LB Order (Transcript Corrections)
ML083120264
Person / Time
Site: Pilgrim
Issue date: 11/07/2008
From: Austin Young
Atomic Safety and Licensing Board Panel
To:
SECY RAS
References
06-848-02-LR, 50-293-LR, RAS J-166
Download: ML083120264 (13)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:

Ann Marshall Young, Chair Dr. Paul B. Abramson Dr. Richard F. Cole In the Matter of: Docket No. 50-293-LR ENTERGY NUCLEAR GENERATION ASLBP No. 06-848-02-LR COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

(Pilgrim Nuclear Power Station) November 7, 2008 ORDER (Transcript Corrections)

Applicant and the NRC Staff have filed motions proposing corrections to the transcript of the April 10, 2008, hearing on Applicants application for renewal of its operating license for the Pilgrim Nuclear Power Station.1 These proposed corrections are attached hereto. Apart from the exceptions listed in the following paragraph, after reviewing all of the proposed changes the Licensing Board approves them, and hereby incorporates the proposed changes into the record.

1 Entergys Proposed Transcript Corrections (June 9, 2008); NRC Staff Proposed Transcript Corrections (June 11, 2008) [hereinafter Staff Corrections]; Entergys Proposed Transcript Corrections (Revised) (June 11, 2008) [hereinafter Entergy Corrections].

On page 795, line 20, HCIC should be changed to HPCI, not HPIC.2 In addition, in two proposed changes the Applicant cites line numbers that are revised as follows: (1) page 626, line 6, should be page 626, line 7; and (2) page 714, line 19, should be page 714, line 9.3 It is so ORDERED.

FOR THE ATOMIC SAFETY AND LICENSING BOARD

/RA/

Ann Marshall Young, Chair ADMINISTRATIVE JUDGE Rockville, Maryland November 7, 20084 2

Staff Corrections at 2.

3 Entergy Corrections at 1, 2.

4 Copies of this Order were sent this date by Internet electronic mail transmission to all counsel and representatives for the parties.

June 11, 2008 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

Entergy Nuclear Generation Co. and )

Entergy Nuclear Operations, Inc. ) Docket No. 50-293-LR

)

) ASLBP No. 06-848-02-LR (Pilgrim Nuclear Power Station) )

NRC STAFF PROPOSED TRANSCRIPT CORRECTIONS The staff of the Nuclear Regulatory Commission (Staff) hereby proposes the following corrections to the transcript of the April 10, 2008 hearing regarding the application for renewal of the operating license for the Pilgrim Nuclear Power Station (Pilgrim). Omitted from the list are obvious typographical errors, capitalization errors and grammatical errors that do not alter the meaning of the statements.

Staff Proposed Corrections to the April 10, 2008 Hearing Transcript Transcript Page/Line Transcript Correction 564/5 Add they between then and can" 567/11 Replace STAFF with AUDIENCE MEMBER 586/7&22 Change Tenure to Ten year 588/6 Change bending to thinning 588/22 Change contained to titled 659/23 Change in toward to into 663/16 Change 12 to 2012 666/7 Add have between not and any

668/3 Add do between to and more 668/11 Change see to seem 674/12 Change MR. SULLIVAN to UNKNOWN 675/24 Change scarfing to scraping 685/13 Change scarfed to scraped 686/21, 688/22,24 Change mls to mils 696/2 Change bi to big 718/24 Change relates to related 724/23 Change thin to pin 737/5 Change phase to phased 739/4 Change HPSI and RPSI to HPCI and RCIC 744/2, 746/3 Change Tebo to Thibault 744/5, 746/4 Change THE CLERK to MS. THIBAULT 755/4 Change expect to expected 765/3 Change MR. LEWIS to DR. AHLFELD 770/7 Change iron to ions 772/7 Change Set hats to So thats 789/4 Change MR. COX to MR. CHAN 795/20 Change HCIC to HPIC 795/23 Change whole to hole 809/25 Change PARTICIPANT to MS. LAMPERT 818/8 Add had between you and contamination 832/5 Change CHAIR YOUNG to MS. UTTAL 848/15 Change ruling to a rule

