Testimony in Response to Ucs Contention 10 & Sc Sholly Contention 3 Re Safety Sys Bypass & Override.Shows That Operator Intervention in Safety Function Does Not Violate Criteria.Prof Qualifications Encl.Related CorrespondenceML19337A422 |
Person / Time |
---|
Site: |
Three Mile Island |
---|
Issue date: |
09/15/1980 |
---|
From: |
Phyllis Clark, Patterson E, Ross M METROPOLITAN EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML19332B231 |
List: |
---|
References |
---|
ISSUANCES-SP, NUDOCS 8009260394 |
Download: ML19337A422 (21) |
|
|
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20210B8491999-07-21021 July 1999 Exemption from Certain Requirements of 10CFR50.54(w),for Three Mile Island Nuclear Station Unit 2 to Reduce Amount of Insurance for Unit to $50 Million for Onsite Property Damage Coverage ML20206D4141999-04-20020 April 1999 Exemption from Requirements of 10CFR50,App R,Section III.G.2 Re Enclosure of Cable & Equipment & Associated non-safety Related Circuits of One Redundant Train in Fire Barrier Having 1-hour Rating ML20206T7211999-02-11011 February 1999 Memorandum & Order (CLI-99-02).* Denies C George Request for Intervention & Dismisses Subpart M License Transfer Proceeding.With Certificate of Svc.Served on 990211 ML20198A5111998-12-11011 December 1998 Comment Opposing Proposed Rule 10CFR50.65 Re Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants.Proposed Rulemaking Details Collaborative Efforts in That Rule Interjects Change ML20154G2941998-09-17017 September 1998 Transcript of 980917 Public Meeting in Rockville,Md Re License Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen. Pp 1-41 ML20199J0121997-11-20020 November 1997 Comment on Pr 10CFR50 Re Financial Assurance Requirements for Decommisioning Nuclear Power Reactors.Three Mile Island Alert Invokes Comments of P Bradford,Former NRC Member ML20148R7581997-06-30030 June 1997 Comment on NRC Proposed Bulletin 96-001,suppl 1, Control Rod Insertion Problems. Licensee References Proposed Generic Communication, Control Rod Insertion, & Ltrs & 961022 from B&W Owners Group ML20078H0431995-02-0101 February 1995 Comment Opposing Proposed Rule 10CFR50 Re Shutdown & Lowpower Operations for Nuclear Reactors ML20077E8231994-12-0808 December 1994 Comment Supporting Proposed Rules 10CFR2,51 & 54 Re Rev to NRC NPP License Renewal Rule ML20149E2021994-04-20020 April 1994 R Gary Statement Re 10 Mile Rule Under Director'S Decision DD-94-03,dtd 940331 for Tmi.Urges Commissioners to Engage in Reconsideration of Author Petition ML20065Q0671994-04-0707 April 1994 Principal Deficiencies in Director'S Decision 94-03 Re Pica Request Under 10CFR2.206 ML20058A5491993-11-17017 November 1993 Exemption from Requirements in 10CFR50.120 to Establish, Implement & Maintain Training Programs,Using Sys Approach to Training,For Catorgories of Personnel Listed in 10CFR50.120 ML20059J5171993-09-30030 September 1993 Transcript of 930923 Meeting of Advisory Panel for Decontamination of TMI-2 in Harrisburg,Pa.Pp 1-130.Related Documentation Encl ML20065J3461992-12-30030 December 1992 Responds to Petition of R Gary Alleging Discrepancies in RERP for Dauphin County,Pa ML20065J3731992-12-18018 December 1992 Affidavit of Gj Giangi Responding to of R Gary Requesting Action by NRC Per 10CFR2.206 ML20198E5581992-12-0101 December 1992 Transcript of Briefing by TMI-2 Advisory Panel on 921201 in Rockville,Md ML20210D7291992-06-15015 June 1992 Exemption from Requirements of 10CFR70.24 Re Criticality Accident Requirements for SNM Storage Areas at Facility Containing U Enriched to Less than 3% in U-235 Isotope ML20079E2181991-09-30030 September 1991 Submits Comments on NRC Proposed Resolution of Generic Issue 23, Reactor Coolant Pump Seal Failure. Informs That Util Endorses Comments Submitted by NUMARC ML20066J3031991-01-28028 January 1991 Comment Supporting SECY-90-347, Regulatory Impact Survey Rept ML20059P0531990-10-15015 October 1990 Comment Opposing Proposed Rules 10CFR2,50 & 54 Re Nuclear Power Plant License Renewal ML20059N5941990-10-0404 October 1990 Transcript of 900928 Public Meeting in Rockville,Md Re Studies of Cancer in Populations Near Nuclear Facilities, Including TMI ML20055F4411990-06-28028 June 1990 Comment Supporting Petition for Rulemaking PRM-50-55 Re Revs to FSAR ML20248J1891989-10-0606 October 1989 Order.* Grants Intervenors 891004 Motion for Permission for Opportunity to Respond to Staff Correspondence.Response Requested No Later That 891020.W/Certificate of Svc.Served on 891006 ML20248J1881989-10-0303 October 1989 Motion for Permission for Opportunity to Respond to Staff Correspondence in Response to Board Order of 890913.* Svc List Encl ML20248J0301989-09-29029 September 1989 NRC Staff Response to Appeal Board Order.* Matters Evaluated in Environ Assessment Involved Subjs Known by Parties During Proceeding & Appear in Hearing Record & Reflect Board Final Initial Decision LBP-89-7.W/Certificate of Svc ML20247E9181989-09-13013 September 1989 Order.* Requests NRC to Explain Purpose of 890911 Fr Notice on Proposed Amend to Applicant License,Revising Tech Specs Re Disposal of Accident Generated Water & Effects on ASLB Findings,By 890929.W/Certificate of Svc.Served on 890913 ML20247G0361989-07-26026 July 1989 Transcript of Oral Argument on 890726 in Bethesda,Md Re Disposal of accident-generated Water.Pp 1-65.Supporting Info Encl ML20247B7781989-07-18018 July 1989 Certificate of Svc.* Certifies Svc of Encl Gpu 890607 & 0628 Ltrs to NRC & Commonwealth of Pa,Respectively.W/Svc List ML20245D3651989-06-20020 June 1989 Notice of Oral Argument.* Oral Argument on Appeal of Susquehanna Valley Alliance & TMI Alert from ASLB 890202 Initial Decision Authorizing OL Amend,Will Be Heard on 890726 in Bethesda,Md.W/Certificate of Svc.Served on 890620 ML20245A5621989-06-14014 June 1989 Order.* Advises That Oral Argument on Appeal of Susquehanna Valley Alliance & TMI Alert from Board 890202 Initial Decision LBP-89-07 Authorizing OL Amend Will Be Heard on 890726 in Bethesda,Md.W/Certificate of Svc.Served on 890614 ML20247F3151989-05-22022 May 1989 NRC Staff Response to Appeal by Joint Intervenors Susquehanna Valley Alliance/Tmi Alert.* Appeal Should Be Denied Based on Failure to Identify Errors in Fact & Law Subj to Appeal.W/Certificate of Svc ML20246Q2971989-05-15015 May 1989 Comment Opposing Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20246J6081989-05-12012 May 1989 Licensee Brief in Reply to Joint Intervenors Appeal from Final Initial Decision.