Monthly Operating Rept for May 1980
ML19310A390
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/03/1980
From: Zufelt E
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML19310A385 List:
References
NUDOCS 8006110188
Download: ML19310A390 (12)


Text

, . . .

. O O

OPERATING DATA REPORT DOCKET NO. .50-333 DATE .Tu n n loan COMPLETED BY E. Zufelt TELEPilONE -(11 R) ta?-3840 OPERATING STATUS FitzPatrick Notes

1. Unit Name:
2. Reporting Period: AnnKnt RonKX1
3. Licensed Thennal Power (51Wr): 2436
4. Nameplate Rating (Gross 51We): 883
5. Design Electrical Rating (Net StWe): 821
6. Sfaximum Dependable Capacity (Gross SlWe): 830
7. 51asimum Dependable Capacity (Net 51We): Ann
8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report, Gise Reasons:

NONR

9. Power Level To Which Restricted,If Any (Net MWe): . NONE
10. Reasons For Restrictions,If Any:

This Month Yr..t o-Date Cumulative

11. Ilours in Reporting Period 7aa 16a7 A9agn
12. Number OfIlours Reactor Was Critical 142.6 2936.1 20K66.X
13. Reactor Reserve Shutdown flours 0 0 0
14. Ilours Generator On-Line 142.6 2893 28631
15. Unit Reserve Shutdown llours 0 0 0
16. Gross Thermal Energy Generated (MWH) 7tn6an 4R67n?a q7ntn?1R
17. Gross Electrical Energy Generated (MWH) 79450 2019020 19372720
18. Net Electrical Energy Generated (MWH) 76545 1953370 18743945
19. Unit Service Factor 19.2% 79.3% 67.4%
20. ifnit Availability Factor 19.2% 79.3% 67.4%

21, Unit Capacity Factor (Using MDC Net) 12.9% 67.0% 60.4%

22. Unit Capacity Factor (Using DER Net) 12.5% 65 2% 53.7%
23. Unit Forced Outage Rate 8.6% 5.4% 19.7%
24. Shutdowns Scheduled Over NeEt 6 Months (Type. Date, and Duration of Each):

NONE

25. If Shut Down At End Of Report Period, Estimated Date of Startup: Mu .Tuly loan
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved -

~

INITIA L CRITICA LITY INITIA L ELECTRICITY COMMERCIAL OPERATION -

80 06110/8f( .J

t...

. a .

!b AVER AGE DAILY UNIT POWER LCVEL

^

DOCKET NO. 50-333 UNIT JAFNPP DATE - hme - 1990 COMPLETED BY _E. Zufelt TELEPilONE (315) 3d?-3840 MONTH MAY 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1 542 37 0 2 527 18 0 3 533 39 0 4 Cal 20 n 5 540 21 0 6 506 22 0 7 n 23 n 8 0 24 0 9 0 0 25 10 0 26 0 11 0 0 27 12 n 28 0 13 0 0 29 0 0 14 30 15 0 33 0 16 0 0 SUM 4ARY: Power was being increased at the preconditioning rate at the beginning of this report period.

On May 6, 1980, the reactor scrammed due to a malfunction in

, the EHC system.

  • Started scheduled refueling outage at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> on May 7,1980.

i l

~ --

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. S0-333 ,

UNIT N AME JAFNPP DATE June 1980 COMPLETED BY E. Zu fel t IkEPORTMONTH May toen TELEPliONE (3151 342-3840 e.

No. Date

-, .! ?  : .Y Licensee ,E ar, , Cause & Corrective R 3g i .3 s 5 Event g7 c-3 Action to

  • $ :., 5 a~5=

~; ! Report a mU !O u Prevent Recurrence 6

13 800506 F 13.4 A 3 MA NA NA Reactor scram while testing CIV/ISV valves. Malfunction in EllC system 14 800507 S 588 C 4 NA NA NA Started refueling outage at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> f

I 2 3 4 F: Forced Reason: Method:

S: Scheduled Exhibit G Instructions A Equipment Failure (Explain) ' I Manual for Preparation of Data B. Maintenance or Test 2 Manual Scram. Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

E-Operatur Training & Ucense Examination F Administrative 5 G-Operational Errur (Explain) Exhibit 1 -Same Source 1104her (Explain) .

