MONTHYEARML24282A6722024-10-0808 October 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24261B8062024-09-17017 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0852024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0242024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24248A0822024-09-0303 September 2024 NRR E-mail Capture - Acceptance Review for Turkey Point Alternative Request VR-02 for Certain Motor-Operated Isolation Valves (L-2024-LLR-0059) ML24234A0842024-08-21021 August 2024 Notification of Inspection and Request for Information ML24234A0142024-08-20020 August 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Spent Fuel Storage License Amendment Request (LAR) (L-2023-LLA-0142) ML24170A9352024-06-18018 June 2024 NRR E-mail Capture - Supplement to Audit Plan - Turkey Point - 18 to 24 Month Fuel Cycle LAR (L-2023-LLA-0161) ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24130A0112024-05-0808 May 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 - Sixth 10-Year Inservice Testing Interval Proposed Alternative PR-02 (L-2024-LLR-0029) ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24113A0372024-04-22022 April 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 and St. Lucie 2 - Request to Use Later Code of ASME (L-2024-LLR-0024) ML24101A0602024-04-11011 April 2024 NRC to NMFS, Notification of Nrc’S Issuance of the Final EIS for Turkey Point Subsequent License Renewal ML24102A2772024-04-11011 April 2024 NRR E-mail Capture - Audit Plan - Turkey Point - Spent Fuel Pool Criticality License Amendment Request (LAR) (L-2023-LLA-0142) ML24101A0592024-04-11011 April 2024 NRC to Fws, Notification of Nrc’S Issuance of the Final EIS for Turkey Point Subsequent License Renewal ML24107A9062024-04-11011 April 2024 Fws to NRC, Response to Notification of Final EIS for Turkey Point SLR ML24102A1692024-04-11011 April 2024 NRR E-mail Capture - Audit Plan - Turkey Point - 18 to 24 Month Fuel Cycle License Amendment Request (LAR) (L-2023-LLA-0161) ML24024A0182024-01-24024 January 2024 LTR-23-0216-1 - (E-Mail) Turkey Point Nuclear Plant, Units 3 and 4 - 10 CFR 2.206 Petition -Turkey Point and PWR RPV Embrittlement E-Mail Closure Letter to Petitioner, January 23, 2024 ML24023A0622024-01-10010 January 2024 10 CFR 2.206 Petition - LTR-23-0216-1 - Turkey Point and PWR RPV Embrittlement - E-mail Final Determination Status to Petitioner - 1-10-2024 - L-2023-CRS-0005 ML23347A0772023-12-13013 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Transition to 24-Month Fuel Cycles (L-2023-LLA-00161) ML23341A0602023-12-0707 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Exemption Request for Use of Axiom Fuel Cladding (L-2023-LLE-0036) ML23317A3752023-11-0808 November 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Update SFP Criticality Analysis (L-2023-LLA-0142) ML23307A2382023-11-0303 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 - Initial Assessment; Turkey Point Subsequent License Renewal with Petitioner 11/3/2023 - L-2023-CRS-0005 ML23333A0092023-10-27027 October 2023 Attachment a - NRC Extension of Comment Period-1 ML23265A2692023-09-15015 September 2023 Turkey Point,_Rp Document Request 2023-004 ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23171B0532023-06-20020 June 2023 NRR E-mail Capture - Change in Estimated Review Schedule for Turkey Point Improved Standard Technical Specifications (ITS) LAR (L-2022-LLI-0002) ML23198A0592023-05-22022 May 2023 FPL to Fws, Notification of Doa Crocodile in CCS on 5/22/23 ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23117A2712023-04-11011 April 2023 NRR E-mail Capture - (External_Sender) Updated Data for Doa Turkey Point American Crocodile at 4/10/2023 ML23067A2812023-03-0808 March 2023 NRR E-mail Capture - (External_Sender) Non-causal American Croc Doa Turkey Point ML23038A1892023-02-0303 February 2023 RP RFI April 2023 ML23006A0262023-01-0505 January 2023 NRR E-mail Capture - Audit Plan - Turkey Point Fire Protection Changes to Support RCP Seal Replacement LAR ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS ML22293B6562022-10-18018 October 2022 Request for 45 Day Extension of Comment Period of Turkey Point Subsequent License Renewal Scoping Process, Docket Id NRC-2022-0172 by Natural Resources Defense Council, Miami Waterkeeper and Counsel for Friends of the Earth ML22265A1522022-09-21021 September 2022 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Revise Fire Protection Program (L-2022-LLA-0128) ML22258A1862022-09-15015 September 2022 NRR E-mail Capture - Turkey Point Unit Nos. 3 and 4 - Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Requests to Replace Instrumentation with Digital Systems ML22181A0562022-06-30030 June 2022 NRR E-mail Capture - Request for Additional Information - Turkey Point U3 Sgtir (L-2022-LRO-0070) ML22178A1032022-06-25025 June 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa American Crocodile 6/25/22 ML22147A0672022-05-19019 May 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa Crocodile 05/19/2022 ML22095A0162022-04-0505 April 2022 NRR E-mail Capture - Verbal Authorization of Turkey Point Nuclear Plant Unit 3 - Icw Relief Request No. 10-II ML22081A0292022-03-21021 March 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21302A0052021-12-23023 December 2021 Email to Nextera/Fpl Re Discussion of Availability of Human Factor Validation Information to Support the Planned Turkey Point Digital I&C License Amendment Request ML21307A2882021-11-18018 November 2021 NRC to Fws, Request to Reinitiate Endangered Species Act Section 7 Consultation for Continued Operation of Turkey Point ML21298A0572021-10-25025 October 2021 NRR E-mail Capture - Final: Tpn Request for Additional Information - Round 2 Concerning Relief Request 10 - Extension EPID: L-2021-LLR-0077 ML21291A1272021-10-14014 October 2021 NRR E-mail Capture - Request for Additional Information - Fifth Ten-Year Inservice Inspection Interval Relief Request No.10 - Extension (L-2021-LLR-0077) 2024-09-06
[Table view] |
Text
Williamson, Alicia From: Clouser, Megan L CIV USARMY CESAJ (US) <Megan.L.Clouser@usace.army.mil>
Sent: Monday, October 23, 2017 9:51 AM To: Williamson, Alicia
Subject:
[External_Sender] FW: RAI from THPO (UNCLASSIFIED)
Original Message-----
From: Moore, Robin E CIV USARMY CESAJ (US)
Sent: Thursday, September 28, 2017 10:54 AM To: Clouser, Megan L CIV USARMY CESAJ (US) <Megan.L.Clouser@usace.army.mil>
Subject:
RE: RAI from THPO (UNCLASSIFIED)
Hi Megan, We can close this out as their requirements are met.
