Letter Sequence Acceptance Review |
---|
TAC:MF3570, Clarification of Rod Position Requirements (Approved, Closed) |
|
MONTHYEARTSTF-14-06, Transmittal of TSTF-547, Revision 0, Clarification of Rod Position Requirements2014-03-0606 March 2014 Transmittal of TSTF-547, Revision 0, Clarification of Rod Position Requirements Project stage: Request ML14223A7822014-08-14014 August 2014 Acceptance for Review Regarding Traveler TSTF-547, Revision 0, Clarification of Rod Position Requirements Project stage: Acceptance Review ML14310A3442014-11-0606 November 2014 Draft RAI from Srxb TSTF-547, Clarification of Rod Position Requirements. Project stage: Draft RAI ML15187A2352015-11-20020 November 2015 Letter Transmitting the Draft SE of Traveler TSTF-547, Revision 0, Clarification of Rod Position Requirements. Project stage: Draft Approval ML15187A2182015-11-20020 November 2015 Proposed SE for Traveler TSTF-547, Rev. 0, Clarification of Rod Position Requirements Project stage: Other TSTF-15-13, TSTF Comments on Draft Model Safety Evaluation of Traveler TSTF-547, Revision 0, Clarification of Rod Position Requirements, and Transmittal of TSTF-547, Revision 12015-12-31031 December 2015 TSTF Comments on Draft Model Safety Evaluation of Traveler TSTF-547, Revision 0, Clarification of Rod Position Requirements, and Transmittal of TSTF-547, Revision 1 Project stage: Draft Request ML16012A1302016-03-0404 March 2016 Letter Transmitting Final SE of Traveler TSTF-547, Revision 1, Clarification of Rod Position Requirements Project stage: Approval ML15328A3502016-03-0404 March 2016 Final Safety Evaluation (SE) of TSTF-547, Rev. 1, Clarification of Rod Position Requirements Project stage: Approval RS-17-058, License Amendment Request to Incorporate Changes Supported by TSTF-547, Clarification of Rod Position Requirements.2017-06-30030 June 2017 License Amendment Request to Incorporate Changes Supported by TSTF-547, Clarification of Rod Position Requirements. Project stage: Request CNL-17-143, Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements, (WBN-TS-16-025)2017-11-16016 November 2017 Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements, (WBN-TS-16-025) Project stage: Supplement 2015-11-20
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML24222A4002024-08-14014 August 2024 TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review Letter ML24207A1822024-07-25025 July 2024 TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter ML24172A0542024-06-20020 June 2024 TSTF-600 Acceptance Review Letter TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML24114A2652024-04-24024 April 2024 TSTF-597 Acceptance Review Letter ML24114A2572024-04-24024 April 2024 TSTF-599 Acceptance Review Letter ML23205A2142023-08-10010 August 2023 Acceptance for Review Regarding Traveler TSTF-596, Revision 0, Expand the Applicability of the Surveillance Frequency Control Program (SFCP) ML23157A2062023-07-0505 July 2023 Acceptance for Review and Revised Schedule Regarding Traveler TSTF-576, Revise Safety/Relief Valve Requirements ML23145A2822023-06-0202 June 2023 Acceptance for Review Regarding Traveler TSTF-585, Provide an Alternative to the LCO 3.0.3 One Hour Preparation Time ML22256A2122022-09-28028 September 2022 Acceptance for Review Regarding Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22181A7442022-06-30030 June 2022 Acceptance for Review Regarding Traveler TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program ML22110A1712022-04-26026 April 2022 Acceptance for Review Regarding Traveler Tstf-584, Rev 0, Eliminate Automatic RWCU System Isolation on SLC Initiation ML22062B3362022-03-0808 March 2022 Acceptance Review of Traveler TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML20037A1292020-02-13013 February 2020 Acceptance for Review Regarding Traveler TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements ML19211D1192019-08-22022 August 2019 Acceptance Review for Traveler TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19211D2842019-08-20020 August 2019 Acceptance Review for Traveler TSTF-554, Revise Reactor Coolant Leakage Requirements ML18057A1602018-03-26026 March 2018 Acceptance for Review Regarding