POWER AUD10RITY OF DIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE SUW.ARY OF OPERATING EXPERIENCE MAY 1980 "Ihe unit's power was being increased at the preconditioning rate at the beginning of this report period. On May 6, 1980, while performing

- normal valve surveillance testing, the reactor scrammed due to a malfunction in the EliC System.

On May 7, 1980, at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />, the unit officially started the scheduled refueling outage.

e.-

W b

1 b

a

ll POWER Alm 10RITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POKER PLANT ,

Safety Related Electrical 6 Mechanical Maintenance Summary WORK REQUEST # REPAIR DATE SYSTEM 110W DETECTED CAUSE OF MALFUNCTION TD;E COMPONENT # ACTION TAKEN TO PRECLUDE RECURRENCE 110URS' 28 Apr 66 5139 Visual NRC Bulletin 79-02 Inspec- Repaired 1166-63 96 1/2 H66-63 tion 28 Apr 10 5116 Visual NRC Bulletin 79-02 Inspec- Repaired ll10-48A 378 1/2 Il10-48A tion 18 Apr 15 _

5119 Visual NRC Bulletin 79-02 Inspec- Repaired 1115-88 211 3/4 1115-88 tion 30 Apr- 10 5147 Visual NRC Bulletin 79-02 Inspec- Repaired 1110-504 106 3/4

/ 1110-504 tion 3

30 Apr 01-125 5152 Visual NRC Bulletin 79-02 Inspec- Repaired ligr B-2 71 ligr B-2 tion 6 May' 70 5742 Ops. Failed motor on ventilation Replaced Motor 4 MOD-106B motor-operated damper 9 May 13 5680 Visual Inadvertent mechanical Replaced Flexible Conduit 18 Panel TU2 damage to flexible conduit 7 May 27 5052 Visual NRC Bulletin 79-02 Inspec- Repaired AZ27-54 121 AZ27-54 tion 2 0 Apr 10 5112 Visual NRC Bulletin 79-02 Inspec- Repaired il10-41A 442 1/2 Il10-41A tion

U FONER ALTTHORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical 6 Mechanical Maintenance Summary WORK REQL":ST # REPAIR

.DATE SYSTEM 110W DETECTED CAUSE OF MALFUNCTION COMPONENT # ACTION TAKEN TO PRECLUDE RECURRENCE TDIE liOURS' 6 May 10 5128 Visual NRC Bulletin 79-02.Inspec- Repaired PFSK-724 477 PFSK-724 tion 6 May 76 5132 Visual NRC Bulletin 79-02 Inspec- Repaired H76-48 67 1/4 H76-48 tion 7 May 10 5140 Visual NRC Bulletin 79-02 Inspec- Repaired PFSK-1346 225 PFSK-1346 tion 6 May 23 5141 Visual NRC Bulletin 79-02 Inspec- Repaired H23-90 185 1123-90 tion 2 May 27 5144 Visual NRC Bulletin 79-02 Inspec- Repaired H27-3 325 1/4 H27-3 tion 6 May. 10 5149 Visual NRC Bulletin 79-02 Inspec- Repaired H10-31 112 3/4 H10-31 tion 3 May 10 5153 Visual NRC Bulletin 79-02 Inspec- Repaired 1110-615 23 1110-615 tion 6 May 10 5155 Visual NRC Bulletin 79-02 Inspec- Repaired H10-164 232 1110-164 tion 2 May 46 5157 Visual NRC Bulletin 79-02 Inspec- Repaired BFSK-404 83 BFSK-404 tion e,

e 9

  • 18 POWER AUT110RITY OF TIIE STATE OF EEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical 6 Mechanical Maintenance Summary WORK REQUEST # REPAIR DATE SYSTEM COMPONENT # 110W DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME ,

