Diablo Canyon Power Plant, Units 1 and 2 - NRC Material Control and Accounting Program Inspection Report 05000275/2017406 and 05000323/2017406
ML17233A361
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/21/2017
From: Gepford H J
NRC/RGN-IV/DRS/PSB-2
To: Halpin E D
Pacific Gas & Electric Co
References
IR 2017406
Download: ML17233A361 (3)


Text

August 21, 2017

Mr. Edward D. Halpin, Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000275/2017406 AND 05000323/2017406

Dear Mr. Halpin:

On August 3, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at Diablo Canyon. The inspection covered a key attribute of the Security Cornerstone of the NRC's Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material. The enclosed inspection report documents the inspection results, which were discussed on August 3, 2017, with Mr. K. Johnston, Acting Site Director, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system, (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,/RA/

Heather J. Gepford, PhD., CHP, Chief Plant Support Branch 2 Division of Reactor Safety

Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82 Nonpublic

Enclosure:

NRC Inspection Report 05000275/2010406; 05000323/2010406

w/Attachment:

1. Supplemental Information 2. Request for Information cc w/o enclosure: Electronic Distribution