ML12122A138
ML12122A138 | |
Person / Time | |
---|---|
Site: | Kewaunee |
Issue date: | 04/29/2012 |
From: | Jordan A Dominion, Dominion Energy Kewaunee |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
12-319, RR-2-3 | |
Download: ML12122A138 (38) | |
Text
{{#Wiki_filter:Dominion Energy Kewaunee, Inc. o N490 HwN,42, Kewaunee, WVI54216 . DaML-U U1UU1 Web Address: www.dom.com April 29, 2012 ATTN: Document Control Desk Serial No. 12-319 U. S. Nuclear Regulatory Commission LIC/CDS/R2 11555 Rockville Pike Docket No.: 50-305 Rockville, MD 20852-2738 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC. KEWAUNEE POWER STATION INSERVICE INSPECTION PROGRAM FOURTH TEN-YEAR INTERVAL 10 CFR 50.55a REQUEST NO. RR-2-3 Pursuant to the provisions of 10 CFR 50.55a(a)(3)(ii), Dominion Energy Kewaunee, Inc. (DEK) hereby requests NRC approval of the attached proposed 10 CFR 50.55a request (RR-2-3) for the Fourth Ten-year Interval of the Inservice Inspection Program for Kewaunee Power Station (KPS). This 10 CFR 50.55a request proposes a temporary deviation from the requirements of ASME Section XI, Appendix IX, Article IX-1000, Paragraph (c)(2) which prohibits the use of clamping devices on "... portions of a piping system that forms the containment boundary" and ASME Section Xl, Appendix IX, Article IX-6000(a) which states that the area immediately adjacent to the clamping device shall be examined using a volumetric method. KPS is currently in a refueling outage. The reactor has been refueled and the reactor vessel has been reassembled. The plant is currently in MODE 5 - Cold Shutdown with the residual heat removal system in operation. Per KPS Technical Specification (TS) 3.4.7, "RCS Loops - MODE 5, Loops Filled," one RHR loop is required to be operable and in operation; and either one additional RHR loop shall be operable, or the secondary side water level of at least one steam generator shall be greater than or equal to 5%. Recently a leak was discovered at a socket weld in a 3/4-inch line that is common to both RHR loops. The leak cannot be repaired without removing both RHR loops from service. DEK is proposing to perform a temporary alternate repair of the RHR piping by installing a leak-limiting device to preserve containment integrity and structural integrity prior to making a MODE change from MODE 5 to MODE 4. This temporary alternate repair will remain in place until the unit achieves MODE 4. After the unit reaches MODE 4, core cooling is provided by reactor coolant pumps circulating water through the core and to the steam generators. In this condition, with core cooling being provided by the steam generators, the leak will be isolated, and the defect will be repaired by welding. The repair will be pursued expeditiously. It is estimated that it will take approximately 24 hours after reaching MODE 4 to isolate the portion of the RHR system with the leak, eliminating the need for the leak-limiting device.
Serial No. 12-319 10 CFR 50.55a Request RR-2-3 Page 2 of 3 The alternative to conducting the proposed temporary alternative repair under ASME Section Xl, Appendix IX is to return the plant to the refueling mode, remove the reactor head, remove the upper core internals and offload the core into the spent fuel pool. DEK believes that this option would result in an undue hardship and unusual difficulty without a compensating increase in the level. of quality and safety, and is therefore justified under 10 CFR 50.55a(a)(3)(ii). The details of 10 CFR 50.55a Request No. RR-2-3 are provided in Attachment 1 to this letter. A copy of the temporary modification package that will be used to perform the alternate repair is provided in Enclosure 1. If you have questions or require additional information, please feel free to contact Mr. Craig Sly at 804-273-2784. Very truly yours, Site Vic P sident - Kewaunee Power Station
Attachment:
- 1. Kewaunee Power Station Fourth Ten-year Interval Inservice Inspection Program 10 CFR 50.55a Request No. RR-2-3
Enclosure:
- 1. Temporary Modification Package 2012-11
References:
None Commitments made by this letter:
- 1. Prior to making the change from MODE 5 to MODE 4, the situation will be re-evaluated if the magnitude of leakage is found to be higher than expected or if the leak rate increases rather than decreases after the sealant is applied. The System Integrity Program (SIP) allows for less than 6 gallons per hour (gph) for combined external leakage from the Safety Injection (SI) system, Internal Containment Spray (ICS) system and the Residual Heat Removal (RHR) system. A review of historical data over the previous nine refueling outages indicates the total external leak rate
Serial No. 12-319 10 CFR 50.55a Request RR-2-3 Page 3 of 3 has not exceeded 0.07 gph. Based on this a limit of 5.5 gph of leakage will be established for the weld leak near RHR-600. At a leak rate above 5.5 gph external system leakage must be evaluated for operability.
- 2. Following installation of the device, a VT-2 examination will be performed and repeated a minimum of once every twelve hours, and leakage will be quantified a minimum of once every twelve hours, until a MODE change from MODE 5 to MODE 4 is made and the resulting portion of residual heat removal piping needed to facilitate repair is isolated and depressurized.
- 3. The sealant injection pressure and volume will be controlled by work instructions and procedures to ensure the sealant is not injected into the RHR system piping.
cc: Regional Administrator, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. Karl D. Feintuch Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-H4A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Kewaunee Power Station
Serial No. 12-319 ATTACHMENT 1 KEWAUNEE POWER STATION FOURTH TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM 10 CFR 50.55a REQUEST NO. RR-2-3 KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.
Serial No. 12-319 10 CFR 50.55a Request RR-2-3 Page 1 of 7 Kewaunee Power Station Fourth Ten-Year Interval Inservice Inspection Program 10 CFR 50.55a Request No. RR-2-3 Proposed Alternative In Accordance with 10 CFR 50.55a(a)(3)(ii) Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality or Safety
- 1. ASME CODE COMPONENTS AFFECTED ASME Code, Section XI Code Class 2 Residual Heat Removal (RHR) system 3/4-inch Sockolet to Valve RHR-600. Pipe is 3/4-inch schedule 40, ASTM A312, type 304.
Fitting is 0.750-inch on 10-inch Sockolet, 3000 Ib, ASTM A182 F 304. Code of record is USAS B31.1 -1967. RHR design temperature and pressure: 400 "F and 600 psig. (The estimated pressure and temperature of the RHR loops during MODE 5 is approximately 350 psig and less than 200°F.)
- 2. APPLICABLE CODE EDITION AND ADDENDA ASME Boiler and Pressure Vessel Code, Section XI, 1998 Edition, 2000 Addenda
- 3. APPLICABLE CODE REQUIREMENTS
- ASME Boiler and Pressure Vessel Code, Section XI, 1998 Edition, 2000 Addenda, IWA-4133 states that mechanical clamping devices used to replace piping pressure boundary shall meet the requirements of ASME Section XI, Appendix IX.
o ASME Section XI, Appendix IX, Article IX-1000(c)(2) states that clamping devices shall not be used on portions of a piping system that forms the containment boundary. o ASME Section XI, Appendix IX, Article IX-6000(a) requires a plan for monitoring defect growth in the area immediately adjacent to the clamping device.
Serial No. 12-319 10 CFR 50.55a Request RR-2-3 Page 2 of 7
- 4. REASON FOR REQUEST Currently, Kewaunee Power Station (KPS) is in MODE 5-Cold Shutdown, and has declared both trains of residual heat removal (RHR) inoperable due to a through-wall leak on a 3/4-inch socket weld connection of ASME Code Class 2 piping in the common RHR pump A and B discharge piping. The RHR system is currently providing flow to the reactor coolant system (RCS) cold leg for the MODE 5 lineup.