110URS 6 May .66 5159 Visual NRC Bulletin 79-02 Inspec- Repaired 1166-89 145 1/4 H66-89 tion 7 May 27 5165 Visual NRC Bulletin 79-02 Inspec- Repaired PFSK-1375 60 1/2 PFSK-1375 tion 7 May 10 5172 Visual NRC Bulletin 79-02 Inspec- Repaired 1110-143 55 1110-143 tion 9 May 10 5154 Visual NRC Bulletin 79-02 Inspec- Repaired 1110-46 245 1110-46 tion D May 46 5179 Visual NRC Bulletin 79-02 Inspec- Repaired 1146-126 42 3/4 1146-126 tion 7 May. 23 5130 Visual NRC Bulletin 79-02 Inspec- Modified 1123-55 '626 3/4 1123-55 tion 12 May 76 5173 Visual NRC Bulletin 79-02 Inspec- Repaired 1176-55 , 83 1176-55 tion 1 2 May 10 5175 Visual NRC Bulletin 79-02 Inspec- Repaired 1110-5 63 1/4 111 0 - 5 tion 1 5 May 10 5176 Visual NRC Bulletin 79-02 Inspec- Repaired 1110-103 93 1110-103 tion l .

U POWER AUTliORITY OF TifE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PIANT Safety Related Electrical 6 Mechanical Maintenance Summary

' REPAIR DATE WORK REQUEST SYSTEM HOW DETECTED CAUSE OF MALFUNCTION COMPONENT # ACTION TAKEN TO PRECLUDE RECURRENCE TIME ,

110URS t

13 May 23 5181 Visual NRC Bulletin 79-02 Inspec- Repaired 1123-91 41 1123-91 tion 14 May 70 5133 Visual NRC Bulletin 79-02 Inspec- Repaired BFSK-555 135 BFSK-555 tion 15 May 76 5168 Visual NRC Bulletin 79-02 Inspec- Repaired 1176-62 193 1/4 1176-62 tion 13 May 10 5170 Titual NRC Bulletin 79-02 Inspec- Repaired 1110-206 137 1/4 1110-206 tion

'12 May 46 5171 Visual NRC Bu11etin.79-02 Inspec- Repaired PFSK-1353 PFSK-1353 67 1/2 tion 13 Nhy 67 5180 Visual NRC Bulletin 79-02 Inspec- Repaired flanger M 148 1/4 Hanger M tion 17 May 10 .5183 Visual NRC Bulletin 79-02 Inspec- Repaired 1110-122 e 108 1/2 H10-122 tion 20 May 66 5191 Visual NRC Bulletin 79-02 Inspec- Repaired 1166-41 1166-41 86 1/4 tion 14 May 10 5126 Visual NRC Bulletin 79-02 Inspec- Repaired il10-14A 56 1/2 Il10-14A tion

U POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical 6 Mechanical Maintenance Summary I ' REPAIR WORK REQUEST #

{ DATE I SYSTEM COMPONEN' # HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME g  ! HOURS t

, c i

15 May 76 5150 Visual NRC Bulletin 79-02 Inspec- Repaired BFSK-569 (H11) 205 BFSK-569 (1111) tion 12 May 76 5151 Visual NRC Bullet.n 79-02 Inspec-i Repaired 1176-34 1176-34 259 1/4 tion 20 May 10 5167 Visual NRC Bulletin 79-02 Inspec- Repaired PFSK-721 PFSK-721 249 1/2 tion 17 May 76 5185 Visual NRC Bulletin 79-02 Inspec- Repaired 1176-63 139 1/4 '

-l 1176-63 tion 4

16 May 46 5190 Visual NRC Bulletin 79-02 Inspec- Repaired 1146-4 107 114 6 - 4 tion 15 May Visual 70 5192 VRC Bulletin 79-02 Inspec- Repaired BFSK-414 BFS).-414 68 3/4 tion 20 May 70 51P3 Visual 4RC Bulletin 79-02 Inspec- Repaired BFSK-364 86 1/4 BFSK-364 tion 20 May 10 5195 Visual :4RC Bulletin 79-02 Inspec- Repaired 1110-612 185 1/2 H10-612 tion L7 May 76 5196 Visual ;4RC Bulletin 79-02 Inspec- Repaired 1176-46

