to cause T46F002A to fail closed Override Functions:

Special Instructions:

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.G JPM B1.g Cue Sheet Initial Conditions:

As observed in the Control Room.

Initiating Cue(s):

You are the Third NSO in the Control Room.

CRS directs you to start Div 1 SGTS, in preparation for RBHVAC fan work.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.H Job Position No. Revision Nuclear Supervising Operator NRC EXAM 2004-301-B1.h 1 JPM Title Duration Page Vent the Torus Irrespective of Offsite Release Rates 10 Minutes COVER SHEET Examinee: SRO / RO Evaluator:

Evaluation Method: Perform / Simulator / Alternate Path Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S U Comments Element S U Comments

1. 17.
2. *18.

3.

4.

5.

6.

  • 10.

11.

  • 12.
  • 13.
  • 14.
  • 15.
  • 16.

______ SATISFACTORY ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question # S U Comments Question # S U Comments

______ SATISFACTORY ______ UNSATISFACTORY Evaluator Signature / Date: /

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.H JPM Title No.: NRC EXAM 2004-301-B1.h Vent the Torus Irrespective of Offsite Release Rates (Alternate Revision: 1 Path) Page 2

References:

Required (R) / Available (A) 29.ESP.07, Primary Containment Venting Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X Walkthrough Discuss Plant Simulator X Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

This JPM will be performed in a Post-LOCA IC with Torus pressure >25#.

Start this JPM at the CRS Desk in the Simulator.

DO NOT FORGET TO RESET MSIV ISOLATIONS.

K/A Reference :

223001 Primary Containment System and Auxiliaries - A4. Ability to manually operate and/or monitor in the control room: (CFR: 41.7 / 45.5 to 45.8)

A4.07 Drywell pressure RO 4.2 / SRO 4.1 Task Standard:

Vent the Torus to maintain pressure less than the PCPL curve.

Initial Conditions:

The plant has experienced a Steam Leak inside containment. Containment pressure exceeded the PSP which caused the crew to Emergency depressurize.

Chemistry has been contacted to sample the Primary Containment atmosphere for activity.

The CRS has directed performance of 29.ESP.22, Defeat of Primary Containment Vent Valve Isolations.

Initiating Cue(s):

You are the Control Room Nuclear Supervising Operator.

The CRS directs you to vent the Torus Irrespective of Offsite Release rates to maintain containment pressure less than the PCPL curve in accordance with 29.ESP.07

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.H JPM Title No.: NRC EXAM 2004-301-B1.h Vent the Torus Irrespective of Offsite Release Rates (Alternate Revision: 1 Path) Page 3 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: All controls and indications are located on COP H11-P808 or COP-H11-P817 unless otherwise specified.

PREREQUSITES: NONE CAUTION Simultaneously venting the Drywell and Torus is prohibited.

2.1 If venting the Drywell, notify the SM and exit 2.1 If venting the Drywell, notify the SM and exit this section. this section.

2.2 If Torus Level is at or above 570 feet (H11- 2.2 Torus Level below 570 feet.

P602), exit this section.

2.3 Contact Chemistry to sample the Primary 2.3 Chemistry has been contacted.

Containment atmosphere for activity.

2.4 Direct Defeat Primary Containment Vent 2.4 29.ESP.22 has been ordered Valve isolations IAW 29.ESP.22 2.5 Determine pressure to stop venting Torus as 2.5 Lowering pressure to maintain <PCPL, follows: therefore pressure should be maintained less 2.5.1 If venting to lower pressure below the than 40 psig per the EOPs.

PCPL curve, stop venting at 32 to 39 psig.

2.5.2 If venting for any other reason, lower pressure as required to achieved desired results as directed by EOP or Severe Accident Guidline Flowcharts.

CAUTION Venting the Primary Containment may release radioactive gas/steam into the Reactor Building.

2.6 If Torus Pressure is less than 1.68 psig, 2.6 Torus pressure is >1.68 psig, therefore perform the following, otherwise continue at continue at 2.10 2.10.