Traveler TSTF-569, Revise Response Time Testing Definition, ML18057A1622018-03-26026 March 2018 Acceptance for Review Regarding Traveler TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, ML18057A1592018-03-0808 March 2018 Acceptance for Review Regarding Traveler TSTF-557, Spent Fuel Storage Rack Neutron Absorber Monitoring Program ML18057A1632018-03-0808 March 2018 Acceptance for Review Regarding Traveler TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML17325B6722017-11-28028 November 2017 Acceptance for Review Regarding Traveler TSTF-564, Safety Limit MCPR ML17236A1352017-08-29029 August 2017 Acceptance for Review Regarding Traveler TSTF-565, Clarify the Term Operational Convenience in the LCO 3.0.2 Bases ML16194A0102016-08-11011 August 2016 Acceptance for Review Regarding Traveler TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement ML14223A7822014-08-14014 August 2014 Acceptance for Review Regarding Traveler TSTF-547, Revision 0, Clarification of Rod Position Requirements ML12158A5472012-06-13013 June 2012 TSTF-523 Acceptance Letter and RAIs ML12163A1592012-06-13013 June 2012 TSTF-454, Extend PCIV Completion Times (NEDC-33046), Acceptance Letter ML1128007042011-10-19019 October 2011 Acceptance for Review of Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML1111703472011-05-0606 May 2011 Acceptance for Review of Traveler TSTF-490, Revision 1, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML0827504932008-10-0707 October 2008 Acceptance for Review and Establishment of Milestone Schedule for TSTF Traveler 508, Revision 0, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation ML0715600542007-06-0707 June 2007 Acceptance for Review and Establishment of Milestone Schedule for TSTF Traveler 425, Revision 1, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5. 2024-08-14
[Table view] |
Text
August 14, 2014 Technical Specifications Task Force (TSTF) 11921 Rockville Pike, Suite 100 Rockville, MD 20852
SUBJECT:
ACCEPTANCE FOR REVIEW REGARDING TRAVELER TSTF-547, REVISION 0, "CLARIFICATION OF ROD POSITION REQUIREMENTS" (TAC NO. MF3570)
Dear Members of the TSTF:
By letter dated March 6, 2014 (Agencywide Documents Access and Management System Accession No. ML14065A582), you submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-547, Revision 0, Clarification of Rod Position Requirements.
Section 170.21 of Title 10 of the Code of Federal Regulations requires that Travelers are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff hours were billed accordingly.
The NRC staff has completed a preliminary review of your submission and determined it is sufficiently complete and appropriate to initiate a more comprehensive review. The review of Traveler TSTF-547 will generally follow the schedule below.
MILESTONE SCHEDULE DATE Requests for Additional Information (RAIs) October 3, 2014 RAI Response from TSTF January 9, 2015 Issue Notice for Comment on Model Safety May 29, 2015 Evaluation and Model Application Issue Notice of Availability for Model Safety September 28, 2015 Evaluation and Model Application If you have any questions, please contact me at (301) 415-1774 or via e-mail to Michelle.Honcharik@nrc.gov.
Sincerely,
/RA/
Michelle C. Honcharik, Sr. Project Manager Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 753 cc: See next page
ML14223A782 NRR-106 *concurred via email OFFICE DPR/PLPB DPR/PLPB DSS/SNPB DSS/STSB* DSS/SRXB DPR/PLPB DPR/PLPB NAME MHoncharik DHarrison JDean RElliott UShoop AMendiola MHoncharik (MChernoff for)
DATE 8/11/14 8/12/14 8/14/14 8/14/14 8/14/14 8/14/14 8/14/14 Technical Specifications Task Force Mailing List cc:
Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com Robert A. Slough Comanche Peak Nuclear Power Plant P. O. Box 1002, Mail Code A08 Glen Rose, TX 76043 E-mail: robert.slough@luminant.com Joseph A. Clark Entergy Nuclear South 5485 Highway 61 St. Francisville, LA 70775 E-mail: jclark@entergy.com Otto W. Gustafson Entergy Nuclear Operations, Inc.
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: ogustaf@entergy.com Henry L. Hegrat FirstEnergy Nuclear Operating Company P. O. Box 97 Perry, OH 44081 Mail Stop A-210 E-mail: hlhegrat@firstenergycorp.com