848/17 Change PARTICIPANT to MR. LEWIS 859/17 Change COMMISSIONER EDWARDS to MR. GUNDERSON 864/1 Change Our cause to Is cost Respectfully submitted,

/RA/

Susan L. Uttal Counsel for NRC Staff Dated at Rockville, Maryland this 11th day of June, 2008

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

Entergy Nuclear Generation Co. and )

Entergy Nuclear Operations, Inc. ) Docket No. 50-293-LR

)

(Pilgrim Nuclear Power Station) ) ASLBP No. 06-848-02-LR

)

CERTIFICATE OF SERVICE I hereby certify that copies of NRC STAFF PROPOSED TRANSCRIPT CORRECTIONS in the above-captioned proceeding have been served on the following by electronic mail and by deposit in the U.S. Nuclear Regulatory Commissions internal mail system, or, as indicated by an asterisk (*), by electronic mail and by deposit in the U.S. Mail system this 11th day of June, 2008.

Administrative Judge Administrative Judge Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: Richard.Cole@nrc.gov E-mail: Paul.Abramson@nrc.gov Administrative Judge Office of Commission Appellate Ann Marshall Young, Chair Adjudication Atomic Safety and Licensing Board Panel Mail Stop: O-16G4 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: OCAAMAIL.Resource@nrc.gov E-mail: Ann.Young@nrc.gov Atomic Safety and Licensing Board Office of the Secretary Mail Stop: T-3F23 Attn: Rulemakings and Adjudications Staff U.S. Nuclear Regulatory Commission Mail Stop: O-16G4 Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission (VIA INTERNAL MAIL ONLY) Washington, DC 20555-0001 E-mail: Hearing.Docket@nrc.gov

Sheila Slocum Hollis* Terence A. Burke, Esq.*

Duane Morris LLP Entergy Nuclear 1667 K Street, NW, Suite 700 1340 Echelon Parkway Washington, DC 20006 Mail Stop: M-ECH-62 E-mail: sshollis@duanemorris.com Jackson, MS 39213 E-mail: tburke@entergy.com Mary Lampert* David R. Lewis, Esq*.

148 Washington Street Paul A. Gaukler, Esq.

Duxbury, MA 02332 Pillsbury, Winthrop, Shaw, Pittman, LLP E- mail: mary.lampert@comcast.net 2300 N Street, NW Washington, DC 20037-1137 E-mail: david.lewis@pillsburylaw.com paul.gaukler@pillsburylaw.com Chief Kevin M. Nord* Town Manager*

Fire Chief & Director Duxbury Emergency Town of Plymouth Management Agency 11 Lincoln St.

668 Tremont Street Plymouth, MA 02360 Duxbury, MA 02332 E-mail: msylvia@townhall.plymouth.ma.us E-mail: nord@town.duxbury.ma.us Richard R. MacDonald* Matthew Brock*

Town Manager Assistant Attorney General, Chief 878 Tremont Street Environmental Protection Division Duxbury, MA 02332 Office of the Attorney General E-mail: macdonald@town.duxbury.ma.us One Ashburton Place, 18th Floor Boston, MA 02108 E-mail: matthew.brock@state.ma.us Diane Curran*

Harmon, Curran, Spielberg, & Eisenberg, LLP 1726 M Street N.W., Suite 600 Washington, D.C. 20036 E-mail: dcurran@harmoncurran.com

/RA/

Susan L. Uttal Counsel for the NRC Staff

June 11, 2008 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board Panel In the Matter of )

)

Entergy Nuclear Generation Company and ) Docket No. 50-293-LR Entergy Nuclear Operations, Inc. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

ENTERGYS PROPOSED TRANSCRIPT CORRECTIONS (REVISED)

Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.