KPS TS 3.4.7, "RCS Loops - MODE 5, Loops Filled," is applicable during MODE 5 with the RCS loops filled. TS LCO 3.4.7 requires one RHR loopto be Operable and in operation. In addition, TS LCO 3.4.7 requires one additional RHR loop be operable (but not necessarily in operation) or the secondary side water level of at least one steam generator shall be greater than or equal to 5%. Currently both loops of RHR are declared inoperable due to the through-wall leak at the 3/4-inch socket weld. Both loops of RHR are available to provide decay heat removal. Additionally, if both RHR loops become unavailable, one SG is available to provide decay heat removal as well as feed and bleed with the Safety Injection system (SI). In order to implement a permanent weld repair (ASME Code repair) for the 3/4-inch socket weld, both RHR cooldown loops must be removed from service and isolated from containment. In order to remove both RHR cooldown loops from service one of two options must be performed. The first option is to return the plant to the refueling mode, remove the reactor head, remove the upper core internals, and offload the core into the spent fuel pool. Then, the RHR system could be isolated and drained to allow weld repair of the socket weld connection. This option would require maneuvering the plant from its current operating condition in MODE 5 with one steam generator (SG) available to provide an alternate method for decay heat removal to a "no-MODE" condition. DEK believes that this option would result in an undue hardship and unusual difficulty without a compensating increase in the level of quality and safety of the plant. This option would require the following actions/conditions:
- RCS cooldown from current plant conditions, thus losing the SG decay heat removal capability, and entry to MODE 6 - Refueling.
- The reactor head would have to be disassembled and detensioned.
Serial No. 12-319 10 CFR 50.55a Request RR-2-3 Page 3 of 7
" The RCS would have to be drained to 6-inches below the reactor vessel flange resulting in the SGs no longer being available for decay heat removal, a reduction in reactor system integrity, and a shorter time-to-boil if decay heat removal were lost. " The reactor head would have to be removed and the reactor cavity flooded to 23 feet. " The reactor core would have to be offloaded to the spent fuel pool.
- The estimated duration of this evolution from the start of cooldown to core offload is 5 days.
" The estimated radiation dose for this overall reactor disassembly, core offload, and subsequent reload and reactor reassembly evolution is approximately 8 REM based on actual exposure measured during the same activities conducted during the current ongoing refueling outage.
The second option is to perform a temporary alternate repair of the RHR piping by installing a leak-limiting strong-back clamp to ensure structural integrity prior to making a MODE change from MODE 5 to MODE 4. This temporary alternate repair will remain in place until the unit achieves MODE 4. After the unit reaches MODE 4, core cooling is provided by the reactor coolant pumps circulating water through the core and to the steam generators. With core cooling being provided by the steam generators, both loops of RHR can be secured, the leak isolated, the defect removed and the pipe repaired by welding. Once in MODE 4, TS 3.6.1, "Containment Integrity," LCO 3.6.1, requires that the containment is Operable. Containment integrity will be maintained by the leak-limiting device as well. The code repair will be pursued expeditiously. It is estimated that it will take approximately 24 hours after reaching MODE 4 to isolate the portion of the RHR system with the leak, eliminating the need for the leak-limiting device. The mechanical clamping device that will be used will comply with the applicable Code requirements outlined in ASME Section Xl, Appendix IX, with the exception that it will be located on piping that is considered a containment boundary. ASME Section XI, Appendix IX, Article IX-1 000, Paragraph (c)(2) prohibits the use of clamping devices on "... portions of a piping system that forms the containment boundary." Therefore, in order to use the device, DEK requires approval of an alternative to allow a temporary deviation from the requirements of Appendix IX,Article IX-1 000, Paragraph (c)(2) for the period of time that it will take to for the plant to reach MODE 4 and to complete the Code repair.
Serial No. 12-319 10 CFR 50.55a Request RR-2-3 Page 4 of 7 Based on the discussion above, DEK requests NRC approval of an alternative to the repair requirements of ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition, 2000 Addenda IWA-4133. Pursuant to 10 CFR 50.55a(a)(3)(ii), DEK is requesting approval to temporarily deviate from the requirements of Appendix IX,Article IX-1 000, Paragraph (c)(2) which prohibits the use of clamping devices on "... portions of a piping system that forms the containment boundary" and ASME Section Xl, Appendix IX, Article IX-6000(a) which states that the area immediately adjacent to the clamping device shall be examined using-a volumetric method. This requested deviation is based on DEKs conclusion that compliance would result in hardship and unusual difficulty without a compensating increase in the level of quality and safety.
- 5. PROPOSED ALTERNATIVE AND BASIS FOR USE The proposed alternative would allow use of a leak-limiting strong-back device on a piping system that forms part of the containment boundary. The device accomplishes two functions; limiting the leakage from the defect, and maintaining the structural integrity of the piping. The proposed alternative uses a leak-limiting device to ensure containment integrity, since this region of the RHR piping is a portion of the containment boundary. A sealant will be injected into a leak-limiting enclosure to provide a temporary pressure boundary for the RHR system. The sealant, X-36, has a low concentration of halogens/chlorides, therefore it is safe for use on stainless steel. The sealant injection pressure and volume will be controlled by work instructions and procedures to ensure the sealant is not injected into the RHR system piping. The leak-limiting device is mechanically fastened with clamps and bolts to the 10-inch diameter RHR pipe and the 3/4-inch diameter pipe is fastened to the leak sealant enclosure with set screws. As an added measure of safety, a full circumferential structural fillet weld will be added at the interface of the 3/4-inch diameter pipe and the leak sealant enclosure. This weld will prevent a catastrophic separation of the 3/4-inch line above the leaking sockolet.
RHR-600 is an outside Containment isolation valve for containment penetration 10, a Class 6 penetration. Penetration Class 6 is a system required to operate post-accident. The design and operational criteria for penetration Class 6 isolation valves are governed by the functional requirements of the system. The isolation valves at penetration 10 are not subject to the requirements of 10 CFR50 Appendix J (reference 5). The requirements for containment isolation will be satisfied by the leak sealant enclosure. The enclosure is designed to RHR temperature and pressure requirements
Serial No. 12-319 10 CFR 50.55a Request RR-2-3 Page 5 of 7 and ASME Section XI, Appendix IX, Mechanical Clamping Devices for Class 2 and 3 Piping Pressure Boundary. The piping remains seismically qualified and the enclosure will prevent system leakage, or maintain leakage within the Current Licensing Basis. ASME Section XI, Appendix IX, Article IX-2000 states that, if the defect size cannot be directly determined, a conservative bound of the size shall be determined and documented. ASME Section Xl, Article IX-6000 states that the area immediately adjacent to the clamping device shall be examined using a volumetric method. Visual examination identifies the existing leak size as a pinhole and has placed the defect at the toe of the socket weld to the 3/4-inch branch line to valve RHR-600. There is no other visual indication of degradation to the piping wall thickness. Therefore, DEK is requesting a deviation from Article IX-6000(a) in that no volumetric inspection in the area of the clamp will be performed on the 10 inch pipe or on the 3/4-inch pipe. The installation of the leak-limiting device also precludes volumetric inspection of the defect. Therefore, the defect can be conservatively characterized as residing within the socket weld and any growth would be limited to the weld itself, effectively limiting the impact of the defect to that of a circumferential crack. The proposed alternative, as a conservative measure to account for nondestructive examination limitations of the sockolet, includes two aspects; installation of a leak-limiting strong-back device which will be welded to the 3/4-inch diameter pipe, and a VT-2 examination a minimum of once every twelve hours. The device will conservatively maintain structural integrity of the affected components during the duration of the proposed alternatives. Application of the leak-limiting strong-back clamping device to maintain containment integrity and the structural integrity of the 3/4-inch line will ensure that the plant can transition from MODE 5 to MODE 4 and perform a Code repair. The strong-back clamping device has been designed to accommodate thrust loads resulting from a complete failure of the welded connection of concern. A review of the piping stress analysis has been performed to ensure that the additional mass does not adversely affect the qualification of the existing system. Following installation of the device, a VT-2 examination will be performed and repeated a minimum of once every twelve hours until a MODE change from MODE 5 to MODE 4 is satisfactorily completed and the resulting portion of residual heat removal piping needed to facilitate repair is isolated and depressurized. Prior to making the change from MODE 5 to MODE 4, the situation will be re-evaluated if the magnitude of leakage is found to be higher than expected or if the leak rate increases rather than decreases after the sealant is applied.
Serial No. 12-319 10 CFR 50.55a Request RR-2-3 Page 6 of 7 The System Integrity Program (SIP) allows for less than 6 gallons per hour (gph) for combined external leakage from the Safety Injection (SI) system, Internal Containment Spray (ICS) system and the Residual Heat Removal (RHR) system. A review of historical data over the previous nine refueling outages indicates the total external leak rate has not exceeded 0.07 gph. Based on this a limit of 5.5 gph of leakage will be established for the weld leak near RHR-600. At a leak rate above 5.5 gph external system leakage must be evaluated for operability. After installing the device, a MODE change from MODE 5 to MODE 4 will be made, the affected piping will be depressurized and isolated, and the Code repair will commence. This approach will provide the safest and most expeditious method to complete a Code repair of the socket weld given the current condition of the plant.