* ASLB 890203 Final Initial Decision LBP-89-07 Re Deleting Prohibition on Disposal of accident- Generated Water Should Be Affirmed.W/Certificate of Svc ML20247D2761989-04-20020 April 1989 Transcript of 890420 Briefing in Rockville,Md on Status of TMI-2 Cleanup Activities.Pp 1-51.Related Info Encl ML20244C0361989-04-13013 April 1989 Order.* Commission Finds That ASLB Decision Resolving All Relevant Matters in Favor of Licensee & Granting Application for OL Amend,Should Become Effective Immediately.Certificate of Svc Encl.Served on 890413 ML20245A8381989-04-13013 April 1989 Transcript of Advisory Panel for Decontamination of TMI-2 890413 Meeting in Harrisburg,Pa.Pp 1-79.Supporting Info Encl ML20245A2961989-04-13013 April 1989 Transcript of 890413 Meeting in Rockville,Md Re Affirmation/Discussion & Vote ML20248H1811989-04-0606 April 1989 Valley Alliance/Tmi Alert Motion for Leave to File Appeal Brief out-of-time.* W/Certificate of Svc.Served on 890411.Granted for Aslab on 890410 ML20248G0151989-04-0606 April 1989 Valley Alliance/Tmi Alert Motion for Leave to File Appeal Brief out-of-time.* Requests to File Appeal Brief 1 Day Late Due to Person Typing Document Having Schedule Problems ML20248G0261989-04-0606 April 1989 Susguehanna Valley Alliance/Tmi Alert Brief in Support of Notification to File Appeal & Request for Oral Argument Re Appeal.* Certificate of Svc Encl ML20248D7211989-04-0404 April 1989 Memorandum & Order.* Intervenors Application for Stay Denied Due to Failure to Lack of Demonstrated Irreparable Injury & Any Showing of Certainty That Intervenors Will Prevail on Merits of Appeal.W/Certificate of Svc.Served on 890404 ML20247A4671989-03-23023 March 1989 Correction Notice.* Advises That Date of 891203 Appearing in Text of Commission 890322 Order Incorrect.Date Should Be 871203.Certificate of Svc Encl.Served on 890323 ML20246M2611989-03-22022 March 1989 Order.* Advises That Commission Currently Considering Question of Effectiveness,Pending Appellate Review of Final Initial Decision in Case Issued by ASLB in LBP-89-07. Certificate of Svc Encl.Served on 890322 ML20236D3821989-03-16016 March 1989 Valley Alliance & TMI Alert Motion for Extension of Time to File Brief in Support of Request for Appeal in Matter of 2.3 Million Gallons Of....* Certificate of Svc Encl.Served on 890316.Granted for Aslab on 890316 ML20236D3121989-03-15015 March 1989 Licensee Answer to Joint Intervenors Motion for Extension of Time to File Brief on Appeal.* Motion Opposed Based on Failure to Demonstrate Good Cause.W/Certificate of Svc ML20236D2901989-03-11011 March 1989 Valley Alliance/Tmi Alert Motion for Extension of Time to File Brief in Support of Request for Appeal in Matter of Disposal of 2.3 Million Gallons of Radioactive Water at Tmi,Unit 2.* Svc List Encl ML20236A3761989-03-0808 March 1989 Licensee Answer Opposing Joint Intervenors Motion for Stay.* Stay of Licensing Board Decision Pending Appeal Unwarranted Under NRC Stds.Stay Could Delay Safe,Expeditious Cleanup of Facility.Certificate of Svc Encl ML20236C2441989-03-0808 March 1989 NRC Staff Response in Opposition to Application for Stay Filed by Joint Intervenors.* Application for Stay of Effectiveness of Final Initial Decision LBP-89-07,dtd 890202 Should Be Denied.W/Certificate of Svc ML20235V2641989-03-0202 March 1989 Notice of Aslab Reconstitution.* TS Moore,Chairman,Cn Kohl & Ha Wilber,Members.Served on 890303.W/Certificate of Svc ML20235V2161989-02-25025 February 1989 Changes & Corrections to Susquehanna Valley Alliance/Three Mile Island Alert Documents Submitted on 890221.* Certificate of Svc Encl 1999-07-21
[Table view] Category:TRANSCRIPTS
MONTHYEARML20154G2941998-09-17017 September 1998 Transcript of 980917 Public Meeting in Rockville,Md Re License Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen. Pp 1-41 ML20059J5171993-09-30030 September 1993 Transcript of 930923 Meeting of Advisory Panel for Decontamination of TMI-2 in Harrisburg,Pa.Pp 1-130.Related Documentation Encl ML20198E5581992-12-0101 December 1992 Transcript of Briefing by TMI-2 Advisory Panel on 921201 in Rockville,Md ML20059N5941990-10-0404 October 1990 Transcript of 900928 Public Meeting in Rockville,Md Re Studies of Cancer in Populations Near Nuclear Facilities, Including TMI ML20247G0361989-07-26026 July 1989 Transcript of Oral Argument on 890726 in Bethesda,Md Re Disposal of accident-generated Water.Pp 1-65.Supporting Info Encl ML20247D2761989-04-20020 April 1989 Transcript of 890420 Briefing in Rockville,Md on Status of TMI-2 Cleanup Activities.Pp 1-51.Related Info Encl ML20245A2961989-04-13013 April 1989 Transcript of 890413 Meeting in Rockville,Md Re Affirmation/Discussion & Vote ML20245A8381989-04-13013 April 1989 Transcript of Advisory Panel for Decontamination of TMI-2 890413 Meeting in Harrisburg,Pa.Pp 1-79.Supporting Info Encl ML20235N2161989-02-17017 February 1989 Follow-up Testimony Clarifying Position on Question of Disposition of Over 2 Million Gallons of Accident Generated Water.Related Documentation & Certificate of Svc Encl ML20235S9911989-02-16016 February 1989 Transcript of 890216 Public Meeting of Advisory Panel for Decontamination of TMI-2 in Harrisburg,Pa.Pp 1-119. Supporting Documentation Encl ML20206C9391988-11-0707 November 1988 Transcript of 881107 Hearing in Lancaster,Pa.Pp 1,122- 1,417.Witnesses:JA Auxier,Ji Fabrikant,Skolnik & Mather ML20235M7601988-11-0303 November 1988 Transcript of 881103 Public Hearing in Lancaster,Pa for Presentation of Limited Appearance Statements.Pp 998-1,121 ML20206C2801988-11-0303 November 1988 Transcript of 881103 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 859-997.Witnesses:JA Martin, SS Yaniv,F Skolnik,S Lewis & a Bhattacharyya ML20205Q6581988-11-0202 November 1988 Transcript of 881102 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 573-858.Supporting Documentation Encl.Witnesses:Gg Baker,Wj Cooper & L Munson ML20205Q6441988-11-0101 November 1988 Transcript of 881101 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 288-572.Supporting Info Encl. Witnesses:K Hofstetter,Kl Harner,L Thomas & M Masnik ML20205N5791988-10-31031 October 1988 Transcript of ASLB 881031 Meeting in Lancaster,Pa Re License Amend Application.Pp 87-287 ML20205P0451988-10-25025 October 1988 Transcript of 881025 Periodic Briefing by TMI-2 Advisory Panel in Rockville,Md.Pp 1-30 ML20205G1851988-10-25025 October 1988 Licensee Testimony of GG Baker & Wj Cooper on Dose Assessments & Microorganisms (Contentions 2,3 & 5d).