ML19267A315
| ML19267A315 | |
| Person / Time | |
|---|---|
| Site: | New England Power |
| Issue date: | 01/02/1979 |
| From: | Stevens J NEW ENGLAND POWER CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19263B062 | List: |
| References | |
| CON-NRC-N-96 NUDOCS 7901040066 | |
| Download: ML19267A315 (2) | |
Text
,
NEP 1 & 2 NUCLEAR PROJECT ef NEWENGLAND POWER COMPANY Telephone 617 366-9011 New England Electric System 20 Turnpike Road, Westborough, Massachusetts 01581
~
January 2, 1979 NRC-N-96 Mr. Harold R. Denton Director, Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sir:
(%]
DOCKET NOS. STN 50-568 AND STN 50-569 to the Atomic Energy Act of (19
, the Commission's v
Pursuant Rules and Regulations issued thereunder, and the National Environmental Policy Act as implemented by 10 CFR Part 51, New England
~
Power Company (NEP) hereby submits 41 copies of Revision 5 to the NEP Environmental Report.
The following information is included in Revision 5:
i) Responses to NRC Staf f requests for additional infomation (RAI) dated June 13, 1978 and July 11, 1978, as well as all responses to previous RAI (Appendix F).
- 11) Discussion of the " slurry wall" proposed for use during excavation and construction to stabilize and ensure groundwater quality and mininize dewatering costs (Chapter 4).
iii) Update of themal impact information as a result of recent far-field themal model studies (Chapter 5).
iv) Update of information on transmission costs associated with alternate sites (Chapter 9).
v) Corrections to estinated thermal plume areas in Appendix C.lA; specifically the intemediate-field analytical model.
79010400 O
=
Director, Nuclear Reactor Regulation Page 2 vi) New England Power Company's Natural Area Management Plan for the Charlestown NALF site (Appendix D.3).
vii) Miscellaneous and minor editorial changes.
Respectfully submitted,
NEW ENGLAND POWER COMPANY By,_ h Johrt R.
Stevens ExechtiveVicePresident STATE OF RHODE ISLAND:
COUNTY OF PROVIDENCE:
Personally appeared before me this lf day of INN i
John R. Stevens, who, being duly sworn, did state that he is Executive Vice President of New England Power Company, an applicant herein, that he is duly authorized to execute and file the foregoing revision in the name and on behalf of New England Power Company, and that the statements in said application are true to the best of his knowledge and belief.
k10up h beadsn' Notary 4Public fj
' f,,
My Commission Expires:,fh6 J ,
v