- 6. DURATION OF PROPOSED ALTERNATIVES This alternative would be applicable for Kewaunee Power Station during the current refueling outage while in MODE 5 and until the plant reaches MODE 4 and the Code repair of the Residual Heat Removal System 3/4-inch Sockolet to Valve RHR-600 is completed. It is estimated that it will take approximately 24 hours after reaching Mode 4 to isolate the portion of the RHR system with the leak, eliminating the need for the leak-limiting device.
- 7. PRECEDENTS Dominion is currently aware of three (3) situations (see references 1, 2, 3 and 4) where similar alternatives have been approved to facilitate repair of ASME Section Xl piping the forms that containment boundary.
- 8. REFERENCES
- 1. Letter from M. L Marchi (WPSC) to NRC, "Relief Request RR-2-1 to Allow Continued Plant Operation with Two Pin Hole Leaks in a % inch ASME Code Class 2 Chemical Injection Weldment," dated August 12, 1996. [ADAMS Accession No. ML111810480]
- 2. NRC SER, "Kewaunee Power Station - Approval of a Relief Request from the requirements of 10CFR50.55a for Repair of 3/4-inch ASME Code Class 2 Chemical Injection Weldment (TAC No. M96273)," dated September 13,1996.
Serial No. 12-319 10 CFR 50.55a Request RR-2-3 Page 7 of 7
- 3. Letter from M. L. Marshall (NRC) to J. A. Stall (Florida Power and Light Co.),
"Turkey Point Nuclear Plant, Unit 4 - Safety Evaluation for Relief Request Regarding Mechanical Clamping Device on Pressure Boundary Piping (TAC No.
MC7338)," dated August 15, 2005. [ADAMS Accession No. ML052090182]
- 4. Letter from R. J. Laufer (NRC) to M. Kansler (Entergy), James A. Fitzpatrick Nuclear Power Plant - Relief Request for Temporary Non-Code Repair of a Shutdown Cooling Pipe (TAC No. MC7544)," dated August 9, 2005. [ADAMS Accession No. ML052070047]
- 5. Letter from Darrell G. Eisenhut, NRC Director Division of Licensing, to C.W.
Geisler, Wisconsin Public Service Corporation, "Exemption to Certain 10 CFR 50 Appendix J Requirements," dated September 30, 1982.
Serial No. 12-319 ENCLOSURE I KEWAUNEE POWER STATION FOURTH TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM 10 CFR 50.55a REQUEST NO. RR-2-3 TEMPORARY MODIFICATION PACKAGE 2012-11 KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.
Temporary Modification i NAAS D- 3' ATCMN --Pge of 11 Site Unit Year Temporary Modification Number Revision Number Work Order(s) KIPS 1 2012 2012-11 1 kW 1046;9 KW100894787 I High Risk? E2 YES M] NO Provide information as required and attach additional sheets as necessary for each item. PartA. TM Description(To be completed by RequestorlOriginator/Engineering)
- 1. Title RHR-600 Leak Repair
- 2. Expiration Date [Not to exceed one refuel cycle (unless approved by site VP)]
KR32 (Remove prior to entering Mode 3)
- 3. Affected Systems/Components/QA Class RHR (System 34)/RHR-600/SR
- 4. Reason (e.g., awaiting parts, testing, calibration, repairs, temporary power supply)
The 3/*" socket weld upstream of RHR-600 has a pinhole leak. Contingent upon receiving a NRC Relief Request, this TM performs a temporary repair of the leak by injecting leak sealant into an enclosure around the leaking fitting to stop or minimize the leak to within allowable limits. This TM will be installed in Mode 5 and removed prior to entering Mode 3. REV 1 revised the section regarding Monitoring Requirements (IX-6000) to be consistent with the NRC relief request requirements. Also provided clarification to the system pressure requirements.
- 5. Description (e.g., specific details on the aspects of the modification): Work Order reference(s), and instrument index as applicable, and locations (e.g., racks, cubicles, building, area, elevation, and rooms to identify in detail the location of the modification).
Attach sketches as necessary. See following pages
- 6. Documents/Drawings/Procedures to be Updated
- a. Vendor procedure for sealant iniection b.
- 7. List any Mode Restrictions This TM can remain installed in Modes 4 and 5. It must be removed and the system restored prior to entering Mode 3.
- 8. Action Plan for Removal - Close-out Document (REA/DCP/DC~t Work Qrder, Proceidur changes)
Repair leaking weld and remove TM perWO # KW100894787 P.orN. *,742 (May 2011)
Temporary Modification ' Dominion 7 'SATC0 ATAHMN 3J Pag 2 of1
- 9. Installation Instructions for TM Install leak sealant enclosure and inject leak sealant per approved procedure.
- 10. Required System Testing Following TM Installation Verify any leakage is within acceptance criteria specified in WO 100894696
- 11. Removal Instructions for TM Per WO KW100894787
- 12. Required System Testing Following TM Removal Permanent repair of the leaking fitting will follow removal of the TM. Therefore, there are no removal test requirements for this TM.
- 13. Requested By (Name - Please Print) 14.Jequestec By (Signature) 15. Date SAk Part B. Design Engineering Reviews/Screening Evaluations Attached
- 1. CM-AA-RSK-1001, Engineering Risk Assessment, Attachments YES F NO 2 and 3
- 2. DNES-AA-GN-1002, Document Impact Summary, Attachment 1 I] YES E: NO
- 3. DNES-AA-GN-1003, Design Effects and Considerations, YES NO Attachment 2
- 4. DNAP-3004, Dominion Program for 10 CFR 50.59 and 10 CFR 72.48 - Changes, Tests, and Experiments (KPS only - perform ONE IS REQUIRED GNP-04.04.01 for Applicability and Pre-Screening prior to DNAP-3004) 0 YES El NO
, 50.59/72.48 Screen, Attachment 4 L1 YES Z NO
- 50.59/72.48 Evaluation, Attachment 6
- 5. Additional Attachments a.
b.-, C. d.
- 6. Summary: Descriptions & Conclusions Resulting from Reviews/Evaluations Performed in Step 3.1.8 and Above RSK-1001: The TM is medium risk AA-GN-1002: A procedure for leak sealant injection is required AA-GN-1003: Components within the ISI boundary are affected.
50.59: The TM screens out of 50.59
- 7. Additional Reviews and/or Comments - Provide Details Below Form No.730749 (May 2011)
Temporary Modification CMAATC0 ATAHMN 3 Pag 3 of 11 None
- 8. Pr pared By.'rin4 Sign) , /}[ 9.,Date
- 10. Independent/Design Authority Rdview (as a p licable) 11. Date (Print & SWi) / 412y Additional reviews't6r Implen*enting Orgi'ization, Training, etc. as necessary in accordance with Section 3.3
- 12. Name (Print & Sign)/Department 13. Date
- a. 1.
- b. 2.
- c. 3.
- d. 4.
- 14. Engineering Supervisor 15. Engineering Supervisor 16. Date (Name - Please Print)
Ml I Lt- ý __e,_ Part C. Operations Review (To be completed by Shift Manager/Designee)
- 1. Are controlled Station drawings affected by the TM and are - YES NO NA they attached? [] YES NO NA
- 2. Necessary Station personnel are informed of the TM? [ YES lNo El NA
- 3. Temporary procedure changes and Temporary procedures 0' N- E NA are implemented to support the TM?
- 4. Evaluated need for check valves and/or other anti-siphon []YES LI NO
- NA protection, if TM utilizes piping or hoses?
- 5. Limiting conditions and special requirements indentified. Z YES E] NO IHNA Note: NRC Relief Request is required before TM installation
- 6. TM verified not to violate Technical Specifications, not to create a hazard to Station safety or personnel, or conflict with 0 YES El NO El NA existing Station conditions?
Note: NRC Relief Request is required before TM installation
- 7. TM Tags generated in accordance with applicable Site Z YES NO [1 NA Tagging procedure and any special instructions included on the tags?