* Supporting Documentation Encl.Related Correspondence ML20205E5021988-10-24024 October 1988 Licensee Rebuttal Testimony of Ji Fabrikant on Health Effects of Tritium (Contention 5d).* Related Correspondence ML20155H1751988-10-11011 October 1988 Licensee Testimony of GG Baker & Wj Cooper on Dose Assessments & Microorganisms (Contentions 2,3 & 5d).* Related Correspondence ML20155H1531988-10-11011 October 1988 Licensee Testimony of Ww Weaver on Accident Risks (Contention 2).* Related Correspondence ML20155H1901988-10-11011 October 1988 Licensee Testimony of Ja Auxier & Ji Fabrikant on Effects of Tritium (Contentions 3 & 5d).* Supporting Info Encl.Related Correpondence ML20155H1661988-10-11011 October 1988 Licensee Testimony of Kl Harner & Kj Hofstetter on Sampling & Analysis of accident-generated Water (Contentions 3 & 4b).* Related Correspondence ML20155H1401988-10-11011 October 1988 Licensee Testimony of Je Tarpinian on Occupational Dose Assessments (Contention 2).* Related Correspondence ML20155H1281988-10-11011 October 1988 Licensee Testimony of Dr Buchanan on Evaporation Proposal & Joint Intervenors Alternative (Contentions 2 & 3).* Related Correspondence ML20155H4751988-10-10010 October 1988 Testimony.* Discusses Environ Impact of Force Evaporation of 2.3 Million Gallons of accident-generated Water by Licensee. W/Certificate of Svc.Related Correspondence ML20155H4711988-10-10010 October 1988 Affidavit of Cw Huver (Contention 5):further Considerations of Biological Effects & Health Hazards of Tritium.* Copyrighted Matl Encl.Related Correspondence ML20154D5201988-09-0707 September 1988 Transcript of Advisory Panel for Decontamination of TMI-2 880907 Meeting in Harrisburg,Pa.Pp 1-109.Supporting Documentation Encl ML20151G6951988-07-14014 July 1988 Transcript of Advisory Panel for Decontamination of TMI-2 880714 Meeting in Harrisburg,Pa.Pp 1-140.Related Documentation Encl ML20196B6041988-05-26026 May 1988 Transcript of 880526 Advisory Panel Meeting in Harrisburg, PA to Discuss Decontamination of TMI-2.Pp 1-117.Supporting Documentation Encl ML20154N4101988-04-14014 April 1988 Transcript of 880414 Advisory Panel for Decontamination of TMI-2 Public Meeting in Lancaster,Pa.Related Info Encl. Pp 1-100 ML20148F2351988-03-17017 March 1988 Transcript of 880317 Briefing in Washington,Dc Re Status of TMI-2.Pp 1-51.Supporting Documentation Encl ML20236Y1061987-12-0808 December 1987 Transcript of Special Prehearing Conference on 871208 in Harrisburg,Pa Re Disposal of accident-generated Water. Pp 1-86 ML20238C6981987-10-0505 October 1987 Deposition of a Beach.* Transcript of 871005 Deposition in Washington,Dc Re R Parks Allegations.Pp 1-244.Supporting Documentation Encl ML20235J7071987-09-30030 September 1987 Transcript of 870930 Prehearing Conference in Bethesda,Md. Pp 225-343 ML20238D4641987-09-0909 September 1987 Transcript of 870909 Oral Argument in Bethesda,Md.Pp 1-57 ML20238C7531987-08-20020 August 1987 Vol II to Transcript of Hl Hofmann 870820 Deposition in San Francisco,Ca Re Civil Penalty.Pp 208-471 & 489-494. Supporting Documentation Encl ML20238C7891987-08-18018 August 1987 Deposition of Rd Parks.* Vol IV to Transcript of 870818 Deposition in San Francisco,Ca Re Civil Penalty.Pp 551-818. Supporting Documentation Encl ML20238C7651987-06-25025 June 1987 Deposition of Hl Hofmann.* Transcript of 870625 Deposition in San Francisco,Ca Re Civil Penalty.Pp 1-206 ML20238C8041987-06-24024 June 1987 Deposition of Rd Parks.* Vol III to Transcript of 870624 Deposition in Newport Beach,Ca Re Civil Penalty.Pp III-1 - III-89 ML20235J1271987-06-24024 June 1987 Deposition of Rd Parks.* Vols II & III of Transcript of Rd Parks 870624 Deposition.Related Correspondence ML20238C7981987-06-23023 June 1987 Deposition of Rd Parks.* Vol II to Transcript of 870623 Deposition in Newport Beach,Ca Re Civil Penalty.Pp II-1 - II-263.Supporting Documentation Encl ML20238C7941987-06-22022 June 1987 Deposition of Rd Parks.* Vol I to Transcript of 870622 Deposition in Newport Beach,Ca Re Civil Penalty.Pp 1-199. Supporting Documentation Encl ML20238C5921987-06-16016 June 1987 Deposition of R Meeks.* Transcript of 870616 Deposition in Washington,Dc Re Allegations of Harassment Against R Parks. Pp 1-198.Supporting Documentation Encl ML20238C6171987-06-16016 June 1987 Deposition of R Meeks.* Corrected Title Page of 870616 Deposition ML20215L2731987-05-0808 May 1987 Transcript of 870508 Prehearing Conference in Bethesda,Md.Pp 19-224.In Camera Session (Pp 101-138) Bound Separately ML20238C7331987-04-24024 April 1987 Deposition of Rc Arnold.* Transcript of 870424 Deposition in Washington,Dc Re Civil Penalty.Pp 1-224.Supporting Documentation Encl ML20212Q9801987-04-16016 April 1987 Transcript of 870416 Periodic Meeting W/Advisory Panel for Decontamination of TMI-2 in Washington,Dc.Pp 1-50.Supporting Documentation Encl ML20212Q8021987-04-15015 April 1987 Transcript of 870415 Briefing by DOE in Washington,Dc Re TMI-2 Core Exam Program.Pp 1-64.Viewgraphs Encl ML20238C6521987-04-10010 April 1987 Deposition of Bk Kanga.* Transcript of 870410 Deposition in Gaithersburg,Md Re R Parks.Pp 1-151.Supporting Documentation Encl 1998-09-17
[Table view] Category:DEPOSITIONS
MONTHYEARML20154G2941998-09-17017 September 1998 Transcript of 980917 Public Meeting in Rockville,Md Re License Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen. Pp 1-41 ML20059J5171993-09-30030 September 1993 Transcript of 930923 Meeting of Advisory Panel for Decontamination of TMI-2 in Harrisburg,Pa.Pp 1-130.Related Documentation Encl ML20198E5581992-12-0101 December 1992 Transcript of Briefing by TMI-2 Advisory Panel on 921201 in Rockville,Md ML20059N5941990-10-0404 October 1990 Transcript of 900928 Public Meeting in Rockville,Md Re Studies of Cancer in Populations Near Nuclear Facilities, Including TMI ML20247G0361989-07-26026 July 1989 Transcript of Oral Argument on 890726 in Bethesda,Md Re Disposal of accident-generated Water.Pp 1-65.Supporting Info Encl ML20247D2761989-04-20020 April 1989 Transcript of 890420 Briefing in Rockville,Md on Status of TMI-2 Cleanup Activities.Pp 1-51.Related Info Encl ML20245A2961989-04-13013 April 1989 Transcript of 890413 Meeting in Rockville,Md Re Affirmation/Discussion & Vote ML20245A8381989-04-13013 April 1989 Transcript of Advisory Panel for Decontamination of TMI-2 890413 Meeting in Harrisburg,Pa.Pp 1-79.Supporting Info Encl