Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20063N7471982-10-0606 October 1982 Motion for Termination of Proceedings.Util Decided to Cancel Plant.Certificate of Svc Encl ML20063N7591982-10-0606 October 1982 Withdrawal of Application for CP ML20055A7221982-07-15015 July 1982 Memorandum & Order Denying Jf Doherty 820615 Submittals, Treated as Motion to Reconsider ASLB 820602 Order.Motion Untimely Filed & Failed to Show Significance or Gravity of Issues ML20055A3551982-07-12012 July 1982 Amended Contention 59.Certificate of Svc Encl ML20054L4521982-07-0202 July 1982 Response Opposing J Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Fails to Establish Timeliness &/Or Significance of Issues Sought to Be Raised.Certificate of Svc Encl ML20054L5531982-07-0202 July 1982 Response Opposing Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Should Be Considered Motion for Reconsideration of ASLB 820602 Order.Timeliness & Significance of Issues Not Established.W/Certificate of Svc ML20054J9371982-06-28028 June 1982 Response Opposing J Doherty 820615 Request to Reopen Record. Request Improper & Insufficient to Support Relief.Commission Rules Cannot Be Circumvented by Refiling Same Argument After ASLB Ruling Issued.Certificate of Svc Encl ML20054F9861982-06-15015 June 1982 Motion to Reopen Record to Take Evidence on Contention 59. Gravity of Issues Warrants Reopening ML20054G0171982-06-15015 June 1982 Contention 50 Re Brown & Root Deficiencies in Quadrex Rept. Certificate of Svc Encl ML20053D0861982-05-24024 May 1982 Response in Opposition to Util 820519 Motion to Strike Doherty Contention 58 Re Applicant Conduct on Reporting Violations.Contention Should Be Treated as Such,Not as Motion.Certificate of Svc Encl.Related Correspondence ML20052H8621982-05-19019 May 1982 Motion to Strike J Doherty Reply to Applicant 820507 Response to Doherty 820422 Motion to Add Contention 58. Commission Rules Do Not Allow Reply.Certificate of Svc Encl ML20052H4441982-05-14014 May 1982 Reply Opposing Applicant 820507 Response to J Doherty 820422 Motion to Add Contention 58.Contention Should Be Admitted W/Amends.Aslb Should Judge Conduct of Applicants. Certificate of Svc Encl ML20052F3121982-05-0707 May 1982 Response Opposing J Doherty 820422 Motion to Add Contention Re Alleged Failure to Rept Design Defects.Substantively, Motion Is Motion to Reopen Record & Stds Have Not Been Met. Certificate of Svc Encl ML20052D1221982-04-29029 April 1982 Findings of Fact on Supplemental Issues to Tx Pirg Addl Contention 31 Re Technical Qualifications.Certificate of Svc Encl ML20052A4541982-04-22022 April 1982 Submittal of Contention 58 Re Applicant Conduct on Reporting Violations at Plant.Certificate of Svc Encl ML20054E0561982-04-21021 April 1982 Supplemental Findings of Fact on Tx Pirg Addl Contention 31 Re Technical Qualifications.Certificate of Svc Encl ML20050J1111982-04-0606 April 1982 Answers to Second & Third Sets of Interrogatories,Questions 29 & 8 Respectively,Re Quadrex Rept.Certificate of Svc Encl. Related Correspondence ML20050E2961982-04-0505 April 1982 Answers & Objections to Seventh Set of Interrogatories. Certificate of Svc Encl.Related Correspondence ML20050E2891982-04-0505 April 1982 Answers & Objections to Doherty Sixth Set of Interrogatories.Related Correspondence ML20050C4211982-04-0202 April 1982 Objections to Request for Admissions.Requests Untimely, Irrelevant to Issues Before ASLB & Extremely & Unduly Burdensome.Certificate of Svc Encl.Related Correspondence ML20050C4081982-03-31031 March 1982 Answers & Objections to Fifth Set of Interrogatories. Certificate of Svc Encl.Related Correspondence ML20050C4791982-03-29029 March 1982 Answers & Objections to Jf Doherty Fourth Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters. Certificate of Svc Encl.Related Correspondence ML20042C6431982-03-29029 March 1982 Motion for ASLB to Call DE Sells as Witness for Tx Pirg Addl Contention 31 & Quadrex-related Matters.Testimony Needed to Explain Why NRC Did Not Immediately Obtain Quadrex Rept. Certificate of Svc Encl ML20042C6181982-03-29029 March 1982 Response Opposing J Doherty 820315 Motion for ASLB to Subpoena Quadrex Corp Employee Witnesses as ASLB Witnesses. Request Is Based on Misperception of Scope of Reopened Hearings.Certificate of Svc Encl ML20050C5091982-03-26026 March 1982 Response to Jf Doherty 20th & 21st Requests for Documents. Certificate of Svc Encl ML20050C5041982-03-26026 March 1982 Testimony of Lj Sas on Tx Pirg Addl Contention 31 Re Quadrex Rept.Rept Raises No Issue as to Whether Ebasco Can Properly Engineer Project.Prof Qualifications Encl ML20050C5011982-03-26026 March 1982 Supplemental Testimony of Jh Goldberg on Technical Qualifications.Brown & Root Terminates Due to Lack of Engineering Productivity,Not Due to Allegations in Quadrex Rept ML20049K0801982-03-25025 March 1982 Answers & Objections to Interrogatories.Certificate of Svc Encl ML20049K0671982-03-25025 March 1982 Reply to Tx Pirg 820315 Addl Proposed Findings of Fact & Conclusions of Law.Certificate of Svc Encl ML20042C5201982-03-25025 March 1982 Motion to Compel Discovery from Applicant & to Postpone Evidentiary Presentations at 820412 Hearings.Applicant Objections to Interrogatories Unsupported & Necessitate Hearings Be Delayed.Certificate