- 8. TM Log updated? El YES "lNO ElNA
- 9. Engineering Post Installation Walkdown Requested?
- 10. Quarterly walkdown required?
- 11. PRA risk impa'6t has been assessed and, if determined to El YES El NO NA be applicable, has been entered into the Risk Monitor and/or Y Shutdown Risk Assessment?
- 12. The affected Unit shall not exceed the operating mode of: 4 or 5 wqý'*"
IOU 7I07l (MayRI01J)
Temporary Modification MA A a 3" P o. f I
- 13. Concurrent or Independent Verification: NA
- 14. Functional Check or Visual Inspection: Per WO KW100894696
- 15. The opposite Unit shall not exceed the operating mode of: NA
- 16. STA Concurrence (Print & Sign) for Virginia Plants Only [Commitment 5.1.4] 17. Date NA
- 18. Shift Manager/Designee (Print & Sign) 19. Date Part D. FSRC Review (as applicable, Refer to LI-AA-600)
NOTE: If the TM is used to move radioactive fluids or gases, the Manager Radiological Protection or Radiological Protection alternate must be a member of FSRC NOTE: TMs which could affect Nuclear Safety must be reviewed by FSRC
- 1. Is FSRC Signature Required? Z YES EL NO
- 2. FSRC Authorized Duration fI<R 3 2- ,lAe 6,l a-P1 ,01rVec' -lo~Al Moa -e39
- 3. FSRC Chairman Approval (Print & Sign) [4. Date Part E. TM Installation (To be completed by applicable personnel)
- 1. Shift Manager Approval for TM Installation (Print & Sign) 2. Date
- 3. Shift Manager Comments (includes any additional requirements in accordance with Section 3.4, "Implementation") - Provide Details Below
- 4. Installation Completed By (Name - 5. Installation Completed By 6. Date Please Print) (Signature)
- 7. Independently Verified By (Name - 8. Independently verified By 9. Date Please Print) (as applicable) (Signature) (as applicable)
Notify the Shift Manager that TM is installed and the required post installation testing can be performed.
- 10. Instructions Used for Post Installation Testing
- 11. Testing Performed By 12. Testing Performed By (Signature) 13. Date (Name - Please Print) I Form No. 730749 (May 2011)
Temporary Modification PDominion CMAATC0 ATAHMN 3 Pag 5 of 11
- 14. Post Installation Testing Satisfactorily? Wj YES [: NO
- 15. Required Administrative Controls Established? [] YES LI NO
- 16. Is Engineering Post Installation Walkdown Required?
NOTE: Responsible Engineering signature is in accordance with El YES El NO Step 3.4.6
- 17. Responsible Engineer (Print & Sign) (Engineering walkdown completed) 18. Date
- 19. Shift Manager (Name - Please Print) 20. Shift Manager (Signature) 21. Date Part F. TM Restoration (To be completed by applicable personnel)
- 1. Shift Manager Approval for TM Removal (Print & Sign) 2. Date
- 3. Shift Manger Comments (includes any additional requirements in accordance with Section 3.7, "TM Removal") - Provide Details Below
- 4. TM Restoration Completed By (Name - 5. TM Restoration Completed By 6. Date Please Print) (Signature)
- 7. Independently Verified By 8. Independently verified By 9. Date (Name - Please Print) (Signature)
Notify the Shift Manager that TM has been removed and the required restoration testing can be performed
- 10. Instructions Used for TM Restoration Testing
- 11. Testing Performed By 12. Testing Performed By 13. Date (Name - Please Print) (Signature)
- 14. Shift Manager (Print & Sign) 15. Date Part G. Post Restoration Review (Completed by Shift ManagerlDesignee following restoration)
- 1. Post restoration testing completed satisfactorily? LI YES El NO
- 2. All Documentation satisfactorily completed? [: YES EL NO
- 3. Temporary drawings removed from Control Room/any other w YES E] NO location? I__YES____NO
- 4. Procedures changed to eliminate TM? (Review Part A) 1 [ YES El NO Form No. 730749 (May 2011)
Temporary Modification C A 3 P o f 11* S Dominion-
- 5. Necessary Station Personal notified? [E YES E: NO
- 6. TM Tags removed? Dj YES F1 NO
- 7. TM Log updated? [] YES El NO
- 8. Shift Manager (Print & Sign) 9. Date Part H. Monthly Audit INITIAL DATE COMMENTS ON AUDIT 1.
2. 3. 4. 5. 6. 7. 8. 9. 10. Form No. 730749 (May 2011)
Temporary Modification T A H 3 Pa 7 of. 1
;FDominion Part A, DESCRIPTION RHR-600 is a 3/4" SR sample valve located off RHR line 10-AC-601 R1 1. A leak repair enclosure, which incorporates a strongback design, will be installed to seal the leak and also prevent the piping/valve from separating from the 10" RHR 1A HX discharge line in event of complete weld failure.
This is a short duration TM, which allows the unit to enter Mode 4 from Mode 5 for permanent repair of the fitting leak. Upon entry into Mode 4, the A train of RHR can be removed from service and the leaking weld repaired. Quality Classification RHR-600 and associated pipe and tubing is SR [1]. All parts used for the leak sealant enclosure are SR. ASME B&PV Code RHR-600 and adjoining pipe is classified as ASME Section Xl Class 2 [2]. ASME Section Xl, Appendix IX provides direction on the use of mechanical clamping devices on Class 2 and 3 piping pressure boundary. The requirements of this appendix will be used to demonstrate the acceptability of this repair on the leaking fitting. Note that Article IX-1 000 prohibits the use of a clamping device on portions of a system that forms the containment boundary. RHR-600 is credited with maintaining containment boundary and therefore the leak sealant injection portion of this TM cannot be performed without a NRC Relief Request. Auxiliary Cooling (AC) System Temperature and Pressure The design pressure and temperature of the piping, AC-601 R-1 1, is 600 psig and 400 -F [5]. The leak sealant enclosure will be designed to these conditions. The TM will be installed and the leak sealant injected in Mode 5. RCS pressure will be maintained greater than 340 psig. The operating pressure will be used to determine the injection pressure for the leak compound. This will assist in preventing injection of sealant into the system. The maximum RCS temperature for this mode is 1950 F [7]. During sealant injection, the RHR heat exchanger outlet temperature will be maintained between 150 - 200 OF. The X-36 sealant is rated for injection from a temperature of 140°F up to 400 °F [15], and is therefore suitable for this application. Overview The leak repair will be completed using a hub clamp assembly designed and fabricated by TEAM Industrial Services, Inc. This assembly incorporates a leak sealant enclosure into a strongback clamp design. Two #10-24 set screws, tightened to 36 in-lbs, are included in the hub assembly. These set screws tighten onto the 3/4" pipe between the leaking sockolet fitting and RHR-600 and will prevent ejection of the 3/4" pipe and RHR-600 in the event of a full circumferential failure of the leaking 3/4" sockolet weld. As an added measure of safety, the hub clamp will also be attached to the 3/4" pipe using a full circumferential structural 3/16" fillet weld. Form No. 730749 (May 2011)
Temporary Modification I C5- AA-D 0 ATAHMN 3 Pag 8 of1 i,- Dominion I This weld, in conjunction with the set screws, is more than adequate to restrain the 520 lbf separation thrust [12] and ensures that no catastrophic separation of the 3/4' line above the leaking sockolet can occur. The leak sealant enclosure is made of stainless steel and, along with the X-36 sealant, provides the pressure boundary up to the design temperature and pressure of the AC pipe, which is 600 psig and 400'F. The studs, which secure the leak sealant enclosure, are tightened to 126 ft-lbs [12]. General Desigqn Requirements (IX-3100) Defect Characterization:The defect is characterized as a pinhole leak in the fillet weld of the 3/4" sockolet upstream of RHR-600. The leak is documented in CRs 472654 and 472226. The apparent failure mode of the leak will be determined by follow-up analysis. Since more accurate data on the defect size or potential for propagation is not available, this TM assumes catastrophic failure as characterized by full circumferential failure of the W"sockolet weld. This failure will not result in ejection of any pipe or RHR-600 because of the restraint provided by the hub clamp installed for leak sealant injection. Material compatibility[12]: The hub clamp is constructed of SA240 Gr 304/316 material. Studs and all-thread material are SA193 Gr B8, hex nuts are SA1 94 Gr 8, and set screws are ANSI B18.3 stainless steel. All materials are acceptable for use with borated water in the AC system. TEAM Industrial