(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:Letter
MONTHYEARML23353A1022023-12-19019 December 2023 Vendor Inspection of Korea Hydro & Nuclear Power Co. Safeguards Information Program Implementation ML20366A1162020-11-30030 November 2020 Korea Hydro & Nuclear Power Co., Ltd, APR1400 Response to NRC Regulatory Issue Summary 2020-02, Review of New Licensing Applications for Light-Water Reactors and Non-Light Water Reactors ML20143A0902020-05-13013 May 2020 Korea Hydro & Nuclear Power Co, Ltd., 10 CFR 50.46 Annual Report for the APR1400 Standard Plant Design ML21124A2362020-03-0404 March 2020 KHNP Request for Approval of New Reviewing Official ML19231A2092019-08-23023 August 2019 Nuclear Regulatory Commission Vendor Inspection Report of KHNP Washington, Dc. 05200046/2019201 ML19228A2142019-08-20020 August 2019 Signing Ceremony for the Advanced Power Reactor 1400 Design Certification ML19207A2742019-07-26026 July 2019 LLC Response to NRC Request for Additional Information No. 386 (Erai No. 9316) on the NuScale Design Certification Application ML19207A2572019-07-26026 July 2019 LLC Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19177A3522019-06-27027 June 2019 Vendor Inspection of KHNP Washington, DC Center Announcement Letter ML19116A2452019-04-26026 April 2019 Schedule to Complete Rulemaking and Certification of the Advanced Power Reactor 1400 Reactor Design ML19106A2642019-04-18018 April 2019 Response Letter to Charles J Poppe on APR1400 FSER ML19081A2042019-03-0808 March 2019 Letter from Charles Poppe to William Ward on APR1400 FSER ML18282A2182018-10-0909 October 2018 Korea Hydro & Nuclear Power Co., Ltd. - Review Result to Final Safety Evaluation Report for Chapter 18 ML18274A4032018-09-28028 September 2018 Korea Hydro & Nuclear Power Co., Ltd - Review Results to Final Safety Evaluation Report for Six Chapters ML18261A1872018-09-28028 September 2018 Letter from F. Brown to Kepco/Khnp Issuing the Standard Design Approval for the Advanced Power Reactor 1400 ML18263A2652018-09-28028 September 2018 Letter from R. Taylor to Korea Electric Power Corporation / Korea Hydro & Nuclear Power Co., Ltd, Issuing the Final Safety Evaluation Report for the Advanced Power Reactor 1400 Design ML18262A0632018-09-25025 September 2018 Advanced Power Reactor 1400 Design Certification Application - Final Safety Evaluation for Six Chapters - Letter ML18264A1272018-09-21021 September 2018 Korea Hydro & Nuclear Power Co., Ltd - Review Results to Final Safety Evaluation Report for Thirteen Chapters ML18262A0642018-09-19019 September 2018 Advanced Power Reactor 1400 Design Certification Application - Final Safety Evaluation for Thirteen Chapters ML18243A4652018-08-31031 August 2018 Korea Hydro & Nuclear Power Co., Ltd - Submittal of LTR-RAM-17-81, Revision 4, Work Order 89: Response to Digital I&C Questions. ML18240A0422018-08-28028 August 2018 Korea Hydro & Nuclear Power Co., Ltd., Submittal of Confirmation of Final Safety Evaluation for the APR1400 Generic Report, Ptlm for RCS Heatup and Cooldown ML18199A3332018-08-23023 August 2018 APR1400, Generic Pressure-Temperature Limits Report, Final Safety Evaluation Report - Letter to KHNP ML18234A4292018-08-22022 August 2018 Korea Hydro & Nuclear Power Co, Ltd., Submittal of Updated Technical Report ML18235A1572018-08-14014 August 2018 Korea