MONTHYEARML20235B4531987-09-22022 September 1987 Final Response to FOIA Request for Documents Re Specified Dockets.Documents in App a Already Available in Pdr.Forwards App B Documents.App B Documents Also Available in Pdr. Documents for Listed Dockets Could Not Be Located ML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML19294B9991980-01-0808 January 1980 Forwards Constituent Ltr of Concern About Plans to Cancel Facility Const ML19211A7631979-12-0303 December 1979 Requests Data on Positive Points of Nuclear Energy,For Use in Class Debate ML20150F3141979-09-24024 September 1979 Forwards Impact of Const & Operation of Cooling Water Sys, App G,Section 316,Type II Demonstration,In Support of 770228 Application for Const & Operation of once-through Cooling Sys ML19208B0131979-09-12012 September 1979 Notifies That EPA Is Suspending Review of Des & Util Application for NPDES Permit in Response to NRC Suspension of CP Review ML19253A5711979-08-29029 August 1979 Forwards Three Technical Reviews of Des Including Reviews of Economic Analysis of alternatives,NUREG-0529,need for Plant, Cost - Benifit Summary & Environ Impacts of Plant Operation ML19208B6651979-08-20020 August 1979 Advises That Antitrust Hearing Is Unnecessary Re Proposed Purchase of Ownership Interests in New England Power by Ma Municipal Wholesale Electric Co & Me Public Svc Co (Per Section 105C,Atomic Energy Act of 1954,as Amended) ML19249A2781979-08-17017 August 1979 Forwards Comments on Des by Natl Weather.Notes Two Meteorological Deficiencies Re Fastest Mile Wind Speeds & Storm Surge from Hurricanes & Tropical Storms ML19275A0641979-08-12012 August 1979 Submits Comments on Des.Comparison of Health Consequences to Background Is Totally Irrelevant & Contrary to NEPA ML19275A0591979-08-0808 August 1979 Forwards Comments Re Review of Draft Eis.Statement of Compliance W/Epa U Fuel Cycle Std Needed.Transportation Section Requires Inclusion of Measures to Insure Public Safety During Shipment ML19225D1381979-08-0707 August 1979 Submits Comments Re Review of Des,Including Daily Commuting of Laborers & Evaluation of Energy Needed to Operate Cooling Alternatives ML19242C4851979-08-0303 August 1979 Forwards Technical Reviews of Des. Comments Are Provisional in Nature ML19242B4581979-07-30030 July 1979 Comments on Draft EIS Submitted by Conservation Law Foundation of Ri.Statement on long-term Negative Impact on Terrestial & Aquatic Wildlife Made W/Paucity of Data. Unclear Justification for Use of once-through Cooling Sys ML19225A5471979-07-13013 July 1979 Forwards Request from Concerned Citizens of Ri,Point Judith Fishermen'S Cooperative & Tl Arnold Trust for Show Cause Order Re Dismissal of CPs ML19246B0101979-07-0303 July 1979 Comments on Des.More Detailed Analysis of Transmission Facilities & Corridors Should Have Been Conducted.Analysis Re Slurry Walls Seems Contradictory.Futher Analysis of Sediment Grain Profile within Trench Site Must Be Included ML19224C9711979-07-0202 July 1979 Forwards Corrected Version of Section 4 to Biological Modeling of Effect of Entrainment on Four Selected Fish Species at New England Power 1 & 2 Site,Charlestown,Ri. W/O Encl ML19224D5381979-06-27027 June 1979 Forwards Decision Paper Re Disposed of Naval Auxiliary Landing Field at Charlestown,Ri. ML19270G9281979-06-15015 June 1979 No Comments on Des Re Plant Const ML19273B9241979-06-13013 June 1979 Forwards Revised Pages to Psar,Indicating That Ref to Westinghouse Resar,Revision 3,includes Amends 1-6.Info Will Be Included in Amend N13 of PSAR ML19259C1331979-06-0505 June 1979 Offers No Comment on Des ML19259C0571979-06-0505 June 1979 Forwards Population Statistics & Commercial Catch Rate of American Lobster (Humarus Americanus) in Charlestown- Matunuck,Ri Region of Block Island Sound. ML19225A3341979-05-25025 May 1979 Comments on AEC Rept, Site Visit to Naval for Facility, Dtd 740103.Town Officials Had No Basis for Giving Assurances Regarding Support for Nuclear Plant Const within Township ML19291A5111979-05-0808 May 1979 Response to 790419 Ltr Re Section 8.5.2 of Des on Economics of Early Operation.Defends Method of Analysis & Capacity Factor Assumptions.Forwards JW Dick 790430 Memo Re Assumptions Used in Section 8 ML19261C7321979-03-22022 March 1979 Evaluates Effect of Total Loss of Onsite & Offsite AC Electrical Power.Similtaneous Loss of Both Sources Is Highly Unlikely Since Multiple Single Failures Are Required for Such Occurrence ML19276F3351979-03-20020 March 1979 Forwards Affidavit of Distribution of PSAR Amend 12 ML19263D3271979-03-20020 March 1979 Forwards 790124 Ltr to C Andrus from Ak Morse Re Location of Proposed Moonstone Beach Facility.Requests Rept of Siting Studies & Proposals for Nuclear Facilities in Ri ML19296A3231979-03-13013 March 1979 Forwards Amend N12 to PSAR ML19261C2021979-02-16016 February 1979 Forwards Notice of Withdrawal of Appearance & New Entry ML19263C4051979-02-13013 February 1979 Forwards Affidavit Re Distribution of Revision 3 to General & Financial Info Portion of Application ML20062G8171979-02-0909 February 1979 Forwards Vol 4 of Revision 3 to General & Financial Info W/Affidavit for Withholding.Encl Withheld (Ref 10CFR2.790) ML19261D3641979-02-0909 February 1979 Applies for Order Withholding Financial Info from Public Disclosure.Forwards Revision 3 in Response to 781016 Ltr. Supporting Affidavit Encl ML19282B2821979-02-0808 February 1979 Requests Consideration of 790122 Ltr from J Feldman Re Use of Nuclear Power ML19261A7101979-02-0202 February 1979 Comments on Environ Rept,Revision 5.Suggests Addl Attention to Historical & Archaeological Matters.Recommends Consultation W/State Preservation Officers Re Identification of Sites for Inclusion in Natl Register ML19270F3081979-01-31031 January 1979 Forwards Suppl Info Requested by NRC on 790104 on Alternate Sites,Which Will Be Included in Revision 6 of Environ Rept ML19270F3781979-01-31031 January 1979 Advises of Inaccuracy in 790115 Ltr to NRC Re Antitrust Review of Me Public Svc Co Interest in Millstone Station; Info Came from 781219 Ltr to NRC from the Atty General Which Was Also Inaccurate ML19289D0861979-01-25025 January 1979 Justifies Use of Quality Group D Main Feedwater Isolation Valves Re NRC 780627 Ltr.Believes Valves Are Presently Designed to Perform Safety Function.Upgrading Would Not Enhance Safety Aspects ML19289D1161979-01-22022 January 1979 Responds to NRC 781122 Request for Addl Info.Info Already Contained in Environ Rept Is Too Detailed & Hypothetical. Some Related Info Is Contained in 781010 Ri Statewide Planning Program Ltr to NRC ML19269C8151979-01-15015 January 1979 Informs of Transfers of Ownership Shares to Ma Municipal Wholesale Elec Co,Me Public Svc Co & Bangor Hydro-Electric Co.Provides Pertinent Info to Facilitate Required Antitrust Review ML19289C3881979-01-0909 January 1979 Forwards Affidavit Avering That Distribution of Required Copies of Revision 5 to Environ Rept Has Been Completed. Distribution List Encl ML19267A3151979-01-0202 January 1979 Forwards Revision 5 to Environ Rept,Including Responses to 780613 & 780711 NRC Questions ML19274D3241978-12-28028 December 1978 Requests Copies of Marked Maps Showing Proposed rights-of- Way.Questions Legality of rights-of-way Authorizing Routes Through Narragansett Tribal Reservation,Which Is Protected by Historical Landmark Legislation ML20147J3581978-12-0606 December 1978 Emphasizes Importance of Submitting Accurate & Complete Info to NRC by Licensees & Applicants.Info Submitted Must Be Substantiated by Data & Calculations.Licensee Must Notify NRC of Any Inaccuracies or Enforcement Action Will Result ML20147D8671978-12-0101 December 1978 Forwards Affidavit Requesting W/Holding of CAW-78-57 Pursuant to 10CFR Part 2.790(b) ML20150C9931978-11-27027 November 1978 Discusses Question of Eminent Domain in Ri Re Review of Alternate Sites for Subj Facil.Counsel Finds No Subsidiary of New Engl Elec Sys Has Pwr of Eminent Domain in Ri for Constr of Pipes or Tunnels for Facil Cooling Sys ML20148S4141978-11-22022 November 1978 Forwards Ltr from Town of Westerly(Ano 7810060173) & State of Ri Re Subj Facil Appl.Requests Submittal of Responses ML20153B2021978-11-20020 November 1978 Follows Up .Purpose of SRI Conservation District Is to Help Landowners & Govt to Improve & Protect Resources. Info Requested in 780927 NRC Ltr Is Extremely Complex.Sri Can Advise Re Soil Suitability,Erosion & Sediment Control ML19256A2821978-11-15015 November 1978 Responds to 781107 NRC Request for New Lic Appl Plan.No New Lic Appl Plans.Unit 1&2 Constr Completion Planned for 861101 & 881101 If Constr Permit Is Received by 791101 ML20197D0851978-11-0808 November 1978 Forwards Amend Version of Appl to Discharge Waste Water Submitted to EPA on 770228.Amends Deal W/Change from Buried Pipes to Hard Rock Tunnels,Change in Dewatering Methods & Combining Backflush Oper ML20148H0841978-11-0303 November 1978 Finds Affidavit AW-76-29 Does Not Meet 2.790 Qual Re Confidentiality.Recipient Has 30 Days to Appeal 1987-09-22
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML19294B9991980-01-0808 January 1980 Forwards Constituent Ltr of Concern About Plans to Cancel Facility Const ML19211A7631979-12-0303 December 1979 Requests Data on Positive Points of Nuclear Energy,For Use in Class Debate ML19208B0131979-09-12012 September 1979 Notifies That EPA Is Suspending Review of Des & Util Application for NPDES Permit in Response to NRC Suspension of CP Review ML19253A5711979-08-29029 August 1979 Forwards Three Technical Reviews of Des Including Reviews of Economic Analysis of alternatives,NUREG-0529,need for Plant, Cost - Benifit Summary & Environ Impacts of Plant Operation ML19208B6651979-08-20020 August 1979 Advises That Antitrust Hearing Is Unnecessary Re Proposed Purchase of Ownership Interests in New England Power by Ma Municipal Wholesale Electric Co & Me Public Svc Co (Per Section 105C,Atomic Energy Act of 1954,as Amended) ML19249A2781979-08-17017 August 1979 Forwards Comments on Des by Natl Weather.Notes Two Meteorological Deficiencies Re Fastest Mile Wind Speeds & Storm Surge from Hurricanes & Tropical Storms ML19275A0641979-08-12012 August 1979 Submits Comments on Des.Comparison of Health Consequences to Background Is Totally Irrelevant & Contrary to NEPA ML19275A0591979-08-0808 August 1979 Forwards Comments Re Review of Draft Eis.Statement of Compliance W/Epa U Fuel Cycle Std Needed.Transportation Section Requires Inclusion of Measures to Insure Public Safety During Shipment ML19225D1381979-08-0707 August 1979 Submits Comments Re Review of Des,Including Daily Commuting of Laborers & Evaluation of Energy Needed to Operate Cooling Alternatives ML19242C4851979-08-0303 August 1979 Forwards Technical Reviews of Des. Comments Are Provisional in Nature ML19242B4581979-07-30030 July 1979 Comments on Draft EIS Submitted by Conservation Law Foundation of Ri.Statement on long-term Negative Impact on Terrestial & Aquatic Wildlife Made W/Paucity of Data. Unclear Justification for Use of once-through Cooling Sys ML19225A5471979-07-13013 July 1979 Forwards Request from Concerned Citizens of Ri,Point Judith Fishermen'S Cooperative & Tl Arnold Trust for Show Cause Order Re Dismissal of CPs ML19246B0101979-07-0303 July 1979 Comments on Des.More Detailed Analysis of Transmission Facilities & Corridors Should Have Been Conducted.Analysis Re Slurry Walls Seems Contradictory.Futher Analysis of Sediment Grain Profile within Trench Site Must Be Included ML19224C9711979-07-0202 July 1979 Forwards Corrected Version of Section 4 to Biological Modeling of Effect of Entrainment on Four Selected Fish Species at New England Power 1 & 2 Site,Charlestown,Ri. W/O Encl ML19224D5381979-06-27027 June 1979 Forwards Decision Paper Re Disposed of Naval Auxiliary Landing Field at Charlestown,Ri. ML19270G9281979-06-15015 June 1979 No Comments on Des Re Plant Const ML19273B9241979-06-13013 June 1979 Forwards Revised Pages to Psar,Indicating That Ref to Westinghouse Resar,Revision 3,includes Amends 1-6.Info Will Be Included in Amend N13 of PSAR ML19259C0571979-06-0505 June 1979 Forwards Population Statistics & Commercial Catch Rate of American Lobster (Humarus Americanus) in Charlestown- Matunuck,Ri Region of Block Island Sound. ML19259C1331979-06-0505 June 1979 Offers No Comment on Des ML19225A3341979-05-25025 May 1979 Comments on AEC Rept, Site Visit to Naval for Facility, Dtd 740103.Town Officials Had No Basis for Giving Assurances Regarding Support for Nuclear Plant Const within Township ML19291A5111979-05-0808 May 1979 Response to 790419 Ltr Re Section 8.5.2 of Des on Economics of Early Operation.Defends Method of Analysis & Capacity Factor Assumptions.Forwards JW Dick 790430 Memo Re Assumptions Used in Section 8 ML19261C7321979-03-22022 March 1979 Evaluates Effect of Total Loss of Onsite & Offsite AC Electrical Power.Similtaneous Loss of Both Sources Is Highly Unlikely Since Multiple Single Failures Are Required for Such Occurrence ML19276F3351979-03-20020 March 1979 Forwards Affidavit of Distribution of PSAR Amend 12 ML19263D3271979-03-20020 March 1979 Forwards 790124 Ltr to C Andrus from Ak Morse Re Location of Proposed Moonstone Beach Facility.Requests Rept of Siting Studies & Proposals for Nuclear Facilities in Ri ML19296A3231979-03-13013 March 1979 Forwards Amend N12 to PSAR ML19261C2021979-02-16016 February 1979 Forwards Notice of Withdrawal of Appearance & New Entry ML19263C4051979-02-13013 February 1979 Forwards Affidavit Re Distribution of Revision 3 to General & Financial Info Portion of Application ML19261D3641979-02-0909 February 1979 Applies for Order Withholding Financial Info from Public Disclosure.Forwards Revision 3 in Response to 781016 Ltr. Supporting Affidavit Encl ML20062G8171979-02-0909 February 1979 Forwards Vol 4 of Revision 3 to General & Financial Info W/Affidavit for Withholding.Encl Withheld (Ref 10CFR2.790) ML19282B2821979-02-0808 February 1979 Requests Consideration of 790122 Ltr from J Feldman Re Use of Nuclear Power ML19261A7101979-02-0202 February 1979 Comments on Environ Rept,Revision 5.Suggests Addl Attention to Historical & Archaeological Matters.Recommends Consultation W/State Preservation Officers Re Identification of Sites for Inclusion in Natl Register ML19270F3081979-01-31031 January 1979 Forwards Suppl Info Requested by NRC on 790104 on Alternate Sites,Which Will Be Included in Revision 6 of Environ Rept ML19270F3781979-01-31031 January 1979 Advises of Inaccuracy in 790115 Ltr to NRC Re Antitrust Review of Me Public Svc Co Interest in Millstone Station; Info Came from 781219 Ltr to NRC from the Atty General Which Was Also Inaccurate ML19289D0861979-01-25025 January 1979 Justifies Use of Quality Group D Main Feedwater Isolation Valves Re NRC 780627 Ltr.Believes Valves Are Presently Designed to Perform Safety Function.Upgrading Would Not Enhance Safety Aspects ML19289D1161979-01-22022 January 1979 Responds to NRC 781122 Request for Addl Info.Info Already Contained in Environ Rept Is Too Detailed & Hypothetical. Some Related Info Is Contained in 781010 Ri Statewide Planning Program Ltr to NRC ML19269C8151979-01-15015 January 1979 Informs of Transfers of Ownership Shares to Ma Municipal Wholesale Elec Co,Me Public Svc Co & Bangor Hydro-Electric Co.Provides Pertinent Info to Facilitate Required Antitrust Review ML19289C3881979-01-0909 January 1979 Forwards Affidavit Avering That Distribution of Required Copies of Revision 5 to Environ Rept Has Been Completed. Distribution List Encl ML19267A3151979-01-0202 January 1979 Forwards Revision 5 to Environ Rept,Including Responses to 780613 & 780711 NRC Questions ML19274D3241978-12-28028 December 1978 Requests Copies of Marked Maps Showing Proposed rights-of- Way.Questions Legality of rights-of-way Authorizing Routes Through Narragansett Tribal Reservation,Which Is Protected by Historical Landmark Legislation ML20147D8671978-12-0101 December 1978 Forwards Affidavit Requesting W/Holding of CAW-78-57 Pursuant to 10CFR Part 2.790(b) ML20150C9931978-11-27027 November 1978 Discusses Question of Eminent Domain in Ri Re Review of Alternate Sites for Subj Facil.Counsel Finds No Subsidiary of New Engl Elec Sys Has Pwr of Eminent Domain in Ri for Constr of Pipes or Tunnels for Facil Cooling Sys ML20153B2021978-11-20020 November 1978 Follows Up .Purpose of SRI Conservation District Is to Help Landowners & Govt to Improve & Protect Resources. Info Requested in 780927 NRC Ltr Is Extremely Complex.Sri Can Advise Re Soil Suitability,Erosion & Sediment Control ML19256A2821978-11-15015 November 1978 Responds to 781107 NRC Request for New Lic Appl Plan.No New Lic Appl Plans.Unit 1&2 Constr Completion Planned for 861101 & 881101 If Constr Permit Is Received by 791101 ML20148E8151978-11-0202 November 1978 Responds to 780925 Request for Review & Comment on Proposed Site & Alternate Sites.Concerns Raised Re Impact on Recreational Facilities Near Hydroelectric Sites & Use of Major Recreational Areas Near Proposed Sites ML20148J8121978-11-0101 November 1978 Responds to 780927 NRC Request for Info Re 3 Ma Sites Being Considered as Alternatives for Subj Facil.Gill & Erving Sites Had More Attention than Rowe,As Rowe Is Less Desirable from Water Availability Standpoint.W/Encl Documentation ML20148E0771978-10-31031 October 1978 Forwards Suppl Info Requested by NRC Re Alternate Sites Including,Revised Transmission Section for Each Candidate Site & Revised Environ Rept Table 9.3-1.Info Will Be Incorporated in Rev 5 to Environ Rept ML20148C1791978-10-27027 October 1978 Responds to 780927 NRC Ltr Re 3 Proposed Sites W/In SRI District.Requests That Recipient Contact M.Puchalski or R.Lee,Soil Conservationist ML20148B1501978-10-24024 October 1978 Advises That Doi Has Reviewed Proposed Facility & Offers No Comments,In Response to NRC 780929 Technical Assistance Request ML20147H8661978-10-23023 October 1978 Responds to 780925 NRC Ltr Requesting Tech Info Re Sites for Nuc Pwr Plant at Charlestown,Wash County,Ri.Gsa'S Draft Er Contained Contradictory Info on Possible Bedrock Fault & the Possiblity Should Be Clarified by NRC in Any Future Es 1987-08-25
[Table view] Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
MONTHYEARML19275A0641979-08-12012 August 1979 Submits Comments on Des.Comparison of Health Consequences to Background Is Totally Irrelevant & Contrary to NEPA ML19242B4581979-07-30030 July 1979 Comments on Draft EIS Submitted by Conservation Law Foundation of Ri.Statement on long-term Negative Impact on Terrestial & Aquatic Wildlife Made W/Paucity of Data. Unclear Justification for Use of once-through Cooling Sys ML19225A3341979-05-25025 May 1979 Comments on AEC Rept, Site Visit to Naval for Facility, Dtd 740103.Town Officials Had No Basis for Giving Assurances Regarding Support for Nuclear Plant Const within Township ML19274D3241978-12-28028 December 1978 Requests Copies of Marked Maps Showing Proposed rights-of- Way.Questions Legality of rights-of-way Authorizing Routes Through Narragansett Tribal Reservation,Which Is Protected by Historical Landmark Legislation ML20148E5941978-10-0101 October 1978 Requests Clarification as to Form of Transport of Heavy Reactor Parts to Site,As Contradictory Statements by Project Coordinator & Info Officer Published in Westerly Sun Paper 1979-08-12
[Table view] |
Text
,. .
The (Consertration 3 Info founbation of Klebe i 3slanh 70 SOUTH MAIN STREET PROVIDENCE, RHODE ISLAND 02903 (401) 861-7550 S. Arlene Violet.
Counsel July 30, 1979 Comments to U.S. Nuclear Regulatory Commission Re: Draf t Environmental Impact Statement on NF" # 1&2 By: The Conservation Law Foundation of Rhode Island These coceents are in response to the Draf t Environmental Impact Statemant (DEIS) issued by the Nuclear Regulat.ry Commission (NRC) on the proposed New England Power (NEP) Units 1 & 2. They are submitted despite knowledge of the motion by Concerned Citizenc of RI (CCRI)
(7-13-79) for reconsideration of acceptability of the NEPCO application, in the event that a decision favorable to CCRI is not found.
CLF/RI's ccaments and questions encompass several points.
- 1. Although the statement claims a long-term negative impact on terrestrial and aquatic wildlife if the nuclear power plant is built, this assessment is made with a paucity of data on the ecological effects of thermal backflushing. On page 10-11, it is stated that such back-flushing will cause short (two hour) periods of elevated temperature up to 120 F either once or twice monthly. The hot water would be expected to mix rapidly with the Sound water as it i ' discharged, so to decrease the temperature. Also, the statement adds that organisms should be able to endure brief thermal shocks. This assertion is presented without supporting scientific data, as to how high a temperature might be withstood, or for how long. We would maintain that a two hour expulsion of 120'F water would pose serious ecological threats to marine life in Block Island Sound, and that further data is needed to disclose the actual impact on the system.
- 2. It is not clear under what justification the applicant is re-questing an exception from EPA to use a once-through cooling system.