of Svc Encl ML20049K0941982-03-23023 March 1982 Answers & Objections to Second Set of Interrogatories. Certificate of Svc Encl ML20049K0841982-03-23023 March 1982 Answers & Objections to Third Set of Interrogatories. Certificate of Svc Encl ML20042C5481982-03-23023 March 1982 Fourth Set of Requests for Admissions Re Quadrex Rept & Tx Pirg Contention 31.Certificate of Svc Encl ML20042B2351982-03-17017 March 1982 Seventh Set of Interrogatories Re Tx Pirg Addl Contention 31 & Quadrex Rept Matters.Certificate of Svc Encl ML20042A4791982-03-17017 March 1982 Response Opposing J Doherty 820310 Motion for Postponement of 820412 Hearings.Sufficient Grounds Not Provided to Justify Delay.Certificate of Svc Encl ML20042B2451982-03-15015 March 1982 Motion for Subpoena of Quadrex Corp Employees.Testimony Necessary for Clear Understanding of Brown & Root Deficiencies Despite Util Supervision & Specific Steps Needed to Correct & Prevent Problems.W/Certificate of Svc ML20042B2381982-03-15015 March 1982 Sixth Set of Interrogatories Re Tx Pirg Addl Contention 31 & Quadrex Rept Matters.Certificate of Svc Encl.Related Correspondence ML20041F0761982-03-10010 March 1982 Fourth Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Rept.Certificate of Svc Encl.Related Correspondence ML20041F0871982-03-10010 March 1982 Motion for Postponement of 820412 Hearing on Tx Pirg Addl Contention 31 & Quadrex-related Matters.Addl Time Needed to Complete Discovery.Certificate of Svc Encl ML20049J6571982-03-0808 March 1982 Answers to First Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters.Certificate of Svc Encl ML20041E1741982-03-0505 March 1982 Brief Opposing R Alexander Appeal from ASLB 820112 Order Denying Petition to Intervene.Aslb Did Not Abuse Discretion in Denying Petition.Certificate of Svc Encl ML20041E1201982-03-0505 March 1982 Motion for Order Directing Applicant to Provide Forthcoming Bechtel Quadrex Rept Review.Rept Pertinent to Remaining Issue.Certificate of Svc Encl.Related Correspondence ML20041E1181982-03-0505 March 1982 Third Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Rept Matters.Related Correspondence ML20041E1071982-03-0505 March 1982 First Set of Interrogatories & Request for Production of Documents Re Tx Pirg Contention 31.Certificate of Svc Encl ML20041E1001982-03-0505 March 1982 First Set of Interrogatories & Request for Production of Documents.Certificate of Svc Encl ML20041E0711982-03-0404 March 1982 Second Set of Interrogatories Re Tx Pirg Contention 21 & Quadrex Rept Matters.Certificate of Svc Encl.Related Correspondence ML20049H8881982-03-0101 March 1982 Response Opposing D Marrack 820213 Motion for Review of Dates for Reopening Hearings & Continuance.No Commission Regulations or Atomic Energy Act Provisions Require Applicant Irrevocable Commitment.Certificate of Svc Encl ML20041B5381982-02-22022 February 1982 Reply to Intervenors Proposed Findings of Fact & Conclusions of Law.Certificate of Svc Encl ML20041C0671982-02-22022 February 1982 Response Opposing Tx Pirg 820209 Motion for Addl Time to File Proposed Findings of Fact & Conclusion of Law.Motion Mooted by Tx Pirg Filing Proposed Findings on 820212. Certificate of Svc Encl ML20041B5421982-02-17017 February 1982 First Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters.Certificate of Svc Encl.Related Correspondence 1982-07-02
[Table view] Category:TRANSCRIPTS
MONTHYEARML20050C5011982-03-26026 March 1982 Supplemental Testimony of Jh Goldberg on Technical Qualifications.Brown & Root Terminates Due to Lack of Engineering Productivity,Not Due to Allegations in Quadrex Rept ML20050C5041982-03-26026 March 1982 Testimony of Lj Sas on Tx Pirg Addl Contention 31 Re Quadrex Rept.Rept Raises No Issue as to Whether Ebasco Can Properly Engineer Project.Prof Qualifications Encl ML20009H2161981-07-30030 July 1981 Suppl Testimony of D Marrack Re Viable Fishery ML20009E3641981-07-24024 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 17 Re Tnt Detonation ML20009E8661981-07-20020 July 1981 Transcript of DA Hamon Testimony on Behalf of Util Re Tx Public Interest Research Group Addl Contention 55 (Rapid Depressurization - Steam Break).Prof Qualifications Encl ML20009E2941981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Applicant Re ASLB Question 8 (Reactor Bldg Subsurface Soil Mechanics) ML20009E2961981-07-20020 July 1981 Transcript of R Cheng Testimony on Behalf of Applicant Re ASLB Question 10 (Drywell Pressure Testing).Prof Qualifications Encl ML20009E3531981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Util Re Doherty Contention 29,blockage of Intake Canal ML20009E3591981-07-20020 July 1981 Transcript of Cg Robertson Testimony Re Doherty Contention 8 & ASLB Question 3 on Atws.Prof Qualifications Encl ML20009E3031981-07-20020 July 1981 Transcript of GL Sozzi on Doherty Contention 32 Re ECCS Vaporization Rate ML20009E3151981-07-20020 July 1981 Transcript of Rl Call 810720 Testimony on Doherty Contention 26 (Stud Bolts).Prof Qualifications Encl ML20009E4351981-07-20020 July 1981 Transcript of Gw Oprea & Jh Goldberg Testimonies on Technical Qualifications & Tx Public Interest Research Group Addl Contention 31.Corporate Nuclear Organization Chart Encl ML20009E3481981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util on Mccorkle