Hydro & Nuclear Power Co., Ltd - Submittal of Revised Samdas Technical Reports ML18225A1372018-08-13013 August 2018 Korea Hydro & Nuclear Power Co, Ltd., Revised Response to RAI 520-8693 for Question 06.02.02-43 (Rev.1) ML18225A3342018-08-13013 August 2018 Korea Hydro & Nuclear Power Co, Ltd., Submittal of APR1400 Applicant'S Environmental Report (Rev.2) ML18222A2582018-08-10010 August 2018 Korea Hydro & Nuclear Power Co., Ltd - Submittal of Revised Technical Report on CCF Coping Analysis ML18222A3492018-08-10010 August 2018 Korea Hydro & Nuclear Power Co., Ltd. - Transmittal of Response to RAI Er 1-8428 for Question EIS ACC/SA-15 (Rev.4) ML18232A1412018-08-10010 August 2018 Korea Hydro & Nuclear Power Co, Ltd., Submittal of Accepted Versions of Topical Report APR1400-F-M-TR-13001-P-A/-NP-A, PLUS7 Fuel Design for the APR1400. ML18233A4322018-08-10010 August 2018 Korea Hydro & Nuclear Power Co., Ltd - Submittal of Accepted Versions of Topical Report APR1400-F-A-TR-12004-P-A/-NP-A, Realistic Evaluation Methodology for Large-Break LOCA of the APR1400 ML18221A5152018-08-0909 August 2018 Korea Hydro & Nuclear Power Co., Ltd. - Submittal of Response to RAI 452-8545 for the Question 10.03.06-21 (Rev.1) ML18218A2042018-08-0606 August 2018 Korea Hydro & Nuclear Power Co, Ltd., Revised Response to RAI 312-8343 for Question 19-16 (Rev. 3) ML18218A2092018-08-0606 August 2018 Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 271-8290 for Question 19-15 (Rev. 5) ML18218A1962018-08-0606 August 2018 Korea Hydro & Nuclear Power Co, Ltd., Revised Response to RAI 434-8352 for Question 19-92 (Rev.5) ML18180A3272018-07-31031 July 2018 APR1400 Topical Report Safety Evaluation, Realistic Evaluation Methodology for Large Break Loss of Coolant Accident of the APR1400 - KHNP Letter ML18212A3462018-07-31031 July 2018 Korea Hydro & Nuclear Power Co., Ltd - Submittal of Revised Technical Reports for APR1400 Design Certification ML18207A2252018-07-30030 July 2018 LTR-18-0307-1 - Letter from M. Doane to M. Corradini Report on the Safety Aspects of the APR1400 Pressurized-Water Reactor ML18225A1182018-07-27027 July 2018 Ametek Solidstate Controls - Notification of Potential Defect-10CFR Part 21 ML18206B0862018-07-26026 July 2018 Report on the Safety Aspects of the APR1400 Pressurized-Water Reactor ML18269A2412018-07-26026 July 2018 APR1400 Final Safety Evaluation Report, Appendix F - ACRS Report on APR1400 Design ML18214A5642018-07-25025 July 2018 Korea Hydro - Transmittal of Revised Technical Reports for APR1400 Design Certification ML18205A6382018-07-24024 July 2018 Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 356-7881 for the Question 07-18 (Rev.3) ML18205A7322018-07-24024 July 2018 Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 558-9456 for Question 14.03.01-1 (Rev.1) ML18204A4082018-07-23023 July 2018 Korea Hydro & Nuclear Power Co, Ltd., Transmittalof Revised Response to RAI 374-8481 for the Question 18-101 (Rev.1) ML18204A4332018-07-23023 July 2018 Korea Hydro & Nuclear Power Co, Ltd., Revised Response to RAI 63-7983 for Question 06.02.02-13 (Rev.2) ML18207A4572018-07-20020 July 2018 Korea Hydro - Transmittal of Revised Response to RAI 112-8015 for Question 13.05.02.01-5, Revision 3 ML18201A4002018-07-20020 July 2018 LLC Response to NRC Request for Additional Information No. 491 (Erai