ML17044A204

From kanterella
Revision as of 00:14, 9 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

NRR E-mail Capture - Nrc'S LIC-109 Acceptance Review for LAR-250 (CACs MF9069 and MF9070)
ML17044A204
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/10/2017
From: Audrey Klett
Plant Licensing Branch II
To: Guth M, Hanek O
Florida Power & Light Co
References
MF9069, MF9070
Download: ML17044A204 (2)


Text

NRR-PMDAPEm Resource From: Klett, Audrey Sent: Friday, February 10, 2017 9:40 AM To: 'Mitch.Guth@fpl.com'; 'Hanek, Olga' (Olga.Hanek@fpl.com)

Subject:

NRC's LIC-109 Acceptance Review for LAR-250 (CACs MF9069 and MF9070)

Hi Mitch, Hi Olga, By letter L-2016-233 dated December 21, 2016 (Agencywide Documents Access and Management System Accession No. ML17012A084), Florida Power & Light Company (the licensee) requested amendments to the Technical Specifications (TSs) of Renewed Facility Operating License (RFOL) Nos. DPR-31 and DPR-41 for Turkey Point Nuclear Generating Unit Nos. 3 and 4, respectively. The U.S. Nuclear Regulatory Commission (NRC) staff performs acceptance reviews of applications to determine if the scope and depth of technical information is sufficient for the staff to complete its technical reviews. The acceptance reviews also intend to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original application. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The staff concluded that the licensees submittal provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which the NRC staff identifies issues that affect its ability to complete the detailed technical review despite completion of an adequate acceptance review. If the NRC staff needs additional information, it will notify the licensee by separate correspondence.

The staff has estimated that it will take approximately 200 hours8.333 days <br />1.19 weeks <br />0.274 months <br /> to complete this licensing request and that it will complete its review by the licensees requested date (i.e., by December 2017). These estimates are based on the NRC staffs initial review of the application and could change because of several factors, such as requests for additional information, unanticipated addition of application scope, review by NRC advisory committees, or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance of or in parallel with industry program initiatives or pilot applications. If complexities or challenges during the review cause significant changes to the estimated hours or completion date, the assigned project manager will communicate the new estimates and reasons for the changes to the licensee during routine interactions.

If you have any questions, please contact me at (301) 415-0489 or Audrey.Klett@nrc.gov.

Audrey Klett Project Manager NRR/DORL/LPLII-2 301-415-0489 1

Hearing Identifier: NRR_PMDA Email Number: 3336 Mail Envelope Properties (Audrey.Klett@nrc.gov20170210093900)

Subject:

NRC's LIC-109 Acceptance Review for LAR-250 (CACs MF9069 and MF9070)

Sent Date: 2/10/2017 9:39:33 AM Received Date: 2/10/2017 9:39:00 AM From: Klett, Audrey Created By: Audrey.Klett@nrc.gov Recipients:

"'Mitch.Guth@fpl.com'" <Mitch.Guth@fpl.com>

Tracking Status: None

"'Hanek, Olga' (Olga.Hanek@fpl.com)" <Olga.Hanek@fpl.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3164 2/10/2017 9:39:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: