LIC-95-0167, Application for Amend to License DPR-40,revising TS 2.7 Extending Allowed Outage Time from 7 Days Per Month to 7 Days W/Addl Once Per Cycle 10 Day Allowed Outage Time

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-40,revising TS 2.7 Extending Allowed Outage Time from 7 Days Per Month to 7 Days W/Addl Once Per Cycle 10 Day Allowed Outage Time
ML20092G063
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/06/1995
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092G064 List:
References
LIC-95-0167, LIC-95-167, NUDOCS 9509190097
Download: ML20092G063 (5)


Text

.

Omaha Public Power District P.O. Box 399 Hwy. 75 - North of Ft. Calhoun Fort Calhoun. NE 68023-0399 402/636-2000 l

September 6, 1995 LIC-95-0167 U. S. Nuclear Regulatory Commission l ATTN: Document Control Desk  !

Mail Station Pl-137 Washington, DC 20555 l

l

Reference:

Docket No. 50-285 l

SUBJECT:

Application for Amendment of Operating License Enclosed please find Omaha Public Power District's (OPPD) " Application for Amendment of Operating License" which seeks to amend Technical Specification 2.7 extending the allowed outage time (A0T) from seven days per month (total for both diesels) to seven days with an additional once per cycle 10 day A0T.

This amendment request is a collaborative effort of participating Combustion Engineering Owners Group members based on an integrated review and assessment of plant operations, deterministic / design basis factors and plant risk.

Attachment A contains a markup reflecting the requested changes of the Technical Specifications. Attachment B provides the " Discussion, Justification and No Significant Hazards Consideration." Attachment C contains a copy of Combustion Engineering Inc. report titled " Joint Applications Report for Emergency Diesel Generators A0T Extension," dated May 1995, if you have additional questions, or require further information, please do not hesitate to contact me or members of my staff.

Sincerely,

/6 . M W. G. Gates Vice President WGG/brh Attachments c: Winston & Strawn L. J. Callan, NRC Regional Administrator, Region IV S. D. Bloom, NRC Project Manager W. C. Walker, NRC Senior Resident Inspector i P. J. Hijeck, CEOG Assistant Project Manager B. E. Casari, Director - Environmental Health Division, State of Nebraska j 45s$29 95o9190097 950906 PDR ADOCK 05000285 P PDR

e 2

A copy of this Application, including its attachments, has been submitted to the Director - Environmental Health Division, State of Nebraska, as required by 10 CFR 50.91.

l OMAHA PUBLIC POWER DISTRICT By - W b Vicegesident Subscribed and sworn to before me this day of b E![vnd o , 1995.

// l/ALAu> t[)ko _, m~

Notary Public

, CEMERhl ROIARY-Stats ct tbrz.tf THERESA PETERSEN

-- My Coma Esp.(ek,3 y,3997 A

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )  ;

) l Omaha Public Power District ) Docket No. 50-285 '

(Fort Calhoun Station )

Unit No. 1) )

AFFIDAVIT W. G. Gates, being duly sworn, hereby deposes and says that he is the Vice President in charge of all nuclear activities of the Omaha Public Power District; that as such he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached information concerning the Application for Amendment dated September 6, 1995 concerning revisions to Technical Specification 2.7 extending the allowed outage time (A0T) from seven days per month (total for both diesels) to seven days with an additional once per cycle 10 day A0T; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, informa' , and belief.

Y $s W. G. Gates Vice President STATE OF NEBRASKA)

) ss COUNTY OF DOUGLAS) to before me,ja fjotary Public in and for the State of

' Subscribed Nebraska on andthis swgrqA W day of 5'l( Asvvth t; , 1995, t

4 s ,!"

IJ1)/LL()W I% LQln u

~ Notary Public

{##

I l

4 BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION l

In the Matter of )

)

Omaha Public Power District ) Docket No. 50-285 (Fort Calhoun Station )

Unit No. 1) )

! APPLICATION FOR AMENDMENT OF OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the U. S. Nuclear Regulatory Commission ("the Commission"), Omaha Public Power District, holder of Facility Operating License No. DPR-40, herewith requests that the Technical Specifications set forth in Appendix A to that License be amended to extend j the allowed outage time (A0T) from seven days per month (total for both diesels) to seven days with an additional once per cycle 10 day A0T.

1 The proposed changes in Technical Specifications are provided in Attachment A to this Application. A Discussion, Justification and No

~

Significant Hazards Consideration Analysis, which demonstrates that the proposed changes do not involve significant hazards considerations, is Attachment C contains a copy of Combustion 2

appended in Attachment B.

i Engineering Inc. report titled " Joint Applications Report for Emergency Diesel

Generators A0T Extension," dated May 1995. The proposed changes in i specifications would not authorize any change in the types or any increase in the amounts of effluents that will be released, or a change in the authorized

.l power level of the facility.

WHEREFORE, Applicant respectfully requests that Specifications 2.1, 2.7, and the Basis of 2.0.1 of Appendix A to Facility Operating License No. DPR-40 4

be amended in the form attached hereto as Attachment A.

L l

i

U.S. Nuclear Regulatory Commission LIC-55-0167 ATTACHMENT A I

i

!