ML20235N2161989-02-17017 February 1989 Follow-up Testimony Clarifying Position on Question of Disposition of Over 2 Million Gallons of Accident Generated Water.Related Documentation & Certificate of Svc Encl ML20235S9911989-02-16016 February 1989 Transcript of 890216 Public Meeting of Advisory Panel for Decontamination of TMI-2 in Harrisburg,Pa.Pp 1-119. Supporting Documentation Encl ML20206C9391988-11-0707 November 1988 Transcript of 881107 Hearing in Lancaster,Pa.Pp 1,122- 1,417.Witnesses:JA Auxier,Ji Fabrikant,Skolnik & Mather ML20235M7601988-11-0303 November 1988 Transcript of 881103 Public Hearing in Lancaster,Pa for Presentation of Limited Appearance Statements.Pp 998-1,121 ML20206C2801988-11-0303 November 1988 Transcript of 881103 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 859-997.Witnesses:JA Martin, SS Yaniv,F Skolnik,S Lewis & a Bhattacharyya ML20205Q6581988-11-0202 November 1988 Transcript of 881102 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 573-858.Supporting Documentation Encl.Witnesses:Gg Baker,Wj Cooper & L Munson ML20205Q6441988-11-0101 November 1988 Transcript of 881101 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 288-572.Supporting Info Encl. Witnesses:K Hofstetter,Kl Harner,L Thomas & M Masnik ML20205N5791988-10-31031 October 1988 Transcript of ASLB 881031 Meeting in Lancaster,Pa Re License Amend Application.Pp 87-287 ML20205P0451988-10-25025 October 1988 Transcript of 881025 Periodic Briefing by TMI-2 Advisory Panel in Rockville,Md.Pp 1-30 ML20205G1851988-10-25025 October 1988 Licensee Testimony of GG Baker & Wj Cooper on Dose Assessments & Microorganisms (Contentions 2,3 & 5d).* Supporting Documentation Encl.Related Correspondence ML20205E5021988-10-24024 October 1988 Licensee Rebuttal Testimony of Ji Fabrikant on Health Effects of Tritium (Contention 5d).* Related Correspondence ML20155H1751988-10-11011 October 1988 Licensee Testimony of GG Baker & Wj Cooper on Dose Assessments & Microorganisms (Contentions 2,3 & 5d).* Related Correspondence ML20155H1531988-10-11011 October 1988 Licensee Testimony of Ww Weaver on Accident Risks (Contention 2).* Related Correspondence ML20155H1901988-10-11011 October 1988 Licensee Testimony of Ja Auxier & Ji Fabrikant on Effects of Tritium (Contentions 3 & 5d).* Supporting Info Encl.Related Correpondence ML20155H1661988-10-11011 October 1988 Licensee Testimony of Kl Harner & Kj Hofstetter on Sampling & Analysis of accident-generated Water (Contentions 3 & 4b).* Related Correspondence ML20155H1401988-10-11011 October 1988 Licensee Testimony of Je Tarpinian on Occupational Dose Assessments (Contention 2).* Related Correspondence ML20155H1281988-10-11011 October 1988 Licensee Testimony of Dr Buchanan on Evaporation Proposal & Joint Intervenors Alternative (Contentions 2 & 3).* Related Correspondence ML20155H4751988-10-10010 October 1988 Testimony.* Discusses Environ Impact of Force Evaporation of 2.3 Million Gallons of accident-generated Water by Licensee. W/Certificate of Svc.Related Correspondence ML20155H4711988-10-10010 October 1988 Affidavit of Cw Huver (Contention 5):further Considerations of Biological Effects & Health Hazards of Tritium.* Copyrighted Matl Encl.Related Correspondence ML20154D5201988-09-0707 September 1988 Transcript of Advisory Panel for Decontamination of TMI-2 880907 Meeting in Harrisburg,Pa.Pp 1-109.Supporting Documentation Encl ML20151G6951988-07-14014 July 1988 Transcript of Advisory Panel for Decontamination of TMI-2 880714 Meeting in Harrisburg,Pa.Pp 1-140.Related Documentation Encl ML20196B6041988-05-26026 May 1988 Transcript of 880526 Advisory Panel Meeting in Harrisburg, PA to Discuss Decontamination of TMI-2.Pp 1-117.Supporting Documentation Encl ML20154N4101988-04-14014 April 1988 Transcript of 880414 Advisory Panel for Decontamination of TMI-2 Public Meeting in Lancaster,Pa.Related Info Encl. Pp 1-100 ML20148F2351988-03-17017 March 1988 Transcript of 880317 Briefing in Washington,Dc Re Status of TMI-2.Pp 1-51.Supporting Documentation Encl ML20236Y1061987-12-0808 December 1987 Transcript of Special Prehearing Conference on 871208 in Harrisburg,Pa Re Disposal of accident-generated Water. Pp 1-86 ML20238C6981987-10-0505 October 1987 Deposition of a Beach.* Transcript of 871005 Deposition in Washington,Dc Re R Parks Allegations.Pp 1-244.Supporting Documentation Encl ML20235J7071987-09-30030 September 1987 Transcript of 870930 Prehearing Conference in Bethesda,Md. Pp 225-343 ML20238D4641987-09-0909 September 1987 Transcript of 870909 Oral Argument in Bethesda,Md.Pp 1-57 ML20238C7531987-08-20020 August 1987 Vol II to Transcript of Hl Hofmann 870820 Deposition in San Francisco,Ca Re Civil Penalty.Pp 208-471 & 489-494. Supporting Documentation Encl ML20238C7891987-08-18018 August 1987 Deposition of Rd Parks.* Vol IV to Transcript of 870818 Deposition in San Francisco,Ca Re Civil Penalty.Pp 551-818. Supporting Documentation Encl ML20238C7651987-06-25025 June 1987 Deposition of Hl Hofmann.* Transcript of 870625 Deposition in San Francisco,Ca Re Civil Penalty.Pp 1-206 ML20238C8041987-06-24024 June 1987 Deposition of Rd Parks.* Vol III to Transcript of 870624 Deposition in Newport Beach,Ca Re Civil Penalty.Pp III-1 - III-89 ML20235J1271987-06-24024 June 1987 Deposition of Rd Parks.* Vols II & III of Transcript of Rd Parks 870624 Deposition.Related Correspondence ML20238C7981987-06-23023 June 1987 Deposition of Rd Parks.* Vol II to Transcript of 870623 Deposition in Newport Beach,Ca Re Civil Penalty.Pp II-1 - II-263.Supporting Documentation Encl ML20238C7941987-06-22022 June 1987 Deposition of Rd Parks.* Vol I to Transcript of 870622 Deposition in Newport Beach,Ca Re Civil Penalty.Pp 1-199. Supporting Documentation Encl ML20238C5921987-06-16016 June 1987 Deposition of R Meeks.* Transcript of 870616 Deposition in Washington,Dc Re Allegations of Harassment Against R Parks. Pp 1-198.Supporting Documentation Encl ML20238C6171987-06-16016 June 1987 Deposition of R Meeks.* Corrected Title Page of 870616 Deposition ML20215L2731987-05-0808 May 1987 Transcript of 870508 Prehearing Conference in Bethesda,Md.Pp 19-224.In Camera Session (Pp 101-138) Bound Separately ML20238C7331987-04-24024 April 1987 Deposition of Rc Arnold.* Transcript of 870424 Deposition in Washington,Dc Re Civil Penalty.Pp 1-224.Supporting Documentation Encl ML20212Q9801987-04-16016 April 1987 Transcript of 870416 Periodic Meeting W/Advisory Panel for Decontamination of TMI-2 in Washington,Dc.Pp 1-50.Supporting Documentation Encl ML20212Q8021987-04-15015 April 1987 Transcript of 870415 Briefing by DOE in Washington,Dc Re TMI-2 Core Exam Program.Pp 1-64.Viewgraphs Encl ML20238C6521987-04-10010 April 1987 Deposition of Bk Kanga.* Transcript of 870410 Deposition in Gaithersburg,Md Re R Parks.Pp 1-151.Supporting Documentation Encl 1998-09-17