Contention 9 Re Chlorine Monitoring.Prof Qualifications Encl ML20009E3451981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util Re Doherty Contention 40,10CFR100 Releases.Prof Qualifications Encl ML20009E3431981-07-20020 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 6 & ASLB Question 12 Re Shell Oil Co 6-inch Liquid Petroleum Gas Pipeline ML20009E3171981-07-20020 July 1981 Transcript of Jc Elliott,Tc Cheng,Md Weingart,Pa Ranzau & Cg Robertson 810720 Testimony on Tx Public Research Interest Group (Prig) Addl Contention 53,ASLB Questions 4B & 4A & Pirg Contentions 28 & 52.W/prof Qualifications ML20009E3211981-07-20020 July 1981 Transcript of SA Hucilk & Jj Boseman Testimonies on Doherty Contention 17,RL Huang Testimony on Tx Public Research Interest Group Addl Contention 41 & Jn Bailey Testimony on Doherty Contention 42.Prof Qualifications Encl ML20009E3111981-07-20020 July 1981 Transcript of MR Lane 810720 Testimony Re Doherty Contention 41 (Reactor Water Level Indicators).Prof Qualifications Encl ML19347F5361981-05-11011 May 1981 Testimony of DG Tees Re Doherty Contention 47,turbine Missiles.Related Correspondence ML19347F5391981-05-11011 May 1981 Testimony of Fj Meyer Re Doherty Contention 30, Interconnection/Grid Stability.Prof Qualifications & Certificate of Svc Encl.Related Correspondence ML19347F5201981-05-11011 May 1981 Testimony of DC Papone Re Board Question 6,ability of Applicant to Demonstrate Compliance w/10CFR50,App A.Prof Qualifications Encl.Related Correspondence ML19347F5241981-05-11011 May 1981 Testimony of RA Clarke & Jf Montalbano Re Doherty Contention 10,diesel Generator Reliability.Prof Qualifications Encl. Related Correspondence ML19347F5271981-05-11011 May 1981 Testimony of Rc Iotti & Ws Carnes Re Doherty Contention 47, Turbine Missiles.Prof Qualifications Encl.Related Correspondence ML19347F5291981-05-11011 May 1981 Testimony of Ma Ross Re Doherty Contention 48,control Rod Drive Return Line.Prof Qualifications Encl.Related Correspondence ML19347F5301981-05-11011 May 1981 Testimony of Cw Dillman Re Doherty Contention 6, Recirculation Pump Overspeed.Prof Qualifications Encl. Related Correspondence ML19347F5311981-05-11011 May 1981 Testimony of Mf Alesky Re Doherty Contention 50,jet Pump Beams.Prof Qualifications Encl.Related Correspondence ML19347F5341981-05-11011 May 1981 Testimony of s Ranganath Re Tx Pirg Contention 39,Generic Task A-11,fracture Toughness.Prof Qualifications Encl. Related Correspondence ML19347F5351981-05-11011 May 1981 Testimony of Rl Baron Re Tx Pirg Addl Contention 21, Occupational Exposure.Prof Qualifications Encl.Related Correspondence ML19347F5321981-05-11011 May 1981 Testimony of Jf Montalbano & FP Barbieri Re Tx Pirg Contention 12,cable Fires.Prof Qualifications Encl.Related Correspondence ML19347F5371981-05-11011 May 1981 Testimony of Ma Ross Re Board Question 8,Seismic Category 1 Control Rods.Prof Qualifications Encl.Related Correspondence ML19347F5221981-05-11011 May 1981 Testimony of MD Weingart & F Barbieri Re Tx Pirg Addl Contention 10 & Mccorkle Contention 30,charcoal Adsorber Fires.Prof Qualifications Encl.Related Correspondence ML19347F5151981-05-11011 May 1981 Testimony of R Williams & N Horton Re Doherty Contentions 14 & 25,on Main Steam Line Radiation Monitor & Fuel Failure/ Flow Blockage,Respectively.Prof Qualifications Encl.Related Correspondence ML20003G6781981-04-20020 April 1981 Testimony on Tx Pirg Addl Contention 26 Re Computer Code Error.Prof Qualifications & Certificate of Svc Encl ML20003G6711981-04-20020 April 1981 Testimony on Behalf of Util Re Doherty Contentions 3,39 & 20(a) Re Fuel Specific Enthalpy,Fuel Swelling & Gap Conductance,Respectively.Prof Qualifications Encl ML20003G6751981-04-20020 April 1981 Testimony on Behalf of Util on Tx Pirg Contention 6 (Mccorkle Contention XI) Re Aircraft Hazards.Prof Qualifications Encl ML20003G6761981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 9 Re Containment Buckling.Prof Qualifications Encl ML20003G6771981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 27 Re Reactor Pedestal.Prof Qualifications Encl ML20003G6741981-04-20020 April 1981 Testimony on Behalf of Util on Bishop Contentions 4,5,7,9 & 10 Re Tx Electric Svc Co 24-inch Natural Gas Pipeline & Pipelines Crossing Brazos River Upstream from Facility.Prof Qualifications Encl ML20003G6731981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 7 Re LPCI Cold Slug.Prof Qualifications Encl ML19345H1121981-04-20020 April 1981 Testimony Supporting Doherty Contention 3 on Inadequacy of Design Safety Limit of Applicant Fuel Rods.Prof Qualifications & Certificate of Svc Encl ML20003B2381981-02-0606 February 1981 Errata Sheet for L Perl Testimony,Page 12,Line 13 & Table 9. Certificate of Svc Encl ML20003A2101981-01-27027 January 1981 Errata Sheet to s Michaelson Testimony.Certificate of Svc Encl ML19343B8481980-12-18018 December 1980 Testimony on Behalf of Util Re Bishop Contention 1 Concerning Population Projections ML19340D1401980-12-18018 December 1980 Testimony Re Tx Pirg Contention 1(f) Re Population Risks. Pp 1-8 ML19343B8451980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8491980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Site.Tera Corp Coastal Site Comparison Rept, Encl ML19343B8391980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 5 Concerning Solid Waste Combustion ML19343B8471980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Concerning South Texas Project 3 Versus Allens Creek 1. Analysis of Prime Farmland Soils Encl ML19343B8461980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8441980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Re South Texas Project 3 Versus Allens Creek Site.Listing of Cost Savings Encl 1982-03-26
