ML19321A377

From kanterella
Revision as of 20:45, 18 February 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Part 21 Rept Re Bristol Structural Steel Framing for Control Bldg.Rework of Fillet Welds Is Being Performed.Next Rept Will Be Submitted by 800815
ML19321A377
Person / Time
Site: Yellow Creek  Tennessee Valley Authority icon.png
Issue date: 07/09/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To:
References
REF-PT21-80-248-000 NUDOCS 8007230255
Download: ML19321A377 (3)


Text

~

ATTAGED IS A PART 21 REPORT FROM IE f%IL UNIT - ROOM 359 E/W

' ' PART 21 IDENTIFICATION NO.- 70 4 W4o o C0FPANY RVE_ YO /4 l IMTE OF LETlFA 7/ '7/ f o DOCKET NO. 5'o -Se 6 ', S'o -f4 7 DATEDISTRIBUTED W/g/4'd ORIGINAL REPORT 'SUPPLEENTARY DISTRIBLITION:

REACTOR (R)

Z FUEL CYCLE & SAEGtMRDS (S) l l IE FILES

., FM M (M)

IE FILES AD/ROI(2) IEFILES AD/S6 AD/RCI(2) AD/FFMSI AD/ROI EGIONS I,II,III,IV,V REGIONSI,II,III,IV,V REGIONSI,II,III,IV,V VENDOR BR R-IV VEf00R BR. R .IV VENDOR BR R-IV L0EB / IPA FIB 5715 ffBS / FCMS SS-396 NRR/ DOL l AEOD FTB 7602 L0EB / FPA tie 5715 ftSS / SG SS-881 NRR/ DOE AEOD M G 7602 LDEB / FPA FIG 5715 NRR/DSI CENTRALFILES 016 AEOD FIB 7602 NRR/ DST CENTRAL FILES ( Q RON) CENTRALFILES 016 NRR/ DOL PDR CEtHRAL FIES (GRON)

CEIRRALFILES 016 LPDR CENTRAL FIES SS-396 CEhTRAL FILES (GROBD TERA PDR PDR .

IPDR LPDR TERA 4iiiW ACTION:

PRELIMINARY EVALUATION OF THE ATTACHED REPORT INDICATES LEAD RESPONSIBILITY FOR FOLLOWUP AS SHOWN BELOW:

IE f .

NRR ffSS __

OBER l

& ROI SG FFMSI .

REV: 7/9/80' 3o o723025S

. TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374o1 400 Cnestnut Street Tower II July 9, 1980 Mr. James P. O'Reilly, Director Office of Inspection and Enfrrcement U.S. Nuclear. Regulatory Co=11ssion Region II - Suite 3100 101 Marietta Street Atlanta, Georgia '30303

Dear Mr. O'Reilly:

YELLOW CREEK NUCLEAR PLANT UNITS 1 AND 2 - STRUCTURAL STEEL FRAMING FOR CONTROL BUILDING - NCR YC-069 - FIRST INTERDi REPORT The subj ect deficiency was initially reported to NRC-0IE Inspector R. W. Wright on June 11, 1980, in accordance with 10CFR50.55(e).

Enclosed ic our first interim report. We expect t.o submit our next report by August 15, 1980. We consider'10CFR21 applicable to this deficie.ncy.

If you have any questions concerning this matter, please get in touch with D. L. Lambert at FTS 857-2581.

Very truly yours, TENNESSEE VALLEY AUTHORITY .

, L. H. Mills, Manager Nuclear Regulation and Safety Enclosure -

cc. Mr. Victor Stello, Jr. , Director (Enclosure) offsc. of Tnspection and Enforcement U.S. Nuclear hesulatory Co._.lssion Washington, DC 20555 An Equal Opportunity Employer e

j ENCLOSURE YELLOW CREEK NUCLEAR iLANT UNITS 1 AND 2 STRUCTURAL STEEL FRAMING FOR CONTROL EUILDING NCR YC-069 10CFR 50.55(e)

FIRST INTERIM REPORT Description of Deficiency Bristol Steel (Mississippi Valley Steel) failed to meet the requirements for fillet welds according to the American Weldf:Ig Society cont:act specification on structural steel framing for the Control Building.

Interim Progress TVA and vendor representatives have met and rework of the fillet welds' is being perforned by vendor representatives at the Yellow Creek site.

Rework items are to comply with contract specification requirements.

9 e

f 4