ML19274D367

From kanterella
Revision as of 17:45, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application to Amend Tech Spec Section 5.0 to Specify Fire Brigade Size of 5 Members.Proposed Changes Do Not Involve Significant Hazards.Proposed Tech Spec & Safety Discussion Encl
ML19274D367
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/19/1979
From: Short T
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML19274D365 List:
References
NUDOCS 7901230253
Download: ML19274D367 (4)


Text

8 A BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of )

OMAHA PUBLIC PO'IER DISTRICT ) Docket No. 50-285 (Fort Calhoun Station, )

Unit No. 1) )

APPLICATION FOR AME'IDMENT OF OPERATI'IG LICENSE Pursuant to Section 50.90 of the regulations of the U. S. Nuclear Regulatory Commission ("the Commission"), Omaha Public Power District, holder of Facility Operating License No. DPR 40, herewith requests that Section 5.0 of the Technical Specifications set forth in Appendix A to that License be amended to specify a fire brigade size of five members.

The proposed changes in Technical Specifications are set forth in Attuchment A to this Application. A discussion, which demonstrates that the proposed changes do not involve significant hazards considerations, is appended in Attachment B. The District has been informed by the Com-mission's Staff that the proposed amendment does not require a fee, with-in the meaning of Section 170.22 of the regulations of the Nuclear Regu-latory Comnission. The proposed changes in specifications would not authorize any change in the types or any increase in the amounts of ef-fluents or any change in the authorized power level of the facility, q901230S O

, WHEREFORE, Applicant respectfully requests that Section 5.0 of Appendix A to Facility Operating License No. DPR 40 be amended in the form attached bereto as Attachment A.

OMAHA PUBLIC PO' DER DISTRICT I

By *li$O l T! E. Short h Assistant General Manager

[! i Subscribed and sworn to before me this /9p/ day of ,u m > > , 1979

/

/

d~ 6l:~ . n 8

./

Notary Public fw g - -. . .. ... ., _,a J I.GLEAson 24- . D "" % 4 A 4 28,tes2 j

. .~ ,

50 ADMINISTRATIVE CONTROLS 51 Responsibility 51.1 The Manager - Fort Calhoun Station shall be responsible for overall facility operation and shall delegate in writing the succession to this responsibility during his absence.

52 Organization Offsite 5 2.1 The offsite organization for facility management and technical support shall be as shown on Figure 5.1 and 5.la.

5 2.2 Plant Staff The plant staff organization shall be as shown in Figure 5.2 and function as follows:

a. The sinimum humber and type of licensed and unlicensed operat-ing personnel required on site for each shift shall be as showri in Table 5 2-1.
b. At least one licensed Operator shall be in the control room when fuel is in the reactor,
c. At least two licensed Operators shall be present in the con-trol room during reactor startup, scheduled reactor shutdown and during recovery from reactor trips.
d. An Operator or Technician qualified in Radiation Protection Procedures shall be on site when fuel is in the reactor,
e. All core alterations shall be directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator limited to fuel handling who has no other concurrent responsi-bilities during the operation.
f. Fire protection program responsibilities are assigned to those positions and/or groups designated by asterisks in Figures 5-1, 5-1A, and 5-2 according to the procedures specified in Section 5.8 of the Technical Specifications.
g. A fire brigade consisting of 5 members shall be maintained onsite at all times. The fire brigade shall not include the minimum shift crew r.ecessary for safe shutdown of the unit (2 membebs).

AmendmentNo./,yl, , 38 5-1 ATTACHMENT A

~

DISCUSSION In accordance with Section 3.1.30 of the Commission's Safety Evalu-ation Report (SER) for the Fort Calhoun Station fire protection program, the Omaha Public Power District will have a five man fire brigade es-tablished at the station by March, 1979. The fire brigade vill not in-clude the minimum shift crew necessary to perform safe shutdown opera-tion or any personnel required for other essential functions, other than fire fighting activities, during a fire emergency. The fire brigade vill receive training as described in Section 6.2 of the SER and as clarified for the additional two (2) members of the fire brigade (the two required to bring the fire brigade to five members) in the August 1,1978, letter from OPPD to USHRC, Attn. Mr. Robert W. Reid.

O ATTACHMENT B