[Table view] Category:DEPOSITIONS
MONTHYEARML20050C5011982-03-26026 March 1982 Supplemental Testimony of Jh Goldberg on Technical Qualifications.Brown & Root Terminates Due to Lack of Engineering Productivity,Not Due to Allegations in Quadrex Rept ML20050C5041982-03-26026 March 1982 Testimony of Lj Sas on Tx Pirg Addl Contention 31 Re Quadrex Rept.Rept Raises No Issue as to Whether Ebasco Can Properly Engineer Project.Prof Qualifications Encl ML20009H2161981-07-30030 July 1981 Suppl Testimony of D Marrack Re Viable Fishery ML20009E3641981-07-24024 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 17 Re Tnt Detonation ML20009E8661981-07-20020 July 1981 Transcript of DA Hamon Testimony on Behalf of Util Re Tx Public Interest Research Group Addl Contention 55 (Rapid Depressurization - Steam Break).Prof Qualifications Encl ML20009E2941981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Applicant Re ASLB Question 8 (Reactor Bldg Subsurface Soil Mechanics) ML20009E2961981-07-20020 July 1981 Transcript of R Cheng Testimony on Behalf of Applicant Re ASLB Question 10 (Drywell Pressure Testing).Prof Qualifications Encl ML20009E3531981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Util Re Doherty Contention 29,blockage of Intake Canal ML20009E3591981-07-20020 July 1981 Transcript of Cg Robertson Testimony Re Doherty Contention 8 & ASLB Question 3 on Atws.Prof Qualifications Encl ML20009E3031981-07-20020 July 1981 Transcript of GL Sozzi on Doherty Contention 32 Re ECCS Vaporization Rate ML20009E3151981-07-20020 July 1981 Transcript of Rl Call 810720 Testimony on Doherty Contention 26 (Stud Bolts).Prof Qualifications Encl ML20009E4351981-07-20020 July 1981 Transcript of Gw Oprea & Jh Goldberg Testimonies on Technical Qualifications & Tx Public Interest Research Group Addl Contention 31.Corporate Nuclear Organization Chart Encl ML20009E3481981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util on Mccorkle Contention 9 Re Chlorine Monitoring.Prof Qualifications Encl ML20009E3451981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util Re Doherty Contention 40,10CFR100 Releases.Prof Qualifications Encl ML20009E3431981-07-20020 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 6 & ASLB Question 12 Re Shell Oil Co 6-inch Liquid Petroleum Gas Pipeline ML20009E3171981-07-20020 July 1981 Transcript of Jc Elliott,Tc Cheng,Md Weingart,Pa Ranzau & Cg Robertson 810720 Testimony on Tx Public Research Interest Group (Prig) Addl Contention 53,ASLB Questions 4B & 4A & Pirg Contentions 28 & 52.W/prof Qualifications ML20009E3211981-07-20020 July 1981 Transcript of SA Hucilk & Jj Boseman Testimonies on Doherty Contention 17,RL Huang Testimony on Tx Public Research Interest Group Addl Contention 41 & Jn Bailey Testimony on Doherty Contention 42.Prof Qualifications Encl ML20009E3111981-07-20020 July 1981 Transcript of MR Lane 810720 Testimony Re Doherty Contention 41 (Reactor Water Level Indicators).Prof Qualifications Encl ML19347F5361981-05-11011 May 1981 Testimony of DG Tees Re Doherty Contention 47,turbine Missiles.Related Correspondence ML19347F5391981-05-11011 May 1981 Testimony of Fj Meyer Re Doherty Contention 30, Interconnection/Grid Stability.Prof Qualifications & Certificate of Svc Encl.Related Correspondence ML19347F5201981-05-11011 May 1981 Testimony of DC Papone Re Board Question 6,ability of Applicant to Demonstrate Compliance w/10CFR50,App A.Prof Qualifications Encl.Related Correspondence ML19347F5241981-05-11011 May 1981 Testimony of RA Clarke & Jf Montalbano Re Doherty Contention 10,diesel Generator Reliability.Prof Qualifications Encl. Related Correspondence ML19347F5271981-05-11011 May 1981 Testimony of Rc Iotti & Ws Carnes Re Doherty Contention 47, Turbine Missiles.Prof Qualifications Encl.Related Correspondence ML19347F5291981-05-11011 May 1981 Testimony of Ma Ross Re Doherty Contention 48,control Rod Drive Return Line.Prof Qualifications Encl.Related Correspondence ML19347F5301981-05-11011 May 1981 Testimony of Cw Dillman Re Doherty Contention 6, Recirculation Pump Overspeed.Prof Qualifications Encl. Related Correspondence ML19347F5311981-05-11011 May 1981 Testimony of Mf Alesky Re Doherty Contention 50,jet Pump Beams.Prof Qualifications Encl.Related Correspondence ML19347F5341981-05-11011 May 1981 Testimony of s Ranganath Re Tx Pirg Contention 39,Generic Task A-11,fracture Toughness.Prof Qualifications Encl. Related Correspondence ML19347F5351981-05-11011 May 1981 Testimony of Rl Baron Re Tx Pirg Addl Contention 21, Occupational Exposure.Prof Qualifications Encl.Related Correspondence ML19347F5321981-05-11011 May 1981 Testimony of Jf Montalbano & FP Barbieri Re Tx Pirg Contention 12,cable Fires.Prof Qualifications Encl.Related Correspondence ML19347F5371981-05-11011 May 1981 Testimony of Ma Ross Re Board Question 8,Seismic