ML17236A135

From kanterella
Revision as of 12:08, 4 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Acceptance for Review Regarding Traveler TSTF-565, Clarify the Term Operational Convenience in the LCO 3.0.2 Bases
ML17236A135
Person / Time
Site: Technical Specifications Task Force
Issue date: 08/29/2017
From: Michelle Honcharik
NRC/NRR/DSS/STSB
To:
Technical Specifications Task Force
Honcharik M, 301-415-1774, DSS/STSB
References
CAC MF9956
Download: ML17236A135 (1)


Text

August 29, 2017 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852

SUBJECT:

ACCEPTANCE FOR REVIEW REGARDING TRAVELER TSTF-565, CLARIFY THE TERM OPERATIONAL CONVENIENCE IN THE LCO 3.0.2 BASES (CAC NO. MF9956)

Dear Members of the Technical Specifications Task Force:

By letter dated May 9, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17130A813), you submitted to the U.S. Nuclear Regulatory Commission (NRC) a request to incorporate Traveler TSTF-565, Clarify the Term Operational Convenience in the LCO 3.0.2 Bases, into the standard technical specifications.

Section 170.21 of Title 10 of the Code of Federal Regulations requires that Travelers are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff hours have been billed accordingly. The NRC staff estimates that the review will require approximately 280 staff hours including project management time.

The NRC staff has completed a preliminary review of your submission and determined it is sufficiently complete and appropriate to initiate a more comprehensive review. The review of Traveler TSTF-565 will generally follow the schedule below.

MILESTONE SCHEDULE DATE Issue Request for Additional Information October 30, 2017 Issue Draft Safety Evaluation April 23, 2018 Issue Final Safety Evaluation July 31, 2018 Dates are provided for draft and final safety evaluations (SEs). It may be determined that SEs will not be issued, because this traveler is a bases only change. If you have any questions, please contact me at (301) 415-1774 or via e-mail to Michelle.Honcharik@nrc.gov.

Sincerely,

/RA/

Michelle C. Honcharik, Senior Project Manager Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753

ML17236A135; *concurred via e-mail NRR-106 OFFICE DSS/STSB DSS/STSB*

NAME MHoncharik JMWhitman DATE 8/29/2017 8/21/2017 Technical Specifications Task Force Project No. 753 cc:

Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James R. Morris Diablo Canyon Power Plant Building 104/5/21A P.O. Box 56 Avila Beach, CA 93424 E-mail: james.morris@pge.com Lisa L. Williams Energy Northwest Columbia Generating Station PO Box 968 Mail Drop PE20 Richland, WA 99352-0968 E-mail: llwilliams@energy-northwest.com Otto W. Gustafson Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: ogustaf@entergy.com Jordan L. Vaughan Duke Energy EC2ZF / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com Jason P. Redd Southern Nuclear Operating Company 42 Inverness Center Parkway Bin B234 Birmingham, AL 35242-4809 E-mail: jpredd@southernco.com