Services compound X-36 will be injected into the enclosure to provide temporary repair of the system pressure boundary. Sealant X-36 has a low concentration of Halogens/Chlorides and is acceptable for use on stainless steel [8]. Defect size: The defect size assumed for the design of the sealant enclosure is a full circumferential failure of the leaking 3/4" pipe socket weld. Per Reference 12, the leak sealant enclosure is adequately designed for this application. These calculations establish the enclosure size and construction, as well as maximum sealant injection pressure and volume necessary to provide the system pressure boundary. Identifying maximum sealant injection volume prevents over-injection and intrusion of the sealant into plant systems. Additional supports: The installation of the enclosure adds a 71 lb point load [12] to line 10-AC-601 R11 between hangers RHR-H9 and RHR-H55 [3]. This load increase is less than 5% of the weight of the supported pipe and is considered within design tolerance. Therefore, no further evaluation of this load addition is required [4]. By virtue of their relatively light weight and their being secured to the 34" and 10" pipe, the leak sealant enclosure does not adversely affect the seismic qualification of the pipe or adjacent equipment Clamping Device (IX-3200) As described above, the hub clamp is constructed of SA240 Gr 304/316 material. Studs and all-thread material are SA1 93 Gr B8, hex nuts are SA1 94 Gr 8, and set screws are ANSI B1 8.3. stainless steel. The leak sealant enclosure is designed to meet Table IX-3200-1 Level A stress limits as well as meet the bounding pressure and temperature requirements of the Auxiliary Cooling System [12]. Fo-r No. 730749 tMay 2011)
Temporary Modification CMAATC-0 ATAHMN 3~ Pag 9 of 11 ii Dominion Piping System (IX-3300) Leak Sealant
Enclosure:
The leak sealant enclosure will be secured rigidly to the 10-inch pipe using a strongback design. The friction between the clamp and the pipe is significant compared to the seismic forces of the relatively light weight clamp and enclosure. The clamp and enclosure are fabricated from SA-204 Gr 304/316 stainless steel and are well stiffened to resist the self weight seismic forces. Vibration: The pipe in question is at the outlet to the RHR heat exchanger and is well supported near the repair area. Vibration is not considered to be the apparent cause of the defect in the weld. Consequently, vibration was not considered in the design of the leak sealant enclosure. PipingEvaluation/Stress:The proposed leak sealant enclosure introduces a relatively small load to the pipe configuration due to the enclosure's weight of approximately 71 lbs and the additional seismic forces associated with the clamps weight multiplied by seismic accelerations. Seismic forces on this configuration will be resisted by the frictional force of the pipe clamp around the 10-inch pipe. The clamp's load will be shared by two supports located 6 to 8 feet horizontally from the sample line's connection to this pipe. Refer to KPS Drawing M-962-2 for the piping and hanger configuration. The existing pipe stress analysis, KPS Calculation RHR-34-004, indicates the stresses for the total span between the supports are relatively small on the order of less than half of the allowable stresses. Considering that the weight of the clamp is less than 5% of the weight of this span of 10 inch diameter pipe, and that the combined pipe stresses are low, it is reasonable to conclude that installing this clamp would not have an adverse affect on the integrity of this piping system including design basis loading conditions. In addition, KPS procedure NEP-04.16, "Piping Configuration Reconciliation to Comply with IEB 79-14" does not require re-analysis of piping systems for weight additions of less than 5%. Joint stiffness: There is no appreciable change in the stiffness of the RHR piping system due to the addition of the leak sealant enclosure.. Constrainingeffects: The clamp holding the leak sealant enclosure is a single clamp band with a 3/16" filet weld at the /" pipe interface. The clamp will not constrain the pipe significantly during thermal expansion. Defect growth: The friction resistance of the pipe clamp and the rigid connection of the leak sealant enclosure stabilizes the % inch pipe and valve, reducing stress. Therefore the defect is not expected to grow during the very short timeframe this TM will be installed. Monitoring Requirement (IX-6000) Compliance with the monitoring requirements of IX-6000 shall be described in relief request No. RR-2-3 (Ref. letter to NRC dated 4129/12, Serial No. 12-319). Sealant Iniection The sealant will be injected at a pressure based on the system operating pressure. Thus, the system pressure will prevent the sealant from entering the system piping. The allowed quantity Form No. 730749 (May 2011)
Temporary Modification C A0I - I A P .0 e 6o i- Dominion of sealant to be injected is calculated to be 6.272 in3 [12]. This volume will be procedurally controlled via GMP-206, Leak Sealant Injection Repair of Steel Components. Sealant will be injected to stop the leak up to maximum predetermined amount of sealant. The acceptance criteria for post-injection leakage from the joint and all other SIP (System Integrity Program) leakage is less than 6 gal/hr. Containment Isolation The leak enclosure will be located on piping outside of containment that is between the containment and the outside isolation valve. Therefore, the leak enclosure will need to [9]:
- 1. Meet Safety Class 2 design requirements.
- 2. withstand containment design temperatures
- 3. withstand internal pressure from containment structural integrity test
- 4. meet seismic Category I design requirements
- 5. be protected against a high energy line break outside of containment when need for containment isolation.
- 6. maintain leakage within the Current Licensing Basis [13]
RHR-600 is an outside Containment isolation valve for Containment Penetration 10, a Class 6 penetration. Penetration Class 6 is a system required to operate post-accident. The design and operational criteria for penetration Class 6 isolation valves are governed by the functional requirements of the system. The isolation valves at Penetration 10 are not relied upon to prevent the escape of Containment air to the atmosphere [14]. The requirements for Containment Isolation are satisfied since the enclosure will satisfy the design requirements of the RHR system. The leak sealant enclosure will be designed in accordance with ASME Section Xl, Appendix IX, Mechanical Clamping Devices for Class 2 and 3 Piping Pressure Boundary. The piping remains seismically qualified and the enclosure will remain intact during a seismic event. The leak sealant enclosure will prevent system leakage, or minimize leakage to a value that results in meeting the leakage requirements of the System Integrity Program for combined allowable leakage from the Safety Injection, RHR and Internal Containment Spray systems. Operations The leak seal enclosure is located near RHR-600. The installation of this TM does not restrict operation of the valve or require any modification to the valve itself. References
- 1. XK-100-18, Rev. BA
- 2. ISIXK-100-18, Rev. AC
- 3. M-962-2, Rev. A
- 4. ANSI/ASME Code Reconciliation For Replacement Material, Parts, And Components, Kewaunee Power Station, Revision 3, July 6, 2010 Form No. 730749 (May 2011)
Temporary Modification CMAATC0 ATAHMN 3 Pag 11 of 11 iP Dominion
- 5. XK-100-371, Rev. 5
- 6. ASME B&PV Code, 1998
- 7. OP-KW-GOP-102, Rev. 13
- 8. Consumable Material Evaluation (CME) 10000005744
- 9. ANSI N271-1976, Containment Isolation Provisions for Fluid Systems.
- 10. KPS Calculation RHR-34-004, Pipe Stress Report (Rhr-34-004) For Residual Heat Removal Piping System Analytical Part No. Rhr-34-004, Rev. 1, 19900228, CA706184
- 11. CEM-0049 and Addendum O0A, Rev 000, Evaluation Of Compensatory Measure Taken In Response To Identified Leakage At 3/4" Drain Line Valve 2-RH-33 Off Line 14"-RH-1 18-602
- 12. TEAM Industrial Services Engineering Order 91511 dated 04/28/2012
- 13. System Integrity Program, Rev. 6
- 14. Darrell G. Eisenhut, NRC Director Division of Licensing, to C.W. Giesler, Wisconsin Public Service Corporation, Exemption to Certain 10 CFR 50 Appendix J Requirements, dated September 30, 1982.