Category 1 Control Rods.Prof Qualifications Encl.Related Correspondence ML19347F5221981-05-11011 May 1981 Testimony of MD Weingart & F Barbieri Re Tx Pirg Addl Contention 10 & Mccorkle Contention 30,charcoal Adsorber Fires.Prof Qualifications Encl.Related Correspondence ML19347F5151981-05-11011 May 1981 Testimony of R Williams & N Horton Re Doherty Contentions 14 & 25,on Main Steam Line Radiation Monitor & Fuel Failure/ Flow Blockage,Respectively.Prof Qualifications Encl.Related Correspondence ML20003G6781981-04-20020 April 1981 Testimony on Tx Pirg Addl Contention 26 Re Computer Code Error.Prof Qualifications & Certificate of Svc Encl ML20003G6711981-04-20020 April 1981 Testimony on Behalf of Util Re Doherty Contentions 3,39 & 20(a) Re Fuel Specific Enthalpy,Fuel Swelling & Gap Conductance,Respectively.Prof Qualifications Encl ML20003G6751981-04-20020 April 1981 Testimony on Behalf of Util on Tx Pirg Contention 6 (Mccorkle Contention XI) Re Aircraft Hazards.Prof Qualifications Encl ML20003G6761981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 9 Re Containment Buckling.Prof Qualifications Encl ML20003G6771981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 27 Re Reactor Pedestal.Prof Qualifications Encl ML20003G6741981-04-20020 April 1981 Testimony on Behalf of Util on Bishop Contentions 4,5,7,9 & 10 Re Tx Electric Svc Co 24-inch Natural Gas Pipeline & Pipelines Crossing Brazos River Upstream from Facility.Prof Qualifications Encl ML20003G6731981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 7 Re LPCI Cold Slug.Prof Qualifications Encl ML19345H1121981-04-20020 April 1981 Testimony Supporting Doherty Contention 3 on Inadequacy of Design Safety Limit of Applicant Fuel Rods.Prof Qualifications & Certificate of Svc Encl ML20003B2381981-02-0606 February 1981 Errata Sheet for L Perl Testimony,Page 12,Line 13 & Table 9. Certificate of Svc Encl ML20003A2101981-01-27027 January 1981 Errata Sheet to s Michaelson Testimony.Certificate of Svc Encl ML19343B8481980-12-18018 December 1980 Testimony on Behalf of Util Re Bishop Contention 1 Concerning Population Projections ML19340D1401980-12-18018 December 1980 Testimony Re Tx Pirg Contention 1(f) Re Population Risks. Pp 1-8 ML19343B8451980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8491980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Site.Tera Corp Coastal Site Comparison Rept, Encl ML19343B8391980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 5 Concerning Solid Waste Combustion ML19343B8471980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Concerning South Texas Project 3 Versus Allens Creek 1. Analysis of Prime Farmland Soils Encl ML19343B8461980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8441980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Re South Texas Project 3 Versus Allens Creek Site.Listing of Cost Savings Encl 1982-03-26
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20050C5011982-03-26026 March 1982 Supplemental Testimony of Jh Goldberg on Technical Qualifications.Brown & Root Terminates Due to Lack of Engineering Productivity,Not Due to Allegations in Quadrex Rept ML20050C5041982-03-26026 March 1982 Testimony of Lj Sas on Tx Pirg Addl Contention 31 Re Quadrex Rept.Rept Raises No Issue as to Whether Ebasco Can Properly Engineer Project.Prof Qualifications Encl ML20009H2161981-07-30030 July 1981 Suppl Testimony of D Marrack Re Viable Fishery ML20009E3641981-07-24024 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 17 Re Tnt Detonation ML20009E8661981-07-20020 July 1981 Transcript of DA Hamon Testimony on Behalf of Util Re Tx Public Interest Research Group Addl Contention 55 (Rapid Depressurization - Steam Break).Prof Qualifications Encl ML20009E2941981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Applicant Re ASLB Question 8 (Reactor Bldg Subsurface Soil Mechanics) ML20009E2961981-07-20020 July 1981 Transcript of R Cheng Testimony on Behalf of Applicant Re ASLB Question 10 (Drywell Pressure Testing).Prof Qualifications Encl ML20009E3531981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Util Re Doherty Contention 29,blockage of Intake Canal ML20009E3591981-07-20020 July 1981 Transcript of Cg Robertson Testimony Re Doherty Contention 8 & ASLB Question 3 on Atws.Prof Qualifications Encl ML20009E3031981-07-20020 July 1981 Transcript of GL Sozzi on Doherty Contention 32 Re ECCS Vaporization Rate ML20009E3151981-07-20020 July 1981 Transcript of Rl Call 810720 Testimony on Doherty Contention 26 (Stud Bolts).Prof Qualifications Encl ML20009E4351981-07-20020 July 1981 Transcript of Gw Oprea & Jh Goldberg Testimonies on Technical Qualifications & Tx Public Interest Research Group Addl Contention 31.Corporate Nuclear Organization Chart Encl ML20009E3481981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util on Mccorkle Contention 9 Re Chlorine Monitoring.Prof Qualifications Encl ML20009E3451981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util Re Doherty Contention 40,10CFR100 Releases.Prof Qualifications Encl ML20009E3431981-07-20020 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 6 & ASLB Question 12 Re Shell Oil Co 6-inch Liquid Petroleum Gas Pipeline ML20009E3171981-07-20020 July 1981 Transcript of Jc Elliott,Tc Cheng,Md Weingart,Pa Ranzau & Cg Robertson 810720 