(collectively, Entergy) have identified additional proposed transcript corrections and hereby provide a revised list of proposed corrections to the transcript of the evidentiary hearing held on April 10, 2008 regarding the license renewal application for the Pilgrim Nuclear Power Station and Pilgrim Watch Contention 1.1 Entergy has also reviewed and does not object to the proposed transcript corrections filed by the NRC Staff on June 11, 2008.2 The list provided herein does not include obvious grammatical or typographical errors that do not affect the meaning of the testimony given by the witnesses and primarily focuses on errors in identifying the witness answering a question.

Entergys Proposed Corrections to Transcript of Evidentiary Hearing on Pilgrim License Renewal Application (Plymouth, MA April 10, 2008)

Transcript Citation Transcript (Page/line) Correction 590/22 Change profile to prefiled 610/22 Change take in the count to take into account 610/23 Change cure in place to cured in place 626/6 Change face ray to phased array 1

The corrections provided herein include the proposed corrections provided in Entergys Proposed Transcript Corrections (June 9, 2008).

2 NRC Staff Proposed Transcript Corrections (June 11, 2008).

640/8 Change failed to felt 648/10 Change MR. GUNDERSEN to MR. SULLIVAN and change very discharges to buried discharge 648/20 Change MR. GUNDERSEN to MR. SULLIVAN 686/21 Change mls to mils 688/22 Change mls to mils 688/23 Change mls to mils 688/24 Change mls to mils 649/1 Change MR. GUNDERSEN to MR. SULLIVAN 652/25 Change receive to received 690/21 Change folded to bolted and change the broke to they broke 703/15 Change the energies to Entergys 714/19 Change arent to are 724/23 Change thin to pin 765/3 Change MR. LEWIS to DR. AHLFELD 775/8 Change thickness to effectiveness 775/9 Change end side to inside 780/4 Change run to are in 780/22 Change HPIC to HPCI 785/2 Change , it to that 785/23 Change setting there are to sitting there 788/1 Change very to every 789/4 Change MR. COX to MR. CHAN 828/13 Change MR. GUNDERSEN to MR. SULLIVAN 832/5 Change CHAIR YOUNG to MS. UTTAL 832/16 Change CHAIR YOUNG to MS. UTTAL 832/21 Change jUDGE YOUNG to MS. UTTAL 832/22 Change for to or 841/23 Change MR. COX to DR. AHLFELD 841/24 Change DR. AHLFELD to CHAIR YOUNG 841/25 Change MR. COX to DR. COLE and insert ? after temporary perched water 859/17 Change COMMISSIONER EDWARDS to MR.

GUNDERSEN Respectfully Submitted,

/s/ Paul A. Gaukler David R. Lewis Paul A. Gaukler PILLSBURY WINTHROP SHAW PITTMAN LLP 2300 N Street, NW Washington, DC 20037-1128 Tel. (202) 663-8000 Dated: June 11, 2008 Counsel for Entergy 2

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

Entergy Nuclear Generation Company and ) Docket No. 50-293-LR Entergy Nuclear Operations, Inc. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of Entergys Proposed Transcript Corrections (Revised),

dated June 11, 2008, were served on the persons listed below by deposit in the U.S. Mail, first class, postage prepaid, and where indicated by an asterisk, by electronic mail, this 11th day of June 2008.

  • Administrative Judge *Administrative Judge Ann Marshall Young, Esq., Chair Dr. Richard F. Cole Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 amy@nrc.gov rfc1@nrc.gov
  • Administrative Judge *Secretary Paul B. Abramson Attn: Rulemakings and Adjudications Staff Atomic Safety and Licensing Board Mail Stop O-16 C1 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 secy@nrc.gov;hearingdocket@nrc.gov pba@nrc.gov Office of Commission Appellate Atomic Safety and Licensing Board Adjudication Mail Stop T-3 F23 Mail Stop O-16 C1 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 400853585v1
  • Susan L. Uttal, Esq. *Mr. Mark D. Sylvia
  • Marcia Simon, Esq. Town Manager
  • James E. Adler, Esq. Town of Plymouth Office of the General Counsel 11 Lincoln St.