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20154G2941998-09-17017 September 1998 Transcript of 980917 Public Meeting in Rockville,Md Re License Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen. Pp 1-41 ML20059J5171993-09-30030 September 1993 Transcript of 930923 Meeting of Advisory Panel for Decontamination of TMI-2 in Harrisburg,Pa.Pp 1-130.Related Documentation Encl ML20198E5581992-12-0101 December 1992 Transcript of Briefing by TMI-2 Advisory Panel on 921201 in Rockville,Md ML20059N5941990-10-0404 October 1990 Transcript of 900928 Public Meeting in Rockville,Md Re Studies of Cancer in Populations Near Nuclear Facilities, Including TMI ML20247G0361989-07-26026 July 1989 Transcript of Oral Argument on 890726 in Bethesda,Md Re Disposal of accident-generated Water.Pp 1-65.Supporting Info Encl ML20247D2761989-04-20020 April 1989 Transcript of 890420 Briefing in Rockville,Md on Status of TMI-2 Cleanup Activities.Pp 1-51.Related Info Encl ML20245A2961989-04-13013 April 1989 Transcript of 890413 Meeting in Rockville,Md Re Affirmation/Discussion & Vote ML20245A8381989-04-13013 April 1989 Transcript of Advisory Panel for Decontamination of TMI-2 890413 Meeting in Harrisburg,Pa.Pp 1-79.Supporting Info Encl ML20235N2161989-02-17017 February 1989 Follow-up Testimony Clarifying Position on Question of Disposition of Over 2 Million Gallons of Accident Generated Water.Related Documentation & Certificate of Svc Encl ML20235S9911989-02-16016 February 1989 Transcript of 890216 Public Meeting of Advisory Panel for Decontamination of TMI-2 in Harrisburg,Pa.Pp 1-119. Supporting Documentation Encl ML20206C9391988-11-0707 November 1988 Transcript of 881107 Hearing in Lancaster,Pa.Pp 1,122- 1,417.Witnesses:JA Auxier,Ji Fabrikant,Skolnik & Mather ML20235M7601988-11-0303 November 1988 Transcript of 881103 Public Hearing in Lancaster,Pa for Presentation of Limited Appearance Statements.Pp 998-1,121 ML20206C2801988-11-0303 November 1988 Transcript of 881103 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 859-997.Witnesses:JA Martin, SS Yaniv,F Skolnik,S Lewis & a Bhattacharyya ML20205Q6581988-11-0202 November 1988 Transcript of 881102 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 573-858.Supporting Documentation Encl.Witnesses:Gg Baker,Wj Cooper & L Munson ML20205Q6441988-11-0101 November 1988 Transcript of 881101 Hearing in Lancaster,Pa Re TMI-2 License Amend Application.Pp 288-572.Supporting Info Encl. Witnesses:K Hofstetter,Kl Harner,L Thomas & M Masnik ML20205N5791988-10-31031 October 1988 Transcript of ASLB 881031 Meeting in Lancaster,Pa Re License Amend Application.Pp 87-287 ML20205P0451988-10-25025 October 1988 Transcript of 881025 Periodic Briefing by TMI-2 Advisory Panel in Rockville,Md.Pp 1-30 ML20205G1851988-10-25025 October 1988 Licensee Testimony of GG Baker & Wj Cooper on Dose Assessments & Microorganisms (Contentions 2,3 & 5d).* Supporting Documentation Encl.Related Correspondence ML20205E5021988-10-24024 October 1988 Licensee Rebuttal Testimony of Ji Fabrikant on Health Effects of Tritium (Contention 5d).* Related Correspondence ML20155H1751988-10-11011 October 1988 Licensee Testimony of GG Baker & Wj Cooper on Dose Assessments & Microorganisms (Contentions 2,3 & 5d).* Related Correspondence ML20155H1531988-10-11011 October 1988 Licensee Testimony of Ww Weaver on Accident Risks (Contention 2).* Related Correspondence ML20155H1901988-10-11011 October 1988 Licensee Testimony of Ja Auxier & Ji Fabrikant on Effects of Tritium (Contentions 3 & 5d).* Supporting Info Encl.Related Correpondence ML20155H1661988-10-11011 October 1988 Licensee Testimony of Kl Harner & Kj Hofstetter on Sampling & Analysis of accident-generated Water (Contentions 3 & 4b).* Related Correspondence ML20155H1401988-10-11011 October 1988 Licensee Testimony of Je Tarpinian on Occupational Dose Assessments (Contention 2).* Related Correspondence ML20155H1281988-10-11011 October 1988 Licensee Testimony of Dr Buchanan on Evaporation Proposal & Joint Intervenors Alternative (Contentions 2 & 3).* Related Correspondence ML20155H4751988-10-10010 October 1988 Testimony.* Discusses Environ Impact of Force Evaporation of 2.3 Million Gallons of accident-generated Water by Licensee. W/Certificate of Svc.Related Correspondence ML20155H4711988-10-10010 October 1988 Affidavit of Cw Huver (Contention 5):further Considerations of Biological Effects & Health Hazards of Tritium.* Copyrighted Matl Encl.Related Correspondence ML20154D5201988-09-0707 September 1988 Transcript of Advisory Panel for Decontamination of TMI-2 880907 Meeting in Harrisburg,Pa.Pp 1-109.Supporting Documentation Encl ML20151G6951988-07-14014 July 1988 Transcript of Advisory Panel for Decontamination of TMI-2 880714 Meeting in Harrisburg,Pa.Pp 1-140.Related Documentation Encl ML20196B6041988-05-26026 May 1988 Transcript of 880526 Advisory Panel Meeting in Harrisburg, PA to Discuss Decontamination of TMI-2.Pp 1-117.Supporting Documentation Encl ML20154N4101988-04-14014 April 1988 Transcript of 880414 Advisory Panel for Decontamination of TMI-2 Public Meeting in Lancaster,Pa.Related Info Encl. Pp 1-100 ML20148F2351988-03-17017 March 1988 Transcript of 880317 Briefing in Washington,Dc Re Status of TMI-2.Pp 1-51.Supporting Documentation Encl ML20236Y1061987-12-0808 December 1987 Transcript of Special Prehearing Conference on 871208 in Harrisburg,Pa Re Disposal of accident-generated Water. Pp 1-86 ML20238C6981987-10-0505 October 1987 Deposition of a Beach.* Transcript of 871005 Deposition in Washington,Dc Re R Parks Allegations.Pp 1-244.Supporting Documentation Encl ML20235J7071987-09-30030 September 1987 Transcript of 870930 Prehearing Conference in Bethesda,Md. Pp 225-343 ML20238D4641987-09-0909 September 1987 Transcript of 870909 Oral Argument in Bethesda,Md.Pp 1-57 ML20238C7531987-08-20020 August 1987 Vol II to Transcript of Hl Hofmann 870820 Deposition in San Francisco,Ca Re Civil Penalty.Pp 208-471 & 489-494. Supporting Documentation Encl ML20238C7891987-08-18018 August 1987 Deposition of Rd Parks.