Testimony on Tx Public Research Interest Group (Prig) Addl Contention 53,ASLB Questions 4B & 4A & Pirg Contentions 28 & 52.W/prof Qualifications ML20009E3211981-07-20020 July 1981 Transcript of SA Hucilk & Jj Boseman Testimonies on Doherty Contention 17,RL Huang Testimony on Tx Public Research Interest Group Addl Contention 41 & Jn Bailey Testimony on Doherty Contention 42.Prof Qualifications Encl ML20009E3111981-07-20020 July 1981 Transcript of MR Lane 810720 Testimony Re Doherty Contention 41 (Reactor Water Level Indicators).Prof Qualifications Encl ML19347F5361981-05-11011 May 1981 Testimony of DG Tees Re Doherty Contention 47,turbine Missiles.Related Correspondence ML19347F5391981-05-11011 May 1981 Testimony of Fj Meyer Re Doherty Contention 30, Interconnection/Grid Stability.Prof Qualifications & Certificate of Svc Encl.Related Correspondence ML19347F5201981-05-11011 May 1981 Testimony of DC Papone Re Board Question 6,ability of Applicant to Demonstrate Compliance w/10CFR50,App A.Prof Qualifications Encl.Related Correspondence ML19347F5241981-05-11011 May 1981 Testimony of RA Clarke & Jf Montalbano Re Doherty Contention 10,diesel Generator Reliability.Prof Qualifications Encl. Related Correspondence ML19347F5271981-05-11011 May 1981 Testimony of Rc Iotti & Ws Carnes Re Doherty Contention 47, Turbine Missiles.Prof Qualifications Encl.Related Correspondence ML19347F5291981-05-11011 May 1981 Testimony of Ma Ross Re Doherty Contention 48,control Rod Drive Return Line.Prof Qualifications Encl.Related Correspondence ML19347F5301981-05-11011 May 1981 Testimony of Cw Dillman Re Doherty Contention 6, Recirculation Pump Overspeed.Prof Qualifications Encl. Related Correspondence ML19347F5311981-05-11011 May 1981 Testimony of Mf Alesky Re Doherty Contention 50,jet Pump Beams.Prof Qualifications Encl.Related Correspondence ML19347F5341981-05-11011 May 1981 Testimony of s Ranganath Re Tx Pirg Contention 39,Generic Task A-11,fracture Toughness.Prof Qualifications Encl. Related Correspondence ML19347F5351981-05-11011 May 1981 Testimony of Rl Baron Re Tx Pirg Addl Contention 21, Occupational Exposure.Prof Qualifications Encl.Related Correspondence ML19347F5321981-05-11011 May 1981 Testimony of Jf Montalbano & FP Barbieri Re Tx Pirg Contention 12,cable Fires.Prof Qualifications Encl.Related Correspondence ML19347F5371981-05-11011 May 1981 Testimony of Ma Ross Re Board Question 8,Seismic Category 1 Control Rods.Prof Qualifications Encl.Related Correspondence ML19347F5221981-05-11011 May 1981 Testimony of MD Weingart & F Barbieri Re Tx Pirg Addl Contention 10 & Mccorkle Contention 30,charcoal Adsorber Fires.Prof Qualifications Encl.Related Correspondence ML19347F5151981-05-11011 May 1981 Testimony of R Williams & N Horton Re Doherty Contentions 14 & 25,on Main Steam Line Radiation Monitor & Fuel Failure/ Flow Blockage,Respectively.Prof Qualifications Encl.Related Correspondence ML20003G6781981-04-20020 April 1981 Testimony on Tx Pirg Addl Contention 26 Re Computer Code Error.Prof Qualifications & Certificate of Svc Encl ML20003G6711981-04-20020 April 1981 Testimony on Behalf of Util Re Doherty Contentions 3,39 & 20(a) Re Fuel Specific Enthalpy,Fuel Swelling & Gap Conductance,Respectively.Prof Qualifications Encl ML20003G6751981-04-20020 April 1981 Testimony on Behalf of Util on Tx Pirg Contention 6 (Mccorkle Contention XI) Re Aircraft Hazards.Prof Qualifications Encl ML20003G6761981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 9 Re Containment Buckling.Prof Qualifications Encl ML20003G6771981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 27 Re Reactor Pedestal.Prof Qualifications Encl ML20003G6741981-04-20020 April 1981 Testimony on Behalf of Util on Bishop Contentions 4,5,7,9 & 10 Re Tx Electric Svc Co 24-inch Natural Gas Pipeline & Pipelines Crossing Brazos River Upstream from Facility.Prof Qualifications Encl ML20003G6731981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 7 Re LPCI Cold Slug.Prof Qualifications Encl ML19345H1121981-04-20020 April 1981 Testimony Supporting Doherty Contention 3 on Inadequacy of Design Safety Limit of Applicant Fuel Rods.Prof Qualifications & Certificate of Svc Encl ML20003B2381981-02-0606 February 1981 Errata Sheet for L Perl Testimony,Page 12,Line 13 & Table 9. Certificate of Svc Encl ML20003A2101981-01-27027 January 1981 Errata Sheet to s Michaelson Testimony.Certificate of Svc Encl ML19343B8481980-12-18018 December 1980 Testimony on Behalf of Util Re Bishop Contention 1 Concerning Population Projections ML19340D1401980-12-18018 December 1980 Testimony Re Tx Pirg Contention 1(f) Re Population Risks. Pp 1-8 ML19343B8451980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8491980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Site.Tera Corp Coastal Site Comparison Rept, Encl ML19343B8391980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 5 Concerning Solid Waste Combustion ML19343B8471980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Concerning South Texas Project 3 Versus Allens Creek 1. Analysis of Prime Farmland Soils Encl ML19343B8461980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8441980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Re South Texas Project 3 Versus Allens Creek Site.Listing of Cost Savings Encl 1982-03-26
