Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20211M6651 September 1999Errata Page 4-45,reflecting Proposed Changes Requested in
ML20211D15520 August 1999Proposed Tech Specs Pages,Revising Degraded Voltage Relay as-left Setpoint Tolerances
ML20210J12629 July 1999Proposed Tech Specs Revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance TSsHydrostatic
ML20195E6204 June 1999Proposed Tech Specs,Modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions
ML20206R11713 May 1999Proposed Tech Specs Section 3.1.1,incorporating Administrative Updating & Changing Bases StatementSafe Shutdown
Fire Protection Program
ML20205H0781 April 1999Proposed Tech Specs Adding LCO Action Statements,Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling
ML20203B0512 February 1999Proposed Tech Specs Expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems Outside of Containment
ML20196H5363 December 1998Proposed Tech Specs Reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG
ML20196G4863 December 1998Non-proprietary Proposed Tech Specs,Consenting to Transfer & Authorization for Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing LicenseSafe Shutdown
Fitness for Duty
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Safeguards Contingency Plan
Earthquake
Minimum staff
Fire Protection Program
Siren
Affidavit
ML20196F86625 November 1998Proposed Tech Specs Revised Pages for TS Change 277 Changing Surveillances Specs for OTSG ISI for TMI Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only. with Certificate of SvcOperating Basis Earthquake
ML20154Q62719 October 1998Proposed Tech Specs Adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18Safe Shutdown
Post Accident Monitoring
ML20154P86619 October 1998Proposed Tech Specs,Providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling OutageHydrostatic
Power change
ML20249B24211 June 1998Proposed Tech Specs Re Alternate High Radiation Area ControlHigh Radiation Area
ML20217J82025 March 1998Proposed Tech Specs Page 6-1,reflecting Change in Trade Name of Owners & Operator of TMI-1 & Correcting Typo
ML20217E53123 March 1998Proposed Tech Specs Pages for Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 EFPY
ML20217G0203 October 1997Proposed Tech Specs Re Revised Pages 4-80 & 4-81 Previously SubmittedOperating Basis Earthquake
ML20211F37824 September 1997Proposed Tech Specs Revising Steam Line Break Accident Dose ConsequencePower change
ML20211C34219 September 1997Proposed Tech Specs Pages 3.8-3.9b to TS Section 3.1.4 Providing More Restrictive Limit of 0.35 Uci/Gram Dose Equivalent I-131 & Clarifying UFSAR AnalysisPower change
ML20211C24319 September 1997Proposed Tech Specs Re Decay Heat Removal Sys LeakageHydrostatic
ML20210K00114 August 1997Proposed Tech Specs Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis
ML20141J40512 August 1997Proposed Tech Specs Revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 OperationOperating Basis Earthquake
ML20198E79430 July 1997Proposed Tech Specs Incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 Nor Considered in TMI-1 UFSAR DBA Analysis Dose Calculations for 2568 MwtReactor Vessel Water Level
Hydrostatic
ML20151K20725 July 1997Revised TS Page 6-19 Replacing Corresponding Page Contained in 970508 Transmittal of TS Change Request 264Shutdown Margin
ML20141E1498 May 1997Proposed Tech Specs,Consisting of Change Request 264, Incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating LimitsShutdown Margin
ML20140E24721 April 1997Proposed Tech Specs 3.3.1.2,changing Required Borated Water in Each Core Flood Tank to 940 ft,4.5.2.1.b,lowering Surveillance Acceptance Criteria for ECCS HPI Flow to 431 Gpm & 3.3.1.1.f Re Operability of Decay Heat ValvesFuel cladding
ML20134M1217 February 1997Proposed Tech Specs,Incorporating Certain Improvements from Revised STS for B&W plants,NUREG-1430Boric Acid
High Radiation Area
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML20133D28224 December 1996Proposed Tech Specs 3.15.3 Re Auxiliary & Fuel Handling Bldg Air Treatment SysReactor Vessel Water Level
ML20132F33016 December 1996Proposed Tech Specs,Reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu EnergySafe Shutdown
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Safeguards Contingency Plan
Minimum staff
Fire Protection Program
ML20135D0993 December 1996Proposed Tech Specs Incorporating Certain Requirements from Revised B&W Std TS,NUREG-1430Shutdown Margin
Hydrostatic
Power change
ML20135C5322 December 1996Proposed Tech Specs Re Relocation of Audit Frequency RequirementsFire Protection Program
ML20128H4123 October 1996Errata to Proposed Ts,Adding Revised Table of Contents & Making Minor Editorial CorrectionsShutdown Margin
Reactor Vessel Water Level
Hydrostatic
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML20117H04529 August 1996Proposed Tech Specs,Consisting of Change Request 257, Incorporating Certain Improvements from STS for B&W Plants (NUREG-1430)Shutdown Margin
Power change
ML20113D19728 June 1996Proposed Tech Specs,Consisting of Change Request 259, Allowing Implementation of Recently Approved Option B to 10CFR50,App JHigh Radiation Area
ML20112C87924 May 1996Proposed Tech Specs Re Pages for App A.Certificate of Svc EnclBoric Acid
Post Accident Monitoring
ML20101R15710 April 1996Proposed Tech Specs,Revising Addl Group of Surveillances in Which Justification Has Been CompletedBoric Acid
Post Accident Monitoring
ML20100J69322 February 1996Proposed Tech Specs,Consisting of Change Request 254, Revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Battery Cell Parameters Not Met
ML20095J23121 December 1995Proposed Tech Specs,Raising Low Voltage Action Level to 105 Volts DC
ML20092K54720 September 1995Revised Tech Spec Pages 4-31,4-32 & 4-33,incorporating Change in TS Section 4.4.1.5
ML20091L29123 August 1995Proposed Tech Specs Page 6-11a,incorporating Ref to 10CFR20.1302
ML20087F49211 August 1995Proposed TS Section 3.2 Re Makeup,Purification & Chemical Addition Sys RequirementsProbabilistic Risk Assessment
ML20085N16022 June 1995Proposed Tech Specs Revising Replacement Pages in Package & Remove Outdated Pages,In Response to NRC Request for Addl Info
ML20084L4351 June 1995Proposed TS 5.3.1.1,describing Use of Advanced Clad AssembliesFuel cladding
ML20084N3501 June 1995Proposed Tech Specs,Deleting RETS & Relocating TSs Per Guidance in GL 89-01 & NUREG-1430Reactor Vessel Water Level
Post Accident Monitoring
Annual Radioactive Effluent Release Report
Process Control Program
ML20084B33624 May 1995Proposed Tech Specs Re Change in Surveillance Test Requirements for source-range Nuclear Instrumentation
ML20083N78417 May 1995Proposed Tech Specs,Consisting of Change Requests 252, Removing Chemical Addition Sys Requirements from TS to COLRBoric Acid
Shutdown Margin
ML20079A78123 December 1994Proposed Tech Specs Page 3-32a
ML20069A67820 May 1994Proposed Tech Specs,Supporting Cycle 10 Control Rod Trip Insertion Time Testing
ML20065M68319 April 1994Proposed Tech Specs,Reflecting Deletion of Audit Program Frequency RequirementsOffsite Dose Calculation Manual
Process Control Program
Minimum staff
Fire Protection Program
ML20065K04511 April 1994Proposed Tech Specs Reflecting Relocation of Detailed Insp Criteria,Methods & Frequencies of Containment Tendon Surveillance Program to FSAR & Providing Direct Ref to Existing Tendon Surveillance Program
ML20073C77322 March 1994Proposed Tech Specs Re Control Rod Trip Insertion Time TestingShutdown Margin
Enforcement Discretion