Mail Stop O-15 D21 Plymouth, MA 02360 U.S. Nuclear Regulatory Commission msylvia@townhall.plymouth.ma.us Washington, DC 20555-0001 slu@nrc.gov; jea1@nrc.gov; Marcia.simon@nrc.gov

  • Ms. Mary Lampert *Chief Kevin M. Nord 148 Washington Street Fire Chief and Director, Duxbury Emergency Duxbury, MA 02332 Management Agency mary.lampert@comcast.net 688 Tremont Street P.O. Box 2824 Duxbury, MA 02331 nord@town.duxbury.ma.us
  • Sheila Slocum Hollis, Esq. *Richard R. MacDonald Duane Morris LLP Town Manager 505 9th Street, N.W. 878 Tremont Street Suite 1000 Duxbury, MA 02332 Washington, DC 20006 macdonald@town.duxbury.ma.us sshollis@duanemorris.com
  • Martha Coakley, Attorney General *Diane Curran
  • Matthew Brock, Assistant Attorney General Harmon, Curran, Spielberg, & Eisenberg, LLP Commonwealth of Massachusetts 1726 M Street NW, Suite 600 Office of the Attorney General Washington, DC 20036 One Ashburton Place dcurran@harmoncurran.com Boston, MA 02108 Martha.Coakley@state.ma.us Matthew.Brock@state.ma.us

/s/ Paul A. Gaukler Paul A. Gaukler 4

400853585v1

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

ENTERGY NUCLEAR GENERATION CO. )

AND )

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket No. 50-293-LR

)

(Pilgrim Nuclear Power Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing LB ORDER (Transcript Corrections) have been served upon the following persons by U.S. mail, first class, or through NRC internal mail.

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Office of the General Counsel Mail Stop: T-3 F23 Mail Stop: O-15 D21 Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Susan L. Uttal, Esq.

Ann Marshall Young, Chair David Roth, Esq.

Marcia J. Simon, Esq.

Administrative Judge Andrea Z. Jones, Esq.

Richard F. Cole Brian Newell, Paralegal Administrative Judge Paul B. Abramson U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Office of Commission Appellate Office of Secretary of the Commission Adjudication Mail Stop: O-16C1 Mail Stop: O-16C1 Washington, DC 20555-0001 Washington, DC 20555-0001 Perry H. Buckberg, Project Manager Plant Licensing Branch I-I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop: O11-F1 Washington, DC 20555-0001

Docket No. 50-293-LR LB ORDER (Transcript Corrections)

Terrence A. Burke, Esq David R. Lewis, Esq.

Entergy Nuclear Paul A. Gaukler, Esq.

1340 Echelon Parkway Jason B. Parker, Esq.

Mail Stop: M-ECH-62 Pillsbury, Winthrop, Shaw, Pittman, LLP Jackson, MS 39213 2300 N. Street, N.W.

Washington, DC 20037-1128 Kevin M. Nord, Fire Chief & Director Matthew Brock, Assistant Attorney General Duxbury Emergency Management Agency Office of the Attorney General 668 Tremont Street Environmental Protection Division Duxbury, MA 02332 One Ashburton Place, 18th Floor Boston, MA 02108 Mary Lampert, Director Mark D. Sylvia, Town Manager Pilgrim Watch Town of Plymouth MA 148 Washington Street Town Managers Office Duxbury, MA 02332 11 Lincoln Street Plymouth, MA 02360 Sheila Slocum Hollis, Esq.

Duane Morris, LLP Town of Plymouth MA 505 9th Street, NW, Suite 1000 Washington, DC 20004-2166

[Original signed by Linda D. Lewis]

Office of the Secretary of the Commission Dated at Rockville, Maryland this 7th day of November 2008 2