[Table view] |
Text
O 1
l l
I DIRECT TESTIMONY OF -
S DONALD VANSICKLE ON BEHALF OF HOUSTON LIGHTING & POWER COMPANY HINDERSTEIN CONTENTION 5/ COASTAL SITES l
1 I
B012coe 793
DIRECT TESTIMONY OF DONALD VANSICKLE RE COASTAL SITES 1
Q. Please state your name and position.
A. My name is Donald VanSickle. I mn a vice presi-3 dent in the firm of Turner Collie & Braden, Inc.
4 Q. Please describe your educational background.
3 A. I received a Bachelor of Science in Civil Engineer-6 ing at the University of Texas in 1954 and a Master of 7 Science in Civil Engineering at the University ofrTexas in 3 1958. I worked as a research engineer and lecturer at the 9 University of Texas between 1954 and 1957. I left.the 10 University in 1957 and joined Turner Collie & Braden.
13 Q. Are you a Registered Professional Engineer?
12 A. Yes, I am a Registered Professional Engineer ir 13 the State of Texas. ,
14 Q. Are you a member of any professional and civic 15 organizations?
16 A. I am a member of the American Society of Civil 17 Engineers, the American Institute of Consulting Engineers, 18 the Consulting Engineers Council, the American Water Re-19 sources Association, the American Waterworks Association, 20 the American Geophysical Union, the Engineering Institute of 21 Canada, the International Association for Hydraulic Re-22 search, the Houston Engineering and Scientific Society, and 23 the Houston Chamber of Commerce. I served.as' Chairman of 24 the Houston Chamber of Commerce Flood Control Committee in zr
I l
I 1
~
1971, and in 1973 I served as Chairman of the Harris County 2
Flood Control Task Force.
3 Q. Have you published any articles?
4 A. I have published a number of articles in the area 5
of drainage design for storm runoff. I have also given 4 l
6 number of lectures to the U. S. Army Corps of Engineers con-7 cerning the effect of urban development on various components 8 I have also lectured at both of the hydrologic system.
9 Texas A & M University and the University of Houston on 10 water resource planning.
11 Q. What is yc/;r area of expertise at Turner Collie &
12 Braden?
13 A. I specialize in the areas of river basin planning, i
14 water resources planning, water quality management, drain-15 age, flood control, flood plain management, water supply 16 treatment and distribution, wastewater collection, treatment 17 and disposal, land development, coastal and estuary en-13 gineering, land reclamation and irrigation, hurricane pro-19 tection, and land subsidence.
20 Q. What is the purpose of your testimony?
21 A. My firm has been employed as a consultant to the 22 City of Houston on a continuous basis since 1964 to under-23 take comprehensive studies of the City's municipal water 24 system. The work we do for the City is an ongoing effort to
I i
1
~
study the City's water needs on an annual basis. I also 2
serve on a Mayor's advisory committee which has the respon-3 sibility of advising the Mayor about the City's water system 4
needs. Because of my experience with the City I am very l -
familiar with all aspects of Houston's water supply and on-6 P
going plans to assure an adequate supply for the future.
t 7
I have been asked by Houston Lighting & Power Company to 3
testify on Hinderstein Contention No. 5 which alleges that 9 HL&P should build a plant at a coastal site rather than at 10 Allens Creek because there is expected to be a shortage of 11 fresh water in the Bra =os River basin. Mr. Saxion, Ms.
19
-~
Hinderstein's expert witness, has asserted that the cause of 13 the alleged shortage of water in the Brazos River is due to 14 the fact that the City of Houston will have to import water l
l 1
3 from the Brazos River basin. As I will explain below, this 1
6 assertion is in error.
l 17 Q. lease describe the City's current water supply l 13 situation.
l l 19 A. The City of Houston currently obtains groundwater 20 from well fields in the Houston area and surface water from .
21 the San Jacinto River Basin and the Trinity River Basin.
22 The City's records show that average municipal use for 1979 l
23 was 341.4 million gallons per day (mgd). Approximately 40 l
1 24 percent of the water supplied to the municipal system during i
l l
l ,
(
_~ - .
1 1979 was treated surface 'Jater from the San Jacinto River 2 Basin (138 mgd). The remaining 60 percent (203.mgd) was 3 supplied from wells located throughout the service area.
4 Houston's groundwater is supplied by 169 wells 5 located in 10 major well fields (ranging in size from 5 to 6 11 wells), 10 secondary wc11 fields (2 to 3 wells), and 60 7 minor (1 well) fields. Two well fields, having a total of 3 8 wells, discharge directly to the distribution system.
9 Houston's surface water is supplied from three 10 reservoirs. Lake Houston and Lake Conroe, constructed 11 primarily for municipal supply, are both located in the San 12 Jacinto River Basir.. Lake Houston has 146,700 acre-feet of 13 storage occupying 12,240 acres of land with an estimated 14 firm yield of 170 mgd. The City of Houston is entitled to 14 approximately 120 mgd from Lake Houston. Lake Conroe has a 16 storage capacity of 430,260 acre-feet and an estimated firm 17 yield of 75 mgd. The City has perpetual right to two-thirds 18 of the yield, a supply of about 50 mgd. However, due to the 19 projected effects of future sedimentation, Houston's future 20 allocations of surface water from Lake Houston and Lake 21 Conroe are 108 mgd and 45 mgd, respectively.