- 15. TEAM email, 04/29/2012 Form No. 730749 (May 2011)
IIndustrial Services Registration# F-003143 Engineering Department Tel: (281) 388-5695 Fax: (281) 388-5690 ROUTING SLIP & COVER SHEET FOR NUCLEAR SAFETY RELATED JOBS Branch Work Order #: 203-04270 __ 1Status: Priority-- Caller: Chad Preston Customer: Domion Energy Safety Review #: 91511 Engr Order #: 91511 1Name: Signature: _ Date: Time: Data Taken By: Heather Hodges - 4/28/2012 06:00 Designed By: Heather Hodges 4/28/2012 13:08 Verified By: Andrew Campbell - 4/28/2012 f 14:15 Shop Received By: T _ QC Received By: _ Specifications: Temperature: 0 F Design Pressure: 600 psi Service: Reactor Coolant Torque Value: 126 ft-lb Total Weight: 70.85 Void: 6.2ý n3--BC(A3) Sealant Type* X36 w/G-Fiber Do Not Paint Note: ASME SECTION XI, APPENDIX IX QC FINAL INSPECTION REQUIRED Nuclear - Safety Related MTRs and COCs Required PMI Required Bill of Materials: SDescription: Material: Qty: Clamp Hub SA 240 GR 304 / 316 Qty: 2 Strongback SA 240 GR 304 / 316 SA 193 GR B8 /8M 1 5/8"-1 1UNC STUDS 4 __ 1/2"-13UNC ALLTHREADS SA 193 GRB8 /8M 5/8" HEX NUTS SA 194 GR 8/8M 8 1/2" HEX NUTS SA 194 GR 8/8M 8
#10-24UNC SET SCREWS ANSI B18.3 STAINLESS STEEL 2 SEALANT X-36 1 TUBE I -tý q
Rev. 3/3/2010
'SAFETY FIRST - QUALITY ALWAYS" bi Elvi:i .C 1-fleD1111 0)3/41" 0*3/41" (2) PLACES NOTES:
- 1. APPROVED TO MANUFACTURE A ECO# 12489
- 2. 1/4" X0.12" TUBING GROOVES INHUB FACE 4/28/2012
- 3. 3/16" X 0.09" TUBING GROOVES INBORE
- 4. INSTALL STAINLESS TUBING REGISTRATION # F-003143 5.
6. DRILL &TAP (2)1/4-NPT INJECTION PORTS INCAVITY MAX INJECTION PRESSURE: 1000 PSI + STATIC 11T E A Mj Industrial Services, mB m% - Pr-PlKAr-Tr-P Vni
..... .... .3 rAnL L
IMIAq PC BC-
- 7. (2)HALVES REQUIRED ENGINEERING ORDER# 91511EM WT. 71 LBSVOL i627ý'-I61NA3 BC OTTWRTE ME&lS SPECFME
- 8. ALL DIMENSIONS ARE TYPICAL UNLESS NOTED DRAWING # N/A DOMINION
- 9. D/T (2) #10-24UNC CUP TIP SETSCREWS IN 1.07- BORE, TECO PART # N/A TQ: 36 IN*LBS HUB CLAMP
- 10. NUCLEAR SAFTEY RELATED - DO NOT PAINT WPS: N/A FRACIUO /132
- 11. ASME SECTION XI, APPENDIX IX DRAWN BY: HH 4/28/2012 ATIGEI 11I2*
- 12. **PLANT WILL WELD FILLET WELD TO THE PIPE ON 1.17 BORE ,M PlACE DECA4AL I=r SIZE A REV_0 OF THE CLAMP CHECKED BY: AC 4/28/2012 ALLOMENSWTO INNCMl
-L L IICALE: 1:4 l]SHEET I O)F 2 L
3 FEEIT rI-K31 - WiUALI IT LWAYS A ECO# 12ý489 4/28/2012 1 ( 3/4)A (4) PLACES F 3/8' R5 3/8' 13" I REGISTRATION # F-003143 NOTES:
- 1. (1) RE( )UIRED
- Industrial Services, Inc! PFPIKAFTF~ VflI PERIMETER VOL (A"))
INIA' RA INA3 Bf-I ENGINEERING ORDER# 91511EM WT- 71 LBSvOL r27 4--I31NA3 BC
- 2. SEND (4) 5/8-11 UNC X 24" LONG ALLTHREADS
- 3. SEND :8) 5/8 HEAVY HEX NUTS DRAWING # N/A DOMINION TECO PART # N/A HUB CLAMP TOLERANCS:
WPS: N/A EPXCTiO`NAL 1i1tm ANGUSAR tin, DRAWN BY: HIH 4/28/2012 IWOMCE OE#A IiOEPLACE OlCi1-toM= Zor SIZE A IREV 0 ICHECKED BY: AC f4fY/28/202 AL W4MI NE SCALE: 1:4 ISHFEETn F 2 ISHEE 2 OF 2
UIndustrial Services, Inc. Sheet 1 of 1 Registration # F-003143 MATERIAL SPECIFICATIONS F1 Non-Critical/Nuclear LI Critical/Nuclear Drawn By: HH Date: 04/28/2012 Engineering Order No.: 91511EM Checked By: AC Date: 04/28/2012 Enclosures Material Specification MTR COC NR PIPE FITTING ROLLED PLATE BLOCK / PLATE / SIDEBARS SA 240 GR 304 / 316 X ENDPLATES STRONGBACK BARS SA 240 GR 304 / 316 X S.B. EARS/FINGERS Fasteners _ ___ STUDS ENCLOSURE SA 193 GR B8 / 8M X STUDS STRONGBACK SA 193 GR 18 / 8M X NUTS ENCLOSURE SA 194 GR 8 / 8M X NUTS STRONGBACK SA 194 GR 818M X SET SCREWS Stainless Steel ANSI B 18.3 X HTS FLANGE TEE RUN (if fabricated) BRANCH (if fabricated) FITTING WELD-O-LET VALVE FES Miscellaneous 05/26/2009
TEAM INDUSTRIAL SERVICES, INC. V hi ENGINEERING DATA COVER SHEET Rev. 12116104 Branc *ork Order #:
)J'/>
o- Qc(o7 Routine: D1 Customer: LRS: HTS: ] Oth Customer #: Ship To.~ ct 61246 Technician Name(s): Date: ." :
-ei45i01. - 1-,kPW 4/~j 6__/y PRESSURE TEMPERATURE i Design: 06 0 Design: Service: *I2_4 Coc. -
60#o-. Package Requirements': (pheck all that are immediately needed) (Check one only) Drawings . For Inimedlate Manufacture Calculations . * ,'Wait for Approval of Package I Price Price (If so C1 ballpark or by engineering) El Price Only I No Calculations/Drawings ate.and Time Required:
.Fax/Email Prints and Calculations: john.p.schroeder@dOm.com To Customer "Name: *, #., !, . . _Fax No:
tTo Branch I)S~. ~ )E-mail:
%'k"-t bereH El Notify Branch Supervisor after faxing *Name: Phone No: ___________
El Immediately El Next Business Day Special Requirements: Strong back needed for separation I vibration jE Stress Relief Required by Customer El IfLifting Lugs are required, where should they be located? El PE Stamp El Are there specific requirements Icodes for this customer? [] MTRs and COCs El Other DESCRIPTION OF ITEM TO BE BUILT (HTS ONLY) STYLE OF FITTING (HTS ONLY) [0 Hot Tap Fitting: 07 Split Tee El Line Stop Fitting: El Full Encirclement Reinforcing Saddle (0 with Nozzle?) (Saddle is non-pressure retaining) El HI-Stop Fitting: El Bolt-on Other. O Ii Weld-o-let" [F Sadidle / Scarfed Nozzle If Tap Size: Existing Line Schedule: Requ ested Nozzle Schedule: V
FORM 104.2 Quality System Supplement TEAM .A 11 Corporate Rev: 5 Page I of 2 NUCLEAR AUTHORIZATION / CONTRACT REVIEW CHECKLIST (NACL) TMS Division o PART A: Used for material only orders and in conjunction with PART B for service related work. Limit 3jobs per Team Job #n/ CJ #. All threejobs must be within the same service line. Submitted by: , Branch: -ý/( 3 Date: /-If- . Utility: ./ , Plant / Location: ,o .
