Tech Specs Pages 193 & 194 Re Limiting Conditions for Operation & Surveillance Requirements for Auxiliary Electrical Sys
ML19321A836
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/02/1978
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML19321A833 List:
References
NUDOCS 8007240259
Download: ML19321A836 (2)


Text

. . . _ .

a IMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.9 AUXILIARY ELECTRICAL' SYSTEM 4.9 AUXILIAR) ELECTRICAL SYSTEM y

Aggi,1cabiliev : Apy_licability Applies to the auxiliary e. trical Applies to tl.e periodic testing paver system. requirements of the auxiliary electrical systems.

Objective: . Objective:

To assure'an adequate supply of elec- Verify the operability of the auxiliary trical power for operation of those electrical system, t systems required for safety.

Sp eci fica t ion : Speci fica t ion :

A. Auxiliacy Electrical Equ,ipment A. Auxiliary Electrical Equipment The reactor shall not be made criti-

cal from a Cold Shutdown Condition unless all of the folle-ing conditions are satisfied

3

1. Both off-site sources (345KV and 1. Diesel Generators 69KV) and the startip transformer and emergency transformer are available a. The diesel-generators shall be started and capable of automatically supply- fro = a cold ambient condition and l ing power to the 4160 Volt emergency loaded to 2000 KW within 30 seconds
buses IF and 1G. a combined total of 293 times. Each j test shall continue until rated engine
2. Both diesel generators shall be temperatures are reached. The test

. . operable and there shall be a mini- shall be run 100 times with no more cum of 45,000 gal. of diesel fuel in than one f ailure prior to loading i the fuel oil storage tanks. fuel. After the first 100 tests are

, completed, the test shall be performed

3. The 4160V critical buses IF and IG a minimum of 12 times per month until 4 and the 480V critical buses IF and 1G a combined total of 298 tests is

!' are energized. reached. The acceptance criteria for the 298 tests will be that no more

4. - The four unit 125V/250V batteries and than 1 failure per 100 starts is  !

4 their chargers shall be operable, observed. See notes 1 and 2. j 4

. l After the test program of 298 starts I each diesel-generator shall be started I

manually and loaded to not less than 35% of rated load for no less th.in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> once each month to demonstrate j operational readiness.

l l

Amendment No. ) 45 193 .

, 1 us

~ 80072 40 26/7

o -.

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQL'IREMENTS 3.9.A 4.9.A (cont'd.)

During the monthly generator test the diesel generator starting air compressor shall be checked for operation and its ability te recharge air receivers.

The operation of the diesel fuel oil transfer pumps'and fuel oil day tank level switches shall be demonstrated, and the diesel starting time to reach rated voltage and frequency shall be logged.

Note 1: Failure to synchronice within 30 seconds will not be construed as a failure, but that particular test will be repeated.

Note 2: Factory tests, which duplicates the conditions of this test, will be included in the total number.

b. Once per operating cycle the condition under which the diesel generator is required will be siculated and a test conducted to demonstrate that it will start and accept the emergency load within :he specified time sequence.

The results shall be logged.

l c. Once a month the quantity of diesel fuel available shall be logged.

d. Every three conths and upon delivery a sa=ple of diesel fuel shall be checked for quality. The quality shall be within the acceptable Ifmits specified in Table 1 of ASTM D975-68 for Nos. 1D or 2D and logged.
e. Each diesel generator shall be given an annual inspection in accordance with instructions based on the manufacturer's recor endations.
2. L*ni t Batteries I
a. Every week the specific gravity, the voltage and temperature of the pilot l

l l