|
---|
Category:Letter
MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion ML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22083A0032022-03-29029 March 2022 Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) 2024-01-08
[Table view] |
Text
C (c DUKE Sharon W. Peavyhouse ENERGY H. B. Robinson Steam Electric Plant Unit 2 Dir Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Hartsville, SC 29550 0:843857 1584 F: 8438571319 Sharon.Peavyhouse@duke-ener gv. corn 10 CFR 55.40 Serial: RN P-RAIl 4-0089 AUG 0 4 ZO1 Mr. Mark Bates Senior Operations Engineer U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE Sui te 1200 Atlanta, Georgia 30303-1 257 H. B. ROB1NSON STEAM ELECTRIC PLANT, UNIT NO.2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REVISED REACTOR OPERATOR AND SENIOR REACTOR OPERAT INITIAL EXAMINATIONS OR
Dear Mr. Bates:
In accordance with the guidelines in Revision 9, Supplement 1, of NU Licensing Examination Standards REG-1 021, Operator for Power Reactors, Duke Energy enclosed operating test for examin Progress, Inc., is providing the ations scheduled to begin the wee k of August 18, 2014.
As required by Attachment 1 of Rev ision 9, Supplement 1, of NURE Examination Security and Integrit G-1 021, Section ES-201, y Considerations, please ensure materials are withheld from public that these examination disclosure until after the examinatio ns are complete.
If you have any questions concern ing this matter, please contact Mr.
1656. James Conder at (843) 857-Since rely, 4j t-;i Sharon Wheeler-Peavyhouse Director Nuc Org Effectiveness
United States Nucear Regul atory Commission Serial: RNP-RAJ14-0089 Page2of2 SW P/cac Enclosure C: Document Control Desk (wlo Enclosure)
NRC Resident (nspector, HBRSEP (w/o Enclosure)
Mr. V. McCree, NRC, Regio n Ii (w/o Enclosure)
Ms. Martha Barillas, NRC (w/o Enclosure)
Mr. M. T. Widmann, NRC, Region Ii (wlo Enclosure)
( DUKE Sharon H. 6. Robinson Steam ENERGY Duke Energy Progress 3581 West Entrance Road Harts vile, Sc 29550 0: 813 857 1584 F; 843 857 1319 Sharan.PeavyhouseC4duke_e,zergy corn 10 CFR 55.40 Serial: RNP-RAI14-0022 ju 0 4 N; Mr. Mark Bates Senior Operations Engineer U. S. Nuclear Regulatory Commission Regi- on II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLA NT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED UCENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPE RATOR INITIAL EXAMINATION OUTLINE S
Dear Mr. Bates:
In accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1 021, Operator Licensing Examination Standards for Pow er Reactors, Duke Energy Progress, Inc.
enclosed outlines for examinations schedule is providing the d to begin the week of August 18, 2014 Pursuant to 10 CFR 55.40(b)(3), Mr. Jam es Conder, as the designated authorized the H. B. Robinson Steam Electric Plant, Unit representative of No. 2, has approved these outlines for exam the applicants. ination of As required by Revision 9, Supplement 1, of NUREG-1 021, Section ES-201, Initial Oper Licensing Examination Process, please ens ator ure that these outlines are withheld from disclosure until after the examinations are public complete.
If you have any questions concerning this matt er, please contact Mr. James Conder at 1656. (843) 857-Sincerely, Sharon W. Peavyhouse Director Nuc Org Effectiveness
United States Nuclear Regulatory Commission Serial: RNP-RA/140022 Page 2 of 2 SW P/cac Enclosure C: Document Control Desk (w/o Enclosure)
NRC Resident Inspector, HBRSEp (w/o Enclosure)
Mr. V. McCree, NRC, Region II (w/o Enclosure)
Ms. Martha Barillas, NRC (w/o Enclosure)
Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)
( DUKE Sharon W. Pea vyhouse ENERGY H. B. Robinson Steam Electric Plant Unit 2 Dir Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Harts vile, SC 29550 0: 843 857 1584 F: 843 857 1319 Sharon.Peavyhouse@duke-energy.c o,n 10 CFR 55.40 Serial: RNP-RA/1 4-0023 JUN 302014 Mr. Mark Bates Senior Operations Engineer U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE Sui te 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EX AMINATIONS
Dear Mr. Bates:
In accordance with the guidelines in Revision 9, Supplement 1, of NURE Licensing Examination Standards for G-1 021, Operator Power Reactors, Duke Energy Pro enclosed operating test for examin gress, Inc., is providing the ations scheduled to begin the week of August 18, 2014.
As required by Attachment 1 of Rev ision 9, Supplement 1, of NUREG-1 Examination Security and Integrit 021, Section ES-201, y Considerations, please ensure that materials are withheld from public disc these examination losure until after the examinations are complete.
If you have any questions concerning this matter, please contact Mr. Jam 1656. es Conder at (843) 857-Sincerely, Sharon Wheeler-Peavyhouse Director Nuc Org Effectiveness
United States Nuclear Regulatory Commission Serial: RNP-RA/1 4-0023 Page 2 of 2 SWP/cac Enclosure C: Document Control Desk (w/o Enclosure)
NRC Resident Inspector, HBRSEP (wlo Enclosure)
Mr. V. McCree, NRC, Region II (w/o Enclosure)
Ms. Martha Barillas, NRC (w/o Enclosure)
Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)