* Vol IV to Transcript of 870818 Deposition in San Francisco,Ca Re Civil Penalty.Pp 551-818. Supporting Documentation Encl ML20238C7651987-06-25025 June 1987 Deposition of Hl Hofmann.* Transcript of 870625 Deposition in San Francisco,Ca Re Civil Penalty.Pp 1-206 ML20238C8041987-06-24024 June 1987 Deposition of Rd Parks.* Vol III to Transcript of 870624 Deposition in Newport Beach,Ca Re Civil Penalty.Pp III-1 - III-89 ML20235J1271987-06-24024 June 1987 Deposition of Rd Parks.* Vols II & III of Transcript of Rd Parks 870624 Deposition.Related Correspondence ML20238C7981987-06-23023 June 1987 Deposition of Rd Parks.* Vol II to Transcript of 870623 Deposition in Newport Beach,Ca Re Civil Penalty.Pp II-1 - II-263.Supporting Documentation Encl ML20238C7941987-06-22022 June 1987 Deposition of Rd Parks.* Vol I to Transcript of 870622 Deposition in Newport Beach,Ca Re Civil Penalty.Pp 1-199. Supporting Documentation Encl ML20238C5921987-06-16016 June 1987 Deposition of R Meeks.* Transcript of 870616 Deposition in Washington,Dc Re Allegations of Harassment Against R Parks. Pp 1-198.Supporting Documentation Encl ML20238C6171987-06-16016 June 1987 Deposition of R Meeks.* Corrected Title Page of 870616 Deposition ML20215L2731987-05-0808 May 1987 Transcript of 870508 Prehearing Conference in Bethesda,Md.Pp 19-224.In Camera Session (Pp 101-138) Bound Separately ML20238C7331987-04-24024 April 1987 Deposition of Rc Arnold.* Transcript of 870424 Deposition in Washington,Dc Re Civil Penalty.Pp 1-224.Supporting Documentation Encl ML20212Q9801987-04-16016 April 1987 Transcript of 870416 Periodic Meeting W/Advisory Panel for Decontamination of TMI-2 in Washington,Dc.Pp 1-50.Supporting Documentation Encl ML20212Q8021987-04-15015 April 1987 Transcript of 870415 Briefing by DOE in Washington,Dc Re TMI-2 Core Exam Program.Pp 1-64.Viewgraphs Encl ML20238C6521987-04-10010 April 1987 Deposition of Bk Kanga.* Transcript of 870410 Deposition in Gaithersburg,Md Re R Parks.Pp 1-151.Supporting Documentation Encl 1998-09-17
[Table view] |
Text
__ -
9 %
'0C#U!c 9 RELATED COIUCGPCNDENGE
'? >;c a 5y Sep
O 3 " g ~
! ff LIC 9/15/80
% p UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
METROPOLITAN EDISCN COMPANY ) Docket No. ?0-289 (Three Mile Island Nuclear
) (Restart)
)
Station, Unit No. 1) )
LICENSEE 'S TESTIMONY OF PHILIP R. CLARK, MICHAEL J. ROSS AND E. S. PATTERSON IN RESPONSE TO UCS CONTENTION NO. 10 AND SHOLLY CONTENTION NO. 3 (SAFETY SYSTEM BYPASS AND OVERRIDE) e ef
- OUTLINE The purposes and objectives of this testimony are to respond to UCS Contention 10 and Sholly Contention 3, which assert that operator ability to intervene in a safety function following automatic initiation violates standard IEEE 279 as incorporated by NRC regulations and endangers public health and safety. The testimony shows that operator intervention in a safety function, following initiation of a protective system action, does not violate applicable criteria. Further, the testimony describes why such operator intervention is desirable and may be necessary in certain circumstances.
i I
l 1
l 1
l l
l l
i t
INDEX l l
INTRODUCTION .............................................. 1 RESPONSE TO CONTENTIONS * .......... ,** ...........,, ,
i l
l l
(
l I
l I
I
(
INTRODUCTION This testimony, by Mr. Philip R. Clark, Vice President, Nuclear Activities, GPU; Mr. Michael J. Ross, TMI-l Supervisor of Operations, GPU; and Mr. E. S. Patterson, Technical Advisor to Equipment Engineering Section, Nuclear Power Generation Division of Babcock & Wilcox Company, is ado.essed to the following contentions:
UCS CONTENTION NO. 10 The design of the safety systems at TMI is such that the operator can prevent the completion of a safety function which is initiated automati-cally; to wit: the operator can (and did) shut of f the emergency core cooling system prematurely. q This violates 54.16 of IEEE 279 as incorporated in !
10 CPR 50.55(a)(h) which states:
The protection system shall be so designed that, once initiated, a protection system action shall go to completion.
The design must be modified so that no operator action can prevent the completion of a safety function once initiated.
SHOLLY COETENTION NO. 3 It is contended that as a result of Licensee's Operating Procedures, the emergency core cooling system can be defeated by operator actions during the course of a transient and/or accident at Unit 1, such defeat consisting of either throttling back the high-pressure injection pumps or tripping these pumps. It is further contended that under the conditions of a loss-of-feedwater transient / loss of coolant accident at Unit 1, defeat of.the emergency core cooling system high-pressure injection system by pump throttling and/or pump trip results in significant w
cladding metal-water reaction, causing the production of amounts of hydrogen gas in excess of the amounts required by NRC regulations to be considered in the design and accident analysis of nuclear power plants. It is contended further that such production of hydrogen gas results in l the high risk of breach of containment integrity
- due to the explosive combustion of the hydrogen i gas in the containment. Inasmuch as the emergency core cooling system is an engineered safety :
feature which is relied upon to protect the public I health and safety, and because proper operation of !
the emergency core cooling system is required to t provide reasonable assurance that Unit I can be operated without endangering the public health and 1 safety, it is contended that the emergency core cooling system operating procedures must be -
modified in order to ensure compliance with the GDC 35 requirement o.t negligible clad metal-water reaction following a loss-of-coolant accident l (LOCA). It is further contended that the emergency core cooling system operating procedures must be appropriately modified prior to restart in order to provide for protection of the public health and safety.
j RESPONSE TO CONTENTIONS BY WITNESS PATTERSON:
UCS Contention 10 asserts that operator ability to intervene in a safety function following automatic in.itiation violates NRC regulations and that system design must be changed to prevent such operator action. The UCS interpretation of the cited requirement - Section 4.16 of IEEE 279, as incorporated in 10 CFB Part 50, Section 50.55a(h) - is not valid.
-6 7
BY WITUESSES CLARK AND ROSS:
Contrary to the thrust of these contentions, the ability for the operator to control a safety function following initiation serves to enhance safety.
