ML17296A888

From kanterella
Revision as of 05:45, 4 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Email from Usace Indicating 106 Consultation Is Complete
ML17296A888
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/28/2017
From: Moore R
US Dept of the Army, Corps of Engineers, Jacksonville District
To: Clouser M
Office of New Reactors, US Dept of the Army, Corps of Engineers, Jacksonville District
williamson a, 415-1878
References
Download: ML17296A888 (3)


Text

Williamson, Alicia From: Clouser, Megan L CIV USARMY CESAJ (US) <Megan.L.Clouser@usace.army.mil>

Sent: Monday, October 23, 2017 9:51 AM To: Williamson, Alicia

Subject:

[External_Sender] FW: RAI from THPO (UNCLASSIFIED)


Original Message-----

From: Moore, Robin E CIV USARMY CESAJ (US)

Sent: Thursday, September 28, 2017 10:54 AM To: Clouser, Megan L CIV USARMY CESAJ (US) <Megan.L.Clouser@usace.army.mil>

Subject:

RE: RAI from THPO (UNCLASSIFIED)

Hi Megan, We can close this out as their requirements are met.

Thanks, Robin E. Moore, MA/RPA Archaeologist, Regulatory Division USACE, Jacksonville District 904 232-3270 (office) 904 412-6933 (cell)

Telework Days:

Wednesday 0800-1630 Friday 0800-1630


Original Message-----

From: Clouser, Megan L CIV USARMY CESAJ (US)

Sent: Monday, September 25, 2017 10:32 AM To: Moore, Robin E CIV USARMY CESAJ (US) <Robin.E.Moore@usace.army.mil>

Subject:

FW: RAI from THPO (UNCLASSIFIED)

Good morning, just playing catch-up with some pending items. My question should have been does this mean our consultation with the tribes is now complete? Or do we need their final blessing to close this out?

Regards, Megan

Original Message-----

From: Clouser, Megan L CIV USARMY CESAJ (US)

Sent: Tuesday, August 8, 2017 2:26 PM To: Moore, Robin E CIV USARMY CESAJ (US) <Robin.E.Moore@usace.army.mil>

Subject:

FW: RAI from THPO (UNCLASSIFIED)

FYI, we got our response from FPL for the Tribes.

1


Original Message-----

From: Bullock, Karl [1]

Sent: Tuesday, August 8, 2017 9:00 AM To: Clouser, Megan L CIV USARMY CESAJ (US) <Megan.L.Clouser@usace.army.mil>; Mechtensimer, Sara

<Sara.Mechtensimer@fpl.com>

Cc: Orthen, Richard <Richard.Orthen@fpl.com>

Subject:

[Non-DoD Source] RE: RAI from THPO (UNCLASSIFIED)

Hi Megan - attached is the FPL Turkey Point Units 6&7 cultural resource assessment survey workplan, revised to address the THPO requests as well as to include the area of the West Consensus Corridor in the scope of work.

Please let us know if you have any questions or need any additional information.

Thanks, Karl Karl Bullock (MS) l Associate and Senior Scientist l Golder Associates Inc.

6026 NW 1st Place, Gainesville, Florida, USA 32607 T: (352) 336-5600 l Direct: (352) 224-1157 l Cell: (352) 222-6961 l E: Karl_Bullock@golder.com

<mailto:Karl_Bullock@golder.com>

This email transmission is confidential and may contain proprietary information for the exclusive use of the intended recipient. Any use, distribution or copying of this transmission, other than by the intended recipient, is strictly prohibited. If you are not the intended recipient, please notify the sender and delete all copies.

Electronic media is susceptible to unauthorized modification, deterioration, and incompatibility. Accordingly, the electronic media version of any work product may not be relied upon.

Please consider the environment before printing this email.


Original Message-----

From: Clouser, Megan L CIV USARMY CESAJ (US) [2]

Sent: Wednesday, May 10, 2017 2:23 PM To: Mechtensimer, Sara <Sara.Mechtensimer@fpl.com>

Cc: Bullock, Karl <Karl_Bullock@golder.com>; Orthen, Richard <Richard.Orthen@fpl.com>

Subject:

RAI from THPO (UNCLASSIFIED)

CLASSIFICATION: UNCLASSIFIED 2

Good afternoon Sara, The Corps received some feedback from the STOF THPO after the review of your survey plan.

THPO requests:

  • In Section 4 (d) where the work plan reads "A reconnaissance level survey will be conducted for previously surveyed areas that do not meet current professional standards, to be defined in consultation with the SHPO" the STOF-THPO would like to respectfully request to be consulted on this as well.
  • In Section 4 (f) the STOF-THPO would like to respectfully request the following requirement be added:

the requirement set forth by the FDHR's Module 3 that a minimum of 10% of the low probability areas be tested.

  • In Section 7 the STOF-THPO would like to respectfully request to be included in Section 106 consultation to identify and resolve any adverse effects to significant resources along with SHPO Please let me know if you have any questions or if these items can be included in the plan?
Thanks, Megan Clouser US Army Corps of Engineers 9900 SW 107th Avenue, Suite 203 Miami, FL 33176 305-526-7182 CLASSIFICATION: UNCLASSIFIED 3