ML20205Q579

From kanterella
Jump to navigation Jump to search
Amend 190 to License DPR-40,revising TS 5.2.f & TS 5.11.2 to Change Title of Shift Supervisor to Shift Manager
ML20205Q579
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/15/1999
From: Stephen Dembek
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20205Q571 List:
References
NUDOCS 9904210308
Download: ML20205Q579 (5)


Text

'

, ps0 nh p *, UNITED STATES s* j 2

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2006H001

\...../

OMAHA PUBLIC POWER DISTRICT DOCKET NO. 50-285 FORT CALHOUN STATION. UNIT NO.1 6!ylENDMENT TO FACILITY OPERATING LICENSE Amendment No.130 License No. DPfA0

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by the Omaha Public Power District (the licensee) dated March 18,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The freility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. Th9 issuance of this license amendment will not be inimical to the commen defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9904210308 990415 PDR ADOCK 05000285 P PDR

2. Accordingly, Facility Operating License No. DPR-40 is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Facility Operating License No. DPR-40 is hereby amended to read as follows:

B. T_echnical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 190, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. The license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Stephen Dembek, Chief, Section 2 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance: April 15,1999

l ATTACHMENT TO LICENSE AMENDMENT NO. 190 FACILITY OPERATING LICENSE NO. DPR-40 DOCKET NO. 50-285 Revise Appendix "A" Technical Specifications as indicated below. The revised pages are identified by amendment number and contain verticallines indicating the area of change.

REMOVE PAGES INSERT PAGES 5-1a 5-1a 5-19a 5-19a l

l I

l l

I l

l

r l

l =

5.0 ADMINISTRATIVE CONTROLS i 5.2 Organization (Continued)

b. An Operator or Technician qualified in Radiation Protection Procedures shall be onsite when fuel is in the reactor.
c. All core alterations shall be directly supervised by either a licensed Senior Reactor i Operator or Senior Reactor Operator limited to fuel handling who has no other concurrent responsibilities during the operation.
d. Fire protection program responsibilities are assigned to those positions and/or groups designated by asterisks in USAR 12.1-1 through 12.1-4 according to the procedures specified in Section 5.8 of the Technical Specifications.
e. Administrative procedures shall be developed and implemented to limit the working hours of plant staff who perform safety-related functions. Administrative procedures shall reflect the personnel whose working hours will be affected. Shift coverage shall be maintained without routine heavy use of overtime.

Deviations from the guidelines shall be authorized in advance by the Department Manager, Manager - Fort Calhoun Station, or their designated alternates, or higher i levels of management, in accordance with established procedures and with l documentation of the basis for granting the deviation. Routine deviation from the j administrative guidelines shall not be authorized.

Controls shall be included in the procedures such that individual overtime shall be  !

reviewed monthly by the Department Manager, Manager - Fort Calhoun Station, or their designated alternates, or higher levels of management, to ensure that excessive hours have not been assigned.

f. The Supervisor - Operations, the Shift Managers and Licensed Senior Operators l shall hold a senior reactor operator license. The Licensed Operators shall hold a reactor operator license.

1 5-la Amendment No. 33,54,05,115,100,181,190

F 5.0 ADMINISTRATIVE CONTRO1E 5.11.1 In lieu of the " control device" required by paragraph 20.1601(a) of 10 CFR Part 20, and as an alternative method allowed under i 20.1601(c), each high radiation area (as defined in i 20.1601) in which the intensity of radiation is 1000 mrem /hr or less shall be barricaded and conspicuously posted as a high radiation area and entrance thereto shall be controlled by required issuance of a Radiation Work Permit.* Any individual or group ofindividuals permitted to enter such areas shall be provided with or accompanied oy one or more of the following:

a. A radiation monitoring device which continuously indicates the radiation l dose rate in the area.

l b. A radiation monitoring device which continuously integrates the radiation l dose rate in the area and alarms when a preset integrated dose is received.

i Entry into such areas with this monitoring device may be made after the dose rate level in the area has been established and personnel have been made knowledgeable of them.

c. An individual qualified in radiation protection procedures who is equipped-l with a radiation dose rate monitoring device. This individual shall be i responsible for providing positive control over the activities within the area

! and shall perform periodic radiation surveillance at the frequency specified by the Manager-Radiation Protection (MRP) in the Radiation Work Permit.

5.11.2 The requirements of 5.11.1, above, shall also apply to each high radiation area in which the intensity of radiation is greater than 1000 mrem /hr** but less than 500 rads /hr*** (Restricted High Radiation Area). In addition, locked doors shall be l provided to prevent unauthorized entry into such areas and the keys shall be maintained under the administrative control of the Shift Manager on duty and/or l the MRP with the following exception:

a. In lieu of the above, for accessible localized Restricted High Radiation Areas located in large areas such as containment, where no lockable l enclosure exists in the immediate vicinity to control access to the Restricted High Radiation Area and no such enclosure can be readily constructed, then the Restricted High Radiation Area shall be:
i. roped off such that an individual at the rope boandary is exposed to 1000 mrem /hr or less, il conspicuously posted, and iii a flashing light shall be activated as a warning device. I l
  • Radiation Protection personnel shall be exempt from the RWP issuance requirement during the performance of their assigned radiation protection duties, provided they comply with approved radistion protection procedures for entry into high radiation areas.
    • At 30 centimeters (12 inches) from the radiation source or from any surface penetrated by the radiation.

"*At i meter from the radiation source or from any surface penetrated by the radiation.

5-19a Amendment No. 20,51,132,154,104,190 1