, BY WITNESS PATTERSON:
Section 1 of IEEE 279-1968, from which the above portion of Section 4.16 is extracted, defines the scope of the protection systems addressed by that standard as follows:
For purposes of these Criteria, the nuclear power plant protection system encompasses all electric and mechanical devices and circuitry (from sensors to actuation device input terminals) involved in generating those signals associated with the protective function. These signals include those that acttaate reactor trip and tha t , in the event of a serisus reactor accident, actuate engineered safeguards such as containment isolation, core spray, safety injection, pressure reduction, and air cleaning.
The requirement of Section 4.16 of IEEE 279 as cited by UCS is therefore applicabi.e only in the context of this protection system scope. For example, for a condition requiring the Emergency Core Cooling System (ECCS), the protection system shall be so designed that, once initiated, nothing within the protection system can prevent the signal frem completing its specified action, which is actuation of the ECCS. .
In support of this position it should be noted that the 1971 issue of IEEE 279 clarified the portion of Section 4.16 cited by UCS to read :
The protection system shall be so designed that, once initiated, a p*otective action at the system level shall go to spletion. (Emphasis added.)
Except for the term " plane" (1968) versus " generating station" (1971) both versionr of IEEE 279 define " system" as follows:
Where not otherwise qualified, the word " system" refers to the nuclear power plant protection system, as defined in the scope section of the criteria.
The definition of the protection system given in the scope, Section 1, of the standard as quoted above cemained essentially unchanged from the 1968 to the 1971 versions.
Clearly, the contended application of IEEE-279 is without a factual basis. The standard is directed at initiation of a protective action, and not at completion of the subsequent safety function.
BY WITNESS CLARK:
Licensee absolutely disagrees with the basic philosophy underlying this contention. The contention implies that it is necessary to provide automatic circuitry to prevent the operator from modifying any protective action once it has been initiated. Not only is this impractical, but attempts to carry out this philosophy would seriously complicate the plant and detract from safety. Contrary to this philosophy, the real need is to prepare the operators to correctly diagnose the plant condition and carry out the appropriate actions.
From the very beginning of the nuclear power industry, the plant operator has been recognized as a required element in correct plant operation. This parallels the philosophy in other industries, such as transportation, where the operator is also highly important. It has always been recognized tha t it would be impossible to constt..a a plant which would operate correctly under all conditions, and that a properly trained operator in control of the plant is the best continuing guarantee of correct operation. This is particularly true since it is impossible to foresee every possible condition which could arise.. The operator, when properly prepared fo r his task, is infinitely more flexible in responding to unexpected situations than any possible automatic control s
mechanisms.
The principal criteria for selecting actions assigned to the operators is that they must be actions operators can reasonably be expected to perform and for which they can be adequately trained. Very rapid actions required fo r immed ia te response to sudden unanticipated changes in plant conditions, for example, do not meet these criteria. For this reason the immediate actions of protective systems (e.g., reactor trip, ECCS actuation and conts.l.nent isolation) are automated and the operator action is simply to verify that the automatic circuitry has functioned properly. Subsequent bypass of such circuits, on the other hand, proceeds on a much more deliberate
'. basis. The operators have suple opportunity to verify that the conditions prerequisite to bypass are in fact met. They can ,
as appropriate, refer to written operating procedures and/or consult with their immediate supervisor prior to activating the bypass. It is fully appropriate, therefore, that this type of action remains under operator control.
It should be noted that continued addition of automatic circuits does not insure greater safety. Additional com-plexities may in fact be counter-productive to safety. The goal must be to keep the plant sufficiently simple that plant operators can understand the plant design, its current configu-ration, and the appropriate operator actions. Additional complexities should be added only where the operator really requires them to perform his job.
Deliberate operator intervention is desirable and necessary after appropriate conditions exist in an accident sequence, as illustrated by the following examples. (1)
Following a small-break loss of coolant accident, if the primary system is subcooled and a pressurizer water level is ind ica ted , the operator may throttle ECCS flow. In this manner the operator ,can properly continue the required safety func-tion, i.e.,
assuring adequate core cooling, while placing the plant into a preferred shutdown condition. Without this action, large quantities of water containing some amount of radioactivity would be released to the reactor containment building. requiring cleanup actions and some degree of personnel exposure. (2) It may also be necessary for the operator to open containment isolation valves after their automatic closure to take samples of the primary coolant or containment atmosphere in order to assess post-accident conditions. This may be desirable or necessary to determine the appropriate actions related to continued containment and cleanup of radioactive products. (3) Operator intervention is desirable to prevent the Emergency Feedwater System from feeding a damaged steam generator following a steam line break in the intermediate building. Stopping the steam flow from the break serves to reduce the hazard to personnel who may be located near the break. (4) It may also be necessary to secure emergency feedwater to prevent overfilling a steam generator if a control valve malfunctior.s. This minimizes the l possibility of generating a water hammer in the main steam lines, with possible damage to equipment. (5) Under all ;
1 conditions following inadvertant actuation, the ability to bypass the protective action promptly is desirable to avoid unnecessary plant transients or to protect personnel.
l BY WITNE5_ ROSS:
As pointed out in NUREG-0578 and in Sholly Contention No.
3, the concern is not with the capability for the operator intervention, but rather with providing the operator with the 1
(
correct information and procedural guidance on which to take subsequent actions. Additional instrumentation added to TMI-l to provide the operator better information on the primary system conditions is discussed in Licensee's testimony on Detection of Inadequate Core Cooling. In addition, the operators have been provided with specific instructions as to when it is necessary or allowable to intervene and over-ride the automatic operation of the ECCS systems. The procedure covering loss of reactor coolant / loss of reactor coolant pressure contains the following guidance:
CAUTION: Do not throttle HPI unless one of the following three conditions exists:
- a. The LPI system is in operation and flowing at a rate in excess of 1000 gpm in each line and the situation has been stable for 20 minutes.
- b. All hot and cold leg temperatures are at least 50*F below the saturation temperature for the existing RCS pressure, and the action is necessary to prevent the indicated pressuizer level from going off-scale high. If 50*F subcooling cannot be maintained, full HPI shall be reactivated.
- c. Or, all indicated hot and cold leg temperatures are at least 50*F below the saturation temperature for the indicated RCS pressure and continued full HPI injection will result in RCS pres-sure/downcomer temperatures within the Restricted Region of Figure 2 (which presents the allowable pressure-temperature relationship for avoidance of brittle fracture of the reactor vessel].
In "hort, the TMI-l emergency procedure governinr, ECCS ope-ration has been modified as recommended in Sholly Contention No. 3.
Similarly, the following guidance is given for the Con-tainment Isolation System:
o Containment isolation valves may be open?d to obtain samples in accordance with approved proced ures . The isolation valves shall be reclosed after the sample is obtained.
o other containment isolation valves automatically closed shall remain closed until the following conditions are met:
- a. Reactor building pressure is less that 2 psig, b.
Containment radiation levels have been assessed based on radiation monitor readings or samples,
- c. The integrity of the system outside the reactor building has been assessed.
(Stable surge tank level, visual inspection or pressure test should be considered to verify integ rity) .
- d. The Shif t Supervisor or Emergency Director shall give permissian to reopen containment isolation valves.
- e. Installed radiation monitors or portable monitors shall be available to detect any l
release that may result from opening the valve.
In its final specification of this contention UCS included the emergency feedwater system along with emergency core coolant systela and containment isolation system. As with the ECCS and containment isolation system, guidance is provided for operating the emergency feedwater system in the event a transition to natural circulation is required:
o Take hand (manual) control of startup feedwater regulatory valves and slowly increase steam generator level to 50% on the operating range level indicator.
o Start the motor driven emergency feedwater pumps, and establish control of the steam generator level by taking hand control and opening the emergency feedwater regulating valves.