- Thanks, Robin E. Moore, MA/RPA Archaeologist, Regulatory Division USACE, Jacksonville District 904 232-3270 (office) 904 412-6933 (cell)
Telework Days:
Wednesday 0800-1630 Friday 0800-1630
Original Message-----
From: Clouser, Megan L CIV USARMY CESAJ (US)
Sent: Monday, September 25, 2017 10:32 AM To: Moore, Robin E CIV USARMY CESAJ (US) <Robin.E.Moore@usace.army.mil>
Subject:
FW: RAI from THPO (UNCLASSIFIED)
Good morning, just playing catch-up with some pending items. My question should have been does this mean our consultation with the tribes is now complete? Or do we need their final blessing to close this out?
- Regards, Megan
Original Message-----
From: Clouser, Megan L CIV USARMY CESAJ (US)
Sent: Tuesday, August 8, 2017 2:26 PM To: Moore, Robin E CIV USARMY CESAJ (US) <Robin.E.Moore@usace.army.mil>
Subject:
FW: RAI from THPO (UNCLASSIFIED)
FYI, we got our response from FPL for the Tribes.
1
Original Message-----
From: Bullock, Karl [1]
Sent: Tuesday, August 8, 2017 9:00 AM To: Clouser, Megan L CIV USARMY CESAJ (US) <Megan.L.Clouser@usace.army.mil>; Mechtensimer, Sara
<Sara.Mechtensimer@fpl.com>
Cc: Orthen, Richard <Richard.Orthen@fpl.com>
Subject:
[Non-DoD Source] RE: RAI from THPO (UNCLASSIFIED)
Hi Megan - attached is the FPL Turkey Point Units 6&7 cultural resource assessment survey workplan, revised to address the THPO requests as well as to include the area of the West Consensus Corridor in the scope of work.
Please let us know if you have any questions or need any additional information.
- Thanks, Karl Karl Bullock (MS) l Associate and Senior Scientist l Golder Associates Inc.
6026 NW 1st Place, Gainesville, Florida, USA 32607 T: (352) 336-5600 l Direct: (352) 224-1157 l Cell: (352) 222-6961 l E: Karl_Bullock@golder.com
<mailto:Karl_Bullock@golder.com>
This email transmission is confidential and may contain proprietary information for the exclusive use of the intended recipient. Any use, distribution or copying of this transmission, other than by the intended recipient, is strictly prohibited. If you are not the intended recipient, please notify the sender and delete all copies.
Electronic media is susceptible to unauthorized modification, deterioration, and incompatibility. Accordingly, the electronic media version of any work product may not be relied upon.
Please consider the environment before printing this email.
Original Message-----
From: Clouser, Megan L CIV USARMY CESAJ (US) [2]
Sent: Wednesday, May 10, 2017 2:23 PM To: Mechtensimer, Sara <Sara.Mechtensimer@fpl.com>
Cc: Bullock, Karl <Karl_Bullock@golder.com>; Orthen, Richard <Richard.Orthen@fpl.com>
Subject:
RAI from THPO (UNCLASSIFIED)
CLASSIFICATION: UNCLASSIFIED 2
Good afternoon Sara, The Corps received some feedback from the STOF THPO after the review of your survey plan.
THPO requests:
- In Section 4 (d) where the work plan reads "A reconnaissance level survey will be conducted for previously surveyed areas that do not meet current professional standards, to be defined in consultation with the SHPO" the STOF-THPO would like to respectfully request to be consulted on this as well.
- In Section 4 (f) the STOF-THPO would like to respectfully request the following requirement be added:
the requirement set forth by the FDHR's Module 3 that a minimum of 10% of the low probability areas be tested.
- In Section 7 the STOF-THPO would like to respectfully request to be included in Section 106 consultation to identify and resolve any adverse effects to significant resources along with SHPO Please let me know if you have any questions or if these items can be included in the plan?
- Thanks, Megan Clouser US Army Corps of Engineers 9900 SW 107th Avenue, Suite 203 Miami, FL 33176 305-526-7182 CLASSIFICATION: UNCLASSIFIED 3