This system does not satisfy the Federal Water Pollution Act guide-lines for best available technology, as it would pump water used for aCl D
& '\
Board of Directors
\
Harotd Arcara f3asard Ewing Ricnarc Sayer \terhn i/ost Sta* ' Barnett Mtred Hanes Claudm Sdne: der Harold w art ma r .m Chm Cameron Thomas Niul!aney Pegn Sharpe Wchael Eserett A,n P'ne' Beniarnin Stures 589, 0D 7908080 <
Comments to U.S. Nuclear Regulatory Commission July 30, 1979 Page 2 cooling back into the Sound with no controls. The thermal effects of this discharge on the ecology of the Sound, again, is not adequately discussed.
- 3. Figures from local and statewide polls are presented on pages c 50, 51, which show that more people both locally (in Charlestown) and statewide oppose the construction of NEP 1 & 2 than approve. No mention is made as to whether these opinions constitute a social impact which must be weighed in the final decision. We would maintain that public opinion of the facility would effect the working environment and effecient running of such a plant in this state, and should be considered a social impact in the EIS.
4 Rate rea tructuring is discussed to the point that the DEIS ad-mits that incen ives may be created to shif t use from periods of peak demand to off-peak periods, but notes that participation in such programs is optional. However, further duscussion of the potential benefits of mandatory participation in these programs should be considered as a partial alternative to building NEP 1 & 2.
In the same section, the statement clains that, while rate restruct-uring may reduce peak generating capacity, this would have no bearing on the need for base load generatiag facilities such as NEP 1 & 2. We feel that, should there become am excess in peak power, all..efforcs to divert that power to base load use should be made before building any additional facilities. The feasibility of such a diversion was not addressed, yet is a pertinent factor in the determination of the need for new facilities.
- 5. The Staff recognizes only two types of conservation which may affect demand for electricity: (1) voluntary conservation in response to higher prices, or (2) mandated government programs. First, this ignores less ' painful' conservation measures more easily implemented through consumer educatisr., such as use of insulation, reduccd wastage, and wise use cf appliances. Secondly, Even without conservation measures which could result frca such an educational program, the DEIS acknow-ledges the importance of conservation as an alternative to the NEP units.
"From this review, staff concludes that although mandated conservation programs are uncertain, if enacted they could result in significantly l alaying the need for generation capacity represented by NEP #1 & 2 beyond the period which staff has forecast in Section 5. 5.1. "( 5- 10 ) Such a delay could then make acceptable and timely the use of solar space and water heating (as discussed in Section S.2.3), which, without conservation, would not have been economically feasible at the time of need for NEP 1 & 2.
The option for empicying canservation measures until such time that solar technology is feasible and prudent, is implied to be a viable alternative according to the DEIS, if one correlates statements from two sections.
However, the statement fails to address this option as a comprehensive energy strategy.
{g 509
Comments to U.S. Nuclear Regulatory Commission July 30, 1979 Pg. 3
- 6. CLF/RI has entered the NRC hearings on NEP 1 & 2, on the grounds that the facilities are of questionable need, even without the aid of conservation measures. Utility forecasts of demand have proven too high when checked against figures of actual consumption. For one example, the 1970 peak load forecast for the 1973 NEPOOL system was 177. over the actual 1973 load. (Booz, Allen, & Hamilton, Electric Power Demand and Supolv in New Enzland: A Review of Trends and Forecasts, Jan. 15, 1975, p. III-3) As is further outlined in our Petition to Intervene, February, 1977, our contention is that excessive reserves will be produced in the mid 1980's in New England, due to overesticated peak loads, and uncertain demand forecasting.
Also, the DEIS recognizes (page 3-17) "from the standpoint of the applicant's required reserve margins, the NEP 1&2 plants are not needed for reliability until sor..etime af ter 1990 at the earliest."
The justification for al. lowing their construction for an earlier target date is that early operation eill substitute for the use of imported oil. This ignores the f act ..... excess reserves are a real possibility and therefore, that the NEP units may be unnecessary and economically unsound.
5B9 0' _