It should be noted that if emergency feedwater has automati-cally started due to loss of main feedwater, the steps for manual raising of steam generator level with the emergency feedwater regulating valves are still applicable.
I have previously described in Licensee's testimony on the Detection of Inadequate Core Cooling, some aspects of operator training at TMI-1. The training emphasizes the importance of following procedures. The training and testing of operators, however, also provides assurance that operators are coinizant of procedural requirements without aid of the procedures.
These personnel are required to demonstrate during testing that the immediate action requirements of emergency procedures are kno wn . Subsequent portions of emergency procedures that require signoff by operators contain requirements for re-verification of immediate action steps.
During the Cperator Accelerated Retraining Program training, the importance of consultation and communication between individuals on shif t has been stressed for significant operations, such as the manual acticas of reducing ECCS flow, overriding containment isolation on specific lines and manipulating steam generator secondary level.
BY WITNESS PATTERSON:
In summary, the interpretation of IEEE-279 contended by UCS is not valid. Following initiation of a protection system action, subsequent operator intervention in the safety function does not violate applicable criteria.
BY WITNESSES CLARK AND ROSS:
Further, operator intervention in a safety system operation is desirable and may be necessary in certain circum-stances. Appropriate instrumentation, procedural guidance and training have been provided to TMI-1 operators on the t
situations in which they should intervene in the automatic operation of the ECCS, containment isolation and emergency feedwater system.
1 i
1 h
I 4
1 c
i i
1 4
l l
. . - .- .. -. . _ . _ _ - . . = . . . _ . . . _..- - - . - . . . - - .
IHILIP R. CLARK, SR.
Business Address: GPU Service Corporation 100 Interpace Parkway Parsippany, New Jersey 07054 Education: B.C.E. (Cum Laude), Civil Engineering, Polytechnic Institute of Brooklyn, 1951. Graduate courses, Civil Engineering, Polytechnic Institute of i Brooklyn, 1951 to 1953. Oak Ridge School of Reactor Technology, 1953 to 1954. '
Experience: Vice President, Nuclear Activities, GPU Service Corporation, January 1980 to present. Responsibilities include:
Directing and monitoring of the opera-tion, maintenance and testing of TMl-1, TMI-2 and Oyster Creek; direc-ting and monitoring of support ac-tivities for these plants including design, manufacturing, quality con-trol, training, and radiological and environmental controls; representing the GPU Nuclear Group by way of con-tacts, negotiations and discussions with vendors, contractors, governmen-tal agencies, other utilities, industry organizations and citizens groups; establishing policies and pro-cedures relating to the GPU nuclear plants; reviewing and approving staffing and budget proposals.
Associate Director, Reactors, Naval Reactors Division, U.S. Department of Energy and Chief, Reactor Engineering Division, Nuclear Power Directorate, Naval Sea Systems Command, Department of the Navy, 1964 to 1979. Responsi-ble for the direction of a major ele-ment of the U.S. Naval Nuclear Propulsion Program. Retired U.S.
Government August 1979.
U.S. Navy, 1954 to 1964. Held various positions within the Navy Nuclear Power Program.
Naval Architect, New York Naval Shipyard, 1951 to 1953.
Honors: Navy Distinguished Civilian Service Award, 1972.
U.S. Energy Research and Development Administration Special Achievement Award, 1976.
t tb d
l l
l
-2_
MICHAEL J. ROSS Business Address: Metropolitan Edison Company Three Mile Island Nuclear Station P.O. Box 480 Middletown, Pennsylvania 17057 Education: U.S. Navy Nuclear Power School, 1961. U.S.
Navy Nuclear Power Prototype School, 1961.
Excerience: Supervisor of Operations, Three Mile Island Unit 1, Metropolitan Edison Company, 1978 to present. Responsible for directing the day-to-day operation of the plant to ensure compliance with the conditions of the plant operating license and technical spe-cifications, including supervision of the Radioactive Waste Processing and Shipment Group and coordination of operations and related maintenance activities with the Superintendent of Maintenance.
Shift Supervisor, Three Mile Island Unit 1, Metropolitan Edison Company, 1972 to 1978.
Responsible for the management of all operations and maintenance activities, including the manipulation of any controls, equipment or components in physical plant systems on his shift.
Shift Foreman, Three Mile Island Unit 1, Metropolitan Edison Company, 1970 to 1972.
Responsible for performance of various pre-operational activities, including preparation of procedures and start-up equipment checks.
Reactor Plant Technician, Saxton Nuclear Experimental Corporation, 1968 to 1970.
Held position of reactor operator; addi-tionally, was responsible for training operations staff.
i l
U.S. Navy, 1960 to 1968. Positions held include reactor operator aboard USS Haddo, Instructor at the Nuclear Power Training Unit, and AEC Field Representative at the Nuclear Power Training Unit Professional Affiliations: Babcock & Wilcox Owner's Group, Fuel Handling Subcommittee.
l l
l
E.S. PATTERSON Business Address: Babcock & Wilcox Company Nuclear Power Generation Division P.O. Box 1260 Lynchburg, Virginia 24505 Education: B.A., Physics, University of Nebraska at Omaha, 1956.
Experience: Technical Advisor, Babcock & Wilcox Company Nuclear Power Generation Division, 1973 to present. Advises Equipment Engineering Section on instrumentation matters.
Instrumentation and Control Design Engineer, Babcock and Wilcox Company, 1957 to 1973. From 1957 to 1966, responsibilities included the design of nuclear instrumentation and safety systems for'various nuclear ships, including the N.S. Savannah and the Otto Hahn, design and procurement of instrumentation and control systems for five test reactors and for the Babcock & Wilcox CNSG. From 1966 through 1969, was responsible for the design of Oconee-type plant reactor protection systems. From 1970 to 1973, performed various assignments relating to the design and procurement of instrumentation and control systems for the B&W NSSS.
Project Engineer, Materials Test Reactor, Idaho, 1956 to 1957.
Professional Affiliations: Member IEEE Nuclear Science Group Standards Committee during the preparation and of IEEE 279-1968. Member Joint Committee on Nuclear Power Standards of the IEEE Group on Nuclear Science and the IEEE Power Engineering Society during the preparation and approval of IEEE 27 9-1971.
e
l Joined the IEEE Nuclear Standard writing effort in 1967 as the founding Chairman of what is now the Subcommittee on Reliability under the Nuclear Power Engineering Committee.
Presently the Chairman of the Editorial Subcommittee and member of the Nuclear Power Engineering Committee.
Member, U.S. Delegation to the International Electrotechnical Commission Committee on Nuclear Instrumentation, 1970-1979.
Chaired 1976 IAEA session on Software i for Protection Systems, meeting on the Use of Computers for Protection Systems and Automatic Control. I l
Chaired 1979 IAEA session on l Man-Machine Communication, meeting on Procedures and Systems for Assisting ~
an Operator during Normal and Anamolous Nuclear Power Plant Operation Situations.
Registered Professional Engineer, California.
Publications: "A Typical Incore Monitoring System,"
IAEA, Ontario, May 1974.
"The Need for Criteria and Philosophical Development for Human Factors Accountability in Nuclear Power Plants," IAEA, Munich, December 1979. i I