No. 9557) on the NuScale Design Certification Application ML18207A4512018-07-20020 July 2018 Korea Hydro - Transmittal of Revised Response to Section 19.1 Issue #PRA-135, Revision 1 ML18199A5612018-07-18018 July 2018 Korea Hydro & Nuclear Power Co, Ltd., Submittal of Revised Technical Reports for APR1400 Design Certification ML18194A4152018-07-13013 July 2018 OEDO-18-00316 - Letter from M. Doane to M. Corradini Safety Evaluation of Topical Report, APR1400-F-A-TR-12004-P, Revision 1, Realistic Evaluation Methodology for Large-Break Loss of Coolant Accident of the APR1400 2023-12-19
[Table view] |
Text
70-1312-gil, Yuseong-daero, Yuseong-gu, Daejeon, 34101, KOREA Tel: +82-42-870-5400 / Fax: +82-42-870-5449 http://www.khnp.co.kr July 31, 2018 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attention: Mr. William Ward Docket No.52-046 Division of New Reactor Licensing MKD/NW-18-0115L
Subject:
Submittal of Revised Technical Reports for APR1400 Design Certification
References:
- 1. KHNP Letter MKD/NW-17-0173L, Additional Submittal of Revised Technical Reports for APR1400, dated July 12, 2017
- 2. KHNP Letter MKD/NW-18-0039L, Submittal of Technical Reports for the APR1400 Design Certification, dated March 19, 2018
- 3. KHNP Letter MKD/NW-18-0091L, Submittal of Technical Reports for APR1400 Design Certification, dated June 18, 2018
- 4. KHNP Letter MKD/NW-17-0147L, Revised Response to RAI 296-8342 for the Question 06.02.01.A-2, dated June 19, 2017
- 5. KHNP Letter MKD/NW-15-0405L, Response to RAI 324-8362 for Question on a 30-Day Response Cycle, dated December 30, 2015
- 6. KHNP Letter MKD/NW-16-0595L, Response to RAI 394-8460 for Questions 06.02.01.03-5, 06.02.01.03-10 and 06.02.01.03-11, dated June 8, 2016
- 7. KHNP Letter MKD/NW-18-0066L, Revised Response to RAI 45-7883 for the Question 07.09-2 (Rev.6), dated May 4, 2018
- 8. KHNP Letter MKD/NW-18-0112L, Revised Response to RAI 374-8481 for Questions18-101, dated July 23, 2018 The purpose of this letter is to transmit four (4) sets of revisions regarding the following titled technical reports:
- 1. Mass and Energy Release Methodologies for LOCA and MSLB (Rev.2)
- 2. Safety I&C System (Rev.3)
- 3. Control System CCF Analysis (Rev.3)
- 4. Human Factors Engineering Program Plan (Rev. 4)
Prior versions of the reports had been submitted under References 1 to 3. Mass and Energy Release Methodologies for LOCA and MSLB Revision 2 incorporates all the responses to the relevant RAIs (See References 4 to 6). Software Program Manual Revision 3 and Control System CCF Analysis Revision 3 reflect all the related mark-ups including the change to External Data Communication System as provided under Reference 7. Human Factors Engineering Program Plan Revision 4 clarifies the application scope of HFE program related to design changes as indicated in the latest RAI response under Reference 8.
provides a copy of the associated affidavit. Enclosures 2 to 9 provide electronic copies of either proprietary or non-proprietary version of each set of the revised technical reports.
If additional information or clarification required, please contact Daegeun Ahn, Director of KHNP Washington DC Center, at ahn.daegeun@khnp.co.kr or 703-388-0592.
Sincerely, Yun-ho Kim Project Manager Advanced Reactors Development Laboratory Korea Hydro & Nuclear Power Co., Ltd.
