ML15167A374

From kanterella
Jump to navigation Jump to search
Initial Exam 2014-301 General Correspondence
ML15167A374
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/29/2014
From: Wheeler-Peavyhouse S
Duke Energy Corp
To: Bates M
Division of Reactor Safety II
References
Download: ML15167A374 (6)


Text

C (c DUKE Sharon W. Peavyhouse ENERGY H. B. Robinson Steam Electric Plant Unit 2 Dir Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Hartsville, SC 29550 0:843857 1584 F: 8438571319 Sharon.Peavyhouse@duke-ener gv. corn 10 CFR 55.40 Serial: RN P-RAIl 4-0089 AUG 0 4 ZO1 Mr. Mark Bates Senior Operations Engineer U. S. Nuclear Regulatory Commission

- Region II Marquis One Tower 245 Peachtree Center Ave., NE Sui te 1200 Atlanta, Georgia 30303-1 257 H. B. ROB1NSON STEAM ELECTRIC PLANT, UNIT NO.2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REVISED REACTOR OPERATOR AND SENIOR REACTOR OPERAT INITIAL EXAMINATIONS OR

Dear Mr. Bates:

In accordance with the guidelines in Revision 9, Supplement 1, of NU Licensing Examination Standards REG-1 021, Operator for Power Reactors, Duke Energy enclosed operating test for examin Progress, Inc., is providing the ations scheduled to begin the wee k of August 18, 2014.

As required by Attachment 1 of Rev ision 9, Supplement 1, of NURE Examination Security and Integrit G-1 021, Section ES-201, y Considerations, please ensure materials are withheld from public that these examination disclosure until after the examinatio ns are complete.

If you have any questions concern ing this matter, please contact Mr.

1656. James Conder at (843) 857-Since rely, 4j t-;i Sharon Wheeler-Peavyhouse Director Nuc Org Effectiveness

United States Nucear Regul atory Commission Serial: RNP-RAJ14-0089 Page2of2 SW P/cac Enclosure C: Document Control Desk (wlo Enclosure)

NRC Resident (nspector, HBRSEP (w/o Enclosure)

Mr. V. McCree, NRC, Regio n Ii (w/o Enclosure)

Ms. Martha Barillas, NRC (w/o Enclosure)

Mr. M. T. Widmann, NRC, Region Ii (wlo Enclosure)

( DUKE Sharon H. 6. Robinson Steam ENERGY Duke Energy Progress 3581 West Entrance Road Harts vile, Sc 29550 0: 813 857 1584 F; 843 857 1319 Sharan.PeavyhouseC4duke_e,zergy corn 10 CFR 55.40 Serial: RNP-RAI14-0022 ju 0 4 N; Mr. Mark Bates Senior Operations Engineer U. S. Nuclear Regulatory Commission Regi- on II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLA NT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED UCENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPE RATOR INITIAL EXAMINATION OUTLINE S

Dear Mr. Bates:

In accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1 021, Operator Licensing Examination Standards for Pow er Reactors, Duke Energy Progress, Inc.

enclosed outlines for examinations schedule is providing the d to begin the week of August 18, 2014 Pursuant to 10 CFR 55.40(b)(3), Mr. Jam es Conder, as the designated authorized the H. B. Robinson Steam Electric Plant, Unit representative of No. 2, has approved these outlines for exam the applicants. ination of As required by Revision 9, Supplement 1, of NUREG-1 021, Section ES-201, Initial Oper Licensing Examination Process, please ens ator ure that these outlines are withheld from disclosure until after the examinations are public complete.

If you have any questions concerning this matt er, please contact Mr. James Conder at 1656. (843) 857-Sincerely, Sharon W. Peavyhouse Director Nuc Org Effectiveness

United States Nuclear Regulatory Commission Serial: RNP-RA/140022 Page 2 of 2 SW P/cac Enclosure C: Document Control Desk (w/o Enclosure)

NRC Resident Inspector, HBRSEp (w/o Enclosure)

Mr. V. McCree, NRC, Region II (w/o Enclosure)

Ms. Martha Barillas, NRC (w/o Enclosure)

Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)

( DUKE Sharon W. Pea vyhouse ENERGY H. B. Robinson Steam Electric Plant Unit 2 Dir Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Harts vile, SC 29550 0: 843 857 1584 F: 843 857 1319 Sharon.Peavyhouse@duke-energy.c o,n 10 CFR 55.40 Serial: RNP-RA/1 4-0023 JUN 302014 Mr. Mark Bates Senior Operations Engineer U. S. Nuclear Regulatory Commission

- Region II Marquis One Tower 245 Peachtree Center Ave., NE Sui te 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EX AMINATIONS

Dear Mr. Bates:

In accordance with the guidelines in Revision 9, Supplement 1, of NURE Licensing Examination Standards for G-1 021, Operator Power Reactors, Duke Energy Pro enclosed operating test for examin gress, Inc., is providing the ations scheduled to begin the week of August 18, 2014.

As required by Attachment 1 of Rev ision 9, Supplement 1, of NUREG-1 Examination Security and Integrit 021, Section ES-201, y Considerations, please ensure that materials are withheld from public disc these examination losure until after the examinations are complete.

If you have any questions concerning this matter, please contact Mr. Jam 1656. es Conder at (843) 857-Sincerely, Sharon Wheeler-Peavyhouse Director Nuc Org Effectiveness

United States Nuclear Regulatory Commission Serial: RNP-RA/1 4-0023 Page 2 of 2 SWP/cac Enclosure C: Document Control Desk (w/o Enclosure)

NRC Resident Inspector, HBRSEP (wlo Enclosure)

Mr. V. McCree, NRC, Region II (w/o Enclosure)

Ms. Martha Barillas, NRC (w/o Enclosure)

Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)