22 The third surface water source for the City of 23 Houston -is Lake Livingston, located in the Trinity River 1
24 Basin. This reservoir has a storage capacity of 1,750,000 j
1 acre-feet, with an estimated firm yield of 1,150 mgd. The 2
City has a perpetual right to 70 percent of this yield, or a 3
dependable supply of 806 mgd.
4 The City also supplied an average of 147 mgd of un-5 treated surface water to large industrial customers. In 6
general, industrial customers now purchase untreated surface I
water from the City of Houston. The Coastal Industrial 3 Water Authority (CIWA) now operates a system of conveyance 9 and distribution facilities to provide this untreated surface 10 water from the Trinity River (Lake Livingston) to industrial 11 customers in the Houston area. By mid-1977, as industrial 12 customers began relying on the CIWA system, the City saw a 13 decrease of approximately 20 mgd in the untreated surface 14 water demand of industry on Lake Houston. This decrease has 15 provided the City with additional curface water supply for 16 municipal uses. As the CIWA system is completed and addi-17 tional industrial customers complete the transfer to CIWA,
~3 industrial use of Lake Houston water is expected to be 19 sharply reduced, further increasing the available municipal l 20 :. ater supply.
21 u. Does the City hava any present shortage in water 22 supplies?
l 23 A. No. Our studies indicate that Lakes Conroe, I 1
1 24 Houston and Livingston can supply surface water to meet the l
l f
l l
1 City's projected demands through approximately the year 2000. However, the projected demands beyond the year 2000 3 indicate that the City will require additional surface water 4 supplies.
5 What are the best potential sources of future Q.
6 water supplies?
7 A. I have been studying this question for many years
l 3 and it is my opinion that the most economical alternatives 9 are to import water from the existing or proposed East Texas 10 reservoirs. The existing East Texas reservoirs I am re-11 ferring to are Toledo Bend in the Sabine Basin, and Sam 12 Rayburn in the Neches Basin, which presently have surplus 13 supplies adequate to meet the projected year 2010 water 14 supply needs of the Houston Municipal Water System. Other l 15 resourses are availacle in East Texas for the years beyond
16 2010. Therefore, we have recomm?nded that the City of r
l 17 Houston turn to the major East Texas reservoirs as a source l
l 18 of supply for the Municipal Water System beyond the year l
l 19 2000.
20 Q. Is the Brazos River a likely source of future 21 water supply for the City?
l 22 A. No. Each time we have done a study for the City 23 we have evaluated the Brazos River Basin as a possible 24 source of supply for the City of Houston in the futura, and 1
i
! l l
1
l l l
~
we have always rejected it as a potential source of water for the City.
3 Q. Would you explain why you have rejected the Brazos 4
River as a source of water for the City?
5 A. There are several reasons. The first reason is 6
that the Brazos River water is of poor quality in comparison ,
7 with the water in the San Jacinto, Trinity, Neches and 8
Sabine Rivers. The low water quality in the Brazos,is 9 attributable in large measure to upstream salt formations.-
10 This problem is pointed out in a report prepared by the 11 Texas Water Development Board in 1977, which is entitled 12 " Continuing Water Resources Planning and Development for 13 Texas." The report notes that:
14 At the present time, full utili-zation of the water resources of the 15 mainstem Brazos River is not possible because of the adverse effects of 16 natural salt pollution from sources l located within its principal upper 1 ,/ basin tributaries. The quality of
(
the mainstem Brazos River water is 13 seriously degraded by emissions from major natural salt sources in the 19 upper Brazos River Basin downstream from the Caprock Escarpment. . . .
l 21
. The location of the salt pollu-22 tion sources are such that they i adversely affect the mainstem Brazos 23 River throughout its entire length.
This is by far the most serious 24 water-quality problem in the Brazos l
l !
l l
l l
l 1 River Basin. Although the amount of water carrying dissolved minerals into the 2 main stem of the river is fairly l
l insignificant when compared to the 3
total amount of water the river empties into the Gulf of Mexico, it 4 is enough to make the water in the l _ river generally unsuitable for domestic 3
use. Also, higher quality tributory
, flows and tributary reservoir re-
- leases become polluted as they enter
, the Brazos River.
I Id. p. II-94. The absence of a large reservoir in the l 8 r lower basin of the Brazos to average out the fluctuations 9
l in quality, and the apparent infeasibility of implementing measures to reduce salt contamination, make it unlikely I
that these quality problems can be alleviated in the near 12 future.
13 The second reason is the mast policy of the State of Texas which suggests that trans-basin diversions from 15
- west to east (as would be required in exporting water from
! 16
( the Brazos to Houston) are not likely to be permitted.
I I
17 Rather, such diversions will be from the water surplus 13 areas in the east to water deficient areas in the west.
19 The third reason is that construction of addi-20 l
tional reservoirs would be required to make a firm supply l 21 l available from the Brazos, the probable reservoirs being l
22 Millican and Navasota on the Navasota River. Diversion 23 directly from these reservoirs to obtain higher quality l
24 l
L
l 1
water would probably not be possible since the flow is needed to provide dilution and improve the quality of run-3 off from the upper basin and such diversions would result 4
in significant deterioration of the quality of flow in the
~
5 lower basin. In additien to the usual problems encountered 6
in any new reservoir construction, these reservoirs face 7
the additional constraint that lignite deposits have been 3
discovered in the reservoir areas and construction would 9 probably be delayed until the lignite is mined and the 10 surface restored.
11 In sum, we do not consider the Brazos River as a 12 potential long-range water supply source for the City of 13 Houston and have never recommended that the City look to 14 the Brazos basin for additional water supplies. To the 15 best of my knowledge, the City has never planned on the 16 Brazos as a source of supply in any of its planning efforts.
17 Q. Does this complete your testimony?
3 A. Yes.
19 20 21 22 23 24