Enclosures:
- 1. Affidavit KAW-18-0115
- 2. Mass and Energy Release Methodologies for LOCA and MSLB (Proprietary) (APR1400-Z-A-NR-14007-P, Rev.2)
- 3. Mass and Energy Release Methodologies for LOCA and MSLB (Non-Proprietary)
(APR1400-Z-A-NR-14007-NP, Rev.2)
- 4. Safety I&C System (Proprietary) (APR1400-Z-J-NR-14001-P, Rev.3)
- 5. Safety I&C System (Non-Proprietary) (APR1400-Z-J-NR-14001-NP, Rev.3)
- 6. Control System CCF Analysis (Proprietary) (APR1400-Z-J-NR-14012-P, Rev.3)
- 7. Control System CCF Analysis (Non-Proprietary) (APR1400-Z-J-NR-14012-NP, Rev.3)
- 8. Human Factors Engineering Program Plan (Proprietary) (APR1400-E-I-NR-14001-P, Rev.4)
- 9. Human Factors Engineering Program Plan (Non-Proprietary) (APR1400-E-I-NR-14001-NP, Rev.4)
Enclosure 1 Affidavit KAW-18-0115 I, Jeong-kwan Suh, state the following:
- 1. I am the General Manager of Korea Hydro & Nuclear Power Co., Ltd. (KHNP), and as such I am authorized to request withholding the information transmitted with this letter from public disclosure and to execute this affidavit.
- 2. I am familiar with the criteria applied by KHNP to determine whether certain information is proprietary, and with the policies established by KHNP to ensure the proper application of these criteria.
- 3. The information, APR1400- Z-A-NR-14007-P, APR1400-Z-J-NR-14001-P, APR1400-Z-J-NR-14012-P, and APR1400-E-I-NR-14001-P, transmitted with this letter has been classified by KHNP as proprietary in accordance with the policies for the control and protection of proprietary and confidential information. The information regarded as proprietary is identified and marked consistent with the requirements of 10 CFR 2.390, § (b)(1)(i).
Accordingly, the proprietary information is enclosed within brackets and the right-hand bracket carries a notation of TS to indicate that the trade secret nature of the information claimed to be proprietary is the basis for proposing that the information so identified be withheld from public disclosure.
- 4. Pursuant to the considerations set forth in 10 CFR Section 2.390(a), KHNP considers the information classified as proprietary to be trade secret information since it is design, analysis, or test information that would be difficult for a competitor to reproduce and hence provides an economic and competitive advantage to KHNP.
- 5. The need for designating the information as proprietary has been raised within KHNP.
The information is being treated proprietary and confidential and has not been disclosed by KHNP to the public.
- 6. Nondisclosure of the proprietary information transmitted with this letter is vital to the competitiveness held by KHNP and, hence, disclosure of the proprietary information transmitted in with this letter would have negative commercial impacts on the competitive position of KHNP in the U.S. nuclear market.
- 7. In accordance with KHNP policy, proprietary information contained in this document may be, or may have been, made available on a limited basis to regulatory bodies, customers, potential customers, and their agents, suppliers, and licensees, and others
under suitable agreements providing for nondisclosure and limited use of the information.
I declare that the foregoing statements are true and correct to the best of my knowledge, information and belief.
Executed on July 31, 2018 Jeong-kwan Suh General Manager APR1400 Licensing Team Korea Hydro and Nuclear Power Co., Ltd
Enclosure 2 APR1400-Z-A-NR-14007-P, Rev.2 Mass and Energy Release Methodologies for LOCA and MSLB (Proprietary)
Enclosure 3 APR1400-Z-A-NR-14007-NP, Rev.2 Mass and Energy Release Methodologies for LOCA and MSLB (Non-proprietary)
Enclosure 4 APR1400-Z-J-NR-14001-P, Rev.3 Safety I&C System (Proprietary)
Enclosure 5 APR1400-Z-J-NR-14001-NP, Rev.3 Safety I&C System (Non-proprietary)
Enclosure 6 APR1400-Z-J-NR-14012-P, Rev.3 Control System CCF Analysis (Proprietary)
Enclosure 7 APR1400-Z-J-NR-14012-NP, Rev.3 Control System CCF Analysis (Non-proprietary)
Enclosure 8 APR1400-E-I-NR-14001-P, Rev.4 Human Factors Engineering Program Plan (Proprietary)
Enclosure 9 APR1400-E-I-NR-14001-NP, Rev.4 Human Factors Engineering Program Plan (Non-proprietary)