- 128 1176-46 tion

/'

JAhES A. FITZPATRICK NUCLEAR POWER PIR4T Safety Related Electrical 6 Mechanical Maintenance Surmary WORK REQUEST # REPAIR DATE SYSTEh!  !!OW DETECTED COMPONENT # CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIFE HOURS i e 19 May 66 5198 Visual 4RC Bulletin 79-02 Inspec- Repaired H66-88 150 H66-88 tion 19 May 14 5209 Visual rorus Modification Relocated H14-55 108 1/4 H14-55 19 M:y 14 5210 Visual Forus Modification Relocated H14-41 118 H14-41 k

.o e

e 9

e

JAMES A. FITZPATRICK NUCLEAR PONER PLANT Maintenance Summart -

ISC. MAY. 1980 Date System h'ork Request # Cause of Results of Repair How Detected Action taken to Component ~# Malfunction Malfunction Preclude Time Recurrence l (Hours) 5/5/80,> 02 6564 OPS Loose Connection Incorrect Tightened 2.0 02-TE-113F Indication connection 5/7/80 02 6603 OPS Defective Relay Incorrect Alarm Replaced Relay 1.0 RSCS 5/13/80 02 3995 IGC Age /Use Leakage Past Various Replaced Valves 3.0 Instrument Valves 5/13/80 03 3361 OPS Age /Use Hard to Operate Replaced Switch 6.0 26-23 Select

]s 5/13/80 03 4009 42-27 Select OPS Age /Use Hard to Operate Replaced Switch 4.0 5/13/80 03 4570 OPS Age /Use Hard to Operate Replaced Switch 4.0 42-11 Select 5/2/80 13 5736 IGC Defective Swich OR 80-87 keplaced Switch 10.0 13-TS-89B No Switch Action b 6574 IGC Excessive Leakage 5/21/80 16 OR-80-04 Procedural Change 6.0

-X-103A 5/21/80 16 6594 IGC Loose Fitting Excessive Leakage X-110D Tightened Fittings 4.0 5/21/80 16 6583 I6C Loose Fitting Excessive Leakage X-109 Tightened Fittings 4.0 5/5/80 17 5344 OPS Drift Incorrect Indica-17-RR-456 Cleaned / Calibrated 5.0 tion 5/6/80 70 5346 OPS Drift Pressor will Calibrated I 70-TIC-131A not S/D 0 Temp. 10.0

'j s

JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary ISC, MAY, 1980 Date System W rk Request #

llow Detected Cause of Results of Action taken to Repair Component # Malfunction Malfunction Preclude Time Recurrence (Hours) 5/26/80' 70 6785 OPS N/A N/A Adjusted '

10.0 70-TS-106B 5/1/80 76 5339 OPS Unknown No Annunciator Tested Satisfactory 8.0 76-C02-P5 5/1/80 07 5708 OPS Use/ Age Recorder will not Replaced Bushing 5.0 07-SRMR-45 move and Amplifier 5/4/80 07 6784 OPS Dirty Connector Downscale Cleaned-Tightened 3.0 SRM "D" Connector

{ 5/15/80 07 6396 OPS IJnknown Replaced detector /

.s SRM "A" Erratic Indication 70.0 Connector 5/15/80 01 6803 OPS Moisture Erratic Indication Cleaned, Replaced 20.0 SRM "A" Connectors 5/26/80 07 6860 OPS Unknown Remote Meter does Performed SRM "A" 1.0 not agree F-IMP-7.1 5/26/80 07 6858 OPS Sticks Incorrect Indica- Calibrated SRM-45 2.0 tion J

e I

~

b

. _ _ _ . _ _ _ _ _ _ _ - . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -- - - ____-