  • 2.10 Shutdown SGTS *2.10 Shutsdown SGTS 2.11 Isolates SGTS by closing or verifying closed: 2.11 SGTS isolated 2.11.1 T4600-F008A 2.11.2 T4600-F409 2.11.3 T4600-F008B 2.11.4 T4600-F408 2.11.5 T4600-F407 2.11.6 T4600-F406 2.11.7 T4600-F410
  • 2.12 Place keylock switch for T4600-F421, SC *2.12 T4600-F421 Keylock switch in OPER Hard Vent Otbd Isol Vlv, in OPER

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.H JPM Title No.: NRC EXAM 2004-301-B1.h Vent the Torus Irrespective of Offsite Release Rates (Alternate Revision: 1 Path) Page 4 Elements Standards

  • 2.13 Place keylock switch for T4600-F420, SC *2.13 T4600-F420 Keylock switch in OPER Hard Vent Inbd Isol Vlv, in OPER
  • 2.14 Open or verify open T4600-F421, SC Hard *2.14 T4600-F421 is Open Vent Otbd Iso Vlv.
  • 2.15 Open or verify open T4600-F420, SC Hard *2.15 T4600-F420 is Open Vent Otbd Iso Vlv.

CUE: If the candidate reports to the CRS that T4600-F412 is not opening and requests direction, tell the candidate (as the CRS) to follow the procedure.

  • 2.16 Open or verify open the following 6 Vent *2.16 T4600-F412 fails shut. Examinee should Path Valves report this to the CRS and continue on with 2.16.1 T4600-F412, Torus 6 Purge Iso Vlv step 2.16.2, opening T4600-F400 to establish a vent path from the Torus 2.16.2 T4600-F400, Torus Exh iso Vlv NOTE (1): The Vent Path can be secured at any time (Step 2.23) to prevent Torus Pressure from going below 5 inches wc.

NOTE (2): Torus Pressure may not be reduced immediately, plant conditions will have to be evaluated by the Shift Team to determine if the larger vent paths are required.

2.17 If Torus Pressure is reduced to the value 2.17 Torus Pressure will not be lowering determined above, proceed to step 2.23.

  • 2.18 If Torus Pressure is not being reduced as *2.18 Opens T4600-F401 and starts lowering fast as necessary, open T4600-F401, Torus Torus Pressure 20 Purge Iso Vlv Time Stop
  • Critical Steps Terminating Cue(s):

Torus pressure lowering and less than 40 psig.

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.H JPM Title No.: NRC EXAM 2004-301-B1.h Vent the Torus Irrespective of Offsite Release Rates (Alternate Revision: 1 Path) Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.H JPM Title No.: NRC EXAM 2004-301-B1.h Vent the Torus Irrespective of Offsite Release Rates (Alternate Revision: 1 Path) Page 6 Simulator Setup IC#:

IC 17 - Need to establish an initial condition for this scenario. You have to insert a LARGE steam leak to get the simulator to reach the PSP.

Malfunctions:

Number Title Value None Remote Functions:

Number Title Value RF 2323 D1 L2/Hi DW Press PC Vent vlv isol Defeat RF 2324 D2 L2/Hi DW Press PC Vent vlv isol Defeat RF 1548 D1 DW Vent isol Defeat RF 1549 D2 DW Vent isol Defeat Override Functions:

None Special Instructions:

You must RESET the MSIV isolation logic for the Vent valves to open!

To Inactivate the Block and prevent T4600-F412 from operating, go to the CETRAN window and type the following:

BP:T4600F412 <CR>

IA=

JOB PERFORMANCE MEASURE NRC EXAM 2004-301-B1.H JPM B1.d Cue Sheet Initial Conditions:

The plant has experienced a Steam Leak inside containment. Containment pressure exceeded the PSP which caused the crew to Emergency depressurize.

Chemistry has been contacted to sample the Primary Containment atmosphere for activity.

The CRS has directed performance of 29.ESP.22, Defeat of Primary Containment Vent Valve Isolations.

Initiating Cue(s):

You are the Control Room Nuclear Supervising Operator.

The CRS directs you to vent the Torus Irrespective of Offsite Release rates to maintain containment pressure less than the PCPL curve in accordance with 29.ESP.07