Contact:
/flkt. &*k/eL- Phone#: Z - 393'- 33" Customer Conft-act/Work Order/PC#: Team Job #:c 0 30,y ' 7? Personnel: l. , 2. (1, .e,- . . 3. 2A, 7;L.-1i&E,--4. Shift: ,44I&O1*- .Additional Personnel: Pre-Job Check List: A new form must be completed each day, by each shift andPriorto any work beign'erformed(
- 1. All Pre-JobSteps must be initialedby the Team IndustrialServices, Inc. technicianwho is leadingactivities at the work site priorto any work beingperformed.
- 2. The Owner Representative must initialStep 8 priorto any work being performed
- 3. All TISI employees on thejob must sign Step #9 prior to any work bePngperformed Steps: Yes No Initial Date Comments:
- 1. Has JSA been com pleted? 1 3, /z ......
- 2. Has Tech. Support been contacted? (Critical Job Review) 4- El 51zi CJ#: T1517
- 3. Have Team personnel READ and do they UNDERSTAND the Owner z Engineemri Control?
- t_ .'u ] E rC d#: 3 *- \
- 4. Have Team personnel verified procedure(s) to be used?' W 1 / f/ rodu.re.#: 3*301
- 5. Have Team personnel READ and UNDERSTOOD the Owner WO. Scope? 0l W.O. #: KW106 ooq' 1
- 6. Have Team personnel been briefed on Owner W.O. Scope and received copy of WO.? 1 , 71__
- 7. Have Team personnel had a Rad. Protection Brief? , q17..
- 8. Has Owner Representative verified all Steps have been performed? 0 *Owner Rep. to Initial.
- 9. Signatures of all Team Personnel:;
o PART B: Used in conjunction with PART A for all service related work. PART B is not required for material only orders. For TechnicalSupport Use Only Number of Jobs reviewed: 1[-] 20-] 3E] Comments: Reviewed by: Signature: Date: ,J-ob f onxuition :__ Re1u7r~ments ". - .. Service Line:/ -$ Leak Severity: f Notifications: Safety Related: Yes j No I' Quality Assurance: Yes a No E] Line Size: /0/(31*7 Service: F*¢fctV ' oci,*" Health Physics: Yes E? No E] Unit: .J Exp. Rate: Yi"OM' Procedure #: 1Rev. I: Op. Temp: /O I Op. Press: 0 Materials & Equipment Design Temp: Y090 0 Design Press: 60& #: Sealant Type: X-5 Y-VAlt,C Lot #: Equip.ID#: ID/k- 60'o SealantType: ,6-7'b r )&JtC_ý Lot#: Comments/Description of Job: Fabrication Data _aeCec,5ic-al iLnc.c* I Mill Tests: Yes NJ No E] N See. III: Yes El No [] Has the Customer expressed mechanical inte*-itY concerns for the component? Yes N- No Plant Rep. (print): 4¢4%, . 9 Initials: 9 Design Caics.: YesS No E] I Engr. Dwgs.: Yes % No Ll
**
- o~ *., o a In i t ia l s : *
,*t0L . P o sitiv e M ate ri al I de n ti fi a o n Ye .
TISI Tech. (print): I s Pication: Yes. No o[][
FORM 104.2 Quality System Supplement TEAM Corporate Rev: 5 Page 2 of 2 NUCLEAR AUTHORIZATION i CONTRACT REVIEW CHECKLIST (NACL) TMS Division Job #2 Information Requirements "t ice Line: Leak Severity: ' ications: Safety Related: Yes E] No E) Lne e:'SevQuality Assurance: Yes 13 No 13 Line e: Service: "-ealth Physics: Yes 13 No E] Unit: Exp. Rate: Procedure #: Rev. #: Op. Temp: Op. Press: M at s & Equipment Design Temp: Design Press: Sealant Type: Lot #: Equip. ID #: Sealant Type: Lot #: Comments/Description of Job: Fabrication Dao CMill Tests: Yes 13 No 13 Sec. III: Ye- No E] Has the Customer expressed mechanical inte. concerns for the component? Yes [I No E3 Plant Rep. (print): Initials: Design Calcs.: Yes [] No EI Engr. Dwgs.: Yes 13 o TISI Tech. (print): Initials: Positive Material Identification: Yes E3 No 13 Job#3,.Information _ Requirements ice Line: Leak Severity: tifications: Safety Related: Yes E3 No E] Line SerQuality Assurance: Yes E] No E] Line Si Service: Health Physics: Yes 13 No E] Unit: Exp. Rate: Procedure #: I Rev. #: Op. Ternp: Op. Press: Agerials & Equipment Design Temp: Design Press: Sealant Type: Lot#: Equip. ID #: Sealant Type: Lot #: Comments/Description of Job: Fabrication Da Mill Tests: Yes E3 No E3 See. III: No 13 Has the Customer expressed mechanical integrity co'erns for the component? I Yes [I No El Plant Rep. (print): Initials: I Design Calcs.: Yes E] No 13 Engr. Dwgs.: Yes [ No 13 TISI Tech. (print): Initials: rPositive Material Identification: Yes 13 No 1. Post Job Steps:
- 1. All Post-JobSteps must be initialedby the Team IndustrialServices, Inc. technicianwho is leading activitiesat the work site.
- 2. Post-Jobmust be signed by customer representative.
Steps: Yes No Initial Date Comments: Complete sign-off ofjob package. _ 9 C_____________ Complete sign-off of Team's procedure. 0, (0 1 ~ z-Complete Work Records and have Owner sign. 13 g.g ¢ Plant Representative (print): I 4~4-/,sb,-- Signature: , /,4 . r/-'.- TISI Technician (print): AI 5(/, j Signature: Additional Comments:
DS 136 TEE COUPLET AND/OR WELD-O-LET E]SCREWEDISOCKET E]SMLS. BUTT WELD FITTING GIVEN'BY: C... I DATE: Z/- ff-- PLANT: I ,I UN: CHKD. BY: /- DATE: 2& - --SURFACE CONDITION: &0, LINE SIZE: 1tO - '" SEVER-IY OF LEAK: t ON 10 SHIP TO: (A IDIMENSIONAL I DATA I LTR. DIM. Al Bi Cl 10,7 - D1 1o, 760 El A2 B2 C2 D2 10. Z - E2 A3 B3 C31 D3 C3 D3 CA, B3 1.0zSo
-W3 +/- CBPTC)- BIl F- 1.25-o CMTAO) -: Al W4 ;.o [OBSTRUCTIONS G1 2.o-G2 oZap H1 .e H2 .Z5'o J1 K /
LOCATION OF BLOW: NyEW A-A)
- K '112 7ZII co~
FýSCREWED 4672- 7 1 o,,psod9- []WELDED ICOPYRIGHT 2000. Team Industrial Services. 10/2/00
Designer HH Date 04/28/2012 TEAM Industrial Services Sheet I of 7[ Checker AC Date 04/2812012 REGISTRATION # F-003143 91511EM Split Circular Endplate Analysis
References:
ASME Boiler and Pressure Vessel Code, Section II, Part D, (Table for Maximum Allowable Stresses, 2010 Edition) Formulas for Stress and Strain by Roark and Young, Fifth Edition, Table 24, Case 31 SimpLy 5upported Edge A-Fr~o Eda/ Data: Design Pressure P := 600.psi Modulus of Elasticity E := 0.279. 10 8 .psi Design Temperature T:= 400.deg Poisson's Ratio v:= 0.30 Split Endplate OD OD := 4.0.in Maximum Allowable Deflection Ymax := 0.05.in Cover Wall Thickness twvaI := 0.75.in Joint Efficiency JE:= I Split Endplate Thickness tendpl := 0.625.in External Corrosion Allowance ExtCA:= 0.in Opening Hole Diameter HD := 0.in Internal Corrosion Allowance IntCA := 0.in (Conservative) OD := OD - 2.ExtCA OD = 4.in Maximum Allowable Stress Sailow := 18300.psi taQ := twall - ExtCA - IntCA twa'1= 0.75.in tendpI := tendpl - ExtCA - IntCA tendp1 = 0.625. in Inside Radius IR:- [OD - 2(twai.)] 2 IR = 1.25-in Analysis: Solving for Modulus of Rigidity E G:= G = 10730769.23 1.psi 2.(1 + v) Solving for variables HD OD - 2 "twal a- - 2 a: a= 1.25. in C c = 0.625-in 2 2 b := a - c b =0.625- in
TEAM Industrial Services Sheet 2 of 7 S951IEM REGISTRATION # F-003143 Solving for Constants K:= 0.42338- b .81-( + 2.85046. b- cI 2- 3.17277.' +2483 (b+c b+c) \ýb+c) b+c K = 2.485
+/-.625-tendpl .G. + 2 2-b +4{ -y = 2.496 1+ 4+b2 71 = 2.463 ,F2 :- 41 4b2 ^12 ~ 7Y2= 0.406 ,F2 c2."4 -. 625-tendpl_).G(r +b2 X:=4-{1 X, = 4.231 11 2+ XIj - 2) 'Y2 Y2taflh 'y,7) x.= X- 0.292 IT ( _ 2 + X, - YI2 ta fl1{-'2.7' I
C1 : c, = 0.012 (b _2) P 1)cosh--
) c os h llY'7 C2 :=
(I\C - - 'Y2,/(_( X - 1 C2 = 0.409 Stress at A (maximum) 6.P-c-b tendpl (c
Ž.13)[ . 12.) + CT{12 7 C + o-t = 7647.346.psi Sailow = 18300.psi Deflection at B (maximum) 24"P'c 2 .b2 (b 11(
y := - 3 c 3. Cl.cosh((- ++ C2.cosh(12 7T) + b y = 0.in < Ymax = 005rn E, tendp1 Minimum Cover Wall Thickness treqd :=(JE'Sa,,ow,)P. IR- (0.6.P) (.6P)trqd trqd(J~aio)
=0.04181I-in < t,,,ji 0.75-in
TEAM Industrial Services Sheet 3 of 7 REGISTRATION # F-003143 91511EM Line Enclosure Analysis
Purpose:
This analysis will calculate the internal stresses and bolt load of a line enclosure.
References:
ASME Boiler and Pressure Vessel Code, Section II, Part D, (Table for Maximum Allowable Stresses), 2010 Edition Team Industrial Services, Teco Manufacturing, Engineering Department, ISO-9001 Quality Manual, FP8.7 13L F2') I F ,. I ~ \+ R1 Dimens ions Free Body Diagram Data: Design Pressure P = 600.psi Length Between Centerline of Seals LS := 30. in Design Temperature T = 400.deg Sidebar Length (at Centerline) LB := 3.0.in Inside Radius R:= IR - IntCA R = 1.25.in # of Studs per Half NS2:= I Cover Thickness t:= twa11 + IntCA t = 0.75.in Hole Size h:= 0.75-in Cavity to Stud CL A:= 0.625.in Stud Tensile Area TA := 0.226.in2 End of Sidebar to Stud CL B 0.875-in Stud Allowable Stress Ss := 13800.psi OD Sidebar Thickness ts .- ts = 2in Enclosure Allowable Stress Sailow = 18300.psi 2 External Corrosion Allowance ExtCA = 0.in Intemal Corrosion Allowance IntCA = 0.in R:= R + IntCA R = 1.25-in B:= B - ExtCA B = 0.875.in t:= t - ExtCA - IntCA t = 0.75.in LB := LB - 2.ExtCA LB = 3-in A:= A- IntCA A= 0.625.in ts := ts - ExtCA ts = 2,in
TEAM Industrial Services Sheet 4 of 7 REGISTRATION # F-003143 91511 EM Analysis: Solving for forces and moments F:= P.R.LS F,:= F FY: F = 2250.1bf Fx = 2250.1bf FY=2250*lbf Setting forces in x direction equal to 0 R2 := F. R2 = 2250.lbf Setting moments around centerpoint of cavity equal to 0 t A+ B - - 2 BL:= F. BL = 2892.857.1bf BL := if(BL < F,F,BL) BL = 2892.857.lbf B Allowable Bolt Load BLa:= TA.Ss-NS2 BLa = 3118.8l1bf Stresses in Shell (thin walled enclosure) or:= P.R cr = I000.psi t Sidebar Stress (at Bolt Centerline) Rl := BL - F R, = 642.857?lbf ts 2 Ob2 := 0-b2 =375-psi 1-2.(LB - NS2.h).ts3 3 F
-,= 750*psi 2 (LB - NS2-h).ts Results:
Less Than Bolt Load Allowable BL = 2892.86.lbf BLa = 3118.8"1bf Stresses in Shell (thin walled enclosure) cr = 1000.psi Salow = 18300"psi Sidebar Stresses (@ bolt centerline) ob2 = 375-psi Sa,)ow = 18300.psi Shear Stresses in Sidebar Ts = 750-psi 0.8'Sailow = 14640.psi
TEAM Industrial Services Sheet 5 of 7. REGISTRATION # F-003143 91511EM Thrust Calculation Due to Unequal Bores Seal Length # 1 DI := 3.5.in Seal Length # 2 D2:= 3.5-in Smaller Diameter d:= 1.05-in Injection Pressure IP:= 1000.psi Number of Studs N:= 4 Size of Studs 5/8-11 UNC 2 Tensile Area of Studs At:= 0.226.in Stud Allowable Stress SS := 13800.psi H:= At.SS Allowable Load of Studs H = 3118.8.lbf Thrust Produced Thrust:= (D1-D2 - d2.4)-IP Thrust = 11384.099.lbf Number of Studs Required Thrust ND. ND = 3.65 N=4 H Force per Stud Thrust F = 2846.025.lbf N Thrust Calculation Due to Separation Diameter d:= 1.05.in Design Pressure p:= 600.psi Number of Set screws Ns:= 2 Size of Set Screws #10 x24 UNC (Cup Tip) Holding Power of Set Screws Hs:= 262.1bf Thrust due to separation Ts := (d ).2P Ts = 519.541 lbf 4 Number of Set Screws Required Ts NDs := NDs = 1.983 Hs Force per Set Screw Ts Fs := - Fs = 259.77.lbf Ns
TEAM Industrial Services Sheet 6 of 7 REGISTRATION # F-003143 91511EMI Thrust and Bending Calculation - Hub Thrust Produced Thrust = 11384.099.1bf Moment Arm X:= 3.375.in Total Width B:= OD B=4.in Number of Studs per Half NS := 2 Cavity b := (IR- IntCA).2 b = 2.5-in Allowable Stress Sa,,ow = 18300.psi Thickness Provided (After Radius) tp:= 2.375.in Joint Efficiency E:= 1.0 Force per Half Thrust Fs NS-= Fs = 5692.049-1bf Thickness Required S 6-Fs-X tr:= tr = 2.049-in < tp =2.375 -in 4(B - b).E(Saiiow) Thrust and Bending Calculation - Flat Bar Thrust Produced Thrust = 11384.099 1bf Moment Arm X:= 3.9.in Total Width B:= 3.in Number of Studs NS = 2 Cavity b:= 0.in Allowable Stress Salow = 18300-psi Thickness Provided (After Radius) tp:= 1.625"in Joint Efficiency E:= I Force per Half Fs. Thrust Fs = 5692.049.1bf NS Thickness Required I 6.Fs-X tr= 1.558-in <tp = 1.625 -in
= (B - b)'E'(Saiiow)
TEAM Industrial Services Sheet 7 of 7 REGISTRATION # F-003143 91511EMI. Weight and Void A ECO # 12489 04/28/2122 Void Injection Valves NIV:= 2 InjVlv:= NIV.0.19.in 3 3 InjVlv = 0.38.in 3 2 7T Cavity := (2.5.in) .-. (1.57.in)AI) Cavity = 7.707.in 4 Line := (1.5.in) 4(0.75.in)
-. + (1.05.in)2.4.(0.5650.in) 3 4 4 Line= 1.815.in Void:= Cavity - Line + TnjVlv Void= 6.272.in3 B.C.
Weight (Clamp & Stronqback from SolidWorks Models) Clamp:= 17.96.1b.2 Clamp = 35.92.lb allthread := 4.0.087 lb.24.in + 8.0.1 1lb allthread = 9.232.lb in Studs:= 4.0.087lb-8.in+ 8.0.11-db Studs = 3.664-Ib in lb Sealant Void- 1.35.0.043 -- Sealant= 0.364.lb "4 in InjValves:= NIV.0.46.lb InjValves = 0.92lb Strongback := 20.56.lb Strongback = 20.56.lb Weight:= Clamp + allthread + Sealant + InjValves + Strongback + Studs Weight = 70.66.1b}}