Tech Spec Change Request 10 to Amend DPR-50,App B. Certificate of Svc Encl
ML19259D465
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/07/1975
From: Arnold R
METROPOLITAN EDISON CO.
To:
Shared Package
ML19259D464 List:
References
NUDOCS 7910240725
Download: ML19259D465 (4)


Text

~

METROPOLITAN EDISO:I COMPANY JERSEY CENTRAL POUER & LIGHT COMPANY AND PENNSYLVANIA ELECTRIC COMPANY THREE MILE ISLAND NUCLEAR STATION UNIT 1 DOCKET No. 50-289 OPERATING LICENSE NO. DPR-50 TECHNICAL S'PECIFICATION CHjuiGE REQUEST NO. 10 This Technical Specification Change Request is submitted in support of Licensee's request to change Appendix B to Operating License No. DPR-50 for Three Mile Island Nuclear Station Unit 1. As a part of this request, proposed replacement pages for Appendix B are also included.

METROPOLITAN EDISON COMPANY ATTEST:

Signed-R. C. ARNOLD Vice President-Generation Sworn and subscribed to me this 'Tth day of May , 1975.

Rita Powers Notary Public 1459 13l 7910240 ] {

a

'IliREE ICLE ISLAND NUCLEAR STATION UNIT 1 OPERATING LICENSE NO. DPR-50 DOCKET No. 50-289 Technical Specification Change Raquest No. 10 License requests that the following changes be made to Appendix B of Technical Specifica tio ns . A copy of proposed changed pagas carked " Change Request No.10" is attached.

Page 7, 2.2.1.b. In the second line, change "first year" to "first two years".

Page 7, 2.2.1, Monitoring Requirement, Specification. In the first line of the second paragraph, change "one year" to "tuo years" Page 8, 2.2.1, Monitoring Requirement Specification. 10 the sixteenth and twentieth lines, change "one year" to "two years".

Reason _for Proposed Change Specification 2.2.1.b provides for a 90-day period for chlorination testing during the first year of operation. Although THI-1 received its Operating License in April 1974, it did not achieve Connercial Operation until September 1974. Accordingly, the first period of full-power, suteer oper-ations, the cost effective for chlorination testing, falls in Sucmer 1975, after one year of the issuance of the Operating License.

Environtental Analysis Justifying Change The current enviroanental technical specifications provide for the 90-day chlorination testing period. As the proposed change does not increase the amount of chlorine per=itted nor increase the duration of the testing period, it does not involve an unreviewed environmental impact nor an un-reviewed safety question.

Cost-Benefit Analysis The change results is no additional costs and provides substantial benefits in permitting testing to take place during the most effective period in terms of unit operating and ambient weather conditions.

~

1459 132

2.0 LIMITING CONDITIONS FOR OPERATION 2.2 Chemical, 2.2.1 Chlorine Monitoring Requirement lll

,0bjective Ob j ect ive The purpose of this specification is to The purpose of this specification is to ensure limit the discharge of chlorine to levels that the chlorine concentration at the plant which are not harmful to the biota in the river water discharge is monitored in such a way Susquehanna River, as to assure compliance with Specifica'  ?. 2.1.

Specification Specification

a. The total chlorine concentration, as The total chlorine concentration shall be nonitored measured at the plant river discharge, and recorded continually at the plant river water shall not exceed 0.2 ppm and the free discharge and in the cooling tower blowdown.

chlorine component shall be less than Instruments employing the amperometric principle 0.1 ppm except as discussed in b. below, or instruments employing another method nf equiva-lentaccuracyandstandardizedagainsttheampero-lll,

b. For one consecutive 90 day period during metric method shall be used. If the automated j the first two years of plant operation, the monitoring equipment at the plant river water total residual chlorinc concentration discharge is out of service, an analysis for measured at the plant river discharge chlorine concentration will be made daily during

--* shall not exceed 0.5 ppm. The starting a chlorination period. The analysis shall be 43= date for this 90 day period will be performed on samples taken at 10, 30, and 50 LJ1 selected by the Metropolitan Edison minutes following the start of the chlorination

'#}

Company and the Director of the Regional period.

__. Operations Office notified bciore its

( ,y commencement. For a temporary period not exceeding two years, (sa a reading of 1 ppm or less total residual chlorine

, s.

UNITED STATES OF ANERICA fE NUCLEAR REGULATORY COMMISSION ' ^;

\~' .

/,

N IN THE MATTER OF DOCKET No. 50-289 OPERATING LICENSE NO. DPR-50 METROPOLITAN EDISON COMPANY This is to certify that a copy of Technical Specification Change Request No. 10 to Appendix B of the Operating License for Three Mile Island Nucle'.r Station, Unit 1, dated May 7,1975, and filed with the U.S.

Nuclear Regulatory Commission on May 7, 1975, has this 7th day of May, been served on the chief executives of Londonderry Township, Dauphin County, Pennsylvania, and of Dauphin County, Pennsylvania, by deposit in the United States Mail, addressed as follows:

Mr. Weldon B. Arehart, Chairman Mr. Charles P. Hoy, Chairman Board of Supervisors of Board of County Commissioners of Londonderry Township Dauphin County R.D. #1, Geyers Church Road Dauphin County Courthouse Middletown, Pennsylvania 17057 Harrisburg, Pennsylvania 17120 METROPOLITAN EDISON COMPANY